Group ID with CMS Screen Cross Reference

Group ID : TASMM
Description : TAS TL PLUS UPDATE TO WELDERS SCREEN
This page Display's Employee Group ID, and the  Screen, that is used by Individual group's from Central office Lab,   Engineers , Field Crew and District to make any changes to the CMS.
"I" indicates Inquiry where an Employee can view the screen but cannnot  make any changes.
"U" indicates update,  where an Employee can update the screen.

"A" indicates to Add.

"D" Indicates delete.

EMPLOYEE SCREEN UPD/INQ   Screen Discription
TASMM    MONFN I        MONITOR FINALIZATION
TASMM    TBLS  I        REFERENCE TALBE MENU
TASMM    TLCHG U        SWITCH USER TEST LAB
TASMM    BITAD I        BITUMINOUS PRICE ADJUSTMENTS
TASMM    CO    I        CHANGE ORDER
TASMM    COH   I        CHANGE ORDER HISTORY
TASMM    COREF I        CHANGE ORDER REFERENCE
TASMM    CORH  I        CO REFERENCE NUMBER HISTORY
TASMM    DFLOW I        DISTRICT CHANGE ORDER FLOW
TASMM    EXPL  I        EXPLANATION OF NECESSITY
TASMM    ITMAS I        ITEM MASTER
TASMM    UNCO  I        UN-APPROVED CHANGE ORDER
TASMM    PCON  I        PROJECTS BY PROJECT CONTRACTOR
TASMM    PCTY  I        PROJECTS FOR COUNTY/ROUTE/SECTION
TASMM    PENG  I        PROJECTS BY PROJECT ENGINEER
TASMM    PNUM  I        PROJECTS BY PROJECT NUMBER
TASMM    PRTE  I        PROJECTS BY ROUTE & SECTION
TASMM    APSUB I        REQUEST TO SUBLET
TASMM    FEDWG I        FEDERAL LABOR COMPLIANCE
TASMM    LPREQ I        LIST PRE-QUALIFIED CONTRACTORS
TASMM    PAYRL I        PAYROLL TRANSCRIPT REPORT
TASMM    SUBS  I        SUBCONTRACTOR APPROVAL
TASMM    SWORK I        SUBCONTRACTOR WORK HISTORY
TASMM    DDCEQ I        CONTRACTOR EQUIPMENT
TASMM    DDCON I        CONTRACTOR WORK
TASMM    DDHRS I        STATE EMPLOYEES
TASMM    DDRMK I        APPROVAL & REMARKS
TASMM    DDWAP I        WEATHER & PAY
TASMM    DRAFT I        DRAFT ESTIMATES
TASMM    EST   I        ESTIMATE
TASMM    ESTH  I        ESTIMATE HISTORY
TASMM    ESTR  I        ESTIMATE REFERENCE
TASMM    ESTRH I        ESTIMATE REFERENCE NUMBER HISTORY
TASMM    LIENS I        ESTIMATE DEDUCTIONS
TASMM    LIQID I        LIQUID DAMAGES & INCENTIVES
TASMM    PEAPR I        PE APPROVED ESTIMATES
TASMM    FINAL I        KEY EVENT TRACKING
TASMM    FINQ  I        FINAL QUANTITIES
TASMM    FINQH I        FINAL QUANTITIES HISTORY
TASMM    FTRAC I        PROJECT FINAL TRACKING
TASMM    DOCTR I        DOCUMENT SUBMISSION TRACKING
TASMM    FINAN I        FINANCIAL DATA
TASMM    KETRK I        KEY EVENT TRACKING
TASMM    LOCN  I        ADDITIONAL LOCATION DATA
TASMM    PHONE I        PROJECTS PHONE NUMBERS AND CONTACTS
TASMM    PROJ  I        BASIC PROJECT DATA
TASMM    SCHED I        CONTRACTOR PROGRESS SCHEDULE
TASMM    DEMAT I        DELIVERED MATERIALS
TASMM    DREF  I        REFERENCE NUMBER PROFILE
TASMM    LREF  I        LIST REFERENCE NUMBERS
TASMM    PBOOK I        PAYBOOK
TASMM    TAKOF I        QUANTITY TAKE-OFF SHEET
TASMM    SSLST I        STRUCTURAL STEEL REFERENCE LIST
TASMM    SSREF I        STRUCTURAL STEEL REFERENCE TRACKING
TASMM    AB448 I        448 PAY FACTOR TABLE A & B
TASMM    AGGQT I        AGGREGATE QUALITY TEST DATA
TASMM    AGSPC I        AGGREGATE SPECS
TASMM    A446  I        446 PAY FACTOR TABLE A
TASMM    BCJMF I        BC JMF'S
TASMM    BCPLT I        BC PLANT INFORMATION
TASMM    CD448 I        448 PAY FACTOR TABLE C & D
TASMM    DASGN I        DISPOSITION ON NON APPROVED MATERIAL
TASMM    GBSPC I        GLASS BEADS SPECS
TASMM    IMA   I        INQUIRE ON MATERIAL ASSIGNMENTS
TASMM    ISRC  I        INQUIRE ON SOURCES OF MATERIAL
TASMM    LBCJ  I        LIST BC JMF'S
TASMM    LBSTA I        LAB BACKLOG STATUS
TASMM    LMATL I        LIST MATERIAL CODES
TASMM    LPCJ  I        LIST PCC JMF'S
TASMM    LPO   I        LIST PURCHASE ORDERS
TASMM    LPRD  I        LIST PRODUCER/SUPPLIERS
TASMM    LSMPL I        LIST MATERIAL SAMPLES
TASMM    LWELD I        LIST WELDER/TECHNICIANS
TASMM    MA    U        MATERIAL ASSIGNMENT  
TASMM    MATL  I        MATERIAL CODES
TASMM    OUTEX I        OUTLIER EXCLUSION
TASMM    PBOM  I        PROJECT BILL OF MATERIAL
TASMM    PCJMF I        PCC JMF'S
TASMM    PCPLT I        PCC PLANT INFORMATION
TASMM    PO    I        PURCHASE ORDER
TASMM    PRD   I        PRODUCER/SUPPLIERS
TASMM    PRDMA I        PRODUCER/SUPPLIER MATERIAL
TASMM    RAGG  U        AGGREGATE GRADATION TEST DATA
TASMM    RASPG U        AGGREGATE AVERAGE SPGR AND ABSORPTION REPORT
TASMM    RBC   U        REPORT OF BC FIELD TESTS
TASMM    RBMSG U        BM AVERAGE SPECIFIC GRAVITY
TASMM    RBSPG U        AGGREGATE BULK SPECIFIC GRAVITY
TASMM    RJMF  U        BC/PCC JMF'S
TASMM    RMA   U        MATERIAL ASSIGNMENT DETAIL 
TASMM    RMATL U        MATERIAL CODES/DESCRIPTION
TASMM    RMCR  U        MATERIAL CONTROL REPORT
TASMM    RMCSR U        MATERIAL CONTROL SUMMARY REPORT
TASMM    RNAPP U        NON APPROVAL MATERIAL ASSIGNMENTS
TASMM    ROUTL U        OUTLIER STATISTICAL ANALYSIS
TASMM    RPCC  U        PCC CYLINDERS
TASMM    RPCCC U        PCC CORES
TASMM    RPCCS U        PCC CYLINDER STANDARD DEVIATION
TASMM    RPJMF U        LIST OF PROJECTS FOR JMF
TASMM    RPRDM U        PRODUCER/SUPPLIER MATERIALS REPORT
TASMM    RSTBO U        STANDARD BILL OF MATERIALS
TASMM    RSUMM U        SUMMARY OF TEST SAMPLES (MATERIAL)
TASMM    RSUMP U        SUMMARY OF TEST SAMPLES (P/S)
TASMM    RSUMS U        SUMMARY OF TEST SAMPLES (LOC)
TASMM    RTSTP U        TEST PERFORMED (PROM/PO)
TASMM    R446  U        BC '446' PAY FACTORS
TASMM    R448  U        BC '448' PAY FACTORS
TASMM    SCSPC I        SODIUM AND CALCIUM CHLORIDE SPECIFICATIONS
TASMM    SMPL  U        MATERIAL SAMPLE/TEST
TASMM    SOJMF I        SOIL/SUB-BASE CNS JMF
TASMM    STBOM I        STANDARD BILL OF MATERIALS
TASMM    TE24  U        TE 24 ASSIGNMENTS
TASMM    WELD  U        WELDERS/TECHNICIANS