SS 859 Asphalt Concrete with Verglimit

1. Specification:

Supplemental Specification 859

2. Materials:

Shall meeting the requirements of 859.02. Use PG64-22 binder. Do not use reclaimed asphalt pavement.

3. Sampling and/or Testing Requirements:

Provide district test lab certified test data indicating the verglimit does not contain any chemicals or solids that are not necessary for deicing proportions or application of verglimit.

For acceptance, obtain five (5) cores per day of production and process the cores in accordance with 446.05, except as stated in 859.06.

4. Method of Tests: