510 Dowel Holes

1. Specifications:

Item 510.02 C&MS

Item 509.02 C&MS

2. Sampling and/or Inspection Requirements:

See 509 for steel materials for dowels

Use materials for grouts meeting 701 and 703.03 or prepackaged materials conforming to 705.20. 

If using 705.20 require manufacturer’s written requirements for use of materials and construction details.

Before applying any stresses to dowels, cure non-shrink, non-metallic grout per given curing time and ambient temperature given in section 510.05. Refer to Qualified Product List (QPL) on the OMM website http://www.dot.state.oh.us/Divisions/ConstructionMgt/Materials/Pages/QPL.aspx for grouting material. Suppliers who are interested in approval of their products should follow the requirements defined for this product on the list website.

3. Method of Tests:

701

703

705.20