201602LUC-65-5.25Atsalis Brothers Painting, Inc.Bridge Painting, Winter Work, Maintenance of Traffic, Plan Ambiguity, Extra WorkDCB02-130395-01,02.pdf
  
201603LOR-58-7.36Beaver Excavating Co.Deck Plate, Rework, Distortion, Design Error, Welding, Corrective Work Plan, Means and MethodsDCB03-130001-01 DCB Decision.pdf
  
201608HAM-75-2.30Kokosing Construction Company, Inc.Maintenance of Traffic, Contract Interpretation/Ambiguity, Negligent Design, Prebid Questions, Constructability, Pre-Contract Damages, CPM Schedule, PN 107DCB08-120599-06 DCB Decision.pdf
  
201504ATB-90-22.06Anthony Allega Cement Contractors, Inc.Embankment Quantity, Backfill, Plan Discrepency, Plan Ambiguity, Basis of Payment, Notice DCB04-101078-01.pdf
  
201506PIC-762-11.18Fechko Excavating, Inc.Weather Delay, , Inexcusable Delay, Soft Base Material, Embankment, Liquidated DamagesDCB06-120541-02.pdf
  
201506FRA-270-52.72Complete General Construction Co.Asphalt Pavement Repair, Pothole Patching, Temporary Pavement, Subsurface Exploration Report, Changed Condition, Differing Site ConditionDCB06-133006-01.pdf
  
201508HAM/WAR-71-19.41/0.00Great Lakes Construction Co.Design-Build, SWPPP, Plan Ambiguity, Extra Work, Lump Sum ItemsDCB08-133025-01.pdf
  
201509HIG-TR144-1.50J&J SchlaegelSpread Footing, Design-Build, Specifications (Design/Performance), Extra Work, Contract Interpretation/Ambiguity DCB09-143018-01.pdf
  
201512CUY-6-14.56360 Construction Company, Inc.Bridge Rehabilitation, Shotcrete Patching, Concrete Patching, Plan Ambiguity, Means and MethodsDCB12-140062-02.pdf
  
201407D07-BH-FY2012Suburban Maintenance & Construction, Inc.Pier Column Repair, Concrete Patching, Plan Ambiguity, Engineering AssessmentDCB07-120512-01.pdf
  
201412LAK-86-2.70Suburban Maintenance & Construction, Inc.Damaged Equipement, Kelly Bar, Differing Site Condition, Drilled Shafts, DCB12-120249-01.pdf
  
201306FRA-IR270-2.60 Shelly & Sands, Inc.Acceptance (express/implied), Bridge painting, Burden of proof, Duty to coordinate subs, ODOT Testing ProceduresDCB06_0341(11)_01DCB.pdf
  
201308BUT-VA-PM/RPMA&A Safety, Inc.Line Marking, Contract interpretation/ambiguity, Method of Measurement, Past practiceDCB08_233(12)_DCB.pdf
  
201309LAW-378-0.20Alan Ston Co., Inc.Drilled shafts, Differing site conditions, Interest, Contract interpretation/ambiguityDCB09_251(12)_DCB.pdf
  
201312CUY-LR-WILLOW AVENUE LIFT BRIDGERuhlin CompanyOpen Grid Deck Welding, Contract interpretation/ambiguity, Industry standard, Reasonably close conformityDCB12_1041(10)_06DCB.pdf
  
201202SEN-Jones Rd.Miller Bros. Construction, Inc.Asphalt Pavement Cracking, Intermediate Course Tenderness, SegregationStep 202-101038-01 Step 2.pdf
  
201203LOR-VA-BH-FY2011 Cosmos Industiral Services, Inc.Maintenance of Traffic, Contract Interpretation/AmbiguityDCB03_0155(11)_01DCB.pdf
  
201203ERI-US250-19.742 (Milan) Becdir Construction Co.Final Quantities - Pavement Removed, Aggregate Base, Removal of Pavement Markings, Beam Seat Repair DCB03_076004_03DCB.pdf
  
201104SUM-8-15.63Beaver Excavating Co.Settlement of Pavement, Corrective Work, Subsurface Conditions, Report04_467(06)_02STEP2.pdf
  
201106FRA-IR270-37.04Complete General Construction Co.Method of Payment of Topsoil in a Median Planter, Method of Measurement, Burden of ProofDCB06_1039(10)_01DCB.pdf
  
201107MOT-LR-South DixieR.B. Jergens Contractors, Inc.Delay in Scheduling Pre-con meeting, Delay - owner caused, Overhead (home/field office), Burden of proof, CPM Progress Schedule, Utility delay DCB07_1060(09)_01DCB.pdf
  
201107MOT-LR-South DixieR.B. Jergens Contractors, Inc.304 Base, Asphalt Surface Course, Discrepancy in quantity, Signif. change in scope/character of work, Means and methods DCB07_1060(09)_02DCB.pdf
  
2010MEG-US33-15.70 (Village of Pomeroy)Mahan/National Joint VentureDRB10_510(02)_PTandTowerLegDecandAppeal.pdf
  
201001PAU-US24-0.00Mosser Construction, Inc.Embankment failure, Subsurface Conditions, Haul RoadStep 201_110(07)_01STEP2.pdf
  
201002WOO/LUC-75-32.68/0.00Posen Construction, Inc.Hydro-Demolition Costs, Extra Work, Differing site conditions, Inefficiency/Loss of productivity, Entitlement agreed/damages in dispute DCB02_8019(01)_01DCB.pdf
  
201003CRA-VA-CHIP-FY2009Specialized Construction, Inc.Chip Seal Warranty, Acceptance (Express/Implied), DelayDCB03_0477(08)_01DCB.pdf
  
201003MED-71-6.06Ruhlin CompanyEmbankment failure, Test Pit, Slope Repair Subsurface Conditions, Haul Road, BenchingDRB03_060349_01DRB.pdf
  
201003MED-71-6.06Ruhlin CompanyEmbankment failure, Test Pit, Slope Repair Subsurface Conditions, Haul RoadStep 203_060349_01STEP2.pdf
  
201006FRA-SR161/IR270-25.900/40.260 (Columbus)National Engineering & Contracting Co.Failure of 1500 mm pipe, Workmanlike construction, Defective specification, Delay - owner caused, Pipe removalDCB06_0163(04)_07DCB.pdf
  
201006FRA-SR161/IR270-25.900/40.260 (Columbus)National Engineering & Contracting Co.Failing Epoxy Urethane Sealer, Defective specification, Workmanlike construction, Precaution against damageDCB06_0163(04)_09DCB.pdf
  
200903RIC-CR424Mosser Construction, Inc.Borrow Pit, Testing of Material, A-1-b Granular Material, EmbankmentStep 203_0216(06)_STEP2.pdf
  
200903HUR-250-18.93Shelly & Sands, Inc.Mechanically Stabilized Earth Wall Backfill, Granular Backfill, MSE Wall, Foundation Preparation, AASHTO Standard, Reinforcing StrapStep 203_0449(07)_STEP2.pdf
  
200903RIC-CR424Mosser Construction, Inc.Borrow Pit, Testing of Material, A-1-b Granular Material, EmbankmentArbitration03_0216(06)_01ARB.pdf
  
200903MED-71-9.56Kokosing Construction Company, Inc.Value Engineering Change Proposal, Subgrade Stabilization, Cement Stabilization, Undercut,  DCB03_343(05)_01and_02DCB.pdf
  
200904ATB-I90/46Tri Span CorporationRejection of Embankment Material, Compaction Testing, Nuclear Gauge, Suspension of Work, Delay, Inefficiency, Mobilization, SWPPP, Borrow Pit, DCB04_080001_01DCB.pdf
  
200905LIC-161/37-6.65/10.25Kokosing Construction Company, Inc.Value Engineering Change Proposal, Contract interpretation/ambiguity, Contractor proposed changeStep 205_0138(07)_02STEP2.pdf
  
200905LIC-161/37-6.65/10.25Kokosing Construction Company, Inc.Value Engineering Change Proposal, Contract interpretation/ambiguity, Contractor proposed changeDCB05_138(07)_01DCB.pdf
  
200906FRA-IR71-19.09Great Lakes Construction Co.Design-Build, Noise wall/barrier, Utility RelocationStep 106_3001(07)_STEP1.pdf
  
200906CLA-IR70-25.11/28.95/29.32/0.00Kokosing Construction Company, Inc.Winter Work, Delay - owner caused, Overhead (home/field office), Fuel Price Adjustment, Material Escalation, Extra Work, Seeding, Interest, Change order policy  DCB06_294(04)_01thru08DCB.pdf
  
200907MOT-70-22.890Kokosing Construction Company, Inc.Changed Condition, Trench Collapse, Water Level, BackfillStep 207_0555(04)_05STEP2.pdf
  
200907MOT-IR75-13.11Kokosing Construction Company, Inc.Sleeper Slab Concrete and Coping, Contract interpretation/ambiguity, Means and methods, Mitigation, Pre-bid questionDRB07_387(07)_01DRB.pdf
  
200907MOT-70-17.04Kokosing Construction Company, Inc.Changed Condition, Maintenance of Traffic, Plan Error, Grade Separation, Mitigation, Schedule LogicStep 207_050465_01DELAY_Step2.pdf
  
200907MOT-US35-15.07Kokosing Construction Company, Inc.Dispute Resolution Process, Notice, Overhead (home/field office), Signif. change in scope/character of workDCB07_0036(06)_02DCB.pdf
  
200910MEG-US33-15.70 (Village of Pomeroy)Mahan/National Joint VentureCPM calendar/logic changes, Delay - critical/non-critical, Delay - owner caused, Entitlement agreed/damages in dispute, Mutual Mistake DRB10_0510(02)_AppealPTandTowerLegDelay_DRB.pdf
  
200802OTT-US20Erie Group of CompaniesRepair of Concrete Cracking, Deceleration Pads, Transverse Cracks, Concrete Pavement, Dowel Bar Retrofit, Joint Repair, HIPERPAV Sawing, Step 202_176(07)_01STEP2.pdf
  
200803MED-71-9.56Kokosing Construction Company, Inc.Value Engineering Change Proposal, Subgrade Treatment, Granular Backfill, Cement Stabilization, Emergency Declaration, Delay, InefficienciesStep 203_0343(05)_STEP2.pdf
  
200803LOR-57-12.54Suburban Maintenance & Construction, Inc.Changed Site Condition, Deck Overlay, Plan Discrepency, Field Inspection Prior to Bid, Mitigation Step 203_0554(07)_01STEP2.pdf
  
200804MAH-IR80Anthony Allega Cement Contractors, Inc.Industry-Wide Shortage, Rental Equipment, CPM Schedule, Mobilization, Non-Compensable Delay, DCB04_0002(06)_01DCB.pdf
  
200804POR-IR76Velotta CompanyTemporary Pavement Repairs, MOT, Subsurface Stability, Contract Specifications, Soft EmbankmentDCB04_030534_02and03and04DCB.pdf
  
200804SUM-IR277-2.47Wolf Creek Engineering & ContractingStructural Steel Splice Bolt Stripped and Snapped, Over Tighten, Nut Rotation, Failure to Follow Specification, DCB04_0440(06)_01DCB.pdf
  
200804SUM-21-2.60/4.62Wolf Creek Engineering & ContractingStructural Steel Source, Material Price Escalation, Single Source, Domestic vs. Foreign SupplierDCB04_0441(06)_01DCB.pdf
  
200804POR-IR76-9.50Velotta CompanyTemporary Pavement Repairs, Burden of proof, Contract interpretation/ambiguityArbitration04_0534(03)_02ARB.pdf
  
200804STA-77-17.93Marshal C. Rardin & Sons, Inc.High Pressure Production Line Relocation, Compensable Delay, Extra Work, Step 204_0350(04)_STEP1.pdf
  
200806FRA-IR71-7.68 (Hoover Rd.)Complete General Construction Co.Bridge Painting, Defective specification, Duty to coordinate subs, Industry standard, Means and methodsDCB06_0162(06)_01.pdf
  
200806FRA-USR62-14.11 (Main Street Bridge)Kokosing Construction Company, Inc.Delay - owner caused, Means and methods, Past practiceDRB06_0264(06)_03DRB.pdf
  
200806FRA-USR62-14.11 (Main Street Bridge)Kokosing Construction Company, Inc.Delay - owner caused, Means and methods, Past practiceStep 206_264(06)_03STEP2.pdf
  
200806FRA-IR71-7.68 (Hoover Rd.)Complete General Construction Co.Pinholing, Bridge painting, Defective specification, Duty to coordinate subs, Industry standard, Means and methodsDCB06_0080(08)_01.pdf
  
200807MOT-70-22.890Kokosing Construction Company, Inc.Impact Attenuators, Past Practice, Accident DamageStep 207_0555(04)_02STEP2.pdf
  
200807SHE-47-15.96Mainline Construction Co.Extra Work, Extra Material, Bid Quantities, Prebid QuestionStep 207_510(06)_01STEP2.pdf
  
200807MOT-IR75-13.11Kokosing Construction Company, Inc.Sleeper Slab Concrete and Coping, Contract interpretation/ambiguity, Means and methods, Mitigation, Pre-bid questionStep 207_0387(07)_06STEP2.pdf
  
200808CLE-US52-7.81/15.44/20.67Double Z Construction Co.Excavation, Contract interpretation/ambiguity, Discrepancy in quantity, Errors and OmissionsDCB08_0497(05)_01DCB.pdf
  
200808CLE-133-17.63Complete General Construction Co.Bridge Painting, Rework, Reblast, Repaint, Testing and Inspection, NoticeStep 208_0497(06)_01Step2.pdf
  
200809SCI-US23-0.00 (City of Portsmouth) C.J. Mahan Construction Co., LLCBaffle Plate, Contract interpretation/ambiguity, Acceptance (express/implied) Arbitration09_0178(01)_02ARB.pdf
  
200809ROS-US35-26.17Kokosing Construction Company, Inc.Late Payment, Interest, Material Price EscalationStep 209_0151(02)_STEP2.pdf
  
200809ROS-US35-14.41Shelly CompanySubgrade Stability, Soft Subgrade, Undercutting, Concrete Barrier End, Changed ConditionsStep 209_0249(06)_STEP2.pdf
  
200812CUY-West 3rd St. (Cleveland)Walsh Construction Co.Tower Floor Replacement, Fiberglass Panel, Extra Work, Total Cost MethodDCB12_0293(04)_02DCB.pdf
  
200812CUY-West 3rd St. (Cleveland)Walsh Construction Co.DCB12_293(04)_03DCB.pdf
  
200812LAK-86Anthony Allega Cement Contractors, Inc.Shale Excavation, Final Measurement, HP Concrete, Elevation of Bedrock, Depth of Footing, Rock Socket,  DCB12_8007(07)_01DCB.pdf
  
200702Edison BridgeGreat Lakes Construction Co.Drilled Shafts, Water Infiltration, Rework, Dewatering, Tremie, Defective Work, Compressive StrengthDCB02_0584(04)_01and_02DCB.pdf
  
200703MED-18-16.03Kenmore Construction Co., Inc.Acceleration, Work Forward Agreement, Settlement03_312(05) Kenmore Work Forward Agreement.pdf
  
200703WAY-30/250-9.18/9.98Ruhlin CompanyExcavation of Subgrade, Embankment, Time Extension, Tickets, Granular Material, Differing Site Condition, Plan Error, Extra WorkDCB03_0082(04)_01and02and03DCB.pdf
  
200705GUE-IR 77-7.54/7.68Complete General Construction Co.Reasonably close conformity, Signif. change in scope/character of work, Change order release/waiver, Unjust enrichment, Inspection, Specifications (design/performance), Bridge painting, Past practice, Defective specification DCB05_023005_01and02and03DCB.pdf
  
200706FRA-USR62-14.11 (Main Street Bridge)Kokosing Construction Company, Inc.Act of God, Contract interpretation/ambiguityDRB06_0264(06)_High Water_DRB.pdf
  
200707MOT-70-22.890Kokosing Construction Company, Inc.Tieback Anchors, SPL Walls, Design Error, Changed Site ConditionsDRB07_0555(04)_Tie_Back_DRB.pdf
  
200707MOT-IR75-31.842 (City of Vandalia)Kokosing Construction Company, Inc.Contract interpretation/ambiguity, Reasonably close conformity, Defective specification, Workmanlike construction, Bridge painting, Past practice DCB07_030100_01DCB.pdf
  
200710MEG-US33-15.70 (Village of Pomeroy)Mahan/National Joint VentureCPM calendar/logic changes, Delay - critical/non-critical, Delay - owner caused, Entitlement agreed/damages in dispute, Mutual Mistake DRB10_0510(02)_PTandTowerLegDelay_DRB.pdf
  
200710MEG-US33-15.70 (Village of Pomeroy)Mahan/National Joint VentureConcrete Quality in Tower Segment Four DRB10_02510_PTandTowerLegDecandAppeal.pdf
  
200712CUY-IR271-6.04Shelly CompanySpecifications (design/performance), Means and methods, Asphalt ConcreteDCB12_0121(06)_01DCB.pdf
  
200712CUY-West 3rd St. (Cleveland)Walsh Construction Co.Disclaimer, Errors and Omissions, Shop Drawings, Acceptance (express/implied), Defective specification, Notice, Mitigation DCB12_040293_01DCB.pdf
  
200712CUY-West 3rd St. (Cleveland)Walsh Construction Co.Bridge Replacement, Lift Span, Rehabilitation, Lift Cable/Rope, Design Error, Failure to Coordinate, Calculate vs. Verify, Shop Drawing Acceptance, Existing Structural VerificationDCB12_0293(04)_01DCB.pdf
  
200603MRW/RIC-I71-19.54/0.00Kokosing Construction Company, Inc.Granular Backfill, Undercuts, Inefficienies, Subgrade Compaction, Measured MileStep 103_040583_01to05Step1.pdf
  
200606FAY-IR71-0.00John R. Jurgensen Co.High Performance Concrete For New Bridge Decks With Warranty Appeal DCB06_030134WarrantyAppeal.pdf
  
200606FAY-IR71-0.00John R. Jurgensen Co.High Performance Concrete For New Bridge Decks With Warranty Appeal DCB06_0134(03)WarrantyAppeal.pdf
  
200606FRA-SR161/IR270-25.900/40.260 (Columbus)National Engineering & Contracting Co.MSE Walls, Material Escalations, Inefficiencies, Winter Protection, FOOH, HOOH DRB06_0163(04)_03DRB.pdf
  
200610MEG-US33-15.70 (Village of Pomeroy)Mahan/National Joint VentureDefective specification, Means and methods, Workmanlike construction, Burden of proof, Changed contract condition DRB10_020510_02DRB.pdf
  
200610MEG-US33-15.70 (Village of Pomeroy)Mahan/National Joint VentureDRB10_0510(02)_02DRB.pdf
  
200612CUY-2-14.41 (Cleveland)Geronimo Painting Co., Inc.Bridge Painting, Testing Equipement, Inspection, Mitigation, Notice, Reasonably close conformity, Entitlement agreed/damages in dispute, Inefficiency/Loss of productivity, Surface Cleanliness DCB12_050107-01and02and03DDB.pdf
  
200612CUY-2-14.41 (Cleveland)Geronimo Painting Co., Inc.Fuel Price EscalationDCB12_050107_04DCB.pdf
  
200612CUY-2-14.41 (Cleveland)Geronimo Painting Co., Inc.Bridge Painting, Structural Steel, Surface Cleanliness, Changed Contract Condition, Testing Equipment, Time Extension, Winter Heating and Containment CostsDCB12_0107(05)-01and02and03DDB.pdf
  
200612CUY-2-14.41 (Cleveland)Geronimo Painting Co., Inc.12_0107(05)_04DCB.pdf
  
200503MRW-IR71-19.54/0.00Kokosing Construction Company, Inc.Partial Depth Pavement Repair, Dispute Resolution Process, Type A Emergency, Inspection, Acceptance (express/implied), Workmanlike construction, Responsibility for project, Burden of proof DCB03_049077_01DDB.pdf
  
200503MRW/RIC-I71-19.54/0.00Kokosing Construction Company, Inc.Partial Depth Pavement Repair, Rework, Extra Work, Joint Failure, Type B Emergency, Asphalt Pavement Repair, Workmanlike ConstructionDCB03_9077(04)_01DDB.pdf
  
200504POR-IR76-9.50Velotta CompanyStructural Steel Plate Girders, Constructive acceleration, Unjust enrichment, Equitable Adjustment, Early Completion Schedule, Mitigation, Duty to coordinate subs, Voluntary Acceleration DCB04_0534(03)_01DDB.pdf
  
200506FRA-SR161/IR270-25.900/40.260 (Columbus)National Engineering & Contracting Co.Contract interpretation/ambiguity, MSE wall, Incorporation by referenceDRB06_0163(04)_01DRB.pdf
  
200506FRA-SR161/IR270-25.900/40.260 (Columbus)National Engineering & Contracting Co.Contract interpretation/ambiguity, MSE wall, Incorporation by referenceDRB06_040163_03DRB.pdf
  
200508BUT-CR115-0.00 (City of Fairfield)John R. Jurgensen Co.Notice, Duty to examine Bid Documents, Errors and Omissions, Contract interpretation/ambiguity, Signif. change in scope/character of work, Mitigation, Duty to coordinate subs, Equitable Adjustment DCB08_030002_01DCB.pdf
  
200508BUT-CR115-0.00 (City of Fairfield)John R. Jurgensen Co.Concrete Testing and Inspection, Notice, Duty to examine Bid Documents, Errors and Omissions, Contract interpretation/ambiguity, Signif. change in scope/character of work, Mitigation, Duty to coordinate subs, Equitable Adjustment DCB08_0002(03)_01DCB.pdf
  
200402LUC-IR280-2.96Fru-Con Construction Corp.Discrepancy in quantity, Signif. change in scope/character of work, NoticeDRBD2.025DRB.pdf
  
200402LUC-IR280-2.96Fru-Con Construction Corp.Precast Concrete, Decreased Quanitity, Plan Discrepency, Unit Price AdjustmentDRB02_0493(01)_01DRB.pdf
  
200404POR-303Shelly & Sands, Inc.Partial Depth Pavement Repair, Extra Work, Significant Change in the Character of Work, Plan QuanititesDCB04_0406(03)_01DDB.pdf
  
200405FAI-USR 33-0.41 (City of Springdale)Kokosing Construction Company, Inc.Utility delay, CPM Progress Schedule, Non-responsiveness as approval/acceptance, Overhead (home/field office), Extra work, Notice, Delay - critical/non-critical, CPM calendar/logic changes DCB05_0068(02)_01DDB.pdf
  
200407MOT-IR75-29.305Kokosing Construction Company, Inc.Utility delay, Mitigation, Notice, CPM Progress ScheduleDCB07_0560(01)_01DDB.pdf
  
200410VIN-CR38A-0.36/VariousBecdir Construction Co.Constructive acceleration, Mitigation, Precaution against damage, Act of God, Dispute Resolution Process, Claim after final change order, Inefficiency/Loss of productivity, Delay - owner causedArbitration10_0236(02)_01ARB.pdf
  
200410ATH-US33-40.981Smith & Johnson Construction Co.Timber Value, Production LossDCB10_0246(01)_0402_02DCB.pdf
  
200302LUC-2Miller Bros. Construction, Inc.Pavement Rutting, Mix Design, Soft Subgrade, Reasonable Conformace with Specification, Excessive Asphalt CementDCB02_0141(99)_02DDB.pdf
  
200302LUC-2-2.24/7.26Miller Bros. Construction, Inc.Asphalt Pavement RuttingDCB/Setlmnt02_0141(99)_0901_01DDB.pdf
  
200304SUM-IR76-24.799/0.00Great Lakes Construction Co.Thin Concrete Pavement, Unjust Enrichment, Pavement WarrantyDCB04_0323(00)_1102_01and02DDB.pdf
  
200306FRA-IR 670-3.17/Various - Part 1 & 2Complete General Construction Co.Differing site conditions, Drilled shafts, Tie back retaining walls, Means and methods, Winter protection DCB06_0069(02)_01DDB.pdf
  
200310ATH-US33-10.41Complete General Construction Co.Engineer-ordered suspension, Extra work, Change order policy, Interest, Inefficiency/Loss of productivity DCB10_3001(01)_1001_04DCB.pdf
  
200204TRU-80-1086Northern Ohio Paving Co.Overlay FailureDCB04_3002(01)_1119_04DDB.pdf
  
200204MOHSoda Construction CompanyNonperformance, Waterline, Anticipated Revenue, Lost Profit, Demolition Debris RemovalDCB04_0181(99)_01DDB.pdf
  
200204TRU-80-1086Northern Ohio Paving Co.Remove and Replace Overlay, Temporary Pavement Repair, Hydro DemolitionDCB/Setlmnt04_3002(01)_04DDB.pdf
  
200207MOT-75Complete General Construction Co.Maintenance of Traffic, Damage to New Concrete PavementDCB07_0747(99)0564(00)0263(01)_01DDB.pdf
  
200208HAM-SR4-4.000 (Paddock Road)Complete General Construction Co.Extent of Repair/Removal of Honeycomb ConcreteDCB08_0158(01)_0102_01DDB.pdf
  
200209SCI-USR23-0.00 (City of Portsmouth)C.J. Mahan Construction Co., LLCCPM Progress Schedule, Delay - owner caused, Errors and OmissionsDCB09_0178(01)_01DDB.pdf
  
200209JAC-32-11.75/VARIOUSIcarus Industrial Painting & Contracting Co., Inc.Dispute Resolution Process, Bridge paintingDCB09_0465(99)_01DDB.pdf
  
200210ATH-US33-40.981Smith & Johnson Construction Co.Timber Value, Production LossDCB10_0246(01)_0402_02DDB.pdf
  
200210ATH-US33-10.41Complete General Construction Co.Engineer-ordered suspension, Extra work, Change order policy, Interest, Inefficiency/Loss of productivity DCB10_3001(01)_1001_04DDB.pdf
  
200105COS-USR 36-27.54Complete General Construction Co.Contract interpretation/ambiguity, Pipe removal, Pre-bid questionArbitration05_0139(97)_0897_03ARB.pdf
  
200105COS-USR36-27.54Complete General Construction Co.Pipe Removal Payment, Contract interpretation/ambiguity, Pipe removal, Pre-bid questionArbitration05_0139(97)_03ARB.pdf
  
200108HAM-275-32.27/0.00John R. Jurgensen Co.Design-Build, Temporary Shoring, Railroad Crossing, Specifications (design/performance), Contract interpretation/ambiguityArbitration08_3012(00)_0201_02ARB.pdf
  
200005COS-USR36-27.54Complete General Construction Co.Contract interpretation/ambiguity, Pipe removal, Pre-bid questionDCB05_0139(97)_0897_03DCB.pdf
  
200005COS-USR36-27.54Complete General Construction Co.Pipe Removal Payment, Contract interpretation/ambiguity, Pipe removal, Pre-bid questionDCB05_0139(97)_03DCB.pdf
  
200009BRO-G.W. Melvin Contracting Co.Pipe Installation, Contaminated Soil, Basis of PaymentDCB09_0712(97)_DRCdecision.pdf
  
199904SUM-Bay State PaintingBridge Painting, Inspection, Delay-Owner Caused, ReworkArbitration04_0613(94)_01ARB.pdf
  
CD1.pdf
  
CD2.pdf
  
CD3.pdf
  
CD4.pdf
  
CD5.pdf
  
CD6.pdf
  
ODOT_Mahan_ARB_DesignBuild091200.pdf
  
ODOT_Mahan_JRJ_ARB_delaysandextrawork012201.pdf
  
ODOT_Mahan_JRJ_ARB_shoring071001.pdf
  
SettlementAgreement458(04)Allstate_ODOT.pdf
  
10_0322(06)_01DCB.pdf
  
10_132(06)_01DCB.pdf
  
12_372(06)_02DRB.pdf
  
12_0107(05)_02DCB.pdf
  
10_0132(06)_01DCBwSUPP.pdf
  
05_0063(07)_STEP2.pdf
  
05_0138(07)_STEP1.pdf
  
09_0530(06)_01STEP2.pdf
  
09_0530(06)_02STEP2.pdf
  
05_0068(02)_01DDBwaddendum.pdf
  
10_0510(02)_03_04Step2.pdf
  
11_0120(06)_01Step2.pdf
  
11_0014(91)_CO107.pdf
  
12_002300_SettlementNotes.pdf
  
12_078007_02STEP2.pdf
  
12_8007(07)_02STEP2.pdf
  
10_0510(02)_01DCBStep4.pdf
  
05_3005-02 step 2 letter.pdf
  
12_060038_1and2STEP2.pdf
  
12_0106(08)_STEP1.pdf
  
12_0372(06)_04Step2.pdf
  
12_107(05)_01DCB.pdf
  
12_070080_1Step2.pdf
  
COsearch1.pdf
  
COsearch2.pdf
  
10_020510_04and05DDB.pdf
  
12_080597_Step1.pdf
  
KrystalisVODOT_appellatecourt.pdf
  
DuganMeyersOhioSupremeCourt.pdf
  
12_372(06)_06DRBptgrout.pdf
  
12_372(06)_07DRBdelay.pdf
  
COURTCentralAlliedvAdjutantGeneral.pdf
  
COURTClevelandConstructionUpholdsDisputeResolutionProcess.pdf
  
COURTWolfCreekBoltDecision.pdf
  
SettlementAgreementKokosingCorconTrafficPhasing.pdf
  
11_1002(09)_01DCB.pdf
  
11_139(09)_01DCB.pdf
  
12_0002(07)_01DCB.pdf
  
12_0597(08)_02DCB.pdf
  
12_597(08)_05DCB.pdf
  
12_597(08)_06DCB.pdf
  
12_80(07)_02DCB.pdf
  
InjunctionRequest_TGL_121710CourtofAppeals.pdf
  
SettlementAgreementKokosingAmer.Native2010.pdf
  
11_618(08)_01DCB.pdf
  
ARB_ODOT_Mahan_DesignBuild091200.pdf
  
ARB_ODOT_Mahan_JRJ_shoring071001.pdf
  
09_0334(08)_STEP2.pdf
  
11_482(08)_01STEP2.pdf
  
12_0597(08)_03DCB.pdf
  
SettlementAgreementFruCon.pdf
  
COURTTEXASCCEvPBSJsw3p.pdf
  
COURTDuganMeyersOhioSupremeCourt.pdf
  
ARB_ODOT_Mahan_JRJ_delaysandextrawork012201.pdf
  
COURTKrystalisVODOT_appellatecourt.pdf
  
12_080598_02.pdf
  
12_101041_01and02DCB.pdf
  
SettlementAgreementRuhlin040082.pdf
  
SettlementAgreementJurgensenWarranty.pdf
  
12_389(10)_01DCB5Districts.pdf
  
SettlementAgreement080597.pdf
  
SettlementAgreement040163.pdf
  
SettlementAgreementKokosingKoker040555.pdf
  
SettlementAgreement080597Allega.pdf
  
SettlementAgreement040163National.pdf
  
InterestCOURT'S DECISIONTGRStipend.pdf
  
SettlementAgreementKokosing050343fourissues.pdf
  
SettlementAgreementKarvoIII(crackedpavt).pdf
  
12_0372(06)_03DRB.pdf
  
Advisory110628MassConcrete.pdf
  
COURTMonoko Appeals Court DECISION 8-11-11PAINTING.pdf
  
12-100186-01DCB.pdf
  
12-100186-01Modified.pdf
  
12_101041-03DCB.pdf
  
SettlementAgreement070078AllegaExtendedPavtWarranty.pdf
  
ARB_HuronCounty_ErieBlacktop_failedpavement.pdf
  
02_0141(99)_01DDB.pdf
  
02_FruConDRB Decision.pdf
  
04_0323(00)_01and02DDB.pdf
  
02_8019(09)_01DCB.pdf
  
06_040163_09DCB.pdf