ITEM 654 RENOVATING EXISTING SOIL
654.03 Construction Requirements
654.01 Description. This work consists of preparing a suitable seedbed by grading and renovating existing soil, and furnishing and placing commercial fertilizer, if specified.
Use removed or excavated materials in the Work when the material conforms to the specifications; if not, then recycle or dispose of the material according to 105.16 and 105.17.
654.02 Materials. Use commercial fertilizer conforming to 659.04.
654.03 Construction Requirements. Prepare the surface area for seed according to 659.10.
If the Contract Documents require commercial fertilizer, place it according to 659.04.
654.04 Method of Measurement. The Department will measure Renovating Existing Soil by the number of M square feet (square meters) completed and accepted.
The Department will measure Commercial Fertilizer by the number tons (kilograms) completed and accepted.
654.05 Basis of Payment. The Department will pay for accepted quantities at the contract prices as follows:
Item Unit Description
654 M Square Feet Renovating
Existing Soil
(Square Meter)
654 Ton (Kilogram) Commercial Fertilizer