Supplemental Specification | Warranted item Description | Warranty Duration (Years) | Warranty Item Cost | Number of Projects | |
SS880 | ASPHALT PAVEMENT | 5 and 7 | $106,263,862 | 17 | |
SS1059 | ASPHALT PAVEMENT | 3 | $2,135,301 | 4 | |
ASPHALT Pavement cost = | $108,399,163 | 21 | |||
SS884 |
CONCRETE PAVEMENT |
7 | $12,707,808 | 4 | |
(Goal 1) TOTAL COST FOR ALL WARRANTY PAVEMENT = | $121,106,971 | 25 | |||
SS893 | NEW CONCRETE DECK, class S | 7 | $1,739,372 | 3 | |
SS894 | NEW CONCRETE DECK, HPC | 7 | $1,943,040 | 4 | |
SS892 | CONCRETE DECK OVERLAY | 2 | $242,722 | 2 | |
TOTAL FOR BRIDGE DECKS = | $3,925,134 | 9 | |||
SS887 |
PAVEMENT MARKINGS |
3 and 5 |
$3,170,685 |
38 | |
SS885 |
BRIDGE PAINTING |
5 |
$7,936,750 |
14 | |
SS825 | CRACK SEAL | 2 | $112,911 | 1 | |
SS881 | MICROSURFACING | 3 | $3,314,396 | 3 | |
SS882 | CHIP SEAL | 3 | $99,939 | 1 | |
SS886 | HOT IN PLACE RECYCLED ASPHALT | 3 | $0 | 0 | |
SS889 | SAW AND SEAL | 2 | $0 | 0 | |
TOTAL FOR MAINTENANCE = | $3,527,246 | 5 | |||
Cost of all non pavement warranty items = | $18,559,815 | ||||
TOTAL COST OF ALL WARRANTY ITEMS = |
$139,666,786 | ||||
NOTES : | |||||
1. The average number of bidders remained the same across the board. | |||||
2. For FY 2000, the number of new pavement construction and major pavement reconstruction projects = 38 | |||||
25 of those projects, or 66% , have a warranty pavement. |