Ohio.gov State Agencies  |  Online Services
Skip Ribbon Commands
Skip to main content
Site ActionsUse SHIFT+ENTER to open the menu (new window).Open Menu Navigate Up
Sign In
  
View: 
Description
Edit
Selection Checkbox
Picture Size
This stimulus project consists of widening approximately three miles of roadway from two to four lanes.  It also provides for adding traffic signals at two intersections.
 District 9- 104 Widening - Workers putting up fencing  104-1.jpg
104-1
2272 x 1704350 KB
U.S. Route 20 Resurfacing ARRA project sign installation
 U.S. Route 20 Resurfacing ARRA project sign installations ARRA Sign 001.jpg
ARRA Sign 001
2304 x 30721255 KB
 Lorain SR 83 Bridge ReplacementD03-LorainSR83BridgeReplacement.jpg
D03-LorainSR83BridgeReplacement
1500 x 667237 KB
 D11HarrisonUS22-6-30-09.jpg
D11HarrisonUS22-6-30-09
1500 x 1079390 KB
 D12-I-490toI-77rampwidening-7-8-09-001.jpg
D12-I-490toI-77rampwidening-7-8-09-001
1125 x 1500355 KB
 D12-I-490toI-77rampwidening-7-8-09-002.jpg
D12-I-490toI-77rampwidening-7-8-09-002
1500 x 1125483 KB
 D12-I-490toI-77rampwidening-7-8-09-003.jpg
D12-I-490toI-77rampwidening-7-8-09-003
1500 x 1125581 KB
 D12-I-490toI-77rampwidening-7-8-09-004.jpg
D12-I-490toI-77rampwidening-7-8-09-004
1500 x 1125483 KB
 D12-I-490toI-77rampwidening-7-8-09-005.jpg
D12-I-490toI-77rampwidening-7-8-09-005
1500 x 1125345 KB
 D12-I-490toI-77rampwidening-7-8-09-006.jpg
D12-I-490toI-77rampwidening-7-8-09-006
1500 x 1125487 KB
 D12-I-490toI-77rampwidening-7-8-09-007.jpg
D12-I-490toI-77rampwidening-7-8-09-007
1600 x 1200523 KB
 D12-I-490toI-77rampwidening-7-8-09-008.jpg
D12-I-490toI-77rampwidening-7-8-09-008
1500 x 1125501 KB
 D2Disalle-workersjackhammer.jpg
D2Disalle-workersjackhammer
2448 x 3264823 KB
Doug Howell of Eagle Bridge is moving encasement for the new bridge on SR 274.
 SR 274 Stimulus Project  D-7 SR274 008.jpg
D-7 SR274 008
2304 x 17281015 KB
Deputy Director Hans Jindal with project personnel from District 8 contractor JR Jurgensen Co.
 Clinton County SR 72 ARRA event  District 8 ARRA SR 72 event.jpg
District 8 ARRA SR 72 event
1254 x 1817244 KB
                                DSC00011.JPG
DSC00011
1632 x 1224835 KB
Cuyahoga I-490 to I-77 Ramp Widening
 Cuyahoga I-490 to I-77 Ramp WideningDSC06483.JPG
DSC06483
2560 x 19202222 KB
                                Geauga Washington St. ARRA Project 8.10.09 (20).JPG
Geauga Washington St. ARRA Project 8.10.09 (20)
2560 x 19202281 KB
                                Geauga Washington St. ARRA Project 8.10.09 (85).JPG
Geauga Washington St. ARRA Project 8.10.09 (85)
1920 x 25602057 KB
                                Geauga Washington St. ARRA Project 8.10.09 (99).JPG
Geauga Washington St. ARRA Project 8.10.09 (99)
1920 x 25602078 KB
                                HAS22-080609C.JPG
HAS22-080609C
1632 x 1224889 KB
                                HAS22-080609G.JPG
HAS22-080609G
1632 x 1224786 KB
                                HAS799-080609J.JPG
HAS799-080609J
1632 x 1224906 KB
 IMG_1492.JPG
IMG_1492
2736 x 36481561 KB
 IMG_1493.JPG
IMG_1493
3648 x 27362247 KB
 IMG_1494.JPG
IMG_1494
3648 x 27361101 KB
 Law-217-19.JPG
Law-217-19
2112 x 2816580 KB
 Law-217-5.JPG
Law-217-5
2816 x 2112731 KB
 Law-217-6.JPG
Law-217-6
2816 x 2112855 KB
 Law-217-9.JPG
Law-217-9
2816 x 2112639 KB
 DCF 1.0PICT1099.JPG
PICT1099
1580 x 20842365 KB
 DCF 1.0PICT1129.JPG
PICT1129
2560 x 19202639 KB
 Pik-23 DOE 5512-4.jpg
Pik-23 DOE 5512-4
529 x 44946 KB
                                 SR 276 Culvert Replacement.JPG
SR 276 Culvert Replacement
1408 x 1676465 KB
ARRA sign is installed at beginning limits of SR 72 14-mile resurfacing project.
 SR 72 ARRA sign SR 72 ARRA event6.jpg
SR 72 ARRA event6
1426 x 2416309 KB
                                 SR 72 Resurfacing3.JPG
SR 72 Resurfacing3
1918 x 26911144 KB
Contractor personnel install ARRA sign at north end of SR 72 resurfacing project.
 Clinton County SR 72 ARRA event  SR72ARRAevent2.jpg
SR72ARRAevent2
1780 x 2009298 KB
 Putting Steel Beams in Place SR-83 Bridge Materials Receiving.jpg
SR-83 Bridge Materials Receiving
3132 x 20946313 KB
Putting Beams in Place for a Concrete Pour 
 Putting Beams in Place for a Concrete Pour  SR-83 Bridge-Concrete Pour Prep.jpg
SR-83 Bridge-Concrete Pour Prep
2575 x 14793671 KB
 US 40 Culvert ReplacementUS 40 Culvert Replacement11.JPG
US 40 Culvert Replacement11
1930 x 2098717 KB
1 - 40Next