| | 2023 | 10 | NOB-SR 146-08.01 | Black Horse Bridge Construction | Falsework, Closure Pour, Bridge Design Manual – 309.3.8.5 Staged Construction | DCB | | 8/9/2023 3:43 PM |
| | 2023 | 4 | TRU-Warner Rd Bridge | Marucci & Gaffney Excavating Company | Borrow Quantity, C&MS 203 Borrow | DCB | | 8/9/2023 3:39 PM |
| | 2023 | 4 | MAH-IR 76/IR 80-03.53/00.00 | Kenmore Construction Company | Fuel Price Adjustment, Diamond Grinding, PN 520 | DCB | | 8/9/2023 3:37 PM |
| | 2023 | 7 | MOT-75-10.44/10.78 | The Ruhlin Company | Deck Cracking, C&MS 511 | DRA | | 8/9/2023 2:42 PM |
| | 2021 | 04 | STA-IR77-08.40/VAR | The Beaver Excavating Company | Steel Pay Weights, CMS 104.02.B & D, CMS 103.01 - Consideration of Proposals | DCB | | 3/7/2022 10:00 AM |
| | 2021 | 11 | BEL-IR 470-06.54 | Complete General Construction Company | Elastomeric Bearings, CMS 105.07, CMS 105.11, CMS 711.23 Elastomeric Bearings: Fabrication and Physical Properties | DCB | | 3/7/2022 9:55 AM |
| | 2021 | 08 | HAM SR 4 4.31 City of Wyoming | Complete General Construction Company | Global Inefficiency, CMS 109.07, Measured Mile Analysis, CMS 104.02.B & D | DCB | | 3/7/2022 9:52 AM |
| | 2021 | 06 | FAY-35-4.52 | John R. Jurgensen Companies | SDC Overlay Cracking, CMS 105.03,& 105.09-11, SS 848 Curing Application MSC and SDC Overlays, CMS 499 | DCB | | 3/7/2022 9:45 AM |
| | 2021 | 11 | TUS-77-33.41 | Marucci and Gaffney Excavating Company | Permitted Lane Closure Map, PN 105, Inefficiency, Baseline Schedule, Extra Work, TIA, CMS 401, Temporary Asphalt Pavement, Maintenance of Traffic 614 | DCB | | 5/27/2021 12:23 PM |
| | 2021 | 01 | DEF-SR15-14.77 | The Great Lakes Construction Co. | Normal High Water Elevation, CMS 503.03, Changed Site Condition, Written Early Notice, Cofferdam, TAF, OHWM | DCB | | 3/30/2021 10:50 AM |
| | 2020 | 01 | DEF-SR15-14.77 | The Great Lakes Construction Co. | Box Beams, Demolition Means and Methods, Changed Site Condition, 104.02.B, CMS 515.15 | DCB | | 8/12/2020 10:12 AM |
| | 2020 | 03 | LOR-SR301-26.67 | Fechko Excavating LLC | Type 2 Curb and Gutter, integral curb and gutter, CMS 105.04, Standard Construction Drawings, Plan Error | DCB | | 5/19/2020 9:22 AM |
| | 2020 | 10 | GAL-SR160-18.84 | Shelly & Sands | precast deck panels, reasonably close conformity, duty to mitigate, CMS 105.03 | DCB | | 2/20/2020 11:09 AM |
| | 2020 | 11 | HAS-US22-02.64 | The Ruhlin Company | Intermediate Diaphragms, ambiguity, prebid, plan note, cms 105.04, BDM, PSID-1-13, CMS 102.05 | DCB | | 2/7/2020 2:26 PM |
| | 2019 | 12 | CUY-SR 10-20.98 | Great Lakes Construction Co. | Design-Build, Railroad, Flaggers, Track Time, Inefficiency, Changed Condition, | DRA | | 12/23/2019 1:00 PM |
| | 2019 | 08 | PRE-SR503-0.00 | Barrett Paving Materials | Lump Sum, Cofferdams and Bracing, Non-Performance, CMS 503, Means and Methods | DCB | | 11/26/2019 10:48 AM |
| | 2019 | 12 | CUY-Interstates 77 and 271 | Infrastructure Unlimited, Inc. | SRS, Waste Water, Flush Water, Interference with Contract, Inefficiency, Civil Rights, OEPA, Deck Seal, Work Type 57, Item 512 | DCB | | 7/23/2019 11:36 AM |
| | 2019 | 03 | LOR-82-8.98 (Boone Rd) | Eclipse Co., LLC | Home Office Overhead, CMS 109.05 Utility Delay, Extra Work | DCB | | 5/29/2019 3:02 PM |
| | 2019 | 09 | SCI-823-0.00 | PGG | Rockfall, Contract Interpretation, P3, means & methods, Substantial Completion | DRB | | 3/28/2019 9:11 AM |
| | 2019 | 05 | LIC-SR16-16.64 | Complete General Construction Co. | PN 540, portland cement price adjustment | DCB | | 2/4/2019 9:26 AM |
| | 2018 | 11 | HAS-799-03.91 | Cross Roads Construction | Post-Tensioning, Beam Alignment, Project Delay, Differential Camber, Contractor Caused Delay | DCB | | 12/3/2018 11:44 AM |
| | 2017 | 05 | KNO-TR127-0.10 | McConnell Contracting, Inc. | Driven Pile, Changed Site Condition, Design-Build, boring logs | DCB | | 11/1/2017 1:52 PM |
| | 2017 | 12 | CUY-77-13.31 | J.D. Williamson, Inc. | Project Delay, 109.05, Extra Work, Incomplete Plans, No Impacted Schedule, HOOH, FOOH | ADR | | 7/21/2017 3:16 PM |
| | 2017 | 12 | GEA-44-1.35 | J.D. Williamson, Inc. | Asphalt Segregation, CMS 401.06, CMS 401.15, Minimum Temperature, Rework, Surface Course | DCB | | 7/5/2017 11:23 AM |
| | 2017 | 03 | ERI-4-8.60 | Eclipse Co., LLC | Excavation vs Pavement Removal, final quantities, CMS 202.05, plan error | DCB | | 6/27/2017 9:39 AM |
| | 2016 | 09 | LAW-7-5.46 | Complete General Construction Co. | Changed Condition, Trench Collapse, Water Level, Drilled Shaft, Static Water, Free Water, Means and Methods | DCB | | 12/2/2016 9:12 AM |
| | 2016 | 06 | FRA-270-52.72 | Complete General Construction Co. | Contract interpretation/ambiguity, Design-Build, Overhead Signage, Design Exception, Responsibility for Design | DCB | | 10/24/2016 1:07 PM |
| | 2016 | 03 | LOR-58-7.36 | Beaver Excavating Co. | Deck Plate, Rework, Distortion, Design Error, Welding, Corrective Work Plan, Means and Methods | DCB | | 6/30/2016 9:30 AM |
| | 2016 | 08 | HAM-75-2.30 | Kokosing Construction Company, Inc. | Maintenance of Traffic, Contract Interpretation/Ambiguity, Negligent Design, Prebid Questions, Constructability, Pre-Contract Damages, CPM Schedule, PN 107 | DCB | | 6/8/2016 9:38 AM |
| | 2016 | 02 | LUC-65-5.25 | Atsalis Brothers Painting, Inc. | Bridge Painting, Winter Work, Maintenance of Traffic, Plan Ambiguity, Extra Work | DCB | | 4/26/2016 12:06 PM |
| | 2015 | 06 | FRA-270-52.72 | Complete General Construction Co. | Asphalt Pavement Repair, Pothole Patching, Temporary Pavement, Subsurface Exploration Report, Changed Condition, Differing Site Condition | DCB | | 4/28/2016 11:13 AM |
| | 2015 | 04 | ATB-90-22.06 | Anthony Allega Cement Contractors, Inc. | Embankment Quantity, Backfill, Plan Discrepency, Plan Ambiguity, Basis of Payment, Notice | DCB | | 4/26/2016 12:10 PM |
| | 2015 | 06 | PIC-762-11.18 | Fechko Excavating, Inc. | Weather Delay, , Inexcusable Delay, Soft Base Material, Embankment, Liquidated Damages | DCB | | 4/26/2016 12:03 PM |
| | 2015 | 08 | HAM/WAR-71-19.41/0.00 | Great Lakes Construction Co. | Design-Build, SWPPP, Plan Ambiguity, Extra Work, Lump Sum Items | DCB | | 4/26/2016 12:00 PM |
| | 2015 | 12 | CUY-6-14.56 | 360 Construction Company, Inc. | Bridge Rehabilitation, Shotcrete Patching, Concrete Patching, Plan Ambiguity, Means and Methods | DCB | | 4/26/2016 11:56 AM |
| | 2015 | 09 | HIG-TR144-1.50 | J&J Schlaegel | Spread Footing, Design-Build, Specifications (Design/Performance), Extra Work, Contract Interpretation/Ambiguity | DCB | | 4/13/2016 7:21 AM |
| | 2014 | 07 | D07-BH-FY2012 | Suburban Maintenance & Construction, Inc. | Pier Column Repair, Concrete Patching, Plan Ambiguity, Engineering Assessment | DCB | | 4/26/2016 12:18 PM |
| | 2014 | 12 | LAK-86-2.70 | Suburban Maintenance & Construction, Inc. | Damaged Equipement, Kelly Bar, Differing Site Condition, Drilled Shafts, | DCB | | 4/26/2016 12:14 PM |
| | 2013 | 06 | FRA-IR270-2.60 | Shelly & Sands, Inc. | Acceptance (express/implied), Bridge painting, Burden of proof, Duty to coordinate subs, ODOT Testing Procedures | DCB | | 11/28/2013 12:05 AM |
| | 2013 | 08 | BUT-VA-PM/RPM | A&A Safety, Inc. | Line Marking, Contract interpretation/ambiguity, Method of Measurement, Past practice | DCB | | 8/23/2013 5:31 PM |
| | 2013 | 12 | CUY-LR-WILLOW AVENUE LIFT BRIDGE | Ruhlin Company | Open Grid Deck Welding, Contract interpretation/ambiguity, Industry standard, Reasonably close conformity | DCB | | 6/21/2013 5:30 PM |
| | 2013 | 09 | LAW-378-0.20 | Alan Ston Co., Inc. | Drilled shafts, Differing site conditions, Interest, Contract interpretation/ambiguity | DCB | | 5/24/2013 12:04 AM |
| | 2013 | 3 | HUR | Erie Blacktop | Failed pavement, 448 type 2 asphalt pavement bonding | Arbitration | | 5/16/2013 12:04 AM |
| | 2012 | 02 | SEN-Jones Rd. | Miller Bros. Construction, Inc. | Asphalt Pavement Cracking, Intermediate Course Tenderness, Segregation | Step 2 | | 4/26/2016 12:25 PM |
| | 2012 | 1 | PAU/DEF-US24-12.3/0.00 | Allega | Extended Warranty | Settlement | | 3/8/2013 12:05 AM |
| | 2012 | 12 | CUY-Willow Street Bridge | Ruhlin | Field repair, pre-fabrication meeting, bridge paint, reasonably close conformity | DCB | | 11/30/2012 5:31 PM |
| | 2012 | 12 | CUY-SR43-6.18 | Burton Scot Contractors, LLC | Delay, scheduling adequate notice, start date | DCB | | 11/30/2012 5:31 PM |
| | 2012 | 12 | GEA-422-18.31 | Karvo Paving Company | Character of work, means and methods, contract limits, compensation for altered quantities, Change Order Policy 27-010-(P) | Settlement | | 8/31/2012 12:04 AM |
| | 2012 | 7 | MOT-70-22.89 | Kokosing | Tieback system, soil borings, accurate and buildable plans, differing site condition, constructive acceleration, groundwater | Settlement | | 8/2/2012 12:06 AM |
| | 2012 | 6 | FRA-SR161-25.9 | National Engineering & Contracting | Time and delay impacts | Settlement | | 7/13/2012 5:33 PM |
| | 2012 | 12 | LAK-2-3.32 | Allega | | Settlement | | 7/13/2012 5:33 PM |
| | 2012 | 12 | Multiple | Perram Electric, Inc. | Signal teathering, pole clamps, alternate methods, multiple projects | DCB | | 6/20/2012 12:07 AM |
| | 2012 | 12 | CUY-Willow Street Bridge | The Ruhlin Company | Aluminum post modification, sidewalk bracket angles, field verification, structural scope of work | DCB | | 5/23/2012 12:03 AM |
| | 2012 | 03 | ERI-US250-19.742 (Milan) | Becdir Construction Co. | Final Quantities - Pavement Removed, Aggregate Base, Removal of Pavement Markings, Beam Seat Repair | DCB | | 5/3/2012 12:05 AM |
| | 2012 | 03 | LOR-VA-BH-FY2011 | Cosmos Industiral Services, Inc. | Maintenance of Traffic, Contract Interpretation/Ambiguity | DCB | | 4/4/2012 12:06 AM |
| | 2011 | 07 | MOT-LR-South Dixie | R.B. Jergens Contractors, Inc. | 304 Base, Asphalt Surface Course, Discrepancy in quantity, Signif. change in scope/character of work, Means and methods | DCB | | 1/11/2013 5:31 PM |
| | 2011 | | | Monoko | SS 815, defective work, warranty | Settlement | | 11/6/2012 12:03 AM |
| | 2011 | 6 | FRA-IR71-17.76 | Trumbull, Great Lakes, Ruhlin (Joint Venture) | Design build, prejudgement interest, design cost, shortlist, joint venture | Settlement | | 8/9/2012 12:06 AM |
| | 2011 | 6 | FRA-SR161-25.9 | National Engineering & Contracting | Time and delay impacts | Arbitration | | 8/3/2012 12:07 AM |
| | 2011 | 12 | CUY-SR237-04.93 | Great Lakes | Delays, railroad, 117-30300 PND, no entitlement | DCB | | 5/11/2012 5:33 PM |
| | 2011 | 06 | FRA-IR270-37.04 | Complete General Construction Co. | Method of Payment of Topsoil in a Median Planter, Method of Measurement, Burden of Proof, CMS 653.04 | DCB | | 6/13/2011 8:32 AM |
| | 2011 | 07 | MOT-LR-South Dixie | R.B. Jergens Contractors, Inc. | Delay in Scheduling Pre-con meeting, Delay - owner caused, Overhead (home/field office), Burden of proof, CPM Progress Schedule, Utility delay | DCB | | 4/8/2011 5:31 PM |
| | 2011 | 4 | SUM-IR277-2.47 | Wolf Creek Engineering and Contracting | Bolt tightening, maximum tension, rejected work, work inspection, clear direction from the district, MOP section 513 | Settlement | | 4/4/2011 1:14 PM |
| | 2011 | 04 | SUM-8-15.63 | Beaver Excavating Co. | Settlement of Pavement, Corrective Work, Subsurface Conditions, | Report | | 4/4/2011 1:14 PM |
| | 2011 | 12 | LAK-SR2-3.33 | Allega | Character of work, revised unit price, 104.02.D, 104.02.G | Step 1 | | 7/20/2009 10:09 PM |
| | 2010 | 02 | LUC-75-00.15 | Posen Construction | Hydro Demolition, CMS 848, SS 848.18, differing site condition, variable thickness concrete overlay | DCB | | 5/20/2016 5:30 PM |
| | 2010 | 3 | MED | Kokosing | VECP, 304 aggregate base, delay due to change order, grading | Arbitration | | 8/17/2012 5:32 PM |
| | 2010 | 03 | MED-71-6.06 | Ruhlin Company | Embankment failure, Test Pit, Slope Repair Subsurface Conditions, Haul Road | Step 2 | | 4/4/2011 4:19 PM |
| | 2010 | 12 | LAK-2-3.32 | Allega/Great Lakes Joint Venture | 8 aggregate, change in materials, Well graded combined aggregate, SS 888 | DCB | | 4/4/2011 4:19 PM |
| | 2010 | 01 | PAU-US24-0.00 | Mosser Construction, Inc. | Embankment failure, Subsurface Conditions, Haul Road | Step 2 | | 4/4/2011 4:19 PM |
| | 2010 | 11 | COL-SR164-21.89 | A.P. O'Horo | Item-special, composite fiber wrap system, prebid obligation | DCB | | 4/4/2011 4:17 PM |
| | 2010 | 7 | MOT-70/75 | Kokosing | Steel coating, bridge construction, IZEU, replacing subcontractor | Settlement | | 4/4/2011 1:39 PM |
| | 2010 | 12 | LAK-SR2-3.33 | Allega/Great Lakes Joint Venture | Dowel insertion, MIT Scan, reasonably close conformity | DCB | | 4/4/2011 1:39 PM |
| | 2010 | 12 | LAK-SR2-03.33 | Allega/Great Lakes Joint Venture | 304 base, CMS 304.05, CMS 451.05, additional costs for compaction of 304 material | DCB | | 4/4/2011 1:39 PM |
| | 2010 | 12 | GEA-US422-18.31 | Karvo Paving Company | Spalling concrete, hydro-demolition, HP4 mix, CMS (105.03, 105.10, 105.11, 106.06, 106.07) | DCB | | 4/4/2011 1:39 PM |
| | 2010 | 12 | LAK-SR2-03.33 | Allega/Great Lakes Joint Venture | Excavation of subgrade, early notice, change order, character of work, method of calculation | DCB | | 4/4/2011 1:39 PM |
| | 2010 | 12 | CUY-IR480-06.78 | Karvo Paving Company | Partial acceptance, CMS 109.11, early age cracking, CMS 451.16 | DCB | | 4/4/2011 1:39 PM |
| | 2010 | 11 | HAS-SR9-9.38 | Shelly & Sands | Raised Pavement Marker, Reasonably close conformity, Defective work, Section 105.11 | DCB | | 4/4/2011 1:39 PM |
| | 2010 | 11 | COL-US62-4.86 | Shelly & Sands | Raised Pavement Marker, Reasonably close conformity, Defective work, Section 105.11 | DCB | | 4/4/2011 1:39 PM |
| | 2010 | 06 | FRA-SR161/IR270-25.900/40.260 (Columbus) | National Engineering & Contracting Co. | Failure of 1500 mm pipe, Workmanlike construction, Defective specification, Delay - owner caused, Pipe removal | DCB | | 4/4/2011 1:39 PM |
| | 2010 | 06 | FRA-SR161/IR270-25.900/40.260 (Columbus) | National Engineering & Contracting Co. | Failing Epoxy Urethane Sealer, Defective specification, Workmanlike construction, Precaution against damage | DCB | | 4/4/2011 1:39 PM |
| | 2010 | 03 | CRA-VA-CHIP-FY2009 | Specialized Construction, Inc. | Chip Seal Warranty, Acceptance (Express/Implied), Delay | DCB | | 4/4/2011 1:39 PM |
| | 2010 | 03 | MED-71-6.06 | Ruhlin Company | Embankment failure, Test Pit, Slope Repair Subsurface Conditions, Haul Road, Benching | DRB | | 4/4/2011 1:39 PM |
| | 2010 | 7 | MOT-35-15.07 | Kokosing | Traffic Phasing, road closure, contract addendum, CMS 107.07 | Settlement | | 4/4/2011 1:14 PM |
| | 2010 | 02 | WOO/LUC-75-32.68/0.00 | Posen Construction, Inc. | Hydro-Demolition Costs, Extra Work, Differing site conditions, Inefficiency/Loss of productivity, Entitlement agreed/damages in dispute | DCB | | 4/4/2011 1:14 PM |
| | 2010 | 10 | MEG-US33-15.70 (Village of Pomeroy) | Mahan/National Joint Venture | PT System Test, field testing, mitigating impact, completion date, delay impact costs, tower leg | Arbitration | | 12/4/2008 1:02 PM |
| | 2009 | 3 | WAY-US30 | Ruhlin | Differing site conditions, contingency quantities, excavation of subgrade, undercutting unsuitable soil and material | Settlement | | 6/7/2012 12:06 AM |
| | 2009 | 11 | Multiple | AERO-MARK, Inc. | Multiple projects, polyester markings, fast-dry markings, retro-reflectivity readings, | Step 2 | | 4/4/2011 4:19 PM |
| | 2009 | 9 | HIG-CR46-3.64 | R.B. Jergens | Excavation, subgrade drainage, approach slabs, shared cost | Step 2 | | 4/4/2011 4:19 PM |
| | 2009 | 12 | CUY-Fulton Road | Kokosing | Mitigation, shared responsibility, extension, weather delays | DRB | | 1/6/2010 10:13 PM |
| | 2009 | 12 | CUY-Fulton Road | Kokosing | Grouting, temperature delays, special provisions, PT tendons | DRB | | 1/6/2010 10:13 PM |
| | 2009 | 07 | MOT-US35-15.07 | Kokosing Construction Company, Inc. | Dispute Resolution Process, Notice, Overhead (home/field office), Signif. change in scope/character of work | DCB | | 12/23/2009 10:11 PM |
| | 2009 | 03 | MED-71-9.56 | Kokosing Construction Company, Inc. | Value Engineering Change Proposal, Subgrade Stabilization, Cement Stabilization, Undercut, | DCB | | 12/9/2009 10:11 PM |
| | 2009 | 03 | RIC-CR424 | Mosser Construction, Inc. | Borrow Pit, Testing of Material, A-1-b Granular Material, Embankment | Arbitration | | 9/16/2009 10:08 PM |
| | 2009 | 04 | ATB-I90/46 | Tri Span Corporation | Rejection of Embankment Material, Compaction Testing, Nuclear Gauge, Suspension of Work, Delay, Inefficiency, Mobilization, SWPPP, Borrow Pit, | DCB | | 9/3/2009 10:08 PM |
| | 2009 | | | A&L Painting LLC | Hazardous working conditions, lead paint, injury, safeguarding work | Settlement | | 7/31/2009 10:09 PM |
| | 2009 | 07 | MOT-70-17.04 | Kokosing Construction Company, Inc. | Changed Condition, Maintenance of Traffic, Plan Error, Grade Separation, Mitigation, Schedule Logic | Step 2 | | 7/20/2009 10:08 PM |
| | 2009 | 06 | CLA-IR70-25.11/28.95/29.32/0.00 | Kokosing Construction Company, Inc. | Winter Work, Delay - owner caused, Overhead (home/field office), Fuel Price Adjustment, Material Escalation, Extra Work, Seeding, Interest, Change order policy | DCB | | 7/2/2009 10:08 PM |
| | 2009 | 05 | LIC-161/37-6.65/10.25 | Kokosing Construction Company, Inc. | Value Engineering Change Proposal, Contract interpretation/ambiguity, Contractor proposed change | DCB | | 6/16/2009 10:08 PM |
| | 2009 | 10 | MEG-USR33-15.70 | Mahan/National Joint Venture | Material quantity, SS 824.18, retaining wall, aesthetic images | DCB | | 5/4/2009 10:08 PM |
| | 2009 | 12 | GEA-US422-18.31 | Karvo Paving Company | Excavation and embankment, trucking and excavating costs, early notice | Step 2 | | 4/9/2009 10:09 PM |
| | 2009 | 05 | LIC-161/37-6.65/10.25 | Kokosing Construction Company, Inc. | Value Engineering Change Proposal, Contract interpretation/ambiguity, Contractor proposed change | Step 2 | | 4/6/2009 10:08 PM |
| | 2009 | 12 | CUY-SR2-14.41 | Geronimo Painting Co., Inc. | Bridge painting, CMS 101.03, Reasonably close conformity, loss of productivity, mirrors | DCB | | 3/30/2009 10:09 PM |
| | 2009 | 12 | CUY-Fulton Road | Kokosing | Accepting damaged work, CMS 105.11, arch sections, engineering review | Step 2 | | 3/30/2009 10:09 PM |
| | 2009 | 07 | MOT-IR75-13.11 | Kokosing Construction Company, Inc. | Sleeper Slab Concrete and Coping, Contract interpretation/ambiguity, Means and methods, Mitigation, Pre-bid question | DRB | | 3/30/2009 10:08 PM |
| | 2009 | 10 | MEG-USR33-15.7 | Mahan Construction Company | PT System Test, field testing, mitigating impact, completion date, delay impact costs | Arbitration | | 3/19/2009 10:08 PM |
| | 2009 | 12 | LAK-SR86-1.32 | Allega | Rip Rap Using 6" Reinforced Concrete, steel trench box, plan changes, inefficiency | Step 2 | | 3/12/2009 10:08 PM |
| | 2009 | 07 | MOT-70-22.890 | Kokosing Construction Company, Inc. | Changed Condition, Trench Collapse, Water Level, Backfill | Step 2 | | 2/27/2009 10:08 PM |
| | 2009 | 06 | FRA-IR71-19.09 | Great Lakes Construction Co. | Design-Build, Noise wall/barrier, Utility Relocation | Step 1 | | 2/27/2009 10:08 PM |
| | 2009 | 5 | LIC-SR161/37-06.65/10.25 | Kokosing | Maintenance of traffic, worksite traffic supervisor | Step 1 | | 2/27/2009 10:08 PM |
| | 2009 | 5 | BUE-IR77-12.44 | Double Z Construction Company | Maintenance of Traffic, lane shift, flying lane shift | Step 2 | | 2/27/2009 10:08 PM |
| | 2009 | 03 | HUR-250-18.93 | Shelly & Sands, Inc. | Mechanically Stabilized Earth Wall Backfill, Granular Backfill, MSE Wall, Foundation Preparation, AASHTO Standard, Reinforcing Strap | Step 2 | | 2/27/2009 10:07 PM |
| | 2009 | 03 | RIC-CR424 | Mosser Construction, Inc. | Borrow Pit, Testing of Material, A-1-b Granular Material, Embankment | Step 2 | | 2/27/2009 10:07 PM |
| | 2009 | 10 | MEG-US33-15.70 (Village of Pomeroy) | Mahan/National Joint Venture | CPM calendar/logic changes, Delay - critical/non-critical, Delay - owner caused, Entitlement agreed/damages in dispute, Mutual Mistake | DRB | | 8/21/2008 9:47 AM |
| | 2008 | 06 | FRA-IR71-7.68 (Hoover Rd.) | Complete General Construction Co. | Pinholing, Bridge painting, Defective specification, Duty to coordinate subs, Industry standard, Means and methods | DCB | | 4/8/2011 5:31 PM |
| | 2008 | 07 | MOT-IR75-13.11 | Kokosing Construction Company, Inc. | Sleeper Slab Concrete and Coping, Contract interpretation/ambiguity, Means and methods, Mitigation, Pre-bid question | Step 2 | | 4/4/2011 4:19 PM |
| | 2008 | 07 | SHE-47-15.96 | Mainline Construction Co. | Extra Work, Extra Material, Bid Quantities, Prebid Question | Step 2 | | 4/10/2009 10:08 PM |
| | 2008 | 08 | CLE-133-17.63 | Complete General Construction Co. | Bridge Painting, Rework, Reblast, Repaint, Testing and Inspection, Notice | Step 2 | | 4/9/2009 10:08 PM |
| | 2008 | 06 | FRA-USR62-14.11 (Main Street Bridge) | Kokosing Construction Company, Inc. | Delay - owner caused, Means and methods, Past practice | Step 2 | | 4/9/2009 10:08 PM |
| | 2008 | 03 | LOR-57-12.54 | Suburban Maintenance & Construction, Inc. | Changed Site Condition, Deck Overlay, Plan Discrepency, Field Inspection Prior to Bid, Mitigation | Step 2 | | 4/9/2009 10:08 PM |
| | 2008 | 02 | OTT-US20 | Erie Group of Companies | Repair of Concrete Cracking, Deceleration Pads, Transverse Cracks, Concrete Pavement, Dowel Bar Retrofit, Joint Repair, HIPERPAV Sawing, | Step 2 | | 4/9/2009 10:07 PM |
| | 2008 | 12 | CUY-Euclid Signals | Perram Electric, Inc. | CMS 105.07, limited knowledge of site contitions, plan notes, conduit | Step 1 | | 3/24/2009 10:08 PM |
| | 2008 | 12 | LAK-SR84-0.43 | Perk Company, Inc. | Suface cleanliness, bolt galvanization painting costs, CMS 514, CMS 711.02 | Step 2 | | 3/23/2009 10:08 PM |
| | 2008 | 10 | MEG-US33-15.70 | Mahan National | Delay for engineering correction, material change | Step 2 | | 3/2/2009 10:08 PM |
| | 2008 | 9 | PIK-CR3-0 | R.C. Construction | Water lines, unit price, cost analysis, reasonable unit price | Step 2 | | 2/27/2009 10:08 PM |
| | 2008 | 9 | PIK-CR3-0 | R.C. Construction | Excavation, embankment, maintenance of traffic, method of calculation, culverts, change of personnel | Step 2 | | 2/27/2009 10:08 PM |
| | 2008 | 09 | ROS-US35-14.41 | Shelly Company | Subgrade Stability, Soft Subgrade, Undercutting, Concrete Barrier End, Changed Conditions | Step 2 | | 2/27/2009 10:08 PM |
| | 2008 | 09 | ROS-US35-26.17 | Kokosing Construction Company, Inc. | Late Payment, Interest, Material Price Escalation | Step 2 | | 2/27/2009 10:08 PM |
| | 2008 | 07 | MOT-70-22.890 | Kokosing Construction Company, Inc. | Impact Attenuators, Past Practice, Accident Damage | Step 2 | | 2/27/2009 10:08 PM |
| | 2008 | 04 | STA-77-17.93 | Marshal C. Rardin & Sons, Inc. | High Pressure Production Line Relocation, Compensable Delay, Extra Work, | Step 2 | | 2/27/2009 10:07 PM |
| | 2008 | 03 | MED-71-9.56 | Kokosing Construction Company, Inc. | Value Engineering Change Proposal, Subgrade Treatment, Granular Backfill, Cement Stabilization, Emergency Declaration, Delay, Inefficiencies | Step 2 | | 2/27/2009 10:07 PM |
| | 2008 | 12 | CUY-Fulton Road | Kokosing | PT System Test, field testing, means and methods, Section .08-2.4 | DRB | | 12/31/2008 10:08 PM |
| | 2008 | 10 | MEG-US33-9.4 | Beaver | Joint sawing, mid-slab cracking, early cracking | DCB | | 12/30/2008 10:08 PM |
| | 2008 | 10 | VIN-US50-0.10 | R.C. Construction | Landslide, borrow sites, use of ODOT right-of-way | DCB | | 12/17/2008 10:08 PM |
| | 2008 | 08 | CLE-US52-7.81/15.44/20.67 | Double Z Construction Co. | Excavation, Contract interpretation/ambiguity, Discrepancy in quantity, Errors and Omissions | DCB | | 12/17/2008 10:08 PM |
| | 2008 | 06 | FRA-USR62-14.11 (Main Street Bridge) | Kokosing Construction Company, Inc. | Delay - owner caused, Means and methods, Past practice | DRB | | 12/5/2008 11:58 AM |
| | 2008 | 12 | LAK-86 | Anthony Allega Cement Contractors, Inc. | Shale Excavation, Final Measurement, HP Concrete, Elevation of Bedrock, Depth of Footing, Rock Socket, | DCB | | 12/4/2008 1:02 PM |
| | 2008 | 12 | CUY-West 3rd St. (Cleveland) | Walsh Construction Co. | Lift bridge, leaking, multiple issues | DCB | | 12/4/2008 1:02 PM |
| | 2008 | 12 | CUY-West 3rd St. (Cleveland) | Walsh Construction Co. | Tower Floor Replacement, Fiberglass Panel, Extra Work, Total Cost Method | DCB | | 12/4/2008 1:02 PM |
| | 2008 | 09 | SCI-US23-0.00 (City of Portsmouth) | C.J. Mahan Construction Co., LLC | Baffle Plate, Contract interpretation/ambiguity, Acceptance (express/implied) | Arbitration | | 12/4/2008 1:02 PM |
| | 2008 | 06 | FRA-IR71-7.68 (Hoover Rd.) | Complete General Construction Co. | Bridge Painting, Defective specification, Duty to coordinate subs, Industry standard, Means and methods | DCB | | 12/4/2008 1:02 PM |
| | 2008 | 04 | POR-IR76-9.50 | Velotta Company | Temporary Pavement Repairs, Burden of proof, Contract interpretation/ambiguity | Arbitration | | 12/4/2008 1:02 PM |
| | 2008 | 04 | SUM-21-2.60/4.62 | Wolf Creek Engineering & Contracting | Structural Steel Source, Material Price Escalation, Single Source, Domestic vs. Foreign Supplier | DCB | | 12/4/2008 1:02 PM |
| | 2008 | 04 | SUM-IR277-2.47 | Wolf Creek Engineering & Contracting | Structural Steel Splice Bolt Stripped and Snapped, Over Tighten, Nut Rotation, Failure to Follow Specification, | DCB | | 12/4/2008 1:02 PM |
| | 2008 | 04 | POR-IR76 | Velotta Company | Temporary Pavement Repairs, MOT, Subsurface Stability, Contract Specifications, Soft Embankment | DCB | | 12/4/2008 1:02 PM |
| | 2008 | 04 | MAH-IR80 | Anthony Allega Cement Contractors, Inc. | Industry-Wide Shortage, Rental Equipment, CPM Schedule, Mobilization, Non-Compensable Delay, | DCB | | 12/4/2008 1:02 PM |
| | 2007 | 2 | LUC-I280 | Fru-Con Construction Corp. | | Settlement | | 4/4/2011 4:19 PM |
| | 2007 | 03 | MED-18-16.03 | Kenmore Construction Co., Inc. | Acceleration, Work Forward Agreement, | Settlement | | 4/4/2011 4:19 PM |
| | 2007 | 11 | COL-SR45-16.920 | The Shelley Company | Non-performed work, contractor notification, Character of work, loss of revenue | Step 2 | | 3/2/2009 10:08 PM |
| | 2007 | 12 | CUY-West 3rd St. (Cleveland) | Walsh Construction Co. | Bridge Replacement, Lift Span, Rehabilitation, Lift Cable/Rope, Design Error, Failure to Coordinate, Calculate vs. Verify, Shop Drawing Acceptance, Existing Structural Verification | DCB | | 12/4/2008 1:02 PM |
| | 2007 | 02 | Edison Bridge | Great Lakes Construction Co. | Drilled Shafts, Water Infiltration, Rework, Dewatering, Tremie, Defective Work, Compressive Strength | DCB | | 8/21/2008 9:47 AM |
| | 2007 | 12 | CUY-West 3rd St. (Cleveland) | Walsh Construction Co. | Disclaimer, Errors and Omissions, Shop Drawings, Acceptance (express/implied), Defective specification, Notice, Mitigation | DCB | | 8/21/2008 9:47 AM |
| | 2007 | 12 | CUY-IR271-6.04 | Shelly Company | Specifications (design/performance), Means and methods, Asphalt Concrete | DCB | | 8/21/2008 9:47 AM |
| | 2007 | 10 | MEG-US33-15.70 (Village of Pomeroy) | Mahan/National Joint Venture | Concrete Quality in Tower Segment Four | DRB | | 8/21/2008 9:47 AM |
| | 2007 | 10 | MEG-US33-15.70 (Village of Pomeroy) | Mahan/National Joint Venture | CPM calendar/logic changes, Delay - critical/non-critical, Delay - owner caused, Entitlement agreed/damages in dispute, Mutual Mistake | DRB | | 8/21/2008 9:47 AM |
| | 2007 | 07 | MOT-IR75-31.842 (City of Vandalia) | Kokosing Construction Company, Inc. | Contract interpretation/ambiguity, Reasonably close conformity, Defective specification, Workmanlike construction, Bridge painting, Past practice | DCB | | 8/21/2008 9:47 AM |
| | 2007 | 07 | MOT-70-22.890 | Kokosing Construction Company, Inc. | Tieback Anchors, SPL Walls, Design Error, Changed Site Conditions | DRB | | 8/21/2008 9:47 AM |
| | 2007 | 06 | FRA-USR62-14.11 (Main Street Bridge) | Kokosing Construction Company, Inc. | Act of God, Contract interpretation/ambiguity | DRB | | 8/21/2008 9:47 AM |
| | 2007 | 05 | GUE-IR 77-7.54/7.68 | Complete General Construction Co. | Reasonably close conformity, Signif. change in scope/character of work, Change order release/waiver, Unjust enrichment, Inspection, Specifications (design/performance), Bridge painting, Past practice, Defective specification | DCB | | 8/21/2008 9:47 AM |
| | 2006 | 07 | | Complete General Construction | | | | 5/17/2022 1:00 PM |
| | 2006 | 5 | GUE-IR77-007.54 | Complete General Construction | High profile, painting, unneccessary striping, caulking, grinding, painting platform | Step 2 | | 3/23/2009 10:07 PM |
| | 2006 | 03 | MRW/RIC-I71-19.54/0.00 | Kokosing Construction Company, Inc. | Granular Backfill, Undercuts, Inefficienies, Subgrade Compaction, Measured Mile | Step 1 | | 3/2/2009 10:07 PM |
| | 2006 | 12 | CUY-271-0.54 | Allstate Painting & Contracting Co | Bridge painting, multiple projects | DCB | | 12/4/2008 1:03 PM |
| | 2006 | 12 | CUY-2-14.41 (Cleveland) | Geronimo Painting Co., Inc. | | | | 12/4/2008 1:02 PM |
| | 2006 | 12 | CUY-2-14.41 (Cleveland) | Geronimo Painting Co., Inc. | Bridge Painting, Structural Steel, Surface Cleanliness, Changed Contract Condition, Testing Equipment, Time Extension, Winter Heating and Containment Costs | DCB | | 12/4/2008 1:02 PM |
| | 2006 | 10 | MEG-US33-15.70 (Village of Pomeroy) | Mahan/National Joint Venture | | DRB | | 12/4/2008 1:02 PM |
| | 2006 | 06 | FRA-SR161/IR270-25.900/40.260 (Columbus) | National Engineering & Contracting Co. | MSE Walls, Material Escalations, Inefficiencies, Winter Protection, FOOH, HOOH | DRB | | 12/4/2008 1:02 PM |
| | 2006 | 06 | FAY-IR71-0.00 | John R. Jurgensen Co. | High Performance Concrete For New Bridge Decks With Warranty Appeal | DCB | | 12/4/2008 1:02 PM |
| | 2006 | 12 | CUY-2-14.41 (Cleveland) | Geronimo Painting Co., Inc. | Fuel Price Escalation | DCB | | 8/21/2008 9:47 AM |
| | 2006 | 12 | CUY-2-14.41 (Cleveland) | Geronimo Painting Co., Inc. | Bridge Painting, Testing Equipement, Inspection, Mitigation, Notice, Reasonably close conformity, Entitlement agreed/damages in dispute, Inefficiency/Loss of productivity, Surface Cleanliness | DCB | | 8/21/2008 9:47 AM |
| | 2006 | 10 | MEG-US33-15.70 (Village of Pomeroy) | Mahan/National Joint Venture | Defective specification, Means and methods, Workmanlike construction, Burden of proof, Changed contract condition | DRB | | 8/21/2008 9:47 AM |
| | 2006 | 06 | FAY-IR71-0.00 | John R. Jurgensen Co. | High Performance Concrete For New Bridge Decks With Warranty Appeal | DCB | | 8/21/2008 9:47 AM |
| | 2005 | 08 | BUT-CR115-0.00 (City of Fairfield) | John R. Jurgensen Co. | Concrete Testing and Inspection, Notice, Duty to examine Bid Documents, Errors and Omissions, Contract interpretation/ambiguity, Signif. change in scope/character of work, Mitigation, Duty to coordinate subs, Equitable Adjustment | DCB | | 12/4/2008 1:02 PM |
| | 2005 | 04 | POR-IR76-9.50 | Velotta Company | Structural Steel Plate Girders, Constructive acceleration, Unjust enrichment, Equitable Adjustment, Early Completion Schedule, Mitigation, Duty to coordinate subs, Voluntary Acceleration | DCB | | 12/4/2008 1:02 PM |
| | 2005 | 03 | MRW/RIC-I71-19.54/0.00 | Kokosing Construction Company, Inc. | Partial Depth Pavement Repair, Rework, Extra Work, Joint Failure, Type B Emergency, Asphalt Pavement Repair, Workmanlike Construction | DCB | | 12/4/2008 1:02 PM |
| | 2005 | 03 | MRW-IR71-19.54/0.00 | Kokosing Construction Company, Inc. | Partial Depth Pavement Repair, Dispute Resolution Process, Type A Emergency, Inspection, Acceptance (express/implied), Workmanlike construction, Responsibility for project, Burden of proof | DCB | | 8/21/2008 9:47 AM |
| | 2005 | 08 | BUT-CR115-0.00 (City of Fairfield) | John R. Jurgensen Co. | Notice, Duty to examine Bid Documents, Errors and Omissions, Contract interpretation/ambiguity, Signif. change in scope/character of work, Mitigation, Duty to coordinate subs, Equitable Adjustment | DCB | | 8/21/2008 9:47 AM |
| | 2005 | 06 | FRA-SR161/IR270-25.900/40.260 (Columbus) | National Engineering & Contracting Co. | Contract interpretation/ambiguity, MSE wall, Incorporation by reference | DRB | | 8/21/2008 9:47 AM |
| | 2005 | 06 | FRA-SR161/IR270-25.900/40.260 (Columbus) | National Engineering & Contracting Co. | Contract interpretation/ambiguity, MSE wall, Incorporation by reference | DRB | | 8/21/2008 9:47 AM |
| | 2004 | 2 | LUC-280-2.96 | Fru-Con Construction Corp. | Scope of work, nonperformance, unit price adjustment | DCB | | 4/29/2016 5:29 PM |
| | 2004 | 5 | FAI-US33-0.041 | Kokosing | Relocation of fiber optic, delays, borrow material, VECP, CPM Progress Schedule, calendar and logic change | DDB | | 3/2/2009 10:08 PM |
| | 2004 | 02 | LUC-IR280-2.96 | Fru-Con Construction Corp. | Precast Concrete, Decreased Quanitity, Plan Discrepency, Unit Price Adjustment | DRB | | 12/4/2008 1:02 PM |
| | 2004 | 02 | LUC-IR280-2.96 | Fru-Con Construction Corp. | Discrepancy in quantity, Signif. change in scope/character of work, Notice | DRB | | 8/21/2008 9:47 AM |
| | 2004 | 10 | VIN-CR38A-0.36/Various | Becdir Construction Co. | Constructive acceleration, Mitigation, Precaution against damage, Act of God, Dispute Resolution Process, Claim after final change order, Inefficiency/Loss of productivity, Delay - owner caused | Arbitration | | 8/21/2008 9:47 AM |
| | 2004 | 10 | ATH-US33-40.981 | Smith & Johnson Construction Co. | Timber Value, Production Loss | DCB | | 8/21/2008 9:47 AM |
| | 2004 | 07 | MOT-IR75-29.305 | Kokosing Construction Company, Inc. | Utility delay, Mitigation, Notice, CPM Progress Schedule | DCB | | 8/21/2008 9:47 AM |
| | 2004 | 05 | FAI-USR 33-0.41 (City of Springdale) | Kokosing Construction Company, Inc. | Utility delay, CPM Progress Schedule, Non-responsiveness as approval/acceptance, Overhead (home/field office), Extra work, Notice, Delay - critical/non-critical, CPM calendar/logic changes | DCB | | 8/21/2008 9:47 AM |
| | 2004 | 04 | POR-303 | Shelly & Sands, Inc. | Partial Depth Pavement Repair, Extra Work, Significant Change in the Character of Work, Plan Quanitites | DCB | | 8/21/2008 9:47 AM |
| | 2003 | 04 | SUM-IR76-24.799/0.00 | Great Lakes Construction Co. | Thin Concrete Pavement, Unjust Enrichment, Pavement Warranty | DCB | | 8/21/2008 9:47 AM |
| | 2003 | 02 | LUC-SR2-21.15 | Miller Bros. Construction, Inc. | Pavement Rutting, Mix Design, Soft Subgrade, Reasonable Conformace with Specification, Excessive Asphalt Cement | DCB | | 8/21/2008 9:47 AM |
| | 2003 | 02 | LUC-2-2.24/7.26 | Miller Bros. Construction, Inc. | Asphalt Pavement Rutting | DCB/Setlmnt | | 8/21/2008 9:47 AM |
| | 2003 | 10 | ATH-US33-10.41 | Complete General Construction Co. | Engineer-ordered suspension, Extra work, Change order policy, Interest, Inefficiency/Loss of productivity | DCB | | 8/21/2008 9:47 AM |
| | 2003 | 06 | FRA-IR 670-3.17/Various - Part 1 & 2 | Complete General Construction Co. | Differing site conditions, Drilled shafts, Tie back retaining walls, Means and methods, Winter protection | DCB | | 8/21/2008 9:47 AM |
| | 2002 | 2 | LUC | Miller Brothers Construction, Inc. | Extra pavement planing, performance liability | DDB | | 4/29/2016 5:29 PM |
| | 2002 | 04 | TRU-80-1086 | Northern Ohio Paving Co. | Remove and Replace Overlay, Temporary Pavement Repair, Hydro Demolition | DCB/Setlmnt | | 12/4/2008 1:02 PM |
| | 2002 | 04 | MAH-SR616-3.09 | Soda Construction Company | Nonperformance, Waterline, Anticipated Revenue, Lost Profit, Demolition Debris Removal | DCB | | 8/21/2008 9:47 AM |
| | 2002 | 10 | ATH-US33-10.41 | Complete General Construction Co. | Engineer-ordered suspension, Extra work, Change order policy, Interest, Inefficiency/Loss of productivity | DCB | | 8/21/2008 9:47 AM |
| | 2002 | 10 | ATH-US33-40.981 | Smith & Johnson Construction Co. | Timber Value, Production Loss | DCB | | 8/21/2008 9:47 AM |
| | 2002 | 09 | SCI-USR23-0.00 (City of Portsmouth) | C.J. Mahan Construction Co., LLC | CPM Progress Schedule, Delay - owner caused, Errors and Omissions | DCB | | 8/21/2008 9:47 AM |
| | 2002 | 09 | JAC-32-11.75/VARIOUS | Icarus Industrial Painting & Contracting Co., Inc. | Dispute Resolution Process, Bridge painting | DCB | | 8/21/2008 9:47 AM |
| | 2002 | 08 | HAM-SR4-4.000 (Paddock Road) | Complete General Construction Co. | Extent of Repair/Removal of Honeycomb Concrete | DCB | | 8/21/2008 9:47 AM |
| | 2002 | 07 | MOT-75 | Complete General Construction Co. | Maintenance of Traffic, Damage to New Concrete Pavement | DCB | | 8/21/2008 9:47 AM |
| | 2002 | 04 | TRU-80-1086 | Northern Ohio Paving Co. | Overlay Failure | DCB | | 8/21/2008 9:47 AM |
| | 2001 | 8 | HAM-SR126-11.68 | Mahan | Delays, extra work, temporary sheeting, retaining walls | Arbitration | | 4/4/2011 4:19 PM |
| | 2001 | 3 | ERI | E.S. Wagner | Worksite traffic supervisor, prebid ammendment | DCB | | 3/3/2009 10:08 PM |
| | 2001 | 8 | HAM | John R. Jurgensen Construction | Delays, extra work, Retaining walls | Arbitration | | 12/4/2008 1:03 PM |
| | 2001 | 8 | HAM | John R. Jurgensen Construction | Temporary shoring, maintenance of traffic, cantilever deck section, means and methods | Arbitration | | 12/4/2008 1:03 PM |
| | 2001 | 05 | COS-USR36-27.54 | Complete General Construction Co. | Pipe Removal Payment, Contract interpretation/ambiguity, Pipe removal, Pre-bid question | Arbitration | | 12/4/2008 1:02 PM |
| | 2001 | 08 | HAM-275-32.27/0.00 | John R. Jurgensen Co. | Design-Build, Temporary Shoring, Railroad Crossing, Specifications (design/performance), Contract interpretation/ambiguity | Arbitration | | 8/21/2008 9:47 AM |
| | 2001 | 05 | COS-USR 36-27.54 | Complete General Construction Co. | Contract interpretation/ambiguity, Pipe removal, Pre-bid question | Arbitration | | 8/21/2008 9:47 AM |
| | 2000 | 8 | HAM, CLE | Mahan | Design build, temporary shoring | Arbitration | | 4/4/2011 4:19 PM |
| | 2000 | 4 | STA | Mahan | Design Build | Settlement | | 4/4/2011 4:19 PM |
| | 2000 | 4 | STA | C.J. Mahan Construction Co. | Design build, MSE walls, Value Engineering, Prebid, conceptual plans | Arbitration | | 12/4/2008 1:03 PM |
| | 2000 | 09 | BRO- | G.W. Melvin Contracting Co. | Pipe Installation, Contaminated Soil, Basis of Payment | DCB | | 12/4/2008 1:02 PM |
| | 2000 | 05 | COS-USR36-27.54 | Complete General Construction Co. | Pipe Removal Payment, Contract interpretation/ambiguity, Pipe removal, Pre-bid question | DCB | | 12/4/2008 1:02 PM |
| | 2000 | 05 | COS-USR36-27.54 | Complete General Construction Co. | Contract interpretation/ambiguity, Pipe removal, Pre-bid question | DCB | | 8/21/2008 9:47 AM |
| | 1999 | 12 | LAK-SR84 | W.M. Brode Company | Sheet piling, driving resistance, waler modifications, bulkhead cap, tieback anchors, prime mark up, home office overhead, CD6 | DCB | | 1/6/2020 1:31 PM |
| | 1999 | 7 | MOT | BECDIR Construction Company | Bikeway construction, prestressed box beam, multiple issues, seeding, mulching, fertilizer, extra work, additional time, interest, CD6 | DCB | | 1/6/2020 1:30 PM |
| | 1999 | 12 | CUY-SR176 | Great Lakes | Delay into following fiscal year, home office overhead, contaminated soil, payment per fiscal year, CD6 | DCB | | 1/6/2020 1:29 PM |
| | 1999 | 12 | CUY-CR27 | Blaze Construction Incorporated | Delay in utility movement, measured mile, owned equipment utilization, CD6 | Arbitration | | 1/6/2020 1:29 PM |
| | 1999 | 4 | SUM-IR277 | The Velotta Company | ODOT Inspection, additional labor and equipment, additional sandblasting, excess material, bridge painting, CD6 | Arbitration | | 1/6/2020 1:26 PM |
| | 1999 | 04 | SUM- | Bay State Painting | Bridge Painting, Inspection, Delay-Owner Caused, Rework | Arbitration | | 11/14/2015 12:02 AM |
| | 1998 | 8 | BUT-Breiel | SK Construction Company, Inc. | Differing subsurface conditions, soil borings, CD4 | Arbitration | | 1/6/2020 1:51 PM |
| | 1998 | 7 | MOT-SR35-15.57 | Civil Construction, Inc. | Delay costs, winter work, lead contaminent, release of liquidated damages, removal of lifting tabs, CD4 | Arbitration | | 1/6/2020 1:50 PM |
| | 1998 | 3 | MED-SR303 | J&J Schlaegel, Inc. | Special Interpretation, item 603.03, conduit installation, backfill, difficulty connecting to box culvert, CD4 | DCB | | 1/6/2020 1:49 PM |
| | 1998 | 4 | SUM-IR76 | WG Lockart Const. | Plan ambiguity on APP item, barrier wall, adapted Type D barrier, 102.06, CD4 | DCB | | 1/6/2020 1:48 PM |
| | 1998 | 3 | WAY | VO Menuez & Sons Inc. | Payment for eliminated items, drilled shafts, 105.03, cast in place reinforced piles, CD4 | DCB | | 1/6/2020 1:47 PM |
| | 1998 | 7 | LOG | Fort Defiance Consr. & Supply | Delay costs, sheet piling, earth cofferdam, damage to adjacent property, delay decision, CD4 | DCB | | 1/6/2020 1:46 PM |
| | 1998 | 7 | CLA | Fort Defiance Consr. & Supply | Added costs for pile driving, equipment approval, calculation of blow counts, CD4 | DCB | | 1/6/2020 1:45 PM |
| | 1998 | 1 | VAN-USR30 | S.E. Johnson Companies | Payment for asphalt leveling,change in site condition, road base, bonus payment, smoothness specification, CD4 | DCB | | 1/6/2020 1:44 PM |
| | 1998 | 4 | SUM-I277 | Velotta Company | Changed site conditions, grinding of butt joints, placement of asphalt adjacent to concrete barrier, subcontractor, CD4 | DCB | | 1/6/2020 1:43 PM |
| | 1998 | 7 | MOT | Complete General/ CJ Mahan | Changed site conditions, pile driving, 507.04, measured mile approach, CD4 | DCB | | 1/6/2020 1:42 PM |
| | 1998 | 8 | HAM-US42 | Ray Prus & Son | Ground water, soil boring, change in site conditions, nearby water source, pump, CD5 | DCB | | 1/6/2020 1:41 PM |
| | 1998 | 8 | PRE-CR15 | Maiden & Jenkins Construction Co. | Over driving of bridge piles, change in site conditions, pile splicing, section 507.05, 507.04, 104.02c, CD5 | DCB | | 1/6/2020 1:40 PM |
| | 1998 | 2 | WOO | Becdir Construction Co. | Delay costs during work suspension, detour, idle equipment, cell phone costs, change order, enddam elevation, CD5 | DCB | | 1/6/2020 1:39 PM |
| | 1998 | 12 | GEA-SR306 | Perk Company, Inc. | Payment for embankment failures, liquidated damages, geotechnical consultant, embankment reconstruction, inadequate compaction, CD5 | DCB | | 1/6/2020 1:38 PM |
| | 1998 | 7 | AUG-Bellfontaine Street | SE Johnson Co. Inc. | A+B bidding incentive wording, disincentive, weather delays, liquidated damages, restricted to traffic, CD5 | DCB | | 1/6/2020 1:37 PM |
| | 1998 | 7 | SHE | SE Johnson Co. Inc. | A+B bidding incentive wording, change order, restricted to traffic, interim completion dates, CD5 | DCB | | 1/6/2020 1:36 PM |
| | 1998 | 9 | Multiple | McDaniels Construction Corp. Inc. | Plan ambiguity, H-piling, cofferdams, anti-washout admixture, 503.12, underwater construction methods, CD5 | DCB | | 1/6/2020 1:35 PM |
| | 1998 | 3 | MED | McDaniels Construction Corp. Inc. | Utility delay, coordination of utility relocation, responsibility for work with utility company, liquidated damages, 105.06, overtime pay, CD5 | DCB | | 1/6/2020 1:34 PM |
| | 1998 | 12 | CUY | Blaze Construction, Inc. | Delay, acceleration, inefficiency, home office overhead, utility delay, winter shutdown, excusable delay, noncompensable delay, CD5 | Arbitration | | 1/6/2020 1:33 PM |
| | 1997 | 3 | HUR/ASH-USR250 | Miller Brothers Construction | New equipment cost, anti-strip material, application of proposal note to existing contract, CD3 | DCB | | 1/6/2020 2:02 PM |
| | 1997 | 8 | 8 | S.K. Construction Co. | deficient inspection, bridge painting, liquidated damages, repainting, CD3 | GRE-USR42 | | 1/6/2020 2:01 PM |
| | 1997 | 3 | CRA-SR4 | Ohio Concrete Construction Co. | Material delivery delay, unavailable materials, liquidated damages, CMS 102.06 & 108.03, CD3 | DCB | | 1/6/2020 2:00 PM |
| | 1997 | 6 | FRA-I270 | Complete General Construction Co. | Misleading plan notes, roadway cleaning, bridge slab removal, force account records, CD3 | DCB | | 1/6/2020 1:59 PM |
| | 1997 | 3 | ASH-SR11 | Youngstown Pneumatic Construction | Plan ambiguity, CMS 511.14, CMS 511.09, SS836, CD3 | DCB | | 1/6/2020 1:58 PM |
| | 1997 | 8 | HAM-SR128 | Ray Prus & sons, Inc. | Dewatering, drilled shafts, CMS 104.02, CD3 | DCB | | 1/6/2020 1:57 PM |
| | 1997 | 10 | WAS-SR26 | Maiden and Jenkins Construction Co. | Delay costs, liquidated damages, lost days due to weather, extra work, catch basin, extension of MoT, CD3 | DCB | | 1/6/2020 1:57 PM |
| | 1997 | 4 | TRU-East Market Street | Parella-Pannuzio Inc. | Changed condition, subgrade contraction, material removal, CD3 | DCB | | 1/6/2020 1:56 PM |
| | 1997 | 3 | RIC/ASH-SR430/39 | The Mansfield Asphalt Paving Co. | Improper direction from inspector, mailbox turnouts, CMS 105.10, CD3 | DCB | | 1/6/2020 1:55 PM |
| | 1997 | 8 | BUT-SR4 | S.E. Johnson Co. | Plan ambiguity & forced acceleration, interim completion date, winter traffic limitations, pre-bid, liquidated damages, CD3 | DCB | | 1/6/2020 1:53 PM |
| | 1997 | 7 | DAR | S.E. Johnson Co. | Soft Subgrade, CD3 | DCB | | 1/6/2020 1:52 PM |
| | 1996 | 4 | SUM | J.D. Williamson Construction | Expansion joints, field painting, plan ambiguity, galvanizing, CD1 | DCB | | 1/6/2020 2:24 PM |
| | 1996 | 8 | HAM | John R. Jurgensen | Longer hauling distances, local road closure, road control, third party road control, CD1 | DCB | | 1/6/2020 2:23 PM |
| | 1996 | 8 | HAM | W.G. Fairfield Company | As per plan, trench depth, CMS 625.12, pre-bid questions, CD1 | DCB | | 1/6/2020 2:22 PM |
| | 1996 | 4 | SUM | J.D. Williamson Construction | Two claims, pole galvanization, CMS 713.01, idle equipment, CMS 109.04, superintendant, CD1 | DCB | | 1/6/2020 2:21 PM |
| | 1996 | 10 | ATH | Maiden & Jenkins Construction Company | Liquidated damages, recognizable delays, additional field costs, approximate plan note, earthwork, wingwall removal, record keeping, CD1 | DCB | | 1/6/2020 2:21 PM |
| | 1996 | 3 | MED-IR76-7 | Force account cost, item decrease, CD2 | Northern Ohio Paving, Inc. | Arbitration | | 1/6/2020 2:15 PM |
| | 1996 | 2 | OTT-SR2-28.47 | McDaniels Construction Corporation, Inc. | Payment for concrete, square yards, cubic yards, variable depth, hydro demolition, changed condition, CD2 | Arbitration | | 1/6/2020 2:14 PM |
| | 1996 | 12 | CUY-SR176-10.14 | Great Lakes Construction Co. | Shifting operations from night to day, tack welding of cross frames, early shutdown of erection work, unanticipated rail traffic, delays, CD2 | Arbitration | | 1/6/2020 2:09 PM |
| | 1996 | 4 | MAH-SR193, USR62, 422 | Parella-Pannuzio Inc. | Delay Costs, change in scope, plan revisions, notification at preconstruction, proper notice of claim, 105.17, acceptance of change orders, CD3 | DCB | | 1/6/2020 2:08 PM |
| | 1996 | 1 | VAN-USR 30 | S.E. Johnson Co. | Plan ambiguity, masonry collars, adjustment to item price, CD3 | DCB | | 1/6/2020 2:07 PM |
| | 1996 | 6 | PIC | Complete General Construction Co. | Misleading plan details, contractor obtained information, structure removal, due diligence at time of bid, CD3 | DCB | | 1/6/2020 2:06 PM |
| | 1996 | 10 | ATH-USR50-27.21 | Dain-Lyon Inc. | Nonperformance of bid item, imbalanced bid, CMS Section 109.03, CMS Section 104.02, CD3 | DCB | | 1/6/2020 2:05 PM |
| | 1996 | 12 | CUY-Bagley Road | Blaze Construction Inc. | Delay, acceleration, inefficiency, home office overhead, loss of profit from cash flow interruption, interest on delay of payments, CD3 | DCB | | 1/6/2020 2:04 PM |
| | 1996 | 6 | FRA | Shelly & Sands | Standard drawing applicability, change in scope of work, fence posts, English (non-metric), CD3 | DCB | | 1/6/2020 2:03 PM |
| | 1996 | 12 | CUY-Bagley Road | Blaze Construction, Inc. | Delay, acceleration, inefficiency, home office overhead, utility delay, winter shutdown, excusable delay, noncompensable delay, CD5 | DCB | | 1/6/2020 1:32 PM |
| | 1995 | 12 | CUY-Mayfield Road | Great Lakes Construction | Backfill, CMS 603.08, plan ambiguity, plan drawings, full depth granular backfill, CD1 | DCB | | 1/6/2020 2:25 PM |
| | 1995 | 2 | OTT-SR2-28.47 | Meroe Contracting and Supply Co. | Removal of latex modified concrete, micro-silica concrete, jack hammer removal, subcontractor, unsupervised work, LMC patching, Proposal Note 504, CD2 | Arbitration | | 1/6/2020 2:18 PM |
| | 1995 | 6 | FRA-IR670-3.66/3.95/5.82 | Complete General Construction Company | Delay, weather, design changes, additional work due to field conditions, railroad coordination, conflict with adjacent project, Eichleay formulay for home office overhead, CD2 | Arbitration | | 1/6/2020 2:17 PM |
| | 1995 | 8 | GRE-USR35-11.84 | S.E. Johnson Companies | Delays, extra work, removal of unstable subgrade, drainage, mitigated home office overhead, CD2 | Arbitration | | 1/6/2020 2:16 PM |
| | 1994 | 11 | BEL-SR7-15.66 | National Engineering & Contracting | Delays, change order, pay | District | | 3/3/2009 10:08 PM |
| | 1987 | 5 | GRE/MOT/COS-IR675-0.00/6.43 | Great Lakes Construction Co. | Deficient thickness, cracked concrete, soft subgrade, production impact, subgrade testing, CMS 401.16, unstable 310 material, project overhead, CD2 | Arbitration | | 1/6/2020 2:18 PM |
| | | | | | | | | 4/28/2016 4:08 PM |
| | | | | | | | | 12/4/2008 1:02 PM |
| | | | | | | | | 12/4/2008 1:02 PM |
| | | | | | | | | 12/4/2008 1:02 PM |
| | | | | | | | | 12/4/2008 1:02 PM |
| | | | | | | | | 12/4/2008 1:02 PM |
| | | | | | | | | 12/4/2008 1:02 PM |
| | | | | | | | | 8/21/2008 9:46 AM |