705.04 Hot Applied Joint Sealer

1. Specification:

Sections 705.04

2. Sampling and/or Inspection Requirements:

Acceptance for use of liquid asphalt material will be under the following plan: (Field)

 Partial Plant Inspection:

Details of this procedure are covered in Appendix C

Compliance:

If documentation cannot be verified under the Partial Plant Inspection plan, joint sealer must be approved before use. Sample at destination following the procedure outlined below.

Field Sampling Procedure:

Obtain unopened package from the project and ship to OMM.  If material is already incorporated into the project process as unapproved material thru the policy ‘Acceptance of Non-specification Material on Construction Projects’.

 Samples shall be accompanied by a TE-31.

3. Methods of Test:

(OMM Asphalt Materials Section)

ASTM D 6690, Type II