Active Disputes and Claims Status

ACTIVE

Disputes and Claims STATUS

 4 STEP PROCESS - Step 3 – Deputy Directors’ Board (DDB)

D-4

534(03)

POR-76

Velotta

04-030534-02

Repairs to Temp. Pavements

04-030534-03

Removal of SIP Form Wind Tabs

04-030534-04

American Native Cons. & Supply

 4 STEP PROCESS - Step 4 – Director’s Claims Board (DCB)
D-12 107(05) CUY-2–14.41 Geronimo   12-050107-02   Testing Equipment
Painting
 3 STEP PROCESS - Step 3 – Director’s Claims Board (DCB)
 
D-2 584(04) OTT-2-28.47 Great Lakes 02-040584-01  Drilled Shaft #19
02-040584-02  Drilled Shaft #15
D-3 82(04) WAY-30-9.18 Ruhlin 03-040082-01  Excavation & Embankment    
       (Ref Items 17 & 19)
03-040082-02  Time Extension
03-040082-03  Payment for 304
D-12 121(06) CUY IR 271 Shelly Co. 12-060121-01  Asphalt Concrete Bump    
 Grinding and Mix Design 
 Changes
 
 DISPUTE REVIEW BOARD PROCESSStep 3 - Appeal to the DRB
 
D-10 510(02) Pomeroy/Mason  CJ Mahan 10-020510-01  Post-Tensioning Duct Air Test
 
 ARBITRATION/MEDIATION
D-9 178(01) US Grant Bridge CJ Mahan 09-010178-02  Baffle Plates