Claim Decisions​

A comprehensive library of previous dispute claims and the resulting decisions.​


  
  
  
  
  
  
  
  
  
  
202310NOB-SR 146-08.01Black Horse Bridge ConstructionFalsework, Closure Pour, Bridge Design Manual – 309.3.8.5 Staged ConstructionDCB10-210485-01 DCB Decision.pdf8/9/2023 3:43 PM
  
20234TRU-Warner Rd BridgeMarucci & Gaffney Excavating CompanyBorrow Quantity, C&MS 203 BorrowDCB04-210100-01 DCB Decision.pdf8/9/2023 3:39 PM
  
20234MAH-IR 76/IR 80-03.53/00.00Kenmore Construction CompanyFuel Price Adjustment, Diamond Grinding, PN 520DCB04-217004-01 DCB Decision.pdf8/9/2023 3:37 PM
  
20237MOT-75-10.44/10.78The Ruhlin CompanyDeck Cracking, C&MS 511DRA07-200341-01 DRA Finding and Recommendation.pdf8/9/2023 2:42 PM
  
202104STA-IR77-08.40/VARThe Beaver Excavating CompanySteel Pay Weights, CMS 104.02.B & D, CMS 103.01 - Consideration of ProposalsDCB04-190328-02 DCB Decision.pdf3/7/2022 10:00 AM
  
202111BEL-IR 470-06.54Complete General Construction CompanyElastomeric Bearings, CMS 105.07, CMS 105.11, CMS 711.23 Elastomeric Bearings: Fabrication and Physical PropertiesDCB11-170502-02 DCB Decision.pdf3/7/2022 9:55 AM
  
202108HAM SR 4 4.31 City of WyomingComplete General Construction CompanyGlobal Inefficiency, CMS 109.07, Measured Mile Analysis, CMS 104.02.B & DDCB08-0287(18)-01 DCB Decision.pdf3/7/2022 9:52 AM
  
202106FAY-35-4.52John R. Jurgensen CompaniesSDC Overlay Cracking, CMS 105.03,& 105.09-11, SS 848 Curing Application MSC and SDC Overlays, CMS 499DCB06-200011-01 DCB Decision.pdf3/7/2022 9:45 AM
  
202111TUS-77-33.41Marucci and Gaffney Excavating CompanyPermitted Lane Closure Map, PN 105, Inefficiency, Baseline Schedule, Extra Work, TIA, CMS 401, Temporary Asphalt Pavement, Maintenance of Traffic 614DCB11-190466-02-03-04 Director's Claims Board Decision.pdf5/27/2021 12:23 PM
  
202101DEF-SR15-14.77The Great Lakes Construction Co.Normal High Water Elevation, CMS 503.03, Changed Site Condition, Written Early Notice, Cofferdam, TAF, OHWMDCB01-180538-02 Director's Claims Board Decision.pdf3/30/2021 10:50 AM
  
202001DEF-SR15-14.77The Great Lakes Construction Co.Box Beams, Demolition Means and Methods, Changed Site Condition, 104.02.B, CMS 515.15DCB01-180538-01  Director's Claims Board Decision.pdf8/12/2020 10:12 AM
  
202003LOR-SR301-26.67Fechko Excavating LLCType 2 Curb and Gutter, integral curb and gutter, CMS 105.04, Standard Construction Drawings, Plan ErrorDCB03-190317-01  Directors Claims Board Decision.pdf5/19/2020 9:22 AM
  
202010GAL-SR160-18.84Shelly & Sandsprecast deck panels, reasonably close conformity, duty to mitigate, CMS 105.03DCB10-180013-01 Director's Claims Board Decision.pdf2/20/2020 11:09 AM
  
202011HAS-US22-02.64The Ruhlin CompanyIntermediate Diaphragms, ambiguity, prebid, plan note, cms 105.04, BDM, PSID-1-13, CMS 102.05DCB11-190090-01 DCB Decision.pdf2/7/2020 2:26 PM
  
201912CUY-SR 10-20.98Great Lakes Construction Co.Design-Build, Railroad, Flaggers, Track Time, Inefficiency, Changed Condition, DRA12-163000-01 DRA Decision.pdf12/23/2019 1:00 PM
  
201908PRE-SR503-0.00Barrett Paving MaterialsLump Sum, Cofferdams and Bracing, Non-Performance, CMS 503, Means and MethodsDCB08-170441-01 DCB Decision Signed.pdf11/26/2019 10:48 AM
  
201912CUY-Interstates 77 and 271Infrastructure Unlimited, Inc.SRS, Waste Water, Flush Water, Interference with Contract, Inefficiency, Civil Rights, OEPA, Deck Seal, Work Type 57, Item 512DCB12-160356-01 and 02 DCB Decision.pdf7/23/2019 11:36 AM
  
201903LOR-82-8.98 (Boone Rd)Eclipse Co., LLCHome Office Overhead, CMS 109.05 Utility Delay, Extra WorkDCB03-150518-01 DCB Decision.pdf5/29/2019 3:02 PM
  
201909SCI-823-0.00PGGRockfall, Contract Interpretation, P3, means & methods, Substantial CompletionDRBPGG ODOT Rockfall FINAL.pdf3/28/2019 9:11 AM
  
201905LIC-SR16-16.64Complete General Construction Co.PN 540, portland cement price adjustmentDCB05-150327-01 DCB Decision.pdf2/4/2019 9:26 AM
  
201811HAS-799-03.91Cross Roads ConstructionPost-Tensioning, Beam Alignment, Project Delay, Differential Camber, Contractor Caused DelayDCB11-160468-03 DCB Decision.pdf12/3/2018 11:44 AM
  
201705KNO-TR127-0.10McConnell Contracting, Inc.Driven Pile, Changed Site Condition, Design-Build, boring logsDCB05-163016-01_DCB_Decision.pdf11/1/2017 1:52 PM
  
201712CUY-77-13.31J.D. Williamson, Inc.Project Delay, 109.05, Extra Work, Incomplete Plans, No Impacted Schedule, HOOH, FOOHADR12-150089-01 Arbitration Award.pdf7/21/2017 3:16 PM
  
201712GEA-44-1.35J.D. Williamson, Inc.Asphalt Segregation, CMS 401.06, CMS 401.15, Minimum Temperature, Rework, Surface CourseDCB12-150040-01 DCB Decision - Signed.pdf7/5/2017 11:23 AM
  
201703ERI-4-8.60Eclipse Co., LLCExcavation vs Pavement Removal, final quantities, CMS 202.05, plan errorDCB03-164002-01 DCB Decision - Final.pdf6/27/2017 9:39 AM
  
201609LAW-7-5.46Complete General Construction Co.Changed Condition, Trench Collapse, Water Level, Drilled Shaft, Static Water, Free Water, Means and MethodsDCB09-140078-01 DCB Decision.pdf12/2/2016 9:12 AM
  
201606FRA-270-52.72Complete General Construction Co.Contract interpretation/ambiguity, Design-Build, Overhead Signage, Design Exception, Responsibility for DesignDCB06-133006-03 DCB Decision - Signed.pdf10/24/2016 1:07 PM
  
201603LOR-58-7.36Beaver Excavating Co.Deck Plate, Rework, Distortion, Design Error, Welding, Corrective Work Plan, Means and MethodsDCB03-130001-01 DCB Decision.pdf6/30/2016 9:30 AM
  
201608HAM-75-2.30Kokosing Construction Company, Inc.Maintenance of Traffic, Contract Interpretation/Ambiguity, Negligent Design, Prebid Questions, Constructability, Pre-Contract Damages, CPM Schedule, PN 107DCB08-120599-06 DCB Decision.pdf6/8/2016 9:38 AM
  
201602LUC-65-5.25Atsalis Brothers Painting, Inc.Bridge Painting, Winter Work, Maintenance of Traffic, Plan Ambiguity, Extra WorkDCB02-130395-01,02.pdf4/26/2016 12:06 PM
  
201506FRA-270-52.72Complete General Construction Co.Asphalt Pavement Repair, Pothole Patching, Temporary Pavement, Subsurface Exploration Report, Changed Condition, Differing Site ConditionDCB06-133006-01.pdf4/28/2016 11:13 AM
  
201504ATB-90-22.06Anthony Allega Cement Contractors, Inc.Embankment Quantity, Backfill, Plan Discrepency, Plan Ambiguity, Basis of Payment, Notice DCB04-101078-01.pdf4/26/2016 12:10 PM
  
201506PIC-762-11.18Fechko Excavating, Inc.Weather Delay, , Inexcusable Delay, Soft Base Material, Embankment, Liquidated DamagesDCB06-120541-02.pdf4/26/2016 12:03 PM
  
201508HAM/WAR-71-19.41/0.00Great Lakes Construction Co.Design-Build, SWPPP, Plan Ambiguity, Extra Work, Lump Sum ItemsDCB08-133025-01.pdf4/26/2016 12:00 PM
  
201512CUY-6-14.56360 Construction Company, Inc.Bridge Rehabilitation, Shotcrete Patching, Concrete Patching, Plan Ambiguity, Means and MethodsDCB12-140062-02.pdf4/26/2016 11:56 AM
  
201509HIG-TR144-1.50J&J SchlaegelSpread Footing, Design-Build, Specifications (Design/Performance), Extra Work, Contract Interpretation/Ambiguity DCB09-143018-01.pdf4/13/2016 7:21 AM
  
201407D07-BH-FY2012Suburban Maintenance & Construction, Inc.Pier Column Repair, Concrete Patching, Plan Ambiguity, Engineering AssessmentDCB07-120512-01.pdf4/26/2016 12:18 PM
  
201412LAK-86-2.70Suburban Maintenance & Construction, Inc.Damaged Equipement, Kelly Bar, Differing Site Condition, Drilled Shafts, DCB12-120249-01.pdf4/26/2016 12:14 PM
  
201306FRA-IR270-2.60 Shelly & Sands, Inc.Acceptance (express/implied), Bridge painting, Burden of proof, Duty to coordinate subs, ODOT Testing ProceduresDCB06_110341_01DCB.pdf11/28/2013 12:05 AM
  
201308BUT-VA-PM/RPMA&A Safety, Inc.Line Marking, Contract interpretation/ambiguity, Method of Measurement, Past practiceDCB08_120233_DCB.pdf8/23/2013 5:31 PM
  
201312CUY-LR-WILLOW AVENUE LIFT BRIDGERuhlin CompanyOpen Grid Deck Welding, Contract interpretation/ambiguity, Industry standard, Reasonably close conformityDCB12_101041_06DCB.pdf6/21/2013 5:30 PM
  
201309LAW-378-0.20Alan Ston Co., Inc.Drilled shafts, Differing site conditions, Interest, Contract interpretation/ambiguityDCB09_120251_DCB.pdf5/24/2013 12:04 AM
  
20133HURErie BlacktopFailed pavement, 448 type 2 asphalt pavement bondingArbitrationErieBlacktop_Arb.pdf5/16/2013 12:04 AM
  
201202SEN-Jones Rd.Miller Bros. Construction, Inc.Asphalt Pavement Cracking, Intermediate Course Tenderness, SegregationStep 202-101038-01 Step 2.pdf4/26/2016 12:25 PM
  
20121PAU/DEF-US24-12.3/0.00AllegaExtended WarrantySettlementAllegaSettlement_01_070078_02.pdf3/8/2013 12:05 AM
  
201212CUY-Willow Street BridgeRuhlinField repair, pre-fabrication meeting, bridge paint, reasonably close conformityDCB12_101041_03_DCB.pdf11/30/2012 5:31 PM
  
201212CUY-SR43-6.18Burton Scot Contractors, LLCDelay, scheduling adequate notice, start dateDCB12-100186-01_DCB.pdf11/30/2012 5:31 PM
  
201212GEA-422-18.31Karvo Paving CompanyCharacter of work, means and methods, contract limits, compensation for altered quantities, Change Order Policy 27-010-(P)Settlement12_070002_Settlement.pdf8/31/2012 12:04 AM
  
20127MOT-70-22.89KokosingTieback system, soil borings, accurate and buildable plans, differing site condition, constructive acceleration, groundwaterSettlement07_040555_Settlement.pdf8/2/2012 12:06 AM
  
20126FRA-SR161-25.9National Engineering & ContractingTime and delay impactsSettlement06_040163_10_Settlement.pdf7/13/2012 5:33 PM
  
201212LAK-2-3.32AllegaSettlementSettlementAgreement080597.pdf7/13/2012 5:33 PM
  
201212MultiplePerram Electric, Inc.Signal teathering, pole clamps, alternate methods, multiple projectsDCB12_100389_01DCB5multiple.pdf6/20/2012 12:07 AM
  
201212CUY-Willow Street BridgeThe Ruhlin CompanyAluminum post modification, sidewalk bracket angles, field verification, structural scope of workDCB12_101041_01and02DCB.pdf5/23/2012 12:03 AM
  
201203ERI-US250-19.742 (Milan) Becdir Construction Co.Final Quantities - Pavement Removed, Aggregate Base, Removal of Pavement Markings, Beam Seat Repair DCB03_076004_03DCB.pdf5/3/2012 12:05 AM
  
201203LOR-VA-BH-FY2011 Cosmos Industiral Services, Inc.Maintenance of Traffic, Contract Interpretation/AmbiguityDCB03_110155_01DCB.pdf4/4/2012 12:06 AM
  
201107MOT-LR-South DixieR.B. Jergens Contractors, Inc.304 Base, Asphalt Surface Course, Discrepancy in quantity, Signif. change in scope/character of work, Means and methods DCB07_091060_02DCB.pdf1/11/2013 5:31 PM
  
2011MonokoSS 815, defective work, warrantySettlementMonoko_2011_Settlement.pdf11/6/2012 12:03 AM
  
20116FRA-IR71-17.76Trumbull, Great Lakes, Ruhlin (Joint Venture)Design build, prejudgement interest, design cost, shortlist, joint ventureSettlement6_113000_Settlement.pdf8/9/2012 12:06 AM
  
20116FRA-SR161-25.9National Engineering & ContractingTime and delay impactsArbitration06_040163_10_ARB.pdf8/3/2012 12:07 AM
  
201112CUY-SR237-04.93Great LakesDelays, railroad, 117-30300 PND, no entitlementDCB12_080598_02_DCB.pdf5/11/2012 5:33 PM
  
201106FRA-IR270-37.04Complete General Construction Co.Method of Payment of Topsoil in a Median Planter, Method of Measurement, Burden of Proof, CMS 653.04DCB06_101039_01DCB.pdf6/13/2011 8:32 AM
  
201107MOT-LR-South DixieR.B. Jergens Contractors, Inc.Delay in Scheduling Pre-con meeting, Delay - owner caused, Overhead (home/field office), Burden of proof, CPM Progress Schedule, Utility delay DCB07_091060_01DCB.pdf4/8/2011 5:31 PM
  
20114SUM-IR277-2.47Wolf Creek Engineering and ContractingBolt tightening, maximum tension, rejected work, work inspection, clear direction from the district, MOP section 513Settlement04_060440_01_Settlement.pdf4/4/2011 1:14 PM
  
201104SUM-8-15.63Beaver Excavating Co.Settlement of Pavement, Corrective Work, Subsurface Conditions, Report04_060467_02STEP2.pdf4/4/2011 1:14 PM
  
201112LAK-SR2-3.33AllegaCharacter of work, revised unit price, 104.02.D, 104.02.GStep 112_080597_Step1.pdf7/20/2009 10:09 PM
  
201002LUC-75-00.15Posen ConstructionHydro Demolition, CMS 848, SS 848.18, differing site condition, variable thickness concrete overlayDCB02_098019_01DCB.pdf5/20/2016 5:30 PM
  
20103MEDKokosingVECP, 304 aggregate base, delay due to change order, gradingArbitrationKokosing_Settlement_2010_ADR.pdf8/17/2012 5:32 PM
  
201003MED-71-6.06Ruhlin CompanyEmbankment failure, Test Pit, Slope Repair Subsurface Conditions, Haul RoadStep 203_060349_01STEP2.pdf4/4/2011 4:19 PM
  
201012LAK-2-3.32Allega/Great Lakes Joint Venture8 aggregate, change in materials, Well graded combined aggregate, SS 888DCB12_080597_03DCB.pdf4/4/2011 4:19 PM
  
201001PAU-US24-0.00Mosser Construction, Inc.Embankment failure, Subsurface Conditions, Haul RoadStep 201_070110_01STEP2.pdf4/4/2011 4:19 PM
  
201011COL-SR164-21.89A.P. O'HoroItem-special, composite fiber wrap system, prebid obligationDCB11_080618_01_DCB.pdf4/4/2011 4:17 PM
  
20107MOT-70/75KokosingSteel coating, bridge construction, IZEU, replacing subcontractorSettlement07_030100_Settlement.pdf4/4/2011 1:39 PM
  
201012LAK-SR2-3.33Allega/Great Lakes Joint VentureDowel insertion, MIT Scan, reasonably close conformityDCB12_080597_05_DCB.pdf4/4/2011 1:39 PM
  
201012LAK-SR2-03.33Allega/Great Lakes Joint Venture304 base, CMS 304.05, CMS 451.05, additional costs for compaction of 304 materialDCB12_080597_06DCB.pdf4/4/2011 1:39 PM
  
201012GEA-US422-18.31Karvo Paving CompanySpalling concrete, hydro-demolition, HP4 mix, CMS (105.03, 105.10, 105.11, 106.06, 106.07)DCB12_070080_02DCB.pdf4/4/2011 1:39 PM
  
201012LAK-SR2-03.33Allega/Great Lakes Joint VentureExcavation of subgrade, early notice, change order, character of work, method of calculationDCB12_080597_02DCB.pdf4/4/2011 1:39 PM
  
201012CUY-IR480-06.78Karvo Paving CompanyPartial acceptance, CMS 109.11, early age cracking, CMS 451.16DCB12_070002_01DCB.pdf4/4/2011 1:39 PM
  
201011HAS-SR9-9.38Shelly & SandsRaised Pavement Marker, Reasonably close conformity, Defective work, Section 105.11DCB11_091002_01DCB.pdf4/4/2011 1:39 PM
  
201011COL-US62-4.86Shelly & SandsRaised Pavement Marker, Reasonably close conformity, Defective work, Section 105.11DCB11_090139_01DCB.pdf4/4/2011 1:39 PM
  
201006FRA-SR161/IR270-25.900/40.260 (Columbus)National Engineering & Contracting Co.Failure of 1500 mm pipe, Workmanlike construction, Defective specification, Delay - owner caused, Pipe removalDCB06_040163_07DCB.pdf4/4/2011 1:39 PM
  
201006FRA-SR161/IR270-25.900/40.260 (Columbus)National Engineering & Contracting Co.Failing Epoxy Urethane Sealer, Defective specification, Workmanlike construction, Precaution against damageDCB06_040163_09DCB.pdf4/4/2011 1:39 PM
  
201003CRA-VA-CHIP-FY2009Specialized Construction, Inc.Chip Seal Warranty, Acceptance (Express/Implied), DelayDCB03_080477_01DCB.pdf4/4/2011 1:39 PM
  
201003MED-71-6.06Ruhlin CompanyEmbankment failure, Test Pit, Slope Repair Subsurface Conditions, Haul Road, BenchingDRB03_060349_01DRB.pdf4/4/2011 1:39 PM
  
20107MOT-35-15.07KokosingTraffic Phasing, road closure, contract addendum, CMS 107.07Settlement07_060036_01_Settlement.pdf4/4/2011 1:14 PM
  
201002WOO/LUC-75-32.68/0.00Posen Construction, Inc.Hydro-Demolition Costs, Extra Work, Differing site conditions, Inefficiency/Loss of productivity, Entitlement agreed/damages in dispute DCB02_018019_01DCB.pdf4/4/2011 1:14 PM
  
201010MEG-US33-15.70 (Village of Pomeroy)Mahan/National Joint VenturePT System Test, field testing, mitigating impact, completion date, delay impact costs, tower legArbitration10_020510_01and02ARB.pdf12/4/2008 1:02 PM
  
20093WAY-US30RuhlinDiffering site conditions, contingency quantities, excavation of subgrade, undercutting unsuitable soil and materialSettlement03_040082_Settlement.pdf6/7/2012 12:06 AM
  
200911MultipleAERO-MARK, Inc.Multiple projects, polyester markings, fast-dry markings, retro-reflectivity readings, Step 211_080482_01STEP2.pdf4/4/2011 4:19 PM
  
20099HIG-CR46-3.64R.B. JergensExcavation, subgrade drainage, approach slabs, shared costStep 209_080334_STEP2.pdf4/4/2011 4:19 PM
  
200912CUY-Fulton RoadKokosingMitigation, shared responsibility, extension, weather delaysDRB12_060372_07DRB.pdf1/6/2010 10:13 PM
  
200912CUY-Fulton RoadKokosingGrouting, temperature delays, special provisions, PT tendonsDRB12_060372_06DRB.pdf1/6/2010 10:13 PM
  
200907MOT-US35-15.07Kokosing Construction Company, Inc.Dispute Resolution Process, Notice, Overhead (home/field office), Signif. change in scope/character of workDCB07_060036_02DCB.pdf12/23/2009 10:11 PM
  
200903MED-71-9.56Kokosing Construction Company, Inc.Value Engineering Change Proposal, Subgrade Stabilization, Cement Stabilization, Undercut,  DCB03_050343_01and02DCB.pdf12/9/2009 10:11 PM
  
200903RIC-CR424Mosser Construction, Inc.Borrow Pit, Testing of Material, A-1-b Granular Material, EmbankmentArbitration03_060216_01ARB.pdf9/16/2009 10:08 PM
  
200904ATB-I90/46Tri Span CorporationRejection of Embankment Material, Compaction Testing, Nuclear Gauge, Suspension of Work, Delay, Inefficiency, Mobilization, SWPPP, Borrow Pit, DCB04_080001_01DCB.pdf9/3/2009 10:08 PM
  
2009A&L Painting LLCHazardous working conditions, lead paint, injury, safeguarding workSettlementKrystalisVODOT_appellatecourt.pdf7/31/2009 10:09 PM
  
200907MOT-70-17.04Kokosing Construction Company, Inc.Changed Condition, Maintenance of Traffic, Plan Error, Grade Separation, Mitigation, Schedule LogicStep 207_050465_01DELAY_Step2.pdf7/20/2009 10:08 PM
  
200906CLA-IR70-25.11/28.95/29.32/0.00Kokosing Construction Company, Inc.Winter Work, Delay - owner caused, Overhead (home/field office), Fuel Price Adjustment, Material Escalation, Extra Work, Seeding, Interest, Change order policy  DCB06_040294_01thru08DCB.pdf7/2/2009 10:08 PM
  
200905LIC-161/37-6.65/10.25Kokosing Construction Company, Inc.Value Engineering Change Proposal, Contract interpretation/ambiguity, Contractor proposed changeDCB05_070138_01DCB.pdf6/16/2009 10:08 PM
  
200910MEG-USR33-15.70Mahan/National Joint VentureMaterial quantity, SS 824.18, retaining wall, aesthetic imagesDCB10_020510_04and05DDB.pdf5/4/2009 10:08 PM
  
200912GEA-US422-18.31Karvo Paving CompanyExcavation and embankment, trucking and excavating costs, early noticeStep 212_070080_1Step2.pdf4/9/2009 10:09 PM
  
200905LIC-161/37-6.65/10.25Kokosing Construction Company, Inc.Value Engineering Change Proposal, Contract interpretation/ambiguity, Contractor proposed changeStep 205_070138_02STEP2.pdf4/6/2009 10:08 PM
  
200912CUY-SR2-14.41Geronimo Painting Co., Inc.Bridge painting,  CMS 101.03, Reasonably close conformity, loss of productivity, mirrorsDCB12_050107_01DCB.pdf3/30/2009 10:09 PM
  
200912CUY-Fulton RoadKokosingAccepting damaged work, CMS 105.11, arch sections, engineering reviewStep 212_060372_04Step2.pdf3/30/2009 10:09 PM
  
200907MOT-IR75-13.11Kokosing Construction Company, Inc.Sleeper Slab Concrete and Coping, Contract interpretation/ambiguity, Means and methods, Mitigation, Pre-bid questionDRB07_070387_01DRB.pdf3/30/2009 10:08 PM
  
200910MEG-USR33-15.7Mahan Construction CompanyPT System Test, field testing, mitigating impact, completion date, delay impact costsArbitration10_020510_01DCB.pdf3/19/2009 10:08 PM
  
200912LAK-SR86-1.32AllegaRip Rap Using 6" Reinforced Concrete, steel trench box, plan changes, inefficiencyStep 212_078007_02STEP2.pdf3/12/2009 10:08 PM
  
200907MOT-70-22.890Kokosing Construction Company, Inc.Changed Condition, Trench Collapse, Water Level, BackfillStep 207_040555_05STEP2.pdf2/27/2009 10:08 PM
  
200906FRA-IR71-19.09Great Lakes Construction Co.Design-Build, Noise wall/barrier, Utility RelocationStep 106_073001_STEP1.pdf2/27/2009 10:08 PM
  
20095LIC-SR161/37-06.65/10.25KokosingMaintenance of traffic, worksite traffic supervisorStep 105_070138_STEP1.pdf2/27/2009 10:08 PM
  
20095BUE-IR77-12.44Double Z Construction CompanyMaintenance of Traffic, lane shift, flying lane shiftStep 205_070063_STEP2.pdf2/27/2009 10:08 PM
  
200903HUR-250-18.93Shelly & Sands, Inc.Mechanically Stabilized Earth Wall Backfill, Granular Backfill, MSE Wall, Foundation Preparation, AASHTO Standard, Reinforcing StrapStep 203_070449_STEP2.pdf2/27/2009 10:07 PM
  
200903RIC-CR424Mosser Construction, Inc.Borrow Pit, Testing of Material, A-1-b Granular Material, EmbankmentStep 203_060216_STEP2.pdf2/27/2009 10:07 PM
  
200910MEG-US33-15.70 (Village of Pomeroy)Mahan/National Joint VentureCPM calendar/logic changes, Delay - critical/non-critical, Delay - owner caused, Entitlement agreed/damages in dispute, Mutual Mistake DRB10_020510_AppealPTandTowerLegDelay_DRB.pdf8/21/2008 9:47 AM
  
200806FRA-IR71-7.68 (Hoover Rd.)Complete General Construction Co.Pinholing, Bridge painting, Defective specification, Duty to coordinate subs, Industry standard, Means and methodsDCB06_080080_01.pdf4/8/2011 5:31 PM
  
200807MOT-IR75-13.11Kokosing Construction Company, Inc.Sleeper Slab Concrete and Coping, Contract interpretation/ambiguity, Means and methods, Mitigation, Pre-bid questionStep 207_070387_06STEP2.pdf4/4/2011 4:19 PM
  
200807SHE-47-15.96Mainline Construction Co.Extra Work, Extra Material, Bid Quantities, Prebid QuestionStep 207_060510_01STEP2.pdf4/10/2009 10:08 PM
  
200808CLE-133-17.63Complete General Construction Co.Bridge Painting, Rework, Reblast, Repaint, Testing and Inspection, NoticeStep 208_060497_01Step2.pdf4/9/2009 10:08 PM
  
200806FRA-USR62-14.11 (Main Street Bridge)Kokosing Construction Company, Inc.Delay - owner caused, Means and methods, Past practiceStep 206_060264_03STEP2.pdf4/9/2009 10:08 PM
  
200803LOR-57-12.54Suburban Maintenance & Construction, Inc.Changed Site Condition, Deck Overlay, Plan Discrepency, Field Inspection Prior to Bid, Mitigation Step 203_070554_01STEP2.pdf4/9/2009 10:08 PM
  
200802OTT-US20Erie Group of CompaniesRepair of Concrete Cracking, Deceleration Pads, Transverse Cracks, Concrete Pavement, Dowel Bar Retrofit, Joint Repair, HIPERPAV Sawing, Step 202_070176_01STEP2.pdf4/9/2009 10:07 PM
  
200812CUY-Euclid SignalsPerram Electric, Inc.CMS 105.07, limited knowledge of site contitions, plan notes, conduitStep 112_080106_STEP1.pdf3/24/2009 10:08 PM
  
200812LAK-SR84-0.43Perk Company, Inc.Suface cleanliness, bolt galvanization painting costs, CMS 514, CMS 711.02Step 212_060038_1and2STEP2.pdf3/23/2009 10:08 PM
  
200810MEG-US33-15.70Mahan NationalDelay for engineering correction, material changeStep 210_020510_03_04Step2.pdf3/2/2009 10:08 PM
  
20089PIK-CR3-0R.C. ConstructionWater lines, unit price, cost analysis, reasonable unit priceStep 209_060530_02STEP2.pdf2/27/2009 10:08 PM
  
20089PIK-CR3-0R.C. ConstructionExcavation, embankment, maintenance of traffic, method of calculation, culverts, change of personnelStep 209_060530_01STEP2.pdf2/27/2009 10:08 PM
  
200809ROS-US35-14.41Shelly CompanySubgrade Stability, Soft Subgrade, Undercutting, Concrete Barrier End, Changed ConditionsStep 209_060249_STEP2.pdf2/27/2009 10:08 PM
  
200809ROS-US35-26.17Kokosing Construction Company, Inc.Late Payment, Interest, Material Price EscalationStep 209_020151_STEP2.pdf2/27/2009 10:08 PM
  
200807MOT-70-22.890Kokosing Construction Company, Inc.Impact Attenuators, Past Practice, Accident DamageStep 207_040555_02STEP2.pdf2/27/2009 10:08 PM
  
200804STA-77-17.93Marshal C. Rardin & Sons, Inc.High Pressure Production Line Relocation, Compensable Delay, Extra Work, Step 204_040350_STEP1.pdf2/27/2009 10:07 PM
  
200803MED-71-9.56Kokosing Construction Company, Inc.Value Engineering Change Proposal, Subgrade Treatment, Granular Backfill, Cement Stabilization, Emergency Declaration, Delay, InefficienciesStep 203_050343_STEP2.pdf2/27/2009 10:07 PM
  
200812CUY-Fulton RoadKokosingPT System Test, field testing, means and methods, Section .08-2.4DRB12_060372_02_DRB.pdf12/31/2008 10:08 PM
  
200810MEG-US33-9.4BeaverJoint sawing, mid-slab cracking, early crackingDCB10_060132_01DCB.pdf12/30/2008 10:08 PM
  
200810VIN-US50-0.10R.C. ConstructionLandslide, borrow sites, use of ODOT right-of-wayDCB10_060322_01DCB.pdf12/17/2008 10:08 PM
  
200808CLE-US52-7.81/15.44/20.67Double Z Construction Co.Excavation, Contract interpretation/ambiguity, Discrepancy in quantity, Errors and OmissionsDCB08_050497_01DCB.pdf12/17/2008 10:08 PM
  
200806FRA-USR62-14.11 (Main Street Bridge)Kokosing Construction Company, Inc.Delay - owner caused, Means and methods, Past practiceDRB06_060264_03DRB.pdf12/5/2008 11:58 AM
  
200812LAK-86Anthony Allega Cement Contractors, Inc.Shale Excavation, Final Measurement, HP Concrete, Elevation of Bedrock, Depth of Footing, Rock Socket,  DCB12_078007_01DCB.pdf12/4/2008 1:02 PM
  
200812CUY-West 3rd St. (Cleveland)Walsh Construction Co.Lift bridge, leaking, multiple issuesDCB12_040293_03DCB.pdf12/4/2008 1:02 PM
  
200812CUY-West 3rd St. (Cleveland)Walsh Construction Co.Tower Floor Replacement, Fiberglass Panel, Extra Work, Total Cost MethodDCB12_040293_02DCB.pdf12/4/2008 1:02 PM
  
200809SCI-US23-0.00 (City of Portsmouth) C.J. Mahan Construction Co., LLCBaffle Plate, Contract interpretation/ambiguity, Acceptance (express/implied) Arbitration09_010178_02ARB.pdf12/4/2008 1:02 PM
  
200806FRA-IR71-7.68 (Hoover Rd.)Complete General Construction Co.Bridge Painting, Defective specification, Duty to coordinate subs, Industry standard, Means and methodsDCB06_060162_01.pdf12/4/2008 1:02 PM
  
200804POR-IR76-9.50Velotta CompanyTemporary Pavement Repairs, Burden of proof, Contract interpretation/ambiguityArbitration04_030534_02ARB.pdf12/4/2008 1:02 PM
  
200804SUM-21-2.60/4.62Wolf Creek Engineering & ContractingStructural Steel Source, Material Price Escalation, Single Source, Domestic vs. Foreign SupplierDCB04_060441_01DCB.pdf12/4/2008 1:02 PM
  
200804SUM-IR277-2.47Wolf Creek Engineering & ContractingStructural Steel Splice Bolt Stripped and Snapped, Over Tighten, Nut Rotation, Failure to Follow Specification, DCB04_060440_01DCB.pdf12/4/2008 1:02 PM
  
200804POR-IR76Velotta CompanyTemporary Pavement Repairs, MOT, Subsurface Stability, Contract Specifications, Soft EmbankmentDCB04_030534_02and03and04DCB.pdf12/4/2008 1:02 PM
  
200804MAH-IR80Anthony Allega Cement Contractors, Inc.Industry-Wide Shortage, Rental Equipment, CPM Schedule, Mobilization, Non-Compensable Delay, DCB04_060002_01DCB.pdf12/4/2008 1:02 PM
  
20072LUC-I280Fru-Con Construction Corp.SettlementFruCon_Settlement_2007.pdf4/4/2011 4:19 PM
  
200703MED-18-16.03Kenmore Construction Co., Inc.Acceleration, Work Forward Agreement, Settlement03_050312 Kenmore Work Forward Agreement.pdf4/4/2011 4:19 PM
  
200711COL-SR45-16.920The Shelley CompanyNon-performed work, contractor notification, Character of work, loss of revenueStep 211_060120_01Step2.pdf3/2/2009 10:08 PM
  
200712CUY-West 3rd St. (Cleveland)Walsh Construction Co.Bridge Replacement, Lift Span, Rehabilitation, Lift Cable/Rope, Design Error, Failure to Coordinate, Calculate vs. Verify, Shop Drawing Acceptance, Existing Structural VerificationDCB12_0293(04)_01DCB.pdf12/4/2008 1:02 PM
  
200702Edison BridgeGreat Lakes Construction Co.Drilled Shafts, Water Infiltration, Rework, Dewatering, Tremie, Defective Work, Compressive StrengthDCB02_0584(04)_01and_02DCB.pdf8/21/2008 9:47 AM
  
200712CUY-West 3rd St. (Cleveland)Walsh Construction Co.Disclaimer, Errors and Omissions, Shop Drawings, Acceptance (express/implied), Defective specification, Notice, Mitigation DCB12_040293_01DCB.pdf8/21/2008 9:47 AM
  
200712CUY-IR271-6.04Shelly CompanySpecifications (design/performance), Means and methods, Asphalt ConcreteDCB12_0121(06)_01DCB.pdf8/21/2008 9:47 AM
  
200710MEG-US33-15.70 (Village of Pomeroy)Mahan/National Joint VentureConcrete Quality in Tower Segment Four DRB10_02510_PTandTowerLegDecandAppeal.pdf8/21/2008 9:47 AM
  
200710MEG-US33-15.70 (Village of Pomeroy)Mahan/National Joint VentureCPM calendar/logic changes, Delay - critical/non-critical, Delay - owner caused, Entitlement agreed/damages in dispute, Mutual Mistake DRB10_020510_PTandTowerLegDelay_DRB.pdf8/21/2008 9:47 AM
  
200707MOT-IR75-31.842 (City of Vandalia)Kokosing Construction Company, Inc.Contract interpretation/ambiguity, Reasonably close conformity, Defective specification, Workmanlike construction, Bridge painting, Past practice DCB07_030100_01DCB.pdf8/21/2008 9:47 AM
  
200707MOT-70-22.890Kokosing Construction Company, Inc.Tieback Anchors, SPL Walls, Design Error, Changed Site ConditionsDRB07_040555_Tie_Back_DRB.pdf8/21/2008 9:47 AM
  
200706FRA-USR62-14.11 (Main Street Bridge)Kokosing Construction Company, Inc.Act of God, Contract interpretation/ambiguityDRB06_060264_High Water_DRB.pdf8/21/2008 9:47 AM
  
200705GUE-IR 77-7.54/7.68Complete General Construction Co.Reasonably close conformity, Signif. change in scope/character of work, Change order release/waiver, Unjust enrichment, Inspection, Specifications (design/performance), Bridge painting, Past practice, Defective specification DCB05_023005_01and02and03DCB.pdf8/21/2008 9:47 AM
  
200607Complete General Construction07-020569-01 and 02 Decision.pdf5/17/2022 1:00 PM
  
20065GUE-IR77-007.54Complete General ConstructionHigh profile, painting, unneccessary striping, caulking, grinding, painting platformStep 205_3005_02STEP2.pdf3/23/2009 10:07 PM
  
200603MRW/RIC-I71-19.54/0.00Kokosing Construction Company, Inc.Granular Backfill, Undercuts, Inefficienies, Subgrade Compaction, Measured MileStep 103_040583_01to05Step1.pdf3/2/2009 10:07 PM
  
200612CUY-271-0.54Allstate Painting & Contracting CoBridge painting, multiple projectsDCBODOT_Allstate_040458_DCB.pdf12/4/2008 1:03 PM
  
200612CUY-2-14.41 (Cleveland)Geronimo Painting Co., Inc.12_0107(05)_04DCB.pdf12/4/2008 1:02 PM
  
200612CUY-2-14.41 (Cleveland)Geronimo Painting Co., Inc.Bridge Painting, Structural Steel, Surface Cleanliness, Changed Contract Condition, Testing Equipment, Time Extension, Winter Heating and Containment CostsDCB12_0107(05)-01and02and03DDB.pdf12/4/2008 1:02 PM
  
200610MEG-US33-15.70 (Village of Pomeroy)Mahan/National Joint VentureDRB10_0510(02)_02DRB.pdf12/4/2008 1:02 PM
  
200606FRA-SR161/IR270-25.900/40.260 (Columbus)National Engineering & Contracting Co.MSE Walls, Material Escalations, Inefficiencies, Winter Protection, FOOH, HOOH DRB06_0163(04)_03DRB.pdf12/4/2008 1:02 PM
  
200606FAY-IR71-0.00John R. Jurgensen Co.High Performance Concrete For New Bridge Decks With Warranty Appeal DCB06_0134(03)WarrantyAppeal.pdf12/4/2008 1:02 PM
  
200612CUY-2-14.41 (Cleveland)Geronimo Painting Co., Inc.Fuel Price EscalationDCB12_050107_04DCB.pdf8/21/2008 9:47 AM
  
200612CUY-2-14.41 (Cleveland)Geronimo Painting Co., Inc.Bridge Painting, Testing Equipement, Inspection, Mitigation, Notice, Reasonably close conformity, Entitlement agreed/damages in dispute, Inefficiency/Loss of productivity, Surface Cleanliness DCB12_050107-01and02and03DDB.pdf8/21/2008 9:47 AM
  
200610MEG-US33-15.70 (Village of Pomeroy)Mahan/National Joint VentureDefective specification, Means and methods, Workmanlike construction, Burden of proof, Changed contract condition DRB10_020510_02DRB.pdf8/21/2008 9:47 AM
  
200606FAY-IR71-0.00John R. Jurgensen Co.High Performance Concrete For New Bridge Decks With Warranty Appeal DCB06_030134WarrantyAppeal.pdf8/21/2008 9:47 AM
  
200508BUT-CR115-0.00 (City of Fairfield)John R. Jurgensen Co.Concrete Testing and Inspection, Notice, Duty to examine Bid Documents, Errors and Omissions, Contract interpretation/ambiguity, Signif. change in scope/character of work, Mitigation, Duty to coordinate subs, Equitable Adjustment DCB08_0002(03)_01DCB.pdf12/4/2008 1:02 PM
  
200504POR-IR76-9.50Velotta CompanyStructural Steel Plate Girders, Constructive acceleration, Unjust enrichment, Equitable Adjustment, Early Completion Schedule, Mitigation, Duty to coordinate subs, Voluntary Acceleration DCB04_030534_01DDB.pdf12/4/2008 1:02 PM
  
200503MRW/RIC-I71-19.54/0.00Kokosing Construction Company, Inc.Partial Depth Pavement Repair, Rework, Extra Work, Joint Failure, Type B Emergency, Asphalt Pavement Repair, Workmanlike ConstructionDCB03_9077(04)_01DDB.pdf12/4/2008 1:02 PM
  
200503MRW-IR71-19.54/0.00Kokosing Construction Company, Inc.Partial Depth Pavement Repair, Dispute Resolution Process, Type A Emergency, Inspection, Acceptance (express/implied), Workmanlike construction, Responsibility for project, Burden of proof DCB03_049077_01DDB.pdf8/21/2008 9:47 AM
  
200508BUT-CR115-0.00 (City of Fairfield)John R. Jurgensen Co.Notice, Duty to examine Bid Documents, Errors and Omissions, Contract interpretation/ambiguity, Signif. change in scope/character of work, Mitigation, Duty to coordinate subs, Equitable Adjustment DCB08_030002_01DCB.pdf8/21/2008 9:47 AM
  
200506FRA-SR161/IR270-25.900/40.260 (Columbus)National Engineering & Contracting Co.Contract interpretation/ambiguity, MSE wall, Incorporation by referenceDRB06_040163_03DRB.pdf8/21/2008 9:47 AM
  
200506FRA-SR161/IR270-25.900/40.260 (Columbus)National Engineering & Contracting Co.Contract interpretation/ambiguity, MSE wall, Incorporation by referenceDRB06_040163_01DRB.pdf8/21/2008 9:47 AM
  
20042LUC-280-2.96Fru-Con Construction Corp.Scope of work, nonperformance, unit price adjustmentDCB02_FruConDRB.pdf4/29/2016 5:29 PM
  
20045FAI-US33-0.041KokosingRelocation of fiber optic, delays, borrow material, VECP, CPM Progress Schedule, calendar and logic changeDDB05_020068_01_DDB.pdf3/2/2009 10:08 PM
  
200402LUC-IR280-2.96Fru-Con Construction Corp.Precast Concrete, Decreased Quanitity, Plan Discrepency, Unit Price AdjustmentDRB02_0493(01)_01DRB.pdf12/4/2008 1:02 PM
  
200402LUC-IR280-2.96Fru-Con Construction Corp.Discrepancy in quantity, Signif. change in scope/character of work, NoticeDRBD2.025DRB.pdf8/21/2008 9:47 AM
  
200410VIN-CR38A-0.36/VariousBecdir Construction Co.Constructive acceleration, Mitigation, Precaution against damage, Act of God, Dispute Resolution Process, Claim after final change order, Inefficiency/Loss of productivity, Delay - owner causedArbitration10_0236(02)_01ARB.pdf8/21/2008 9:47 AM
  
200410ATH-US33-40.981Smith & Johnson Construction Co.Timber Value, Production LossDCB10_0246(01)_0402_02DCB.pdf8/21/2008 9:47 AM
  
200407MOT-IR75-29.305Kokosing Construction Company, Inc.Utility delay, Mitigation, Notice, CPM Progress ScheduleDCB07_010560_01DDB.pdf8/21/2008 9:47 AM
  
200405FAI-USR 33-0.41 (City of Springdale)Kokosing Construction Company, Inc.Utility delay, CPM Progress Schedule, Non-responsiveness as approval/acceptance, Overhead (home/field office), Extra work, Notice, Delay - critical/non-critical, CPM calendar/logic changes DCB05_0068(02)_01DDB.pdf8/21/2008 9:47 AM
  
200404POR-303Shelly & Sands, Inc.Partial Depth Pavement Repair, Extra Work, Significant Change in the Character of Work, Plan QuanititesDCB04_0406(03)_01DDB.pdf8/21/2008 9:47 AM
  
200304SUM-IR76-24.799/0.00Great Lakes Construction Co.Thin Concrete Pavement, Unjust Enrichment, Pavement WarrantyDCB04_0323(00)_1102_01and02DDB.pdf8/21/2008 9:47 AM
  
200302LUC-SR2-21.15Miller Bros. Construction, Inc.Pavement Rutting, Mix Design, Soft Subgrade, Reasonable Conformace with Specification, Excessive Asphalt CementDCB02_990141_02DDB.pdf8/21/2008 9:47 AM
  
200302LUC-2-2.24/7.26Miller Bros. Construction, Inc.Asphalt Pavement RuttingDCB/Setlmnt02_0141(99)_0901_01DDB.pdf8/21/2008 9:47 AM
  
200310ATH-US33-10.41Complete General Construction Co.Engineer-ordered suspension, Extra work, Change order policy, Interest, Inefficiency/Loss of productivity DCB10_3001(01)_1001_04DCB.pdf8/21/2008 9:47 AM
  
200306FRA-IR 670-3.17/Various - Part 1 & 2Complete General Construction Co.Differing site conditions, Drilled shafts, Tie back retaining walls, Means and methods, Winter protection DCB06_020069_01DDB.pdf8/21/2008 9:47 AM
  
20022LUCMiller Brothers Construction, Inc. Extra pavement planing, performance liabilityDDB02_990141_01DDB.pdf4/29/2016 5:29 PM
  
200204TRU-80-1086Northern Ohio Paving Co.Remove and Replace Overlay, Temporary Pavement Repair, Hydro DemolitionDCB/Setlmnt04_3002(01)_04DDB.pdf12/4/2008 1:02 PM
  
200204MAH-SR616-3.09Soda Construction CompanyNonperformance, Waterline, Anticipated Revenue, Lost Profit, Demolition Debris RemovalDCB04_990181_01DDB.pdf8/21/2008 9:47 AM
  
200210ATH-US33-10.41Complete General Construction Co.Engineer-ordered suspension, Extra work, Change order policy, Interest, Inefficiency/Loss of productivity DCB10_3001(01)_1001_04DDB.pdf8/21/2008 9:47 AM
  
200210ATH-US33-40.981Smith & Johnson Construction Co.Timber Value, Production LossDCB10_0246(01)_0402_02DDB.pdf8/21/2008 9:47 AM
  
200209SCI-USR23-0.00 (City of Portsmouth)C.J. Mahan Construction Co., LLCCPM Progress Schedule, Delay - owner caused, Errors and OmissionsDCB09_010178_01DDB.pdf8/21/2008 9:47 AM
  
200209JAC-32-11.75/VARIOUSIcarus Industrial Painting & Contracting Co., Inc.Dispute Resolution Process, Bridge paintingDCB09_990465_01DDB.pdf8/21/2008 9:47 AM
  
200208HAM-SR4-4.000 (Paddock Road)Complete General Construction Co.Extent of Repair/Removal of Honeycomb ConcreteDCB08_0158(01)_0102_01DDB.pdf8/21/2008 9:47 AM
  
200207MOT-75Complete General Construction Co.Maintenance of Traffic, Damage to New Concrete PavementDCB07_0747(99)0564(00)0263(01)_01DDB.pdf8/21/2008 9:47 AM
  
200204TRU-80-1086Northern Ohio Paving Co.Overlay FailureDCB04_013002_1119_04DDB.pdf8/21/2008 9:47 AM
  
20018HAM-SR126-11.68MahanDelays, extra work, temporary sheeting, retaining wallsArbitration08_960516_0400_05_ARB.pdf4/4/2011 4:19 PM
  
20013ERIE.S. WagnerWorksite traffic supervisor, prebid ammendmentDCB12_002300_SettlementNotes.pdf3/3/2009 10:08 PM
  
20018HAMJohn R. Jurgensen ConstructionDelays, extra work, Retaining wallsArbitrationODOT_Mahan_JRJ_ARB_delaysandextrawork012201.pdf12/4/2008 1:03 PM
  
20018HAMJohn R. Jurgensen ConstructionTemporary shoring, maintenance of traffic, cantilever deck section, means and methodsArbitrationODOT_Mahan_JRJ_ARB_shoring071001.pdf12/4/2008 1:03 PM
  
200105COS-USR36-27.54Complete General Construction Co.Pipe Removal Payment, Contract interpretation/ambiguity, Pipe removal, Pre-bid questionArbitration05_0139(97)_03ARB.pdf12/4/2008 1:02 PM
  
200108HAM-275-32.27/0.00John R. Jurgensen Co.Design-Build, Temporary Shoring, Railroad Crossing, Specifications (design/performance), Contract interpretation/ambiguityArbitration08_3012(00)_0201_02ARB.pdf8/21/2008 9:47 AM
  
200105COS-USR 36-27.54Complete General Construction Co.Contract interpretation/ambiguity, Pipe removal, Pre-bid questionArbitration05_0139(97)_0897_03ARB.pdf8/21/2008 9:47 AM
  
20008HAM, CLEMahanDesign build, temporary shoringArbitration08_3012(00)-0201-02_ARB.pdf4/4/2011 4:19 PM
  
20004STAMahanDesign BuildSettlementMahan_ARB_2000.pdf4/4/2011 4:19 PM
  
20004STAC.J. Mahan Construction Co.Design build, MSE walls, Value Engineering, Prebid, conceptual plansArbitrationODOT_Mahan_ARB_DesignBuild091200.pdf12/4/2008 1:03 PM
  
200009BRO-G.W. Melvin Contracting Co.Pipe Installation, Contaminated Soil, Basis of PaymentDCB09_0712(97)_DRCdecision.pdf12/4/2008 1:02 PM
  
200005COS-USR36-27.54Complete General Construction Co.Pipe Removal Payment, Contract interpretation/ambiguity, Pipe removal, Pre-bid questionDCB05_0139(97)_03DCB.pdf12/4/2008 1:02 PM
  
200005COS-USR36-27.54Complete General Construction Co.Contract interpretation/ambiguity, Pipe removal, Pre-bid questionDCB05_0139(97)_0897_03DCB.pdf8/21/2008 9:47 AM
  
199912LAK-SR84W.M. Brode CompanySheet piling, driving resistance, waler modifications, bulkhead cap, tieback anchors, prime mark up, home office overhead, CD6DCB12_970166_DCB.pdf1/6/2020 1:31 PM
  
19997MOTBECDIR Construction CompanyBikeway construction, prestressed box beam, multiple issues, seeding, mulching, fertilizer, extra work, additional time, interest, CD6DCB07_950573_DCB.pdf1/6/2020 1:30 PM
  
199912CUY-SR176Great LakesDelay into following fiscal year, home office overhead, contaminated soil, payment per fiscal year, CD6DCB12_960305_DCB.pdf1/6/2020 1:29 PM
  
199912CUY-CR27Blaze Construction IncorporatedDelay in utility movement, measured mile, owned equipment utilization, CD6Arbitration12_950042_ARB.pdf1/6/2020 1:29 PM
  
19994SUM-IR277The Velotta CompanyODOT Inspection, additional labor and equipment, additional sandblasting, excess material, bridge painting, CD6Arbitration04_940613_ARB(1).pdf1/6/2020 1:26 PM
  
199904SUM-Bay State PaintingBridge Painting, Inspection, Delay-Owner Caused, ReworkArbitration04_0613(94)_01ARB.pdf11/14/2015 12:02 AM
  
19988BUT-BreielSK Construction Company, Inc.Differing subsurface conditions, soil borings, CD4Arbitration08_970290_ARB.pdf1/6/2020 1:51 PM
  
19987MOT-SR35-15.57Civil Construction, Inc.Delay costs, winter work, lead contaminent, release of liquidated damages, removal of lifting tabs, CD4Arbitration07_960217_ARB.pdf1/6/2020 1:50 PM
  
19983MED-SR303J&J Schlaegel, Inc.Special Interpretation, item 603.03, conduit installation, backfill, difficulty connecting to box culvert, CD4DCB03_960216_DCB.pdf1/6/2020 1:49 PM
  
19984SUM-IR76WG Lockart Const.Plan ambiguity on APP item, barrier wall, adapted Type D barrier, 102.06, CD4DCB04_940436_DCB.pdf1/6/2020 1:48 PM
  
19983WAYVO Menuez & Sons Inc.Payment for eliminated items, drilled shafts, 105.03, cast in place reinforced piles, CD4DCB03_960302_DCB.pdf1/6/2020 1:47 PM
  
19987LOGFort Defiance Consr. & SupplyDelay costs, sheet piling, earth cofferdam, damage to adjacent property, delay decision, CD4DCB07_960752_DCB.pdf1/6/2020 1:46 PM
  
19987CLAFort Defiance Consr. & SupplyAdded costs for pile driving, equipment approval, calculation of blow counts, CD4DCB07_960670_DCB.pdf1/6/2020 1:45 PM
  
19981VAN-USR30S.E. Johnson CompaniesPayment for asphalt leveling,change in site condition, road base, bonus payment, smoothness specification, CD4DCB01_970219_DCB.pdf1/6/2020 1:44 PM
  
19984SUM-I277Velotta CompanyChanged site conditions, grinding of butt joints, placement of asphalt adjacent to concrete barrier, subcontractor, CD4DCB04_940613_DCB.pdf1/6/2020 1:43 PM
  
19987MOTComplete General/ CJ MahanChanged site conditions, pile driving, 507.04, measured mile approach, CD4DCB07_960444_DCB.pdf1/6/2020 1:42 PM
  
19988HAM-US42Ray Prus & SonGround water, soil boring, change in site conditions, nearby water source, pump, CD5DCB08_950659_DCB.pdf1/6/2020 1:41 PM
  
19988PRE-CR15Maiden & Jenkins Construction Co.Over driving of bridge piles, change in site conditions, pile splicing, section 507.05, 507.04, 104.02c, CD5DCB08_970483_DCB.pdf1/6/2020 1:40 PM
  
19982WOOBecdir Construction Co.Delay costs during work suspension, detour, idle equipment, cell phone costs, change order, enddam elevation, CD5DCB02_950413_DCB.pdf1/6/2020 1:39 PM
  
199812GEA-SR306Perk Company, Inc.Payment for embankment failures, liquidated damages, geotechnical consultant, embankment reconstruction, inadequate compaction, CD5DCB12_970240_DCB.pdf1/6/2020 1:38 PM
  
19987AUG-Bellfontaine StreetSE Johnson Co. Inc.A+B bidding incentive wording, disincentive, weather delays, liquidated damages, restricted to traffic, CD5DCB07_960760_DCB.pdf1/6/2020 1:37 PM
  
19987SHESE Johnson Co. Inc.A+B bidding incentive wording, change order, restricted to traffic, interim completion dates, CD5DCB07_970091_DCB.pdf1/6/2020 1:36 PM
  
19989MultipleMcDaniels Construction Corp. Inc.Plan ambiguity, H-piling, cofferdams, anti-washout admixture, 503.12, underwater construction methods, CD5DCB09_960492_DCB.pdf1/6/2020 1:35 PM
  
19983MEDMcDaniels Construction Corp. Inc.Utility delay, coordination of utility relocation, responsibility for work with utility company, liquidated damages, 105.06, overtime pay, CD5DCB03_960703_DCB.pdf1/6/2020 1:34 PM
  
199812CUYBlaze Construction, Inc.Delay, acceleration, inefficiency, home office overhead, utility delay, winter shutdown, excusable delay, noncompensable delay, CD5Arbitration12_930758_ARB.pdf1/6/2020 1:33 PM
  
19973HUR/ASH-USR250Miller Brothers ConstructionNew equipment cost, anti-strip material, application of proposal note to existing contract, CD3DCB03_950339_DCB.pdf1/6/2020 2:02 PM
  
199788S.K. Construction Co.deficient inspection, bridge painting, liquidated damages, repainting, CD3GRE-USR4208_930796_DCB.pdf1/6/2020 2:01 PM
  
19973CRA-SR4Ohio Concrete Construction Co.Material delivery delay, unavailable materials, liquidated damages, CMS 102.06 & 108.03, CD3DCB03_950526_DCB.pdf1/6/2020 2:00 PM
  
19976FRA-I270Complete General Construction Co.Misleading plan notes, roadway cleaning, bridge slab removal, force account records, CD3DCB06_960395_DCB.pdf1/6/2020 1:59 PM
  
19973ASH-SR11Youngstown Pneumatic Construction Plan ambiguity, CMS 511.14, CMS 511.09, SS836, CD3DCB03_950561_DCB.pdf1/6/2020 1:58 PM
  
19978HAM-SR128Ray Prus & sons, Inc.Dewatering, drilled shafts, CMS 104.02, CD3DCB08_960313_DCB.pdf1/6/2020 1:57 PM
  
199710WAS-SR26Maiden and Jenkins Construction Co.Delay costs, liquidated damages, lost days due to weather, extra work, catch basin, extension of MoT, CD3DCB10_950384_DCB.pdf1/6/2020 1:57 PM
  
19974TRU-East Market StreetParella-Pannuzio Inc.Changed condition, subgrade contraction, material removal, CD3DCB04_960300_DCB.pdf1/6/2020 1:56 PM
  
19973RIC/ASH-SR430/39The Mansfield Asphalt Paving Co.Improper direction from inspector, mailbox turnouts, CMS 105.10, CD3DCB03_960168_DCB.pdf1/6/2020 1:55 PM
  
19978BUT-SR4S.E. Johnson Co.Plan ambiguity & forced acceleration, interim completion date, winter traffic limitations, pre-bid, liquidated damages, CD3DCB08_960059_DCB.pdf1/6/2020 1:53 PM
  
19977DARS.E. Johnson Co.Soft Subgrade, CD3DCB07_960422_DCB.pdf1/6/2020 1:52 PM
  
19964SUMJ.D. Williamson ConstructionExpansion joints, field painting, plan ambiguity, galvanizing, CD1DCB04_940848_DCB.pdf1/6/2020 2:24 PM
  
19968HAMJohn R. JurgensenLonger hauling distances, local road closure, road control, third party road control, CD1DCB08_940645_DCB.pdf1/6/2020 2:23 PM
  
19968HAMW.G. Fairfield CompanyAs per plan, trench depth, CMS 625.12, pre-bid questions, CD1DCB08_950501_DCB.pdf1/6/2020 2:22 PM
  
19964SUMJ.D. Williamson ConstructionTwo claims, pole galvanization, CMS 713.01, idle equipment, CMS 109.04, superintendant, CD1DCB04_950587_DCB.pdf1/6/2020 2:21 PM
  
199610ATHMaiden & Jenkins Construction CompanyLiquidated damages, recognizable delays, additional field costs, approximate plan note, earthwork, wingwall removal, record keeping, CD1DCB10_930906_DCB.pdf1/6/2020 2:21 PM
  
19963MED-IR76-7Force account cost, item decrease, CD2Northern Ohio Paving, Inc.Arbitration03_931032_ARB.pdf1/6/2020 2:15 PM
  
19962OTT-SR2-28.47McDaniels Construction Corporation, Inc.Payment for concrete, square yards, cubic yards, variable depth, hydro demolition, changed condition, CD2Arbitration02_930170_ARB.pdf1/6/2020 2:14 PM
  
199612CUY-SR176-10.14Great Lakes Construction Co.Shifting operations from night to day, tack welding of cross frames, early shutdown of erection work, unanticipated rail traffic, delays, CD2Arbitration12_940683_ARB.pdf1/6/2020 2:09 PM
  
19964MAH-SR193, USR62, 422Parella-Pannuzio Inc.Delay Costs, change in scope, plan revisions, notification at preconstruction, proper notice of claim, 105.17, acceptance of change orders, CD3DCB04_930130_DCB.pdf1/6/2020 2:08 PM
  
19961VAN-USR 30S.E. Johnson Co.Plan ambiguity, masonry collars, adjustment to item price, CD3DCB01_950454_DCB.pdf1/6/2020 2:07 PM
  
19966PICComplete General Construction Co.Misleading plan details, contractor obtained information, structure removal, due diligence at time of bid, CD3DCB06_950595_DCB.pdf1/6/2020 2:06 PM
  
199610ATH-USR50-27.21Dain-Lyon Inc.Nonperformance of bid item, imbalanced bid, CMS Section 109.03, CMS Section 104.02, CD3DCB10_954005_DCB.pdf1/6/2020 2:05 PM
  
199612CUY-Bagley RoadBlaze Construction Inc.Delay, acceleration, inefficiency, home office overhead, loss of profit from cash flow interruption, interest on delay of payments, CD3DCB12_930758_DCB.pdf1/6/2020 2:04 PM
  
19966FRAShelly & SandsStandard drawing applicability, change in scope of work, fence posts, English (non-metric), CD3DCB06_960147_DCB.pdf1/6/2020 2:03 PM
  
199612CUY-Bagley RoadBlaze Construction, Inc.Delay, acceleration, inefficiency, home office overhead, utility delay, winter shutdown, excusable delay, noncompensable delay, CD5DCB12_930758_DCB(2).pdf1/6/2020 1:32 PM
  
199512CUY-Mayfield RoadGreat Lakes ConstructionBackfill, CMS 603.08, plan ambiguity, plan drawings, full depth granular backfill, CD1DCB12_931019_DCB.pdf1/6/2020 2:25 PM
  
19952OTT-SR2-28.47Meroe Contracting and Supply Co.Removal of latex modified concrete, micro-silica concrete, jack hammer removal, subcontractor, unsupervised work, LMC patching, Proposal Note 504, CD2Arbitration02_940151_ARB.pdf1/6/2020 2:18 PM
  
19956FRA-IR670-3.66/3.95/5.82Complete General Construction CompanyDelay, weather, design changes, additional work due to field conditions, railroad coordination, conflict with adjacent project, Eichleay formulay for home office overhead, CD2Arbitration06_880017_ARB.pdf1/6/2020 2:17 PM
  
19958GRE-USR35-11.84S.E. Johnson CompaniesDelays, extra work, removal of unstable subgrade, drainage, mitigated home office overhead, CD2Arbitration08_908005_ARB.pdf1/6/2020 2:16 PM
  
199411BEL-SR7-15.66National Engineering & ContractingDelays, change order, payDistrict11_0014(91)_CO107.pdf3/3/2009 10:08 PM
  
19875GRE/MOT/COS-IR675-0.00/6.43Great Lakes Construction Co.Deficient thickness, cracked concrete, soft subgrade, production impact, subgrade testing, CMS 401.16, unstable 310 material, project overhead, CD2Arbitration05_830916_ARB.pdf1/6/2020 2:18 PM
  
Folder: Director's Claims Board Digests4/28/2016 4:08 PM
  
CD6.pdf12/4/2008 1:02 PM
  
CD5.pdf12/4/2008 1:02 PM
  
CD4.pdf12/4/2008 1:02 PM
  
CD3.pdf12/4/2008 1:02 PM
  
CD2.pdf12/4/2008 1:02 PM
  
CD1.pdf12/4/2008 1:02 PM
  
Folder: Claims-HTMs8/21/2008 9:46 AM