Construction Management - Claims by Issue
(Updated April 14, 2016 12:00:02 AM)
- CLAIMS HOME -
Acceptance (express/implied)
Act of God
Asphalt pavement rutting
Bridge painting
Burden of proof
Change order policy
Change order release/waiver
Changed contract condition
Claim after final change order
Concrete pavement w/warranty
Constructive acceleration
Contract interpretation/ambiguity
Contractor proposed change
CPM calendar/logic changes
CPM Progress Schedule
Defective specification
Delay - critical/non-critical
Delay - owner caused
Design-Build
Differing site conditions
Disclaimer
Discrepancy in quantity
Dispute Resolution Process
Drilled shafts
Duty to coordinate subs
Duty to examine Bid Documents
Early Completion Schedule
Engineer-ordered suspension
Entitlement agreed/damages in dispute
Equitable Adjustment
Errors and Omissions
Extra work
Incorporation by reference
Industry standard
Industry-wide shortage/impacts
Inefficiency/Loss of productivity
Inspection
Interest
Material escalation
Means and methods
Method of Measurement
Mitigation
MSE wall
Mutual Mistake
Non-responsiveness as approval/acceptance
Notice
ODOT Testing Procedures
Overhead (home/field office)
Partial Depth Pavement Repair
Past practice
Pipe removal
Pre-bid question
Precaution against damage
Railroad Conflict
Reasonably close conformity
Responsibility for project
Shop Drawings
Signif. change in scope/character of work
Specifications (design/performance)
Thin concrete pavement
Tie back retaining walls
Type A Emergency
Unjust enrichment
Utility delay
Value Engineering Proposal
Voluntary Acceleration
Warranty
Winter protection
Workmanlike construction