Ohio.gov State Agencies  |  Online Services
Skip Ribbon Commands
Skip to main content
  
  
  
  
  
  
  
  
  
  
1
HAN755207/1/2014Mill and FillHAN US 68/15 12.73/17.38
$2,614,000.00
Minor rehabilitation of US68 and SR15, grind and pave mainline pavement.
1
HAN755207/1/2014Mill and FillHAN US 68/15 12.73/17.38
$2,614,000.00
Minor rehabilitation of US68 and SR15, grind and pave mainline pavement.
1
HAN755207/1/2014Mill and FillHAN US 68/15 12.73/17.38
$2,614,000.00
Minor rehabilitation of US68 and SR15, grind and pave mainline pavement.
1
ALL804927/1/2015Resurfacing,  Undivided SystemALL SR 81-19.05
$1,723,000.00
2 LANE RESURFACING
1
DEF8050110/1/2014Resurfacing,  Undivided SystemDEF SR 2/49 2.34/4.01
$1,475,000.00
Plane and resurface the 2-lane pavement with asphalt concrete.
1
VAN845657/1/2014Bridge ReplacementVAN SR 697-1.78
$710,000.00
REPLACE BRIDGE OVER THE LITTLE AUGLAIZE RIVER
1
HAR845801/1/2015Bridge RepairHAR SR 67-3.29
$400,000.00
OVERLAY BRIDGE DECK WITH CONCRETE ON STRUCTURE OVER THE SCIOTO RIVER.  REPLACE DECK EDGES.  EPOXY SEAL CONCRETE SURFACES
1
WYA845821/1/2015Bridge ReplacementWYA SR 53-21.85/24.16
$2,318,000.00
Replace the bridges at 21.85 over Tymochtee Creek and at 24.16 over Thorn Run.  See comments about changes to the scope.
1
PUT8713810/1/2014Resurfacing,  Undivided SystemPUT SR 114 3.06
$685,000.00
GRIND AND RESURFACE WITH ASPHALT CONCRETE
1
HAR871951/1/2014Resurfacing,  Undivided SystemHAR US 68 0.00
$1,380,000.00
GRIND AND RESURFACE WITH ASPHALT CONCRETE
1
PAU872007/1/2014Resurfacing,  Undivided SystemPAU US 127/SR 111 9.67/11.15
$2,043,000.00
RESURFACE WITH ASPHALT CONCRETE
1
PUT872047/1/2015Resurfacing,  Undivided SystemPUT SR 15/634 0.00/15.43
$2,798,000.00
GRIND AND RESURFACE WITH ASPHALT CONCRETE
1
PUT872051/1/2014Resurfacing,  Undivided SystemPUT SR 115 0.00
$1,399,000.00
GRIND AND RESURFACE WITH ASPHALT CONCRETE
1
D01878541/1/2015Bridge MaintenanceD01 BM FY15
$500,000.00
PERFORM MISCELLANOUS BRIDGE MAINTENANCE ACTIVITIES ON VARIOUS STRUCTURES
1
HAN883513/31/2015Add SidewalksHAN SRTS VAN BUREN
$114,000.00
THROUGH THE SAFE ROUTES TO SCHOOL PROGRAM, PROVIDE SCHOOL ZONE FLASHING SIGNAGE, SCHOOL ZONE MARKINGS, CROSSWALKS AND SIGNAGE, CROSS WALK RELOCATION AND SIDEWALKS AT THE TOWN SQUARE.
1
ALL888407/1/2015Resurfacing,  Undivided SystemALL SR 65/81/117/309 7.17
$1,013,000.00
Resurface pavements with asphalt concrete on the following routes:  North Street (SR65 and SR81) from Charles St to Jackson St; On Shawnee Rd and Spencerville Rd (SR117) from Seriff Rd. to Shawnee Rd and from the RJ Coleman RR overpass to Woodlawn Avenue;
1
D01906471/1/2015Herbicidal SprayingD01 HS FY15
$224,000.00
Offroad and R/W fence herbicidal spraying for 4-lane and 2-lane sections in District One for FY2015.
1
PAU909521/1/2015Add SidewalksPAU SRTS Paulding Sidewalks
$825,000.00
S.R.T.S. project.  Add new sidewalks along Water Street from Jackson Street to Baldwin Street, along Emerald Road from Johnson Road to the school and along North Main Street from Baldwin Street to Miles Street.  Add new sidewalk at missing sections on Car
1
HAR919437/1/2014Resurfacing,  Undivided SystemHAR SR 31 0.00
$1,459,000.00
Resurface with asphalt concrete.
1
D01924201/1/2015Pavement MarkingD01 PM FY15
$1,569,000.00
Upgrade existing painted pavement markings on rural state highway routes.
1
D01924227/1/2014Raised Pavement MarkersD01 RPM FY15
$216,000.00
Replace raised pavement marker castings and/or lenses as needed on various routes.
1
D01924237/1/2015Raised Pavement MarkersD01 RPM FY16
$229,000.00
Replace raised pavement marker castings and/or lenses as needed on various routes.
1
D01924241/1/2015Guardrail RebuildingD01 GR FY15
$400,000.00
Repair or replace guardrail sections and/or posts as needed on various routes.
1
HAN924457/1/2014Slide RepairHAN SR 15 17.80
$370,000.00
Perform preliminary engineering to determine if the current 2:1 slopes need to be flattened and whether chemical stabilization may be possible.  Remove the existing guardrail. Regrade and re-vegetate the existing slope and the graded shoulder. Add pipe un
1
PAU924504/1/2015Slide RepairPAU SR 637 8.63
$527,000.00
Excavate foreslope and reconstruct with a geotechnically reinforced slope.  Re-establish vegetation. Reconstruct outside edge of pavement.
1
VAN924514/1/2015Slide RepairVAN US 224 11.64
$513,000.00
Remove the existing guardrail.  Excavate slope approximately 5 feet deep at edge of shoulder to remove eroded sloughing areas. Regrade and re-vegetate the existing slope and the graded shoulder. Add pipe underdrain, widen the paved shoulder to face of gua
1
PAU935891/1/2015Add SidewalksPAU SRTS Antwerp Phase II
$170,000.00
Add new sidewalk along the west side of Harrmann Road from the Antwerp School to Canal Road and along the north side of Canal Road from Harrmann Road westerly to Koos Drive.
1
HAN936831/1/2015Resurfacing,  Undivided SystemHAN US 224 13.77
$1,424,000.00
Plane and resurface with asphalt concrete.
1
PAU936887/1/2015Resurfacing,  Undivided SystemPAU SR 49/613 5.78/0.00/6.08
$1,879,000.00
Resurface with asphalt concrete.
1
ALL944694/1/2015BikewaysALL Augsburger Rd Bikepath
$197,000.00
Construct a 10' wide walk-bike pathway from the existing pedestrian facilities in the village to the senior citizen and subdivision housing.
1
DEF949684/1/2015Buildings - Mix Shed,etc.DEF New Pole Building
$200,000.00
Construct new pole building
1
VAN9500210/1/2013Buildings - Mix Shed,etc.VAN New Pole Building
$200,000.00
Construct new 40' x 100' pole building with 5 bay cold storage at 4000 sq. ft.
1
VAN950034/1/2015Buildings - Mix Shed,etc.VAN Decanting Station
$150,000.00
Build new decanting station.
1
ALL9527410/1/2014Mill and FillALL SR 309 10.22
$1,244,000.00
Resurface the roadway with asphalt concrete, replace guard rail, curb, gutter and inlets.  Reconstruct signals at Rosedale Ave. and Cole St..  Remove Grand Ave. extention from Rosedale Ave. to Kenilworth Ave.
1
HAR954794/5/2015Culvert Construction/Reconstr/RepairHAR 81 15.13
$103,000.00
Replace existing culvert with a new structure
1
WYA954954/5/2015Culvert Construction/Reconstr/RepairWYA SR 67 7.76
$130,000.00
Replace existing culvert with a new structure, new ditch with clear zone grading.
1
D01961811/1/2014Minor Rehabilitation - Pavement Prmy SysD01 CPR FY15
$995,000.00
Repair various concrete pavements and ramp sections in District One.
1
DEF961831/1/2015Culvert Construction/Reconstr/RepairDEF US 127 6.26
$105,000.00
Replace existing culvert with a new structure.
1
PAU961961/1/2015Culvert Construction/Reconstr/RepairPAU SR 637 10.76
$205,000.00
Replace existing culvert with a new structure.
1
HAN755207/1/2014Mill and FillHAN US 68/15 12.73/17.38
$2,614,000.00
Minor rehabilitation of US68 and SR15, grind and pave mainline pavement.
1
ALL804927/1/2015Resurfacing,  Undivided SystemALL SR 81-19.05
$1,723,000.00
2 LANE RESURFACING
1
DEF8050110/1/2014Resurfacing,  Undivided SystemDEF SR 2/49 2.34/4.01
$1,475,000.00
Plane and resurface the 2-lane pavement with asphalt concrete.
1
VAN845657/1/2014Bridge ReplacementVAN SR 697-1.78
$710,000.00
REPLACE BRIDGE OVER THE LITTLE AUGLAIZE RIVER
1
HAR845801/1/2015Bridge RepairHAR SR 67-3.29
$400,000.00
OVERLAY BRIDGE DECK WITH CONCRETE ON STRUCTURE OVER THE SCIOTO RIVER.  REPLACE DECK EDGES.  EPOXY SEAL CONCRETE SURFACES
1
WYA845821/1/2015Bridge ReplacementWYA SR 53-21.85/24.16
$2,318,000.00
Replace the bridges at 21.85 over Tymochtee Creek and at 24.16 over Thorn Run.  See comments about changes to the scope.
1
PUT8713810/1/2014Resurfacing,  Undivided SystemPUT SR 114 3.06
$685,000.00
GRIND AND RESURFACE WITH ASPHALT CONCRETE
1
HAR871951/1/2014Resurfacing,  Undivided SystemHAR US 68 0.00
$1,380,000.00
GRIND AND RESURFACE WITH ASPHALT CONCRETE
1
PAU872007/1/2014Resurfacing,  Undivided SystemPAU US 127/SR 111 9.67/11.15
$2,043,000.00
RESURFACE WITH ASPHALT CONCRETE
1
PUT872047/1/2015Resurfacing,  Undivided SystemPUT SR 15/634 0.00/15.43
$2,798,000.00
GRIND AND RESURFACE WITH ASPHALT CONCRETE
1
PUT872051/1/2014Resurfacing,  Undivided SystemPUT SR 115 0.00
$1,399,000.00
GRIND AND RESURFACE WITH ASPHALT CONCRETE
1
D01878541/1/2015Bridge MaintenanceD01 BM FY15
$500,000.00
PERFORM MISCELLANOUS BRIDGE MAINTENANCE ACTIVITIES ON VARIOUS STRUCTURES
1
HAN883513/31/2015Add SidewalksHAN SRTS VAN BUREN
$114,000.00
THROUGH THE SAFE ROUTES TO SCHOOL PROGRAM, PROVIDE SCHOOL ZONE FLASHING SIGNAGE, SCHOOL ZONE MARKINGS, CROSSWALKS AND SIGNAGE, CROSS WALK RELOCATION AND SIDEWALKS AT THE TOWN SQUARE.
1
ALL888407/1/2015Resurfacing,  Undivided SystemALL SR 65/81/117/309 7.17
$1,013,000.00
Resurface pavements with asphalt concrete on the following routes:  North Street (SR65 and SR81) from Charles St to Jackson St; On Shawnee Rd and Spencerville Rd (SR117) from Seriff Rd. to Shawnee Rd and from the RJ Coleman RR overpass to Woodlawn Avenue;
1
D01906471/1/2015Herbicidal SprayingD01 HS FY15
$224,000.00
Offroad and R/W fence herbicidal spraying for 4-lane and 2-lane sections in District One for FY2015.
1
PAU909521/1/2015Add SidewalksPAU SRTS Paulding Sidewalks
$825,000.00
S.R.T.S. project.  Add new sidewalks along Water Street from Jackson Street to Baldwin Street, along Emerald Road from Johnson Road to the school and along North Main Street from Baldwin Street to Miles Street.  Add new sidewalk at missing sections on Car
1
HAR919437/1/2014Resurfacing,  Undivided SystemHAR SR 31 0.00
$1,459,000.00
Resurface with asphalt concrete.
1
D01924201/1/2015Pavement MarkingD01 PM FY15
$1,569,000.00
Upgrade existing painted pavement markings on rural state highway routes.
1
D01924227/1/2014Raised Pavement MarkersD01 RPM FY15
$216,000.00
Replace raised pavement marker castings and/or lenses as needed on various routes.
1
D01924237/1/2015Raised Pavement MarkersD01 RPM FY16
$229,000.00
Replace raised pavement marker castings and/or lenses as needed on various routes.
1
D01924241/1/2015Guardrail RebuildingD01 GR FY15
$400,000.00
Repair or replace guardrail sections and/or posts as needed on various routes.
1
HAN924457/1/2014Slide RepairHAN SR 15 17.80
$370,000.00
Perform preliminary engineering to determine if the current 2:1 slopes need to be flattened and whether chemical stabilization may be possible.  Remove the existing guardrail. Regrade and re-vegetate the existing slope and the graded shoulder. Add pipe un
1
PAU924504/1/2015Slide RepairPAU SR 637 8.63
$527,000.00
Excavate foreslope and reconstruct with a geotechnically reinforced slope.  Re-establish vegetation. Reconstruct outside edge of pavement.
1
VAN924514/1/2015Slide RepairVAN US 224 11.64
$513,000.00
Remove the existing guardrail.  Excavate slope approximately 5 feet deep at edge of shoulder to remove eroded sloughing areas. Regrade and re-vegetate the existing slope and the graded shoulder. Add pipe underdrain, widen the paved shoulder to face of gua
1
PAU935891/1/2015Add SidewalksPAU SRTS Antwerp Phase II
$170,000.00
Add new sidewalk along the west side of Harrmann Road from the Antwerp School to Canal Road and along the north side of Canal Road from Harrmann Road westerly to Koos Drive.
1
HAN936831/1/2015Resurfacing,  Undivided SystemHAN US 224 13.77
$1,424,000.00
Plane and resurface with asphalt concrete.
1
PAU936887/1/2015Resurfacing,  Undivided SystemPAU SR 49/613 5.78/0.00/6.08
$1,879,000.00
Resurface with asphalt concrete.
1
ALL944694/1/2015BikewaysALL Augsburger Rd Bikepath
$197,000.00
Construct a 10' wide walk-bike pathway from the existing pedestrian facilities in the village to the senior citizen and subdivision housing.
1
DEF949684/1/2015Buildings - Mix Shed,etc.DEF New Pole Building
$200,000.00
Construct new pole building
1
VAN9500210/1/2013Buildings - Mix Shed,etc.VAN New Pole Building
$200,000.00
Construct new 40' x 100' pole building with 5 bay cold storage at 4000 sq. ft.
1
VAN950034/1/2015Buildings - Mix Shed,etc.VAN Decanting Station
$150,000.00
Build new decanting station.
1
ALL9527410/1/2014Mill and FillALL SR 309 10.22
$1,244,000.00
Resurface the roadway with asphalt concrete, replace guard rail, curb, gutter and inlets.  Reconstruct signals at Rosedale Ave. and Cole St..  Remove Grand Ave. extention from Rosedale Ave. to Kenilworth Ave.
1
HAR954794/5/2015Culvert Construction/Reconstr/RepairHAR 81 15.13
$103,000.00
Replace existing culvert with a new structure
1
WYA954954/5/2015Culvert Construction/Reconstr/RepairWYA SR 67 7.76
$130,000.00
Replace existing culvert with a new structure, new ditch with clear zone grading.
1
D01961811/1/2014Minor Rehabilitation - Pavement Prmy SysD01 CPR FY15
$995,000.00
Repair various concrete pavements and ramp sections in District One.
1
DEF961831/1/2015Culvert Construction/Reconstr/RepairDEF US 127 6.26
$105,000.00
Replace existing culvert with a new structure.
1
PAU961961/1/2015Culvert Construction/Reconstr/RepairPAU SR 637 10.76
$205,000.00
Replace existing culvert with a new structure.
1
WYA888547/29/2013Culvert Construction/Reconstr/RepairWYA SR 199 13.397/18/2013
$190,000.00
REPLACE TWIN ELIPTICAL CONCRETE CULVERTS, CLEAR ZONE GRADING
1
WYA888547/29/2013Culvert Construction/Reconstr/RepairWYA SR 199 13.397/18/2013
$190,000.00
REPLACE TWIN ELIPTICAL CONCRETE CULVERTS, CLEAR ZONE GRADING
1
PUT850938/12/2013Resurfacing,  Undivided SystemPUT US 224/SR 108/694 12.13/1.688/1/2013
$1,889,000.00
Grind and resurface the 2-lane pavements with asphalt concrete: On US224 from just east of Ralph St. in the Village of Kalida to the CSX RR spur at log point 21.39 in Ottawa; On SR108 from the bridge south of SR613 to just south of the intersection with C
1
PUT850938/12/2013Resurfacing,  Undivided SystemPUT US 224/SR 108/694 12.13/1.688/1/2013
$1,889,000.00
Grind and resurface the 2-lane pavements with asphalt concrete: On US224 from just east of Ralph St. in the Village of Kalida to the CSX RR spur at log point 21.39 in Ottawa; On SR108 from the bridge south of SR613 to just south of the intersection with C
1
HAR850958/26/2013Culvert Construction/Reconstr/RepairHAR SR 31-5.008/15/2013
$257,000.00
Abandon in place the existing culvert by filling it in with grout.  Place a new culvert to the south of it to better align with drainage.  Provide clear zone grading.
1
HAR850958/26/2013Culvert Construction/Reconstr/RepairHAR SR 31-5.008/15/2013
$257,000.00
Abandon in place the existing culvert by filling it in with grout.  Place a new culvert to the south of it to better align with drainage.  Provide clear zone grading.
1
HAN9245210/7/2013SignalsHAN US 224 15.679/26/2013
$440,000.00
Review and Upgrade signal timing, equipment and increase storage lanes where possible along US 224 (Tiffin Avenue).  Work derived from traffic study completed under PID 83199.
1
HAN9245210/7/2013SignalsHAN US 224 15.679/26/2013
$440,000.00
Review and Upgrade signal timing, equipment and increase storage lanes where possible along US 224 (Tiffin Avenue).  Work derived from traffic study completed under PID 83199.
1
HAN8455710/21/2013Bridge ReplacementHAN US 224 11.8110/10/2013
$11,090,000.00
Replace deficient bridge that carries US224 over IR75.  Modify interchange ramps to accommdate profile adjustments and widening of the bridge.  Replace the approach pavment on both sides of the interchange with new concrete pavement.  The approaches will
1
HAN8455710/21/2013Bridge ReplacementHAN US 224 11.8110/10/2013
$11,090,000.00
Replace deficient bridge that carries US224 over IR75.  Modify interchange ramps to accommdate profile adjustments and widening of the bridge.  Replace the approach pavment on both sides of the interchange with new concrete pavement.  The approaches will
1
ALL9223310/22/2013Buildings - Mix Shed,etc.D01 HQ Campus10/11/2013
$4,500,000.00
Build new storage facilities and update existing district garage and office facilities to accomodate crews and Allen county operations. Facility Project Number F20122.  See PID 95597 for additional non-let work.
1
ALL9223310/22/2013Buildings - Mix Shed,etc.D01 HQ Campus10/11/2013
$4,500,000.00
Build new storage facilities and update existing district garage and office facilities to accomodate crews and Allen county operations. Facility Project Number F20122.  See PID 95597 for additional non-let work.
1
HAN7682311/4/2013Resurfacing,  Undivided SystemHAN SR 330/568 0.20/0.2310/24/2013
$496,000.00
Plane and resurface the 2 lane pavements on SR330 and SR568 with asphalt concrete.
1
HAN7682311/4/2013Resurfacing,  Undivided SystemHAN SR 330/568 0.20/0.2310/24/2013
$496,000.00
Plane and resurface the 2 lane pavements on SR330 and SR568 with asphalt concrete.
1
HAN7682311/4/2013Resurfacing,  Undivided SystemHAN SR 330/568 0.20/0.2310/24/2013
$496,000.00
Plane and resurface the 2 lane pavements on SR330 and SR568 with asphalt concrete.
1
HAN7682311/4/2013Resurfacing,  Undivided SystemHAN SR 330/568 0.20/0.2310/24/2013
$496,000.00
Plane and resurface the 2 lane pavements on SR330 and SR568 with asphalt concrete.
1
ALL8902911/25/2013Major RehabilitationALL IR 75 0.2111/15/2013
$62,601,000.00
Major Rehab From Interstate Plan.  IR 75 Reconstruction From Auglaize Co Line Thru Mm 5.53.  Geometrics To Be Corrected.  Capacity Needs Analyzed.  Interchanges & Bridges Will Be Reconstructed.
1
ALL8902911/25/2013Major RehabilitationALL IR 75 0.2111/15/2013
$62,601,000.00
Major Rehab From Interstate Plan.  IR 75 Reconstruction From Auglaize Co Line Thru Mm 5.53.  Geometrics To Be Corrected.  Capacity Needs Analyzed.  Interchanges & Bridges Will Be Reconstructed.
1
HAN7552312/2/2013Mill and FillHAN/WYA SR 15 21.52/0.0011/21/2013
$3,659,000.00
Minor rehabilitation on SR15, grind and pave mainline pavement.
1
HAN7552312/2/2013Mill and FillHAN/WYA SR 15 21.52/0.0011/21/2013
$3,659,000.00
Minor rehabilitation on SR15, grind and pave mainline pavement.
1
HAN7552312/2/2013Mill and FillHAN/WYA SR 15 21.52/0.0011/21/2013
$3,659,000.00
Minor rehabilitation on SR15, grind and pave mainline pavement.
1
D019077512/2/2013Signal Maintenance/Repair (NEW)D01 SIGNALS FY1411/21/2013
$300,000.00
Upgrade or reconstruction signals at 3 locations.  Some locations may be a total rebuild.  Locations include All-65/Bluelick Rd.; Han-US224/CR140 and Wya-US23/CR330.
1
HAN7552312/2/2013Mill and FillHAN/WYA SR 15 21.52/0.0011/21/2013
$3,659,000.00
Minor rehabilitation on SR15, grind and pave mainline pavement.
1
D019077512/2/2013Signal Maintenance/Repair (NEW)D01 SIGNALS FY1411/21/2013
$300,000.00
Upgrade or reconstruction signals at 3 locations.  Some locations may be a total rebuild.  Locations include All-65/Bluelick Rd.; Han-US224/CR140 and Wya-US23/CR330.
1
D018468512/23/2013Pavement MarkingD01 PM FY1412/12/2013
$1,485,000.00
UPGRADE EXISTING PAINTED PAVEMENT MARKINGS ON RURAL STATE HIGHWAY ROUTES
1
DEF8723512/23/2013Culvert Construction/Reconstr/RepairDEF SR 18-26.0212/12/2013
$749,000.00
REPLACE THE EXISTING STONE ARCH CULVERT WITH A NEW STRUCTURE.  REPLACE GUARDRAIL, CURBS, SIDEWALKS AND CHAIN LINK FENCE THAT IS DISTURBED DURING CONSTRUCTION.
1
D018468512/23/2013Pavement MarkingD01 PM FY1412/12/2013
$1,485,000.00
UPGRADE EXISTING PAINTED PAVEMENT MARKINGS ON RURAL STATE HIGHWAY ROUTES
1
DEF8723512/23/2013Culvert Construction/Reconstr/RepairDEF SR 18-26.0212/12/2013
$749,000.00
REPLACE THE EXISTING STONE ARCH CULVERT WITH A NEW STRUCTURE.  REPLACE GUARDRAIL, CURBS, SIDEWALKS AND CHAIN LINK FENCE THAT IS DISTURBED DURING CONSTRUCTION.
1
D01878531/20/2014Bridge MaintenanceD01 BM FY141/9/2014
$500,000.00
PERFORM MISCELLANEOUS BRIDGE MAINTENANCE ACTIVITIES ON VARIOUS STRUCTURES
1
D01906441/20/2014Herbicidal SprayingD01 HS FY141/9/2014
$212,000.00
Offroad and R/W fence herbicidal spraying for 4-lane and 2-lane sections in District One for FY2014.
1
D01878531/20/2014Bridge MaintenanceD01 BM FY141/9/2014
$500,000.00
PERFORM MISCELLANEOUS BRIDGE MAINTENANCE ACTIVITIES ON VARIOUS STRUCTURES
1
D01906441/20/2014Herbicidal SprayingD01 HS FY141/9/2014
$212,000.00
Offroad and R/W fence herbicidal spraying for 4-lane and 2-lane sections in District One for FY2014.
1
HAN937002/3/2014Pavement/Shoulder Sealing and/or RepairHAN IR 75 3.221/23/2014
$792,000.00
Minor rehab to repair bad sections and joints.
1
HAN937002/3/2014Pavement/Shoulder Sealing and/or RepairHAN IR 75 3.221/23/2014
$792,000.00
Minor rehab to repair bad sections and joints.
1
WYA820332/17/2014Resurfacing,  Undivided SystemWYA SR 53 11.63/12.952/6/2014
$595,000.00
Plane and resurface with asphalt concrete inside city corp limits; overlay with asphalt outside corp limits.
1
WYA820332/17/2014Resurfacing,  Undivided SystemWYA SR 53 11.63/12.952/6/2014
$595,000.00
Plane and resurface with asphalt concrete inside city corp limits; overlay with asphalt outside corp limits.
1
WYA937872/28/2014Mill and FillWYA Marseilles Ave./Eighth St.2/18/2014
$1,100,000.00
Full depth repairs (as needed), mill and resurface with asphalt concrete.  (SR 53/SR 67)
1
WYA937872/28/2014Mill and FillWYA Marseilles Ave./Eighth St.2/18/2014
$1,100,000.00
Full depth repairs (as needed), mill and resurface with asphalt concrete.  (SR 53/SR 67)
1
PUT872083/24/2014Resurfacing,  Undivided SystemPUT SR 634 0.27/8.333/13/2014
$1,899,000.00
GRIND AND RESURFACE WITH ASPHALT CONCRETE
1
PUT872083/24/2014Resurfacing,  Undivided SystemPUT SR 634 0.27/8.333/13/2014
$1,899,000.00
GRIND AND RESURFACE WITH ASPHALT CONCRETE
1
ALL909541/1/2015Add SidewalksALL SRTS Elida Sidewalks7/10/2014
$96,000.00
S.R.T.S. project.  Construct sidewalks along Sunnydale St. and Pioneer Rd.  Add School Zone pavement markings on Pioneer Rd. and Sunnydale St.  Add crosswalk pavement markings at one locations on Pioneer Rd and one locaton on Elida Road.  Upgrade the pede
1
ALL909541/1/2015Add SidewalksALL SRTS Elida Sidewalks7/10/2014
$96,000.00
S.R.T.S. project.  Construct sidewalks along Sunnydale St. and Pioneer Rd.  Add School Zone pavement markings on Pioneer Rd. and Sunnydale St.  Add crosswalk pavement markings at one locations on Pioneer Rd and one locaton on Elida Road.  Upgrade the pede
1
VAN937822/23/2015Major RehabilitationVAN Van Wert W. Main St. PhaseII2/12/2015
$2,018,000.00
Reconstruction and widening of W. Main St.  Proposed  project will include curbing, 5' sidewalks, curb ramps, reconstruction of driveway approaches, new storm sewer piping,, catch basins, man holes, and underdrains.  A 8" watermain and fire hydrants are a
1
VAN937822/23/2015Major RehabilitationVAN Van Wert W. Main St. PhaseII2/12/2015
$2,018,000.00
Reconstruction and widening of W. Main St.  Proposed  project will include curbing, 5' sidewalks, curb ramps, reconstruction of driveway approaches, new storm sewer piping,, catch basins, man holes, and underdrains.  A 8" watermain and fire hydrants are a
1
ALL908493/26/2015Mill and FillALL SR 309 0.003/16/2015
$5,437,000.00
Resurface the roadway with asphalt concrete.  Replace the existing curb and gutter in the Village of Elida.  From Pioneer Road to just west of Eastown Road - widen the roadway to meet design standards (5 - 12' lanes), install new curb and gutter and impro
1
ALL908493/26/2015Mill and FillALL SR 309 0.003/16/2015
$5,437,000.00
Resurface the roadway with asphalt concrete.  Replace the existing curb and gutter in the Village of Elida.  From Pioneer Road to just west of Eastown Road - widen the roadway to meet design standards (5 - 12' lanes), install new curb and gutter and impro
2
D02927887/29/2013SignalsD02 TSG FY20147/18/2013
$207,000.00
A district allocation funded project to maintain/upgrade existing traffic signals district wide; perform necessary related work.  Quantity Splits may be needed once the signal locations are chosen due to the Fed/State funding. For the signal on SR-120 @ E
2
STW952107/28/2013MowingD02 MOW FY13 (NW)7/18/2013
$178,000.00
A maintenance contract to perform mowing on a regionwide basis.(D-1, D-2, D-3 and D-6); perform necessary related work.
2
D02961827/29/2013MowingD02 MOW FY2013 (NC)7/18/2013
$191,000.00
A maintenance contract to perform mowing ona region wide basis (North-Central); perform necessary related work.
2
D02927887/29/2013SignalsD02 TSG FY20147/18/2013
$207,000.00
A district allocation funded project to maintain/upgrade existing traffic signals district wide; perform necessary related work.  Quantity Splits may be needed once the signal locations are chosen due to the Fed/State funding. For the signal on SR-120 @ E
2
STW952107/28/2013MowingD02 MOW FY13 (NW)7/18/2013
$178,000.00
A maintenance contract to perform mowing on a regionwide basis.(D-1, D-2, D-3 and D-6); perform necessary related work.
2
D02961827/29/2013MowingD02 MOW FY2013 (NC)7/18/2013
$191,000.00
A maintenance contract to perform mowing ona region wide basis (North-Central); perform necessary related work.
2
WOO955758/12/2013Bridge Vehicle Damage Repair (NEW)WOO IR 280 6.47 Brdg Damg Rpr8/1/2013
$28,000.00
A project to straighten beam web, cross frame, and stiffners as a result of high load. Perform necessary related work.
2
WOO955758/12/2013Bridge Vehicle Damage Repair (NEW)WOO IR 280 6.47 Brdg Damg Rpr8/1/2013
$28,000.00
A project to straighten beam web, cross frame, and stiffners as a result of high load. Perform necessary related work.
2
D02944738/26/2013Guardrail Maintenance/Repair (NEW)D02 GR FY20148/15/2013
$387,000.00
A district maintenance (4CP7) funded project to maintain existing guardrail district wide; perform necessary related work.
2
LUC956588/26/2013Building DemolitionLUC McCord Rd/NSRR Demolition8/15/2013
$279,000.00
Demolish the structures/buildings on 7 parcels associated with the construction of a new railroad grade separation on McCord Rd in Lucas County.  Project split out from PID 75107; perform necessary related work.
2
D02944738/26/2013Guardrail Maintenance/Repair (NEW)D02 GR FY20148/15/2013
$387,000.00
A district maintenance (4CP7) funded project to maintain existing guardrail district wide; perform necessary related work.
2
LUC956588/26/2013Building DemolitionLUC McCord Rd/NSRR Demolition8/15/2013
$279,000.00
Demolish the structures/buildings on 7 parcels associated with the construction of a new railroad grade separation on McCord Rd in Lucas County.  Project split out from PID 75107; perform necessary related work.
2
WOO927319/9/2013Minor Rehabilitation - Pavement Gnrl SysWOO 20/25 0.0/21.81 Sfty/UrbPv8/29/2013
$797,000.00
A urban paving district allocation funded project to resurface SR-25 from Perrysburg south corp line to US-20; perform necessary related work.  Quantity splits required. UPDATE (12-19-12): Add piece on US-20 funded with safety. Update (3-21-13): added pie
2
WOO959959/9/2013Bridge MaintenanceWOO US 20 11.63 Slopes Repair8/29/2013
$55,000.00
Place tied rock protection and add catch basins to eliminate/control embankements erosion to Pemberville Rd bridge over US-20; perform necessary related work
2
LUC961039/9/2013Culvert Construction/Reconstr/RepairLUC IR 280 3.08 Culvert8/29/2013
$31,000.00
Replace a crushed 36" pipe under the south end of the VGCS bridge; perfom necessary related work.
2
WOO927319/9/2013Minor Rehabilitation - Pavement Gnrl SysWOO 20/25 0.0/21.81 Sfty/UrbPv8/29/2013
$797,000.00
A urban paving district allocation funded project to resurface SR-25 from Perrysburg south corp line to US-20; perform necessary related work.  Quantity splits required. UPDATE (12-19-12): Add piece on US-20 funded with safety. Update (3-21-13): added pie
2
WOO959959/9/2013Bridge MaintenanceWOO US 20 11.63 Slopes Repair8/29/2013
$55,000.00
Place tied rock protection and add catch basins to eliminate/control embankements erosion to Pemberville Rd bridge over US-20; perform necessary related work
2
LUC961039/9/2013Culvert Construction/Reconstr/RepairLUC IR 280 3.08 Culvert8/29/2013
$31,000.00
Replace a crushed 36" pipe under the south end of the VGCS bridge; perfom necessary related work.
2
OTT868919/23/2013Minor Rehabilitation - Pavement Gnrl SysOTT SR 19/269 0.00/4.379/12/2013
$942,000.00
A 2-lane district allocation funded project to resurface two routes in Ottawa County.  The first route is SR-19 from the Sandusky County Line to Oak Harbor south corp line; the second is SR-269 from SR-163 to TR-139 (Buck); perform necessary related work.
2
D02944749/23/2013Electrical MaintenanceD02 LG FY20149/12/2013
$550,000.00
A district maintenance (4CP7) funded project to perform an annual lighting maintenance contract; perform necessary related work.
2
D02958739/23/2013MowingD02 MOW FY14 Regionwide9/12/2013
$600,000.00
A maintenance contract tp perform mowing on a regionwide basis (D-, D-2, D-3 & D-6); perform necessary related work.
2
OTT868919/23/2013Minor Rehabilitation - Pavement Gnrl SysOTT SR 19/269 0.00/4.379/12/2013
$942,000.00
A 2-lane district allocation funded project to resurface two routes in Ottawa County.  The first route is SR-19 from the Sandusky County Line to Oak Harbor south corp line; the second is SR-269 from SR-163 to TR-139 (Buck); perform necessary related work.
2
D02944749/23/2013Electrical MaintenanceD02 LG FY20149/12/2013
$550,000.00
A district maintenance (4CP7) funded project to perform an annual lighting maintenance contract; perform necessary related work.
2
D02958739/23/2013MowingD02 MOW FY14 Regionwide9/12/2013
$600,000.00
A maintenance contract tp perform mowing on a regionwide basis (D-, D-2, D-3 & D-6); perform necessary related work.
2
HEN8802310/21/2013Bridge RepairHEN SR 66 4.82 Bridge Repair10/10/2013
$303,000.00
A district allocation funded project to repair HEN-66 bridge over tributary of Brush Creek.  Work involves removing the wearing surface, replacing the 2 center beams, applying water proofing and placing a new wearing surface. Perform necessary related wor
2
D029447210/21/2013Raised Pavement MarkersD02 RPM FY201410/10/2013
$169,000.00
A district maintenance (4MP7) funded project to install raised pavement markers (RPMs) district wide, perform necessary related work.
2
HEN8802310/21/2013Bridge RepairHEN SR 66 4.82 Bridge Repair10/10/2013
$303,000.00
A district allocation funded project to repair HEN-66 bridge over tributary of Brush Creek.  Work involves removing the wearing surface, replacing the 2 center beams, applying water proofing and placing a new wearing surface. Perform necessary related wor
2
D029447210/21/2013Raised Pavement MarkersD02 RPM FY201410/10/2013
$169,000.00
A district maintenance (4MP7) funded project to install raised pavement markers (RPMs) district wide, perform necessary related work.
2
OTT9286211/4/2013Culvert Construction/Reconstr/RepairOTT SR 163 38.50 Culvert/Seawall10/24/2013
$202,000.00
A district allocation and Local funded project to replace the culvert and seawall on SR-163 located between Cottage Cove and Lakeland in the Village of Marblehead, perform necessary related work.  Project was split out from PID 87889.
2
LUC9457811/4/2013Bridge Maintenance/Repair (NEW)LUC/OTT 280/65/163 Mant/Opr FY1410/24/2013
$900,000.00
A district maintenance project to maintain and operate the VGSC (I-280), Craig Bridge (SR-65) over the Maumee River in Toledo and SR-163 bridge over the Portage River in Port Clinton. perform necessary related work.
2
OTT9286211/4/2013Culvert Construction/Reconstr/RepairOTT SR 163 38.50 Culvert/Seawall10/24/2013
$202,000.00
A district allocation and Local funded project to replace the culvert and seawall on SR-163 located between Cottage Cove and Lakeland in the Village of Marblehead, perform necessary related work.  Project was split out from PID 87889.
2
LUC9457811/4/2013Bridge Maintenance/Repair (NEW)LUC/OTT 280/65/163 Mant/Opr FY1410/24/2013
$900,000.00
A district maintenance project to maintain and operate the VGSC (I-280), Craig Bridge (SR-65) over the Maumee River in Toledo and SR-163 bridge over the Portage River in Port Clinton. perform necessary related work.
2
SEN9087111/18/2013Bridge ReplacementSEN SR 12 10.49 Bridge Repl11/7/2013
$411,000.00
A district allocation project to replace existing bridge over Fishe Creek; investigate prefabricated structure, clear zone grade; perform necessary related work.
2
SEN9087111/18/2013Bridge ReplacementSEN SR 12 10.49 Bridge Repl11/7/2013
$411,000.00
A district allocation project to replace existing bridge over Fishe Creek; investigate prefabricated structure, clear zone grade; perform necessary related work.
2
WOO8850412/2/2013Minor Rehabilitation - Pavement Gnrl SysWOO/SEN US 23 11.84/12.26 Resurf11/21/2013
$2,093,000.00
A 2-lane district allocation funded project to resurface US-23 in Wood County from south of US-6 to south of SR-105; perform necessary related work. UPDATE (1-22-13): added SEN-23 piece which is safety funded.
2
HEN9236212/2/2013Minor Rehabilitation - Pavement Gnrl SysHEN/WOO 18/582 17.43/0.00 Resurf11/21/2013
$2,000,000.00
A 2-Lane district allocation funded project to resurafce SR-18 in Henry County from SR-65 to Wood County Line; perform necessary related work. UPDATE (3-1-13): Added PID 94341 to this project to address the single bid issue, WOO-SR582 from SR-65 to SR-25.
2
WOO8850412/2/2013Minor Rehabilitation - Pavement Gnrl SysWOO/SEN US 23 11.84/12.26 Resurf11/21/2013
$2,093,000.00
A 2-lane district allocation funded project to resurface US-23 in Wood County from south of US-6 to south of SR-105; perform necessary related work. UPDATE (1-22-13): added SEN-23 piece which is safety funded.
2
HEN9236212/2/2013Minor Rehabilitation - Pavement Gnrl SysHEN/WOO 18/582 17.43/0.00 Resurf11/21/2013
$2,000,000.00
A 2-Lane district allocation funded project to resurafce SR-18 in Henry County from SR-65 to Wood County Line; perform necessary related work. UPDATE (3-1-13): Added PID 94341 to this project to address the single bid issue, WOO-SR582 from SR-65 to SR-25.
2
OTT8525512/23/2013Minor Rehabilitation - Pavement Prmy SysOTT SR 2 14.90 Resurf12/12/2013
$1,460,000.00
Resurface SR-2 in ottawa County from near Camp Perry Rd to CR 1 (Lake Shore Rd), perform necessary related work. UPDATE (5-21-12): deleted section from 18.38 to 23.40. UPDATE (2-20-13): Added bridge @ 16.54
2
LUC8808412/23/2013Bridge Deck ReplacementLUC IR475 6.48/7.53 Hill/Dorr Br12/12/2013
$12,000,000.00
A district funded project to widen and redeck the main line I-475 bridges (L & R) over Hill Ave and Dorr St; perform necessary related work.
2
WOO8864612/23/2013Minor Rehabilitation - Pavement Prmy SysWOO/LUC IR 475 0.00/0.00 Resurf12/12/2013
$6,258,000.00
Resurface I-475 from I-75 in Wood County near Mosque to Monclova Rd in Lucas County; perform necessary related work. See PID 88564 for smoothseal. (mill 3.5" add 4.75" with minimal repairs). UPDATE (11-8-12): added bridges. UPDATE (2-27-13): added piece i
2
OTT8525512/23/2013Minor Rehabilitation - Pavement Prmy SysOTT SR 2 14.90 Resurf12/12/2013
$1,460,000.00
Resurface SR-2 in ottawa County from near Camp Perry Rd to CR 1 (Lake Shore Rd), perform necessary related work. UPDATE (5-21-12): deleted section from 18.38 to 23.40. UPDATE (2-20-13): Added bridge @ 16.54
2
LUC8808412/23/2013Bridge Deck ReplacementLUC IR475 6.48/7.53 Hill/Dorr Br12/12/2013
$12,000,000.00
A district funded project to widen and redeck the main line I-475 bridges (L & R) over Hill Ave and Dorr St; perform necessary related work.
2
WOO8864612/23/2013Minor Rehabilitation - Pavement Prmy SysWOO/LUC IR 475 0.00/0.00 Resurf12/12/2013
$6,258,000.00
Resurface I-475 from I-75 in Wood County near Mosque to Monclova Rd in Lucas County; perform necessary related work. See PID 88564 for smoothseal. (mill 3.5" add 4.75" with minimal repairs). UPDATE (11-8-12): added bridges. UPDATE (2-27-13): added piece i
2
WOO255211/1/2014Major ReconstructionWOO IR 75 19.43 Pav Widen1/1/2014
$46,000,000.00
Major Rehabilitation Of The Existing Pavement; Perform Necessary Related Work. (See Pid 77801); Update: Project Will Widen Pavement To Accomodate 3 Lanes In Each Direction; UPDATE (3-4-13): Address the weave problems at I-475/SR-25 using safety funds.
2
WOO255211/1/2014Major ReconstructionWOO IR 75 19.43 Pav Widen1/1/2014
$46,000,000.00
Major Rehabilitation Of The Existing Pavement; Perform Necessary Related Work. (See Pid 77801); Update: Project Will Widen Pavement To Accomodate 3 Lanes In Each Direction; UPDATE (3-4-13): Address the weave problems at I-475/SR-25 using safety funds.
2
WOO255211/1/2014Major ReconstructionWOO IR 75 19.43 Pav Widen1/1/2014
$46,000,000.00
Major Rehabilitation Of The Existing Pavement; Perform Necessary Related Work. (See Pid 77801); Update: Project Will Widen Pavement To Accomodate 3 Lanes In Each Direction; UPDATE (3-4-13): Address the weave problems at I-475/SR-25 using safety funds.
2
WOO255211/1/2014Major ReconstructionWOO IR 75 19.43 Pav Widen1/1/2014
$46,000,000.00
Major Rehabilitation Of The Existing Pavement; Perform Necessary Related Work. (See Pid 77801); Update: Project Will Widen Pavement To Accomodate 3 Lanes In Each Direction; UPDATE (3-4-13): Address the weave problems at I-475/SR-25 using safety funds.
2
WIL901412/3/2014Bridge RepairWIL SR 576 17.72 Bridge Rehab1/23/2014
$500,000.00
A district allocation funded project to rehabilitate a bridge by replacing bituminous wearing surface with Micro-Silica Concrete, replacing deck edges and railings, rehabing abutments to semi integral, replacing approach slabs and approach pavement, patch
2
LUC938572/3/2014ParksLUC/OTT-ODNR-FY141/23/2014
$70,000.00
An ODNR funded project to perform asphalt repairs, crack sealing, pavement markings, and aggregate resurfacing at various ODNR parks; perform necessary related work.
2
WIL901412/3/2014Bridge RepairWIL SR 576 17.72 Bridge Rehab1/23/2014
$500,000.00
A district allocation funded project to rehabilitate a bridge by replacing bituminous wearing surface with Micro-Silica Concrete, replacing deck edges and railings, rehabing abutments to semi integral, replacing approach slabs and approach pavement, patch
2
LUC938572/3/2014ParksLUC/OTT-ODNR-FY141/23/2014
$70,000.00
An ODNR funded project to perform asphalt repairs, crack sealing, pavement markings, and aggregate resurfacing at various ODNR parks; perform necessary related work.
2
FUL909762/17/2014Add SidewalksFUL Pettisville Sidewalk SRTS2/6/2014
$381,000.00
A SRTS funded project to build new and repair existing sidewalks, place flashing school zone signs, crosswalks,... perform necessary related work. UPDATE (11-2-11): Using D-2 Task Order (PID 90869) to design the project. Discussed fee with Julie Walcoff a
2
HEN944102/17/2014Mill and FillHEN SR 424 7.07 PM Rsrf to Abdn2/6/2014
$900,000.00
A district allocation funded project to perform preventive maintenace (smoothseal) project on the pavement of SR-424 through the City of Napoleon; perform necessary related work.
2
FUL909762/17/2014Add SidewalksFUL Pettisville Sidewalk SRTS2/6/2014
$381,000.00
A SRTS funded project to build new and repair existing sidewalks, place flashing school zone signs, crosswalks,... perform necessary related work. UPDATE (11-2-11): Using D-2 Task Order (PID 90869) to design the project. Discussed fee with Julie Walcoff a
2
HEN944102/17/2014Mill and FillHEN SR 424 7.07 PM Rsrf to Abdn2/6/2014
$900,000.00
A district allocation funded project to perform preventive maintenace (smoothseal) project on the pavement of SR-424 through the City of Napoleon; perform necessary related work.
2
LUC799022/28/2014Bridge MaintenanceLUC SR 51 06.65 Bridge Rehab2/18/2014
$325,000.00
Rehab structure by performing a deck overlay, semi-integral abutments, and paint, perform necessary related work.
2
LUC799022/28/2014Bridge MaintenanceLUC SR 51 06.65 Bridge Rehab2/18/2014
$325,000.00
Rehab structure by performing a deck overlay, semi-integral abutments, and paint, perform necessary related work.
2
LUC799022/28/2014Bridge MaintenanceLUC SR 51 06.65 Bridge Rehab2/18/2014
$325,000.00
Rehab structure by performing a deck overlay, semi-integral abutments, and paint, perform necessary related work.
2
WIL869622/28/2014Culvert Construction/Reconstr/RepairWIL SR 2 01.22 Culvert Repl2/18/2014
$140,000.00
A district allocation funded project to replace the existing twin concrete pipes carrying Lick Creek under SR-2 in Williams County with a concrete box culvert; perform necessary related work.
2
WOO885052/28/2014Minor Rehabilitation - Pavement Gnrl SysWOO SR 65 12.00 Resurf2/18/2014
$1,300,000.00
A 2-lane district allocation funded project to resurface SR-65 in Wood county from SR-64 (near Waterville) to SR-25 in Perrysburg; perform necessary related work. Quantity splits required.
2
LUC799022/28/2014Bridge MaintenanceLUC SR 51 06.65 Bridge Rehab2/18/2014
$325,000.00
Rehab structure by performing a deck overlay, semi-integral abutments, and paint, perform necessary related work.
2
WIL869622/28/2014Culvert Construction/Reconstr/RepairWIL SR 2 01.22 Culvert Repl2/18/2014
$140,000.00
A district allocation funded project to replace the existing twin concrete pipes carrying Lick Creek under SR-2 in Williams County with a concrete box culvert; perform necessary related work.
2
WOO885052/28/2014Minor Rehabilitation - Pavement Gnrl SysWOO SR 65 12.00 Resurf2/18/2014
$1,300,000.00
A 2-lane district allocation funded project to resurface SR-65 in Wood county from SR-64 (near Waterville) to SR-25 in Perrysburg; perform necessary related work. Quantity splits required.
2
LUC868433/24/2014Turn Lane AdditionLUC US 20 10.12 (Central/H-Syl)3/13/2014
$2,160,000.00
A safety funded project to design, acquire land, and build raised medians and exclusive right turn lanes on all four approaches of the intersection of US-20 (Central Ave) and Holland-Sylvania including signal plan and lighting plan; perform necessary rela
2
SEN910723/24/2014Minor Rehabilitation - Pavement Gnrl SysSEN US 224 14.74 Resurf3/13/2014
$1,120,000.00
A district allocation funded project to resurface US-224 in Seneca County from SR-100 to SR-67; perform necessary related work.
2
FUL913203/24/2014Culvert Construction/Reconstr/RepairFUL US 20 7.82/10.24 Culverts3/13/2014
$250,000.00
A district allocation funded project to replace 2 culverts on US-20 in Fulton County.  The first is a slab culvert (84"x60"x58') located at SLM 7.82, and the second is 2-cell (36"x58') RCP, perform necessary related work.
2
WOO934173/24/2014Minor Rehabilitation - Pavement Gnrl SysWOO SR 18 11.58 Resurf3/13/2014
$1,531,000.00
A district allocation funded project to resurface old SR-18 from West Corp line of North Baltimore to Hancock County Line; perform necessary related work. (See PID 94659 for piece inside N. Baltimore).  Update 2-11-2013: changed project begin point to SLM
2
LUC868433/24/2014Turn Lane AdditionLUC US 20 10.12 (Central/H-Syl)3/13/2014
$2,160,000.00
A safety funded project to design, acquire land, and build raised medians and exclusive right turn lanes on all four approaches of the intersection of US-20 (Central Ave) and Holland-Sylvania including signal plan and lighting plan; perform necessary rela
2
SEN910723/24/2014Minor Rehabilitation - Pavement Gnrl SysSEN US 224 14.74 Resurf3/13/2014
$1,120,000.00
A district allocation funded project to resurface US-224 in Seneca County from SR-100 to SR-67; perform necessary related work.
2
FUL913203/24/2014Culvert Construction/Reconstr/RepairFUL US 20 7.82/10.24 Culverts3/13/2014
$250,000.00
A district allocation funded project to replace 2 culverts on US-20 in Fulton County.  The first is a slab culvert (84"x60"x58') located at SLM 7.82, and the second is 2-cell (36"x58') RCP, perform necessary related work.
2
WOO934173/24/2014Minor Rehabilitation - Pavement Gnrl SysWOO SR 18 11.58 Resurf3/13/2014
$1,531,000.00
A district allocation funded project to resurface old SR-18 from West Corp line of North Baltimore to Hancock County Line; perform necessary related work. (See PID 94659 for piece inside N. Baltimore).  Update 2-11-2013: changed project begin point to SLM
2
WOO922144/7/2014Culvert Construction/Reconstr/RepairWOO SR 281 0.61/var Culverts3/27/2014
$600,000.00
A district allocation funded project to extend and/or replace 5 culverts at various location on SR-281 in Wood County; perform necessary related work. Project was split out from PID 86499.
2
HEN924634/7/2014Bridge RepairHEN SR 109 20.41 Bridge Repair3/27/2014
$200,000.00
A district allocation funded project to repair bridge edges and place a new bridge wearing surface over Dry Creek, perform necessary related work.  This is a small project that eventually should be combined with a nearby resurfacing project.
2
OTT925824/7/2014Turn Lane AdditionOTT SR 53 4.90 Safety Improv3/27/2014
$360,000.00
A safety funded project to install new guardrail, turn lanes, highway lighting and pavement markings on SR-53 at SR-2  in Ottawa County; perform necessary related work. UPDATE (5-2-13): add slope repair work (NE Ramp). Quantity Splits required.
2
LUC947324/7/2014RealignmentLUC IR 475 9.05 Ramp Reconfig3/27/2014
$10,000,000.00
A safety funded project to reconfigure the ramps at I-475  and US-23 and US-20, perform necessary related work. See PIDs 88252 and 88254.
2
SAN962244/7/2014Minor Rehabilitation - Pavement Gnrl SysSAN SR 105 2.46 Resurf in Woodvi3/27/2014
$530,000.00
Resurface SR-105 in the village of Woodville from west corp line to US-20, then from US-20 (south of town) to Ottawa County line; perform necessary related work
2
WOO922144/7/2014Culvert Construction/Reconstr/RepairWOO SR 281 0.61/var Culverts3/27/2014
$600,000.00
A district allocation funded project to extend and/or replace 5 culverts at various location on SR-281 in Wood County; perform necessary related work. Project was split out from PID 86499.
2
HEN924634/7/2014Bridge RepairHEN SR 109 20.41 Bridge Repair3/27/2014
$200,000.00
A district allocation funded project to repair bridge edges and place a new bridge wearing surface over Dry Creek, perform necessary related work.  This is a small project that eventually should be combined with a nearby resurfacing project.
2
OTT925824/7/2014Turn Lane AdditionOTT SR 53 4.90 Safety Improv3/27/2014
$360,000.00
A safety funded project to install new guardrail, turn lanes, highway lighting and pavement markings on SR-53 at SR-2  in Ottawa County; perform necessary related work. UPDATE (5-2-13): add slope repair work (NE Ramp). Quantity Splits required.
2
LUC947324/7/2014RealignmentLUC IR 475 9.05 Ramp Reconfig3/27/2014
$10,000,000.00
A safety funded project to reconfigure the ramps at I-475  and US-23 and US-20, perform necessary related work. See PIDs 88252 and 88254.
2
SAN962244/7/2014Minor Rehabilitation - Pavement Gnrl SysSAN SR 105 2.46 Resurf in Woodvi3/27/2014
$530,000.00
Resurface SR-105 in the village of Woodville from west corp line to US-20, then from US-20 (south of town) to Ottawa County line; perform necessary related work
2
LUC751075/5/2014Railroad Grade SeparationLUC McCord Grade Separation4/24/2014
$17,503,000.00
McCord Rd grade separation at Norfolk-Southern Rail Road. Perform necessary related work.  Originally PID 23116. (MPO fund 80/20 county match; GSP fund 90%, 5% county, 5% RR). UPDATE (3-19-13): See PID 95658 for demolition.
2
LUC751075/5/2014Railroad Grade SeparationLUC McCord Grade Separation4/24/2014
$17,503,000.00
McCord Rd grade separation at Norfolk-Southern Rail Road. Perform necessary related work.  Originally PID 23116. (MPO fund 80/20 county match; GSP fund 90%, 5% county, 5% RR). UPDATE (3-19-13): See PID 95658 for demolition.
2
LUC751075/5/2014Railroad Grade SeparationLUC McCord Grade Separation4/24/2014
$17,503,000.00
McCord Rd grade separation at Norfolk-Southern Rail Road. Perform necessary related work.  Originally PID 23116. (MPO fund 80/20 county match; GSP fund 90%, 5% county, 5% RR). UPDATE (3-19-13): See PID 95658 for demolition.
2
LUC935645/5/2014Pavement MarkingLUC US 20 10.65 Safety4/24/2014
$300,000.00
A safety funded project to to improve signage, signals and pavement markings at the intersection of Reynolds Rd and Central Ave, perform necessary related work.
2
LUC751075/5/2014Railroad Grade SeparationLUC McCord Grade Separation4/24/2014
$17,503,000.00
McCord Rd grade separation at Norfolk-Southern Rail Road. Perform necessary related work.  Originally PID 23116. (MPO fund 80/20 county match; GSP fund 90%, 5% county, 5% RR). UPDATE (3-19-13): See PID 95658 for demolition.
2
LUC935645/5/2014Pavement MarkingLUC US 20 10.65 Safety4/24/2014
$300,000.00
A safety funded project to to improve signage, signals and pavement markings at the intersection of Reynolds Rd and Central Ave, perform necessary related work.
2
LUC936045/19/2014Major ReconstructionLUC IR 75 2.75 Pav Reconst5/8/2014
$19,400,000.00
A multi-Lane funded project (project # 3) to reconstruct existing I-75 pavement from Dorr St to Central Ave, perform necessary related work See PID 93592 for project # 1 and PID 93594 for project # 2. UPDATE (2-25-13): added Indiana Bridge repl and Dorr S
2
LUC936045/19/2014Major ReconstructionLUC IR 75 2.75 Pav Reconst5/8/2014
$19,400,000.00
A multi-Lane funded project (project # 3) to reconstruct existing I-75 pavement from Dorr St to Central Ave, perform necessary related work See PID 93592 for project # 1 and PID 93594 for project # 2. UPDATE (2-25-13): added Indiana Bridge repl and Dorr S
2
LUC933416/2/2014Noise WallLUC IR 475 11.38 Noisewall5/22/2014
$4,000,000.00
Construct a type II noise barrier on I-475 between Corey and Woodley; perform necessary related work. Designed thru Central Office Task Order. Update (11-27-12): Too big for task order. Now in the Jan 13 programmatic.
2
LUC852886/2/2014Minor Rehabilitation - Pavement Prmy SysLUC IR 475 4.51/9.63 Resurf5/22/2014
$5,427,000.00
Resurface I-475 in Lucas county from US-23 to just west of Douglas Rd, Perform necessary related work.  Coordinate project with the widening of I-475 from Douglas to split near old Jeep Plant (PID 77255). (deleted the piece from Central to US-23 which was
2
SAN885036/2/2014Minor Rehabilitation - Pavement Gnrl SysSAN SR 412 0.00 Resurf5/22/2014
$1,610,000.00
A 2-lane district allocation funded project to resurface SR-412 in Sandusky county from US20 to TR-244 (Karbler); perform necessary related work. UPDATE (3-10-11) added bridges to project as per Bradley. ( Update 10-22-12 ) 4 culverts need replaced; these
2
LUC947246/2/2014Intersection ImprovementLUC SR 2 10.67/11.71 Intersecton5/22/2014
$3,150,000.00
A safety funded project to improve intersections of SR-2 (Airport Hwy) with US-20 (Reynolds Rd) and SR-2 (Airport Hwy) with Holland-Sylvania Ave; perform necessary related work. Design using Central Office Task Order.
2
WOO963526/2/2014Spot SafetyWOO 280/420 0.00/2.60 Safty Impr5/22/2014
$2,232,000.00
W00-280-0.00, and WOO-420- 2.60 (Libbey Rd), increase taper of on ramp from Ohio Turnpike to IR- 280 NB, installation of SB LT J-turn, re-stripe pavement markings on Libbey Rd to accommodate a right tum lane.
2
LUC852886/2/2014Minor Rehabilitation - Pavement Prmy SysLUC IR 475 4.51/9.63 Resurf5/22/2014
$5,427,000.00
Resurface I-475 in Lucas county from US-23 to just west of Douglas Rd, Perform necessary related work.  Coordinate project with the widening of I-475 from Douglas to split near old Jeep Plant (PID 77255). (deleted the piece from Central to US-23 which was
2
SAN885036/2/2014Minor Rehabilitation - Pavement Gnrl SysSAN SR 412 0.00 Resurf5/22/2014
$1,610,000.00
A 2-lane district allocation funded project to resurface SR-412 in Sandusky county from US20 to TR-244 (Karbler); perform necessary related work. UPDATE (3-10-11) added bridges to project as per Bradley. ( Update 10-22-12 ) 4 culverts need replaced; these
2
LUC933416/2/2014Noise WallLUC IR 475 11.38 Noisewall5/22/2014
$4,000,000.00
Construct a type II noise barrier on I-475 between Corey and Woodley; perform necessary related work. Designed thru Central Office Task Order. Update (11-27-12): Too big for task order. Now in the Jan 13 programmatic.
2
LUC947246/2/2014Intersection ImprovementLUC SR 2 10.67/11.71 Intersecton5/22/2014
$3,150,000.00
A safety funded project to improve intersections of SR-2 (Airport Hwy) with US-20 (Reynolds Rd) and SR-2 (Airport Hwy) with Holland-Sylvania Ave; perform necessary related work. Design using Central Office Task Order.
2
WOO963526/2/2014Spot SafetyWOO 280/420 0.00/2.60 Safty Impr5/22/2014
$2,232,000.00
W00-280-0.00, and WOO-420- 2.60 (Libbey Rd), increase taper of on ramp from Ohio Turnpike to IR- 280 NB, installation of SB LT J-turn, re-stripe pavement markings on Libbey Rd to accommodate a right tum lane.
2
LUC879417/1/2014Bridge Deck ReplacementLUC IR 475 08.03 @ Bancroft7/1/2014
$1,920,000.00
A project to redeck the Bancroft St bridge over I-475 in Lucas County; perform necessary related work. UPDATE: Originally a stimulus (round 2) candidate, changed funding to Dist. Alloc. & eliminated the "Stimulus 2 Candidate" report code as requested, Des
2
FUL885167/1/2014Minor Rehabilitation - Pavement Gnrl SysFUL US 20A 23.94 Resurf7/1/2014
$712,000.00
A 2-lane district allocation funded project to resurface US-20A in Fulton County from near CR-3 to Lucas County line; perform necessary related work.
2
SAN885197/1/2014Minor Rehabilitation - Pavement Gnrl SysSEN/SAN SR 12 12.01/0.00 Resurf7/1/2014
$1,600,000.00
A 2-lane district allocation funded project to resurface SR 12 from Bettisville west corp line in seneca County to SR-53 in Sandusky County; perform necessary related work.
2
OTT886307/1/2014Bridge RepairOTT SR 2 18.30 Bridge Repair7/1/2014
$600,000.00
Repair the piers and drill shafts of the OTT-2 bridge over portage river; perform necessary related work.  Project was separated from PID 85916.
2
LUC908177/1/2014Bridge MaintenanceLUC US24/SR51/SR65 Brdg Paint7/1/2014
$1,800,000.00
A district allocation funded project to paint the structural steel of 3 bridges in Lucas County.  These bridges are: LUC-US24 @ Fallen Timbers Lane, LUC-SR51 (Summit St) @ Swan Creek, LUC-SR65 (Miami St) @ CSX RR; perform necessary related work.
2
OTT922277/1/2014Bridge RepairOTT SR 163 25.11 Bascule Replc7/1/2014
$9,500,000.00
A major bridge program funded project to replace the bascule of the Port Clinton lift bridge (OTT-163-25.11); perform necessary related work.
2
WOO961677/1/2014Add SidewalksWOO Rossford SRTS Sdwlk/Sign7/1/2014
$180,000.00
Install sidewalks, signage, school zone and crosswalk upgradesat various locations in the City of Rossford; perform necessary related work.
2
LUC879417/1/2014Bridge Deck ReplacementLUC IR 475 08.03 @ Bancroft7/1/2014
$1,920,000.00
A project to redeck the Bancroft St bridge over I-475 in Lucas County; perform necessary related work. UPDATE: Originally a stimulus (round 2) candidate, changed funding to Dist. Alloc. & eliminated the "Stimulus 2 Candidate" report code as requested, Des
2
FUL885167/1/2014Minor Rehabilitation - Pavement Gnrl SysFUL US 20A 23.94 Resurf7/1/2014
$712,000.00
A 2-lane district allocation funded project to resurface US-20A in Fulton County from near CR-3 to Lucas County line; perform necessary related work.
2
SAN885197/1/2014Minor Rehabilitation - Pavement Gnrl SysSEN/SAN SR 12 12.01/0.00 Resurf7/1/2014
$1,600,000.00
A 2-lane district allocation funded project to resurface SR 12 from Bettisville west corp line in seneca County to SR-53 in Sandusky County; perform necessary related work.
2
OTT886307/1/2014Bridge RepairOTT SR 2 18.30 Bridge Repair7/1/2014
$600,000.00
Repair the piers and drill shafts of the OTT-2 bridge over portage river; perform necessary related work.  Project was separated from PID 85916.
2
LUC908177/1/2014Bridge MaintenanceLUC US24/SR51/SR65 Brdg Paint7/1/2014
$1,800,000.00
A district allocation funded project to paint the structural steel of 3 bridges in Lucas County.  These bridges are: LUC-US24 @ Fallen Timbers Lane, LUC-SR51 (Summit St) @ Swan Creek, LUC-SR65 (Miami St) @ CSX RR; perform necessary related work.
2
OTT922277/1/2014Bridge RepairOTT SR 163 25.11 Bascule Replc7/1/2014
$9,500,000.00
A major bridge program funded project to replace the bascule of the Port Clinton lift bridge (OTT-163-25.11); perform necessary related work.
2
WOO961677/1/2014Add SidewalksWOO Rossford SRTS Sdwlk/Sign7/1/2014
$180,000.00
Install sidewalks, signage, school zone and crosswalk upgradesat various locations in the City of Rossford; perform necessary related work.
2
LUC8069410/1/2014Bridge Deck ReplacementLUC IR 475 4.33/5.22/5.47 L&R10/1/2014
$14,900,000.00
Redeck and widen the I-475 L&R bridges over Wolf Creek, the NS RR tracks and the L&R bridges over Angola Rd., The redeck cost is to be funded with district allocation and the widening with Multi-Lane (not approved), Perform necessary related work. Project
2
SAN8693110/1/2014Bridge ReplacementSAN SR 590 1.22 Bridge Repl10/1/2014
$210,000.00
A district allocation funded project to replace the existing concrete slab structure on SR-590 in Sandusky County over Winters Ditch with a concrete box culvert; perform necessay related work.
2
WOO9237510/1/2014Minor Rehabilitation - Pavement Gnrl SysWOO SR 65 5.89 Resurf10/1/2014
$1,400,000.00
A 2 lane district allocation funded project to resurface SR-65 from SR-235 to SR-64; perform necessary related work.
2
LUC8069410/1/2014Bridge Deck ReplacementLUC IR 475 4.33/5.22/5.47 L&R10/1/2014
$14,900,000.00
Redeck and widen the I-475 L&R bridges over Wolf Creek, the NS RR tracks and the L&R bridges over Angola Rd., The redeck cost is to be funded with district allocation and the widening with Multi-Lane (not approved), Perform necessary related work. Project
2
SAN8693110/1/2014Bridge ReplacementSAN SR 590 1.22 Bridge Repl10/1/2014
$210,000.00
A district allocation funded project to replace the existing concrete slab structure on SR-590 in Sandusky County over Winters Ditch with a concrete box culvert; perform necessay related work.
2
WOO9237510/1/2014Minor Rehabilitation - Pavement Gnrl SysWOO SR 65 5.89 Resurf10/1/2014
$1,400,000.00
A 2 lane district allocation funded project to resurface SR-65 from SR-235 to SR-64; perform necessary related work.
2
D02778251/1/2015Minor Rehabilitation - Pavement Prmy SysSAN US 6 15.06 Resurf1/1/2015
$2,850,000.00
Resurface US-6 from US-20 near CR-20 on the west side of Fremont to SR-19 (Fremont by-pass); perform necessary related work. (Originally PID 76709)
2
LUC799911/1/2015Bridge Deck ReplacementLUC IR 475 14.18 Redeck 3 Brdg1/1/2015
$4,500,000.00
A district allocation funded project to redeck and paint the structural steel of 3 bridges over I-475 in the City of Toledo, perform necessary related work. UPDATE (5-5-11): Project scope increased from paint to now include redeck as per Bradley.  Quantit
2
LUC933121/1/2015Intersection ImprovementLUC SR 64/Finzel Roundabout1/1/2015
$1,590,000.00
A TMACOG (CMAQ) funded project to realign the offset intersection of SR-64 and Finzel Rd by constructing a modern roundabout in the Village of Whitehouse; perform necessary related work. CMAQ eligibility determination
2
D02778251/1/2015Minor Rehabilitation - Pavement Prmy SysSAN US 6 15.06 Resurf1/1/2015
$2,850,000.00
Resurface US-6 from US-20 near CR-20 on the west side of Fremont to SR-19 (Fremont by-pass); perform necessary related work. (Originally PID 76709)
2
LUC799911/1/2015Bridge Deck ReplacementLUC IR 475 14.18 Redeck 3 Brdg1/1/2015
$4,500,000.00
A district allocation funded project to redeck and paint the structural steel of 3 bridges over I-475 in the City of Toledo, perform necessary related work. UPDATE (5-5-11): Project scope increased from paint to now include redeck as per Bradley.  Quantit
2
D02778251/1/2015Minor Rehabilitation - Pavement Prmy SysSAN US 6 15.06 Resurf1/1/2015
$2,850,000.00
Resurface US-6 from US-20 near CR-20 on the west side of Fremont to SR-19 (Fremont by-pass); perform necessary related work. (Originally PID 76709)
2
LUC799911/1/2015Bridge Deck ReplacementLUC IR 475 14.18 Redeck 3 Brdg1/1/2015
$4,500,000.00
A district allocation funded project to redeck and paint the structural steel of 3 bridges over I-475 in the City of Toledo, perform necessary related work. UPDATE (5-5-11): Project scope increased from paint to now include redeck as per Bradley.  Quantit
2
LUC810581/1/2015Culvert Construction/Reconstr/RepairLUC SR 2 21.10 Struct Repl1/1/2015
$371,000.00
Replace existing structure.  Perform necessary related work.  This culvert is on the detour (local) route for the MRC project. This project should be constructed after the MRC project is open to traffic. (This PID & PID 86960 projects are being designed b
2
SAN840791/1/2015Minor Rehabilitation - Pavement Gnrl SysSAN SR523 0.00 Ditch Reloc/Rsurf1/1/2015
$1,060,000.00
Enclose and or relocate ditch along SR-523 in Sandusky county from SR-19 to SR-53. Then resurface SR-523. Perform necessary related work.  Relocating the ditch will cost about $370k while enclosing it will be about $950k.
2
SEN852751/1/2015Minor Rehabilitation - Pavement Gnrl SysSEN SR 18 17.96 Resurf1/1/2015
$2,300,000.00
Resurface SR-18 in Seneca County from TR-159 (Gillig) to SR-19 in Republic; perform necessary related work.
2
SEN853761/1/2015Culvert Construction/Reconstr/RepairSEN SR 587 10.66 Culvert1/1/2015
$147,000.00
Replace the existing 72"x34' spiral steel culvert located on SEN-SR587 about 0.25 mile south of TR-112; perform necessary related work.
2
SAN869291/1/2015Bridge RepairSAN US 6 30.34 Bridge1/1/2015
$500,000.00
A district allocation funded project to repair three bridges.  The first bridge is on SAN-6 over Sandusky River and requires parapets repairs; the second bridge is on SAN-6 over Little Pickerel Creek and requires beams replacement and new wearing surface;
2
HEN869651/1/2015Bridge Deck ReplacementHEN/WOO SR 281 09.69/12.931/1/2015
$1,250,000.00
A district allocation funded project to replace the existing continuous concrete slab bridges on WOO-281 with aspahlt wearing surface on prestressed box beams; and replace existing steel arch on HEN-281 with a concrete box culvert; perform necessary relat
2
WOO876701/1/2015Slide RepairWOO SR 65 04.38 Slide Repair1/1/2015
$2,000,000.00
A district allocation funded project to repair slide on SR-65 (SB between Roadway and Maumee River) @ SLM 4.38 between TR205 (Benshoter) and TR-42 (Weston).  GSM program did not approve project for funding.  Perform necessary related work.
2
WOO876711/1/2015Slide RepairWOO SR 64 11.42 Slide Repair1/1/2015
$2,000,000.00
A district allocation funded project to repair slide on WOO-64 (SB) near Waterville between Reitz and River Rd; perform necessary related work.  No final solution has been developed as of the time of programming the project.  Coordinate with PID 85200 (SR
2
WOO880651/1/2015Bridge ReplacementWOO US 20 05.67/10.08 Bridges1/1/2015
$500,000.00
A district funded allocation to replace 2 structures on WOO-20 at 5.67 (over Cedar Creek trib.) and at 10.08 (over Crane Creek); perform necessary related work. Quantity splits required due to BR elg bridge (Woo-20-10.08)
2
WOO885111/1/2015Minor Rehabilitation - Pavement Gnrl SysWOO US 6 11.73 Resurf Part Urban1/1/2015
$2,350,000.00
A 2-lane district allocation funded project to resurface US-6 in Wood County from Rudolph (TR-133) to SR-199 (west); perform necessary related work. Added PID 92129 which was deleted. Urban Paving in BG.
2
SEN885131/1/2015Minor Rehabilitation - Pavement Gnrl SysSEN US 224 29.54 Resurf1/1/2015
$1,000,000.00
A 2-lane district allocation funded project to resurface US-224 in Seneca county from Attica east corp line to Huron County line; perform necessary related work.
2
SEN885141/1/2015Minor Rehabilitation - Pavement Gnrl SysSEN SR 18 30.53 Resurf1/1/2015
$1,300,000.00
A 2-lane district allocation funded project to resurface SR-18 in Seneca county from CR-32 to Sandusky County line; perform necessary related work.
2
SEN885211/1/2015Minor Rehabilitation - Pavement Gnrl SysSEN SR 19 0.00 Resurf1/1/2015
$2,300,000.00
A 2-lane district allocation funded project to resurface SR-19 from Crawford County line to US-224; perform necessary related work.
2
SEN885231/1/2015Minor Rehabilitation - Pavement Gnrl SysSEN SR 67 0.00 Resurf1/1/2015
$700,000.00
A 2-lane district allocation funded project to resurface SR-67 from Wyandot County Line to SR-100; perform necessary related work.
2
HEN906511/1/2015Culvert Construction/Reconstr/RepairHEN SR 18 1.91 Culvert1/1/2015
$250,000.00
A district allocation funded project to replace a 68"x48"x42' stone slab culvert; perform necessary related work.
2
HEN906521/1/2015Culvert Construction/Reconstr/RepairHEN SR 281 0.76/0.84 Culverts1/1/2015
$450,000.00
A district allocation funded project to replace 2 culverts.  The first is at SLM 0.76 (84"x54"x50') and the second is at SLM 0.84 (84"x54"x50') with 2 extensions; perform necessary related work.
2
SAN906541/1/2015Culvert Construction/Reconstr/RepairSAN SR 53 14.73 Culvert1/1/2015
$200,000.00
A district allocation funded project to replace an existing 48"x42"x28' arch slab culvert near CR-119; perform necessary related work.
2
SAN906551/1/2015Culvert Construction/Reconstr/RepairSAN SR 590 4.99 Culvert1/1/2015
$200,000.00
A district allocation funded project to repalce existing (72"x60"x48') slab stone culvert @ SLM 4.99; perform necessary related work.
2
SAN908191/1/2015Bridge MaintenanceSAN US 6 18.83 Bridge Paint1/1/2015
$700,000.00
A district allocation funded project to paint the structural steel on the bridge which carries US 6 over US 20 on the far east side of Fremont; perform necessary related work.
2
HEN909911/1/2015Bridge ReplacementHEN SR 109 18.02 Major Brdg Repl1/1/2015
$15,000,000.00
A major bridge funded project to replace existing narrow bridge with a new wider bridge; perform necessary related work.
2
WIL927511/1/2015Bridge ReplacementWIL SR 107 5.66 Bridge Rehab1/1/2015
$250,000.00
A district allocation funded project to replace existing structure over Eagle Creek; perform necessary related work.
2
WOO927521/1/2015Bridge RepairWOO SR 582 12.41 Bridge Rehab1/1/2015
$300,000.00
A district allocation funded project to rehabilitate the existing bridge over Toussaint creek; perform necessary related work.
2
HEN928331/1/2015RelocationHEN SR 110 0.66 Relocate1/1/2015
$1,350,000.00
A GSM funded project to address the landslide located on SR-110 adjacent to the Maumee River, in the City of Napoleon, from about Maumee Lane to Campbell's Soup factory entarnce; perform necessary related work.
2
WOO934431/1/2015Minor Rehabilitation - Pavement Gnrl SysWOO SR 105 8.81 Resurf1/1/2015
$850,000.00
A district allocation funded project to resurface SR-105 from Pemberville west corp line to US-23/Sandusky County Line, perform necessary related work.
2
HEN936761/1/2015Culvert Construction/Reconstr/RepairHEN SR 65 10.04 Culvert1/1/2015
$150,000.00
A district allocation funded project to replace existing 72"x58"x32 slab culvert neat TR-K; perform necessary related work.
2
SEN936771/1/2015Culvert Construction/Reconstr/RepairSEN SR 100 1.23 Culvert1/1/2015
$150,000.00
A district allocation funded project to replace a twin 54"x40' RCP culvert, perform necessary related work.
2
WIL951221/1/2015Culvert Construction/Reconstr/RepairWIL US 6 5.00 Culvert/Drainage1/1/2015
$100,000.00
A project to improve/revise drainage on the south side of US-6 near CR-6, perform necessary related work.
2
SEN951251/1/2015Culvert Construction/Reconstr/RepairSEN SR 4 10.08 Culvert1/1/2015
$100,000.00
Replace a culvert ON SEN-4 at SLM 10.08, perform necessary related work.
2
LUC963441/1/2015Intersection ImprovementLUC SR 2/25 17.27/7.18 Stfy Impv1/1/2015
$3,179,000.00
On SR 2, install SB right turn lane on AWT approach; reduce size of grass median to minimize all red clearance intervals; include concretemedian with pedestrian refuge area for partial crossing; increase lane width on AWT to 12ft. lane and 2ft. shoulder;
2
D02778251/1/2015Minor Rehabilitation - Pavement Prmy SysSAN US 6 15.06 Resurf1/1/2015
$2,850,000.00
Resurface US-6 from US-20 near CR-20 on the west side of Fremont to SR-19 (Fremont by-pass); perform necessary related work. (Originally PID 76709)
2
LUC799911/1/2015Bridge Deck ReplacementLUC IR 475 14.18 Redeck 3 Brdg1/1/2015
$4,500,000.00
A district allocation funded project to redeck and paint the structural steel of 3 bridges over I-475 in the City of Toledo, perform necessary related work. UPDATE (5-5-11): Project scope increased from paint to now include redeck as per Bradley.  Quantit
2
LUC810581/1/2015Culvert Construction/Reconstr/RepairLUC SR 2 21.10 Struct Repl1/1/2015
$371,000.00
Replace existing structure.  Perform necessary related work.  This culvert is on the detour (local) route for the MRC project. This project should be constructed after the MRC project is open to traffic. (This PID & PID 86960 projects are being designed b
2
SAN840791/1/2015Minor Rehabilitation - Pavement Gnrl SysSAN SR523 0.00 Ditch Reloc/Rsurf1/1/2015
$1,060,000.00
Enclose and or relocate ditch along SR-523 in Sandusky county from SR-19 to SR-53. Then resurface SR-523. Perform necessary related work.  Relocating the ditch will cost about $370k while enclosing it will be about $950k.
2
SEN852751/1/2015Minor Rehabilitation - Pavement Gnrl SysSEN SR 18 17.96 Resurf1/1/2015
$2,300,000.00
Resurface SR-18 in Seneca County from TR-159 (Gillig) to SR-19 in Republic; perform necessary related work.
2
SEN853761/1/2015Culvert Construction/Reconstr/RepairSEN SR 587 10.66 Culvert1/1/2015
$147,000.00
Replace the existing 72"x34' spiral steel culvert located on SEN-SR587 about 0.25 mile south of TR-112; perform necessary related work.
2
SAN869291/1/2015Bridge RepairSAN US 6 30.34 Bridge1/1/2015
$500,000.00
A district allocation funded project to repair three bridges.  The first bridge is on SAN-6 over Sandusky River and requires parapets repairs; the second bridge is on SAN-6 over Little Pickerel Creek and requires beams replacement and new wearing surface;
2
HEN869651/1/2015Bridge Deck ReplacementHEN/WOO SR 281 09.69/12.931/1/2015
$1,250,000.00
A district allocation funded project to replace the existing continuous concrete slab bridges on WOO-281 with aspahlt wearing surface on prestressed box beams; and replace existing steel arch on HEN-281 with a concrete box culvert; perform necessary relat
2
WOO876701/1/2015Slide RepairWOO SR 65 04.38 Slide Repair1/1/2015
$2,000,000.00
A district allocation funded project to repair slide on SR-65 (SB between Roadway and Maumee River) @ SLM 4.38 between TR205 (Benshoter) and TR-42 (Weston).  GSM program did not approve project for funding.  Perform necessary related work.
2
WOO876711/1/2015Slide RepairWOO SR 64 11.42 Slide Repair1/1/2015
$2,000,000.00
A district allocation funded project to repair slide on WOO-64 (SB) near Waterville between Reitz and River Rd; perform necessary related work.  No final solution has been developed as of the time of programming the project.  Coordinate with PID 85200 (SR
2
WOO880651/1/2015Bridge ReplacementWOO US 20 05.67/10.08 Bridges1/1/2015
$500,000.00
A district funded allocation to replace 2 structures on WOO-20 at 5.67 (over Cedar Creek trib.) and at 10.08 (over Crane Creek); perform necessary related work. Quantity splits required due to BR elg bridge (Woo-20-10.08)
2
WOO885111/1/2015Minor Rehabilitation - Pavement Gnrl SysWOO US 6 11.73 Resurf Part Urban1/1/2015
$2,350,000.00
A 2-lane district allocation funded project to resurface US-6 in Wood County from Rudolph (TR-133) to SR-199 (west); perform necessary related work. Added PID 92129 which was deleted. Urban Paving in BG.
2
SEN885131/1/2015Minor Rehabilitation - Pavement Gnrl SysSEN US 224 29.54 Resurf1/1/2015
$1,000,000.00
A 2-lane district allocation funded project to resurface US-224 in Seneca county from Attica east corp line to Huron County line; perform necessary related work.
2
SEN885141/1/2015Minor Rehabilitation - Pavement Gnrl SysSEN SR 18 30.53 Resurf1/1/2015
$1,300,000.00
A 2-lane district allocation funded project to resurface SR-18 in Seneca county from CR-32 to Sandusky County line; perform necessary related work.
2
SEN885211/1/2015Minor Rehabilitation - Pavement Gnrl SysSEN SR 19 0.00 Resurf1/1/2015
$2,300,000.00
A 2-lane district allocation funded project to resurface SR-19 from Crawford County line to US-224; perform necessary related work.
2
SEN885231/1/2015Minor Rehabilitation - Pavement Gnrl SysSEN SR 67 0.00 Resurf1/1/2015
$700,000.00
A 2-lane district allocation funded project to resurface SR-67 from Wyandot County Line to SR-100; perform necessary related work.
2
HEN906511/1/2015Culvert Construction/Reconstr/RepairHEN SR 18 1.91 Culvert1/1/2015
$250,000.00
A district allocation funded project to replace a 68"x48"x42' stone slab culvert; perform necessary related work.
2
HEN906521/1/2015Culvert Construction/Reconstr/RepairHEN SR 281 0.76/0.84 Culverts1/1/2015
$450,000.00
A district allocation funded project to replace 2 culverts.  The first is at SLM 0.76 (84"x54"x50') and the second is at SLM 0.84 (84"x54"x50') with 2 extensions; perform necessary related work.
2
SAN906541/1/2015Culvert Construction/Reconstr/RepairSAN SR 53 14.73 Culvert1/1/2015
$200,000.00
A district allocation funded project to replace an existing 48"x42"x28' arch slab culvert near CR-119; perform necessary related work.
2
SAN906551/1/2015Culvert Construction/Reconstr/RepairSAN SR 590 4.99 Culvert1/1/2015
$200,000.00
A district allocation funded project to repalce existing (72"x60"x48') slab stone culvert @ SLM 4.99; perform necessary related work.
2
SAN908191/1/2015Bridge MaintenanceSAN US 6 18.83 Bridge Paint1/1/2015
$700,000.00
A district allocation funded project to paint the structural steel on the bridge which carries US 6 over US 20 on the far east side of Fremont; perform necessary related work.
2
HEN909911/1/2015Bridge ReplacementHEN SR 109 18.02 Major Brdg Repl1/1/2015
$15,000,000.00
A major bridge funded project to replace existing narrow bridge with a new wider bridge; perform necessary related work.
2
WIL927511/1/2015Bridge ReplacementWIL SR 107 5.66 Bridge Rehab1/1/2015
$250,000.00
A district allocation funded project to replace existing structure over Eagle Creek; perform necessary related work.
2
WOO927521/1/2015Bridge RepairWOO SR 582 12.41 Bridge Rehab1/1/2015
$300,000.00
A district allocation funded project to rehabilitate the existing bridge over Toussaint creek; perform necessary related work.
2
HEN928331/1/2015RelocationHEN SR 110 0.66 Relocate1/1/2015
$1,350,000.00
A GSM funded project to address the landslide located on SR-110 adjacent to the Maumee River, in the City of Napoleon, from about Maumee Lane to Campbell's Soup factory entarnce; perform necessary related work.
2
LUC933121/1/2015Intersection ImprovementLUC SR 64/Finzel Roundabout1/1/2015
$1,590,000.00
A TMACOG (CMAQ) funded project to realign the offset intersection of SR-64 and Finzel Rd by constructing a modern roundabout in the Village of Whitehouse; perform necessary related work. CMAQ eligibility determination
2
WOO934431/1/2015Minor Rehabilitation - Pavement Gnrl SysWOO SR 105 8.81 Resurf1/1/2015
$850,000.00
A district allocation funded project to resurface SR-105 from Pemberville west corp line to US-23/Sandusky County Line, perform necessary related work.
2
HEN936761/1/2015Culvert Construction/Reconstr/RepairHEN SR 65 10.04 Culvert1/1/2015
$150,000.00
A district allocation funded project to replace existing 72"x58"x32 slab culvert neat TR-K; perform necessary related work.
2
SEN936771/1/2015Culvert Construction/Reconstr/RepairSEN SR 100 1.23 Culvert1/1/2015
$150,000.00
A district allocation funded project to replace a twin 54"x40' RCP culvert, perform necessary related work.
2
WIL951221/1/2015Culvert Construction/Reconstr/RepairWIL US 6 5.00 Culvert/Drainage1/1/2015
$100,000.00
A project to improve/revise drainage on the south side of US-6 near CR-6, perform necessary related work.
2
SEN951251/1/2015Culvert Construction/Reconstr/RepairSEN SR 4 10.08 Culvert1/1/2015
$100,000.00
Replace a culvert ON SEN-4 at SLM 10.08, perform necessary related work.
2
LUC963441/1/2015Intersection ImprovementLUC SR 2/25 17.27/7.18 Stfy Impv1/1/2015
$3,179,000.00
On SR 2, install SB right turn lane on AWT approach; reduce size of grass median to minimize all red clearance intervals; include concretemedian with pedestrian refuge area for partial crossing; increase lane width on AWT to 12ft. lane and 2ft. shoulder;
2
LUC935652/15/2015Intersection ImprovementLUC US20A 5.56 Roundabt @ Eber2/1/2015
$1,270,000.00
A safety funded project to construct a roundabout at the intersection of US-20A and Eber Rd in Monclova Twp, Lucas County, perform necessary related work. UPDATE (7/3/12): culvert @ 5.87, which was deleted from PID 85252, is added to this PID.
2
LUC935652/15/2015Intersection ImprovementLUC US20A 5.56 Roundabt @ Eber2/1/2015
$1,270,000.00
A safety funded project to construct a roundabout at the intersection of US-20A and Eber Rd in Monclova Twp, Lucas County, perform necessary related work. UPDATE (7/3/12): culvert @ 5.87, which was deleted from PID 85252, is added to this PID.
2
OTT807354/1/2015Bridge RepairOTT SR 2 25.33/27.25 Bridg Rehab4/1/2015
$2,270,000.00
Rehabilitation of 2bridges.  OTT-2-27.25 (SFN 6200729): Replace latex wearing surface with new micro-silica, remove and replace backwall and expansion joints, replace abutment bearings, replace end cross-frames, repair paint system.  OTT-2-25.33 L&R: Repl
2
WOO840704/1/2015Culvert Construction/Reconstr/RepairWOO SR 582 11.51 Culvert4/1/2015
$294,000.00
Replace an existing 94'x64'x42' culvert located on WOO-582 @ SLM 11.51 near Caris Rd, Perform necessary related work.
2
WIL852694/1/2015Minor Rehabilitation - Pavement Gnrl SysWIL 20A/2/15 1.15/0.00/8.01 Resr4/1/2015
$3,850,000.00
Resurface US-20A from SR-15 to SR-107 , SR-2 from Defiance County Line to US-6, and SR-15 from US-20A to US-127 all in Williams County;  Perform necessary related work. UPDATE (4/11/13): added PID 85291. UPDATE (4/30/13) End SR 2 resurfacing at joint with
2
SEN869584/1/2015Bridge ReplacementSEN SR 587 03.70 Struct Repl4/1/2015
$136,000.00
A district allocation funded project to replace the existing concret slab top structure on SR587 over E. branch of Wolf Creek with a a concrete box culvert; perform necessary related work.
2
OTT909884/1/2015SignsOTT SRTS Put-in-Bay Sdwlk Xwlk S4/1/2015
$96,000.00
A SRTS funded project to build strategies 1, 2,3,5,6,7,8,9,12,13  and 14. These startegies involve complete missing sidewalk link on west side of Concord Ave (1&2), construct bike parking area with new bike racks (3), establish primary school crosswalks o
2
OTT920954/1/2015Bridge Deck ReplacementOTT Lightner Rd Brdge4/1/2015
$2,750,000.00
A district allocation funded project to widen and redeck the Lightner Rd bridge over SR-2 in Ottawa County; perform necessary related work.  See PID 87668 for bridge abutment slide repair.
2
WOO962794/1/2015Facility RenovationWOO-Full Serv Maint Facility4/1/2015
$1,950,000.00
Construct a full service maintenance facility in Wood County Garage and other improvements; perform necessary related work.
2
WIL962804/1/2015Construct Steel BuildingWIL-Full Serv Maint Facility4/1/2015
$400,000.00
Construct a full service maintenance facility in Willams County Garage and other improvements; perform necessary related work.
2
OTT962814/1/2015Construct Steel BuildingOTT-Full Serv Maint Facility4/1/2015
$700,000.00
Construct a full service maintenance facility in Ottawa County Garage and other improvements, perform necessary related work.
2
OTT807354/1/2015Bridge RepairOTT SR 2 25.33/27.25 Bridg Rehab4/1/2015
$2,270,000.00
Rehabilitation of 2bridges.  OTT-2-27.25 (SFN 6200729): Replace latex wearing surface with new micro-silica, remove and replace backwall and expansion joints, replace abutment bearings, replace end cross-frames, repair paint system.  OTT-2-25.33 L&R: Repl
2
WOO840704/1/2015Culvert Construction/Reconstr/RepairWOO SR 582 11.51 Culvert4/1/2015
$294,000.00
Replace an existing 94'x64'x42' culvert located on WOO-582 @ SLM 11.51 near Caris Rd, Perform necessary related work.
2
WIL852694/1/2015Minor Rehabilitation - Pavement Gnrl SysWIL 20A/2/15 1.15/0.00/8.01 Resr4/1/2015
$3,850,000.00
Resurface US-20A from SR-15 to SR-107 , SR-2 from Defiance County Line to US-6, and SR-15 from US-20A to US-127 all in Williams County;  Perform necessary related work. UPDATE (4/11/13): added PID 85291. UPDATE (4/30/13) End SR 2 resurfacing at joint with
2
SEN869584/1/2015Bridge ReplacementSEN SR 587 03.70 Struct Repl4/1/2015
$136,000.00
A district allocation funded project to replace the existing concret slab top structure on SR587 over E. branch of Wolf Creek with a a concrete box culvert; perform necessary related work.
2
OTT909884/1/2015SignsOTT SRTS Put-in-Bay Sdwlk Xwlk S4/1/2015
$96,000.00
A SRTS funded project to build strategies 1, 2,3,5,6,7,8,9,12,13  and 14. These startegies involve complete missing sidewalk link on west side of Concord Ave (1&2), construct bike parking area with new bike racks (3), establish primary school crosswalks o
2
OTT920954/1/2015Bridge Deck ReplacementOTT Lightner Rd Brdge4/1/2015
$2,750,000.00
A district allocation funded project to widen and redeck the Lightner Rd bridge over SR-2 in Ottawa County; perform necessary related work.  See PID 87668 for bridge abutment slide repair.
2
WOO962794/1/2015Facility RenovationWOO-Full Serv Maint Facility4/1/2015
$1,950,000.00
Construct a full service maintenance facility in Wood County Garage and other improvements; perform necessary related work.
2
WIL962804/1/2015Construct Steel BuildingWIL-Full Serv Maint Facility4/1/2015
$400,000.00
Construct a full service maintenance facility in Willams County Garage and other improvements; perform necessary related work.
2
OTT962814/1/2015Construct Steel BuildingOTT-Full Serv Maint Facility4/1/2015
$700,000.00
Construct a full service maintenance facility in Ottawa County Garage and other improvements, perform necessary related work.
3
D03887787/29/2013Minor Rehabilitation - Pavement Gnrl SysD03 CHIP FY20147/18/2013
$1,166,000.00
Preventive Maintenance/Reactive Maintenance - Chip Seal CRA-181-00.77 - 01.78RIC-181-00.00 - 02.69 HUR-162-19.98 - 23.62HUR-162-25.06 - 29.02LOR-162-00.00 - 08.79 MED-162-00.00 - 02.10MED-162-02.10 - 02.97 (Plan and Pave w/asphalt in Spencer) Added Roadwa
3
ERI907187/25/2013Slide RepairERI SR 0004 00.407/18/2013
$413,000.00
Various activities at slip locationGeoTech Funds approved March 2013
3
D03887787/29/2013Minor Rehabilitation - Pavement Gnrl SysD03 CHIP FY20147/18/2013
$1,166,000.00
Preventive Maintenance/Reactive Maintenance - Chip Seal CRA-181-00.77 - 01.78RIC-181-00.00 - 02.69 HUR-162-19.98 - 23.62HUR-162-25.06 - 29.02LOR-162-00.00 - 08.79 MED-162-00.00 - 02.10MED-162-02.10 - 02.97 (Plan and Pave w/asphalt in Spencer) Added Roadwa
3
ERI907187/25/2013Slide RepairERI SR 0004 00.407/18/2013
$413,000.00
Various activities at slip locationGeoTech Funds approved March 2013
3
D03894278/12/2013Pruning, Tree/Bush RemovalD03 PR FY20148/1/2013
$183,000.00
Tree/Stump Removal and Prunning
3
CRA913018/12/2013Slide RepairCRA US 0030 06.748/1/2013
$416,000.00
FY2015 Geologic Site Management Funds Application Slide Repair south side of roadwayCRA-030-06.74 - 0.17 miles west of CSX RR underpassDesigner switched to D03 Task Order consultant on 12/13/2011.
3
D03894278/12/2013Pruning, Tree/Bush RemovalD03 PR FY20148/1/2013
$183,000.00
Tree/Stump Removal and Prunning
3
CRA913018/12/2013Slide RepairCRA US 0030 06.748/1/2013
$416,000.00
FY2015 Geologic Site Management Funds Application Slide Repair south side of roadwayCRA-030-06.74 - 0.17 miles west of CSX RR underpassDesigner switched to D03 Task Order consultant on 12/13/2011.
3
LOR888159/23/2013Bridge ReplacementLOR SR 0511 04.709/12/2013
$620,000.00
Replace entire structure.
3
LOR888159/23/2013Bridge ReplacementLOR SR 0511 04.709/12/2013
$620,000.00
Replace entire structure.
3
MED8014010/7/2013Bridge Deck ReplacementMED IR 0071 22.429/26/2013
$947,000.00
Rehabilitate Sleepy Hollow Road structure over IR71Deck Replacement/New Approach Slabs/Various Substructure repairs
3
MED8242710/7/2013Culvert Construction/Reconstr/RepairMED SR 0003 21.199/26/2013
$692,000.00
Design and Construct the permanent slope correction and culvert replacementlocation temporarily repaired by Soil Nailing with PID: 80255 summer 2005
3
ERI8344210/7/2013Bridge MaintenanceERI SR 0004 00.339/26/2013
$743,000.00
Bridge Deck Overlay / Bridge Repairs ERI-004-00.33Previously named D03 DECK OVERLAYS FY2014.PID 90718 now has FY14 Geotech funds to fix the slipat this bridge in CY 2013.
3
CRA8876010/7/2013Minor Rehabilitation - Pavement Gnrl SysCRA SR 0097 00.839/26/2013
$750,000.00
2 Lane Resurfacing.  Galion corp to Morrow Co. Line
3
D038942810/7/2013Lighting MaintenanceD03 LG FY20149/26/2013
$94,000.00
Highway Lighting Maintenance - 4CP7
3
MED8014010/7/2013Bridge Deck ReplacementMED IR 0071 22.429/26/2013
$947,000.00
Rehabilitate Sleepy Hollow Road structure over IR71Deck Replacement/New Approach Slabs/Various Substructure repairs
3
MED8242710/7/2013Culvert Construction/Reconstr/RepairMED SR 0003 21.199/26/2013
$692,000.00
Design and Construct the permanent slope correction and culvert replacementlocation temporarily repaired by Soil Nailing with PID: 80255 summer 2005
3
ERI8344210/7/2013Bridge MaintenanceERI SR 0004 00.339/26/2013
$743,000.00
Bridge Deck Overlay / Bridge Repairs ERI-004-00.33Previously named D03 DECK OVERLAYS FY2014.PID 90718 now has FY14 Geotech funds to fix the slipat this bridge in CY 2013.
3
CRA8876010/7/2013Minor Rehabilitation - Pavement Gnrl SysCRA SR 0097 00.839/26/2013
$750,000.00
2 Lane Resurfacing.  Galion corp to Morrow Co. Line
3
D038942810/7/2013Lighting MaintenanceD03 LG FY20149/26/2013
$94,000.00
Highway Lighting Maintenance - 4CP7
3
MED8019510/21/2013Bridge Deck ReplacementMED IR 0071 20.3410/10/2013
$1,132,000.00
Replace and widen bridge deck on structure - Remsen Road over IR71
3
MED8878510/21/2013Minor Rehabilitation - Pavement Gnrl SysMED SR 0303 09.8210/10/2013
$1,560,000.00
ResurfacingMED-303-09.82 - 11.91 / MED-094-17.75 - 18.74 / MED-303-12.90 - 15.05Brunswick East corp/W130th to Summit County Line
3
RIC8878710/21/2013Minor Rehabilitation - Pavement Gnrl SysRIC SR 39 16.8010/10/2013
$777,000.00
ResurfacingRIC-SR-39-16.80-17.36/RIC-SR-430-06.96-10.04
3
MED8019510/21/2013Bridge Deck ReplacementMED IR 0071 20.3410/10/2013
$1,132,000.00
Replace and widen bridge deck on structure - Remsen Road over IR71
3
MED8878510/21/2013Minor Rehabilitation - Pavement Gnrl SysMED SR 0303 09.8210/10/2013
$1,560,000.00
ResurfacingMED-303-09.82 - 11.91 / MED-094-17.75 - 18.74 / MED-303-12.90 - 15.05Brunswick East corp/W130th to Summit County Line
3
RIC8878710/21/2013Minor Rehabilitation - Pavement Gnrl SysRIC SR 39 16.8010/10/2013
$777,000.00
ResurfacingRIC-SR-39-16.80-17.36/RIC-SR-430-06.96-10.04
3
ERI8018411/18/2013Minor Rehabilitation - Pavement Gnrl SysERI SR 0013 01.8411/7/2013
$1,098,000.00
Resurface SR13 from US 250 (1.84) to Huron corp (6.92)Huron Urban segment (06.92-08.13) was split out as PID:86686
3
D038675511/18/2013SignalsD03 TSG FY201411/7/2013
$150,000.00
District Wide Traffic Signal / Electrical Installations ReconstructionInstall Fire Station Pre-Emption at intersection of MED SR 3 and SR 303 - Hinkley TownshipMED-224-2.43 (@ SR 301-02.60) FlasherRW Services ($6,500) and RW Acquisistion ($15,000) for MED
3
RIC9309311/18/2013Bridge Deck ReplacementRIC SR 0096 13.4111/7/2013
$367,000.00
Box Beam Replacement @ RIC-096-13.41Design Build
3
ERI8018411/18/2013Minor Rehabilitation - Pavement Gnrl SysERI SR 0013 01.8411/7/2013
$1,098,000.00
Resurface SR13 from US 250 (1.84) to Huron corp (6.92)Huron Urban segment (06.92-08.13) was split out as PID:86686
3
D038675511/18/2013SignalsD03 TSG FY201411/7/2013
$150,000.00
District Wide Traffic Signal / Electrical Installations ReconstructionInstall Fire Station Pre-Emption at intersection of MED SR 3 and SR 303 - Hinkley TownshipMED-224-2.43 (@ SR 301-02.60) FlasherRW Services ($6,500) and RW Acquisistion ($15,000) for MED
3
RIC9309311/18/2013Bridge Deck ReplacementRIC SR 0096 13.4111/7/2013
$367,000.00
Box Beam Replacement @ RIC-096-13.41Design Build
3
LOR8012712/2/2013Bridge ReplacementLOR SR 0303 09.9411/21/2013
$247,000.00
Replace a structurally deficient 22' bridge over Tributary of Elk Creek
3
RIC8882612/2/2013Bridge ReplacementRIC US 0042 01.0211/21/2013
$747,000.00
Replace 80' concrete slab bridge over Cedar Creek.RIC-US-42-1.02
3
D038942512/2/2013Guardrail Maintenance/Repair (NEW)D03 GR FY201411/21/2013
$600,000.00
Guardrail Maintenance
3
LOR8012712/2/2013Bridge ReplacementLOR SR 0303 09.9411/21/2013
$247,000.00
Replace a structurally deficient 22' bridge over Tributary of Elk Creek
3
RIC8882612/2/2013Bridge ReplacementRIC US 0042 01.0211/21/2013
$747,000.00
Replace 80' concrete slab bridge over Cedar Creek.RIC-US-42-1.02
3
D038942512/2/2013Guardrail Maintenance/Repair (NEW)D03 GR FY201411/21/2013
$600,000.00
Guardrail Maintenance
3
ERI8225912/23/2013SignsERI SR 0002 SYSSIGN FY201412/12/2013
$225,000.00
Systematic Sign Replacement
3
CRA8344312/23/2013Bridge ReplacementCRA SR 0061 05.0812/12/2013
$300,000.00
Bridge Replacement
3
RIC8672312/23/2013Minor Rehabilitation - Pavement Gnrl SysRIC SR 0603 04.7212/12/2013
$3,648,000.00
Resurfacing  RIC-603-04.72 to 05.85 / ASD-603-00.00 to 06.33 / RIC-603-05.85 to 06.32 / ASD-603-06.33 to 11.57 / RIC-603-06.32 to 09.36Added segments, work and funds from PID:86724 ASD SR 0603 04.84
3
WAY9309912/23/2013Minor Rehabilitation - Pavement Gnrl SysWAY SR 0301 00.0012/12/2013
$803,000.00
ResurfacingWAY-301-00.00 - 03.84
3
ERI8225912/23/2013SignsERI SR 0002 SYSSIGN FY201412/12/2013
$225,000.00
Systematic Sign Replacement
3
CRA8344312/23/2013Bridge ReplacementCRA SR 0061 05.0812/12/2013
$300,000.00
Bridge Replacement
3
RIC8672312/23/2013Minor Rehabilitation - Pavement Gnrl SysRIC SR 0603 04.7212/12/2013
$3,648,000.00
Resurfacing  RIC-603-04.72 to 05.85 / ASD-603-00.00 to 06.33 / RIC-603-05.85 to 06.32 / ASD-603-06.33 to 11.57 / RIC-603-06.32 to 09.36Added segments, work and funds from PID:86724 ASD SR 0603 04.84
3
WAY9309912/23/2013Minor Rehabilitation - Pavement Gnrl SysWAY SR 0301 00.0012/12/2013
$803,000.00
ResurfacingWAY-301-00.00 - 03.84
3
CRA831381/20/2014Minor WideningCRA SR 0061 01.291/9/2014
$2,918,000.00
The proposed project will widen the roadway and bridge to three lanes, reconfigure the driveways, eliminate drives where feasible, investigate converting Church Street to right in, right out operation, storm drainage as required, minor signal modification
3
LOR867301/20/2014Minor Rehabilitation - Pavement Gnrl SysLOR SR 0058 16.511/9/2014
$1,206,000.00
ResurfacingLOR-058-16.51 to 20.97 / LOR-113-06.48 to 07.45added work and funds from PID:84526 LOR SR 0113 06.31Funds not yet updated to reflect added roadway
3
HUR893671/20/2014Slide RepairHUR SR 0013 06.901/9/2014
$750,000.00
Plug Pile Wall / extending culvert with rip rap @ outlet.Geotech Funds increased and approved 09/17/12.
3
D03898321/20/2014Mill and FillD03 RM FY20141/9/2014
$250,000.00
Reactive Pavement Maintenancepotential locations......The WB off ramp and EB on ramp at the west junction of SR2 and US6 (Matt B)
3
CRA831381/20/2014Minor WideningCRA SR 0061 01.291/9/2014
$2,918,000.00
The proposed project will widen the roadway and bridge to three lanes, reconfigure the driveways, eliminate drives where feasible, investigate converting Church Street to right in, right out operation, storm drainage as required, minor signal modification
3
LOR867301/20/2014Minor Rehabilitation - Pavement Gnrl SysLOR SR 0058 16.511/9/2014
$1,206,000.00
ResurfacingLOR-058-16.51 to 20.97 / LOR-113-06.48 to 07.45added work and funds from PID:84526 LOR SR 0113 06.31Funds not yet updated to reflect added roadway
3
HUR893671/20/2014Slide RepairHUR SR 0013 06.901/9/2014
$750,000.00
Plug Pile Wall / extending culvert with rip rap @ outlet.Geotech Funds increased and approved 09/17/12.
3
D03898321/20/2014Mill and FillD03 RM FY20141/9/2014
$250,000.00
Reactive Pavement Maintenancepotential locations......The WB off ramp and EB on ramp at the west junction of SR2 and US6 (Matt B)
3
WAY256552/3/2014Minor Rehabilitation - Pavement Gnrl SysWAY SR 0226 00.451/23/2014
$1,369,000.00
2-LANE RESURFACINGWAY-226-00.00 - 00.91 will be resurfaced with Distrct 11 project
3
LOR257322/3/2014Bridge Deck ReplacementLOR SR 0002 10.461/23/2014
$11,700,000.00
REPLACE AND WIDEN STRUCTURE DECK
3
WAY256552/3/2014Minor Rehabilitation - Pavement Gnrl SysWAY SR 0226 00.451/23/2014
$1,369,000.00
2-LANE RESURFACINGWAY-226-00.00 - 00.91 will be resurfaced with Distrct 11 project
3
LOR257322/3/2014Bridge Deck ReplacementLOR SR 0002 10.461/23/2014
$11,700,000.00
REPLACE AND WIDEN STRUCTURE DECK
3
WAY256552/3/2014Minor Rehabilitation - Pavement Gnrl SysWAY SR 0226 00.451/23/2014
$1,369,000.00
2-LANE RESURFACINGWAY-226-00.00 - 00.91 will be resurfaced with Distrct 11 project
3
LOR257322/3/2014Bridge Deck ReplacementLOR SR 0002 10.461/23/2014
$11,700,000.00
REPLACE AND WIDEN STRUCTURE DECK
3
ERI887632/3/2014Minor Rehabilitation - Pavement Gnrl SysERI SR 0099 00.001/23/2014
$961,000.00
2 Lane Resurfacing.ERI-SR-99-0.00-4.73Huron Co. Line to ERI-SR-4
3
RIC888162/3/2014Bridge RepairRIC SR 0013 16.781/23/2014
$918,000.00
Bridge RehabilitationRIC-013-1678  0.25 miles south of US 30
3
WAY256552/3/2014Minor Rehabilitation - Pavement Gnrl SysWAY SR 0226 00.451/23/2014
$1,369,000.00
2-LANE RESURFACINGWAY-226-00.00 - 00.91 will be resurfaced with Distrct 11 project
3
LOR257322/3/2014Bridge Deck ReplacementLOR SR 0002 10.461/23/2014
$11,700,000.00
REPLACE AND WIDEN STRUCTURE DECK
3
ERI887632/3/2014Minor Rehabilitation - Pavement Gnrl SysERI SR 0099 00.001/23/2014
$961,000.00
2 Lane Resurfacing.ERI-SR-99-0.00-4.73Huron Co. Line to ERI-SR-4
3
RIC888162/3/2014Bridge RepairRIC SR 0013 16.781/23/2014
$918,000.00
Bridge RehabilitationRIC-013-1678  0.25 miles south of US 30
3
D03948272/17/2014Culvert Construction/Reconstr/RepairD03 Culvert Invert FY20142/6/2014
$320,000.00
Paved Invert at CulvertsLOR-090-14.00LOR-480-01.00MED-071-14.60MED-303-11.85RIC-030-18.00WAY-030-1.10
3
D03948272/17/2014Culvert Construction/Reconstr/RepairD03 Culvert Invert FY20142/6/2014
$320,000.00
Paved Invert at CulvertsLOR-090-14.00LOR-480-01.00MED-071-14.60MED-303-11.85RIC-030-18.00WAY-030-1.10
3
ERI835482/28/2014Intersection ImprovementERI US 0250 01.922/18/2014
$1,754,000.00
Reconstruct intersection of US 250 and Strub Road in accordance with PID:76235 Corridor Study.The traffic signal will eventually be interconnected to the ERI-250-0.00 pid 88407 project.
3
WAY867262/28/2014Minor Rehabilitation - Pavement Gnrl SysWAY SR 0094 07.592/18/2014
$1,434,000.00
Resurfacing WAY-094-07.59 to 14.16 / WAY-30A-00.00 to 02.20
3
ERI835482/28/2014Intersection ImprovementERI US 0250 01.922/18/2014
$1,754,000.00
Reconstruct intersection of US 250 and Strub Road in accordance with PID:76235 Corridor Study.The traffic signal will eventually be interconnected to the ERI-250-0.00 pid 88407 project.
3
WAY867262/28/2014Minor Rehabilitation - Pavement Gnrl SysWAY SR 0094 07.592/18/2014
$1,434,000.00
Resurfacing WAY-094-07.59 to 14.16 / WAY-30A-00.00 to 02.20
3
RIC819423/24/2014Bridge ReplacementRIC SR 0013 25.463/13/2014
$455,000.00
Bridge/Culvert Replacement RIC-013-25.46Some PE and R/W activities were completed with PID:82772 RIC SR 0013 21.55 - FY2012 Resurfacing
3
WAY822603/24/2014SignsWAY SR 0003 SYSSIGN FY20143/13/2014
$120,000.00
Systematic Sign ReplacementIncludes WAY SR 3/SR 83 Overlap Section. WAY-3-14.77-18.05 (just south of US 250 interchange to end of Cleveland Rd. exit ramp)WAY-83-13.77-14.69 (approximately 0.05 miles north of the end of the SR 3 overlap to approximately 0.
3
D03834403/24/2014Bridge Maintenance/Repair (NEW)D03 BH FY20143/13/2014
$248,000.00
Bridge MaintenanceASD-039-0897 - ASD-430-0003 - RIC-030-1915 L/R
3
LOR868373/24/2014Resurfacing,  Undivided SystemLOR SR 0058 14.883/13/2014
$1,345,000.00
Oberlin - Urban Paving Program
3
LOR922663/24/2014Culvert Construction/Reconstr/RepairLOR SR 0058 21.443/13/2014
$164,000.00
Culvert Replacement0.35 miles north of SR 113
3
RIC819423/24/2014Bridge ReplacementRIC SR 0013 25.463/13/2014
$455,000.00
Bridge/Culvert Replacement RIC-013-25.46Some PE and R/W activities were completed with PID:82772 RIC SR 0013 21.55 - FY2012 Resurfacing
3
WAY822603/24/2014SignsWAY SR 0003 SYSSIGN FY20143/13/2014
$120,000.00
Systematic Sign ReplacementIncludes WAY SR 3/SR 83 Overlap Section. WAY-3-14.77-18.05 (just south of US 250 interchange to end of Cleveland Rd. exit ramp)WAY-83-13.77-14.69 (approximately 0.05 miles north of the end of the SR 3 overlap to approximately 0.
3
D03834403/24/2014Bridge Maintenance/Repair (NEW)D03 BH FY20143/13/2014
$248,000.00
Bridge MaintenanceASD-039-0897 - ASD-430-0003 - RIC-030-1915 L/R
3
LOR868373/24/2014Resurfacing,  Undivided SystemLOR SR 0058 14.883/13/2014
$1,345,000.00
Oberlin - Urban Paving Program
3
LOR922663/24/2014Culvert Construction/Reconstr/RepairLOR SR 0058 21.443/13/2014
$164,000.00
Culvert Replacement0.35 miles north of SR 113
3
D03894293/31/2014Raised Pavement MarkersD03 RPM FY20143/20/2014
$329,000.00
Raised Pavement Markers
3
D03894313/31/2014Pavement MarkingD03 PM FY20143/20/2014
$1,667,000.00
Pavement Markings
3
D03894293/31/2014Raised Pavement MarkersD03 RPM FY20143/20/2014
$329,000.00
Raised Pavement Markers
3
D03894313/31/2014Pavement MarkingD03 PM FY20143/20/2014
$1,667,000.00
Pavement Markings
3
ERI848264/7/2014Resurfacing,  Undivided SystemERI US 0250 00.003/27/2014
$622,000.00
Sandusky Urban Paving Project - Preliminary Roadway SegmentsNote: PID:24811 ERI SR 0004 11.03 - FY09 Local Let RR Bridge projectCoordinate with Corridor Project in FY 2015 PID 88407
3
ERI848264/7/2014Resurfacing,  Undivided SystemERI US 0250 00.003/27/2014
$622,000.00
Sandusky Urban Paving Project - Preliminary Roadway SegmentsNote: PID:24811 ERI SR 0004 11.03 - FY09 Local Let RR Bridge projectCoordinate with Corridor Project in FY 2015 PID 88407
3
RIC822614/21/2014SignsRIC US 0030 SYSSIGN FY20144/10/2014
$550,000.00
Systematic Sign Replacement RIC-30-08.93 - 19.20 (approximately 0.03 miles west of SR 309 overpass to Ashland County line).
3
CRA834444/21/2014Bridge ReplacementCRA SR 0598 09.114/10/2014
$591,000.00
Bridge Replacement
3
LOR862764/21/2014Resurfacing,  Undivided SystemLOR US 0020 19.404/10/2014
$2,636,000.00
Urban Paving Program - Elyria + short segment in LorainPreliminary Segments enteredLOR-57-19.45-20.72 will be skipped due to PID: 82645
3
MED886754/21/2014Resurfacing,  Undivided SystemMED US 0042 14.404/10/2014
$1,218,000.00
Medina Urban Paving ProjectMED-042-14.40 - 17.68 / MED-003-11.48 - 13.22 / MED-003D-00.00 - 00.17
3
MED962274/21/2014Intersection ImprovementMED IR 0071 24.02 (SR303 RmpClr)4/10/2014
$3,270,000.00
FY2014 Design Acquire Build project (M May approved D-A-B in FY 2014)MED-071-24.02 - 24.22/MED-303-09.04Improve southbound exit from I-71 to SR 303 withexit ramp widening/extending/restriping on I-71 and SR 303.(Scope of Services to be completed by DistriDesign Build
3
RIC822614/21/2014SignsRIC US 0030 SYSSIGN FY20144/10/2014
$550,000.00
Systematic Sign Replacement RIC-30-08.93 - 19.20 (approximately 0.03 miles west of SR 309 overpass to Ashland County line).
3
CRA834444/21/2014Bridge ReplacementCRA SR 0598 09.114/10/2014
$591,000.00
Bridge Replacement
3
LOR862764/21/2014Resurfacing,  Undivided SystemLOR US 0020 19.404/10/2014
$2,636,000.00
Urban Paving Program - Elyria + short segment in LorainPreliminary Segments enteredLOR-57-19.45-20.72 will be skipped due to PID: 82645
3
MED886754/21/2014Resurfacing,  Undivided SystemMED US 0042 14.404/10/2014
$1,218,000.00
Medina Urban Paving ProjectMED-042-14.40 - 17.68 / MED-003-11.48 - 13.22 / MED-003D-00.00 - 00.17
3
MED962274/21/2014Intersection ImprovementMED IR 0071 24.02 (SR303 RmpClr)4/10/2014
$3,270,000.00
FY2014 Design Acquire Build project (M May approved D-A-B in FY 2014)MED-071-24.02 - 24.22/MED-303-09.04Improve southbound exit from I-71 to SR 303 withexit ramp widening/extending/restriping on I-71 and SR 303.(Scope of Services to be completed by DistriDesign Build
3
ASD954284/15/2014Buildings - Mix Shed,etc.ASD Perrysville OP Salt Bldg4/15/2014
$400,000.00
Construct 60' x 100' (6,000 sq.ft.) Fabric Salt Storage Building - 3800 tons
3
ASD954394/15/2014Buildings - Mix Shed,etc.ASD Perrysville OP Cld Strg Bldg4/15/2014
$200,000.00
Construct 40' x 60' (2,400 sq.ft.) 3 bay Cold Storage Building
3
ASD954284/15/2014Buildings - Mix Shed,etc.ASD Perrysville OP Salt Bldg4/15/2014
$400,000.00
Construct 60' x 100' (6,000 sq.ft.) Fabric Salt Storage Building - 3800 tons
3
ASD954394/15/2014Buildings - Mix Shed,etc.ASD Perrysville OP Cld Strg Bldg4/15/2014
$200,000.00
Construct 40' x 60' (2,400 sq.ft.) 3 bay Cold Storage Building
3
LOR837935/5/2014Minor WideningLOR SR 0254 00.014/24/2014
$2,878,000.00
LOR-254-00.01 - 00.43 Intersection SR 254 and West River RoadInstall an exclusive right-turn lane for eastbound vehicles at West River Road intersection in Elyria.Also install a two-way left turn on SR 254 between SR57 and West River Road. Safety project:
3
D03901925/5/2014Lighting MaintenanceD03 LG FY2014 (B)4/24/2014
$852,000.00
Reconstruction of Highway Lighting @ LOR IR 480 / SR 10 / Turnpike interchangesDesign will be done with Central Office Task Order - MS Consultants
3
LOR837935/5/2014Minor WideningLOR SR 0254 00.014/24/2014
$2,878,000.00
LOR-254-00.01 - 00.43 Intersection SR 254 and West River RoadInstall an exclusive right-turn lane for eastbound vehicles at West River Road intersection in Elyria.Also install a two-way left turn on SR 254 between SR57 and West River Road. Safety project:
3
D03901925/5/2014Lighting MaintenanceD03 LG FY2014 (B)4/24/2014
$852,000.00
Reconstruction of Highway Lighting @ LOR IR 480 / SR 10 / Turnpike interchangesDesign will be done with Central Office Task Order - MS Consultants
3
CRA775255/19/2014Preventive MaintenanceCRA US 0030 09.53 PM5/8/2014
$6,057,000.00
Preventive Maintenance - Surface TreatmentAdded Work and funds from PID:79733 CRA US 030 14.82 &  PID:79735 RIC US 030 00.00
3
CRA775255/19/2014Preventive MaintenanceCRA US 0030 09.53 PM5/8/2014
$6,057,000.00
Preventive Maintenance - Surface TreatmentAdded Work and funds from PID:79733 CRA US 030 14.82 &  PID:79735 RIC US 030 00.00
3
CRA775255/19/2014Preventive MaintenanceCRA US 0030 09.53 PM5/8/2014
$6,057,000.00
Preventive Maintenance - Surface TreatmentAdded Work and funds from PID:79733 CRA US 030 14.82 &  PID:79735 RIC US 030 00.00
3
HUR845235/19/2014Minor Rehabilitation - Pavement Gnrl SysHUR SR 0099 00.005/8/2014
$2,139,000.00
2 Lane Resurfacing - Willard and General System
3
LOR922645/19/2014Culvert Construction/Reconstr/RepairLOR SR 0057 02.225/8/2014
$190,000.00
Culvert Replacement0.58 miles south of SR 303
3
CRA775255/19/2014Preventive MaintenanceCRA US 0030 09.53 PM5/8/2014
$6,057,000.00
Preventive Maintenance - Surface TreatmentAdded Work and funds from PID:79733 CRA US 030 14.82 &  PID:79735 RIC US 030 00.00
3
HUR845235/19/2014Minor Rehabilitation - Pavement Gnrl SysHUR SR 0099 00.005/8/2014
$2,139,000.00
2 Lane Resurfacing - Willard and General System
3
LOR922645/19/2014Culvert Construction/Reconstr/RepairLOR SR 0057 02.225/8/2014
$190,000.00
Culvert Replacement0.58 miles south of SR 303
3
ASD903556/2/2014Culvert Construction/Reconstr/RepairASD SR 0060 13.435/22/2014
$132,000.00
Culvert Replacement
3
HUR903606/2/2014Culvert Construction/Reconstr/RepairHUR SR 0547 06.915/22/2014
$140,000.00
Culvert Replacement
3
RIC922636/2/2014Culvert Construction/Reconstr/RepairRIC SR 0603 06.405/22/2014
$250,000.00
Culvert Replacement0.08 miles north of Ashland County Line/Faulk Road
3
ASD903556/2/2014Culvert Construction/Reconstr/RepairASD SR 0060 13.435/22/2014
$132,000.00
Culvert Replacement
3
HUR903606/2/2014Culvert Construction/Reconstr/RepairHUR SR 0547 06.915/22/2014
$140,000.00
Culvert Replacement
3
RIC922636/2/2014Culvert Construction/Reconstr/RepairRIC SR 0603 06.405/22/2014
$250,000.00
Culvert Replacement0.08 miles north of Ashland County Line/Faulk Road
3
WAY832036/16/2014Section ImprovementWAY SR 0585 02.756/5/2014
$4,052,000.00
This is a safety improvement project which includes constructing SR 585 on a geometrically improved alignment from approximately 1500 feet south of Geyers-Chapel Road to approximately 500 feet north of Thompson Road. Included in this work are improved ali
3
D03887346/16/2014Mill and FillD03 IR 0071 RM FY2014 (A)6/5/2014
$318,000.00
Mill and Fill of failing surface course (spot treatment of delaminated areas only).
3
D03887356/16/2014Mill and FillD03 IR 0071 RM FY2014 (B)6/5/2014
$222,000.00
Mill and Fill of failing surface course (spot treatment of delaminated areas only).
3
ERI922626/16/2014Culvert Construction/Reconstr/RepairERI US 0006 01.076/5/2014
$218,000.00
Culvert Replacement0.32 miles West of SR269
3
WAY832036/16/2014Section ImprovementWAY SR 0585 02.756/5/2014
$4,052,000.00
This is a safety improvement project which includes constructing SR 585 on a geometrically improved alignment from approximately 1500 feet south of Geyers-Chapel Road to approximately 500 feet north of Thompson Road. Included in this work are improved ali
3
D03887346/16/2014Mill and FillD03 IR 0071 RM FY2014 (A)6/5/2014
$318,000.00
Mill and Fill of failing surface course (spot treatment of delaminated areas only).
3
D03887356/16/2014Mill and FillD03 IR 0071 RM FY2014 (B)6/5/2014
$222,000.00
Mill and Fill of failing surface course (spot treatment of delaminated areas only).
3
ERI922626/16/2014Culvert Construction/Reconstr/RepairERI US 0006 01.076/5/2014
$218,000.00
Culvert Replacement0.32 miles West of SR269
3
ERI774407/1/2014Preventive MaintenanceERI SR 0002 30.467/1/2014
$3,917,000.00
Preventive Maintenance - Surface Treatmentincludes work/funds from PID:77442
3
HUR775827/1/2014Preventive MaintenanceHUR US 0020 00.98 PM7/1/2014
$1,677,000.00
Preventive Maintenance - Surface Treatment
3
MED797607/1/2014Preventive MaintenanceMED SR 0018 15.15 PM7/1/2014
$512,000.00
Preventive Maintenance - Smoothseal
3
ERI798517/1/2014Preventive MaintenanceERI SR 0002 00.147/1/2014
$4,686,000.00
Preventive Maintenance - Smoothseal
3
ERI774407/1/2014Preventive MaintenanceERI SR 0002 30.467/1/2014
$3,917,000.00
Preventive Maintenance - Surface Treatmentincludes work/funds from PID:77442
3
HUR775827/1/2014Preventive MaintenanceHUR US 0020 00.98 PM7/1/2014
$1,677,000.00
Preventive Maintenance - Surface Treatment
3
MED797607/1/2014Preventive MaintenanceMED SR 0018 15.15 PM7/1/2014
$512,000.00
Preventive Maintenance - Smoothseal
3
ERI798517/1/2014Preventive MaintenanceERI SR 0002 00.147/1/2014
$4,686,000.00
Preventive Maintenance - Smoothseal
3
ERI774407/1/2014Preventive MaintenanceERI SR 0002 30.467/1/2014
$3,917,000.00
Preventive Maintenance - Surface Treatmentincludes work/funds from PID:77442
3
HUR775827/1/2014Preventive MaintenanceHUR US 0020 00.98 PM7/1/2014
$1,677,000.00
Preventive Maintenance - Surface Treatment
3
MED797607/1/2014Preventive MaintenanceMED SR 0018 15.15 PM7/1/2014
$512,000.00
Preventive Maintenance - Smoothseal
3
ERI798517/1/2014Preventive MaintenanceERI SR 0002 00.147/1/2014
$4,686,000.00
Preventive Maintenance - Smoothseal
3
LOR826457/1/2014Major RehabilitationLOR SR 0057 19.427/1/2014
$2,260,000.00
Appraisal & Acquisition to be separate Agreement as part of LOR/MED-57/42-19.42/19.33 RW Services from 9/10/12 Programmatic.  Also see PID 86893.Appraisal Review & Relocation Review to be separate Agreement as part of ERI/LOR/MED-250/57/42-0.00/19.42/19.3
3
D03845817/1/2014Bridge Maintenance/Repair (NEW)D03 BH FY20157/1/2014
$608,000.00
Misc Bridge MaintenanceStructures  ERI-002-26.40 / ERI-002-27.20 / ERI-002-28.27
3
D03866917/1/2014Preventive MaintenanceD03 MICRO FY20157/1/2014
$1,402,000.00
Preventive Maintenance - Surface TreatmentTentative Segments:
3
D03866927/1/2014Preventive MaintenanceD03 SMOOTH FY20157/1/2014
$1,603,000.00
Preventive Maintenance - Surface Treatment Tentative Segments:
3
D03866937/1/2014Chip SealD03 CHIP FY20157/1/2014
$500,000.00
Preventive/Reactive Maintenance - Chip Seal
3
D03866947/1/2014Crack SealD03 CRSEAL FY20157/1/2014
$506,000.00
Preventive Maintenance - Crack Seal Added funds / Tentative locations from PID:79739 RIC US 0030 13.22 Added funds / Tentative locations from PID:79752 WAY US 0030 19.85suggestion ASD-US250 north, recently paved but the centerline joint is in need of crac
3
CRA887617/1/2014Minor Rehabilitation - Pavement Gnrl SysCRA SR 0103 00.007/1/2014
$2,029,000.00
2 Lane Resurfacing.  CRA-SR-103-0.00 to 2.29 Wyandot Co. line SR100 overlapCRA-100-22.18 to 22.32 Overlap section with SR103CRA-103-2.43 to 8.82 End overlap section to CRA SR 4
3
RIC888087/1/2014Minor Rehabilitation - Pavement Gnrl SysRIC SR 0095 00.007/1/2014
$4,011,000.00
2 Lane ResurfacingRIC-095-00.00-11.26 / ASD-095-00.00-1.46 RIC-603-00.00 - 04.72 (segment used to be PID:88789)
3
D03894437/1/2014Guardrail Maintenance/Repair (NEW)D03 GR FY20157/1/2014
$650,000.00
Guardrail Maintenance
3
D03894447/1/2014Pruning, Tree/Bush RemovalD03 PR FY20157/1/2014
$125,000.00
Tree/Stump Removal and prunningRequest Safety Funds for LOR 2 segment (SR 58 - IR 90)
3
ERI774407/1/2014Preventive MaintenanceERI SR 0002 30.467/1/2014
$3,917,000.00
Preventive Maintenance - Surface Treatmentincludes work/funds from PID:77442
3
HUR775827/1/2014Preventive MaintenanceHUR US 0020 00.98 PM7/1/2014
$1,677,000.00
Preventive Maintenance - Surface Treatment
3
MED797607/1/2014Preventive MaintenanceMED SR 0018 15.15 PM7/1/2014
$512,000.00
Preventive Maintenance - Smoothseal
3
ERI798517/1/2014Preventive MaintenanceERI SR 0002 00.147/1/2014
$4,686,000.00
Preventive Maintenance - Smoothseal
3
LOR826457/1/2014Major RehabilitationLOR SR 0057 19.427/1/2014
$2,260,000.00
Appraisal & Acquisition to be separate Agreement as part of LOR/MED-57/42-19.42/19.33 RW Services from 9/10/12 Programmatic.  Also see PID 86893.Appraisal Review & Relocation Review to be separate Agreement as part of ERI/LOR/MED-250/57/42-0.00/19.42/19.3
3
D03845817/1/2014Bridge Maintenance/Repair (NEW)D03 BH FY20157/1/2014
$608,000.00
Misc Bridge MaintenanceStructures  ERI-002-26.40 / ERI-002-27.20 / ERI-002-28.27
3
D03866917/1/2014Preventive MaintenanceD03 MICRO FY20157/1/2014
$1,402,000.00
Preventive Maintenance - Surface TreatmentTentative Segments:
3
D03866927/1/2014Preventive MaintenanceD03 SMOOTH FY20157/1/2014
$1,603,000.00
Preventive Maintenance - Surface Treatment Tentative Segments:
3
D03866937/1/2014Chip SealD03 CHIP FY20157/1/2014
$500,000.00
Preventive/Reactive Maintenance - Chip Seal
3
D03866947/1/2014Crack SealD03 CRSEAL FY20157/1/2014
$506,000.00
Preventive Maintenance - Crack Seal Added funds / Tentative locations from PID:79739 RIC US 0030 13.22 Added funds / Tentative locations from PID:79752 WAY US 0030 19.85suggestion ASD-US250 north, recently paved but the centerline joint is in need of crac
3
CRA887617/1/2014Minor Rehabilitation - Pavement Gnrl SysCRA SR 0103 00.007/1/2014
$2,029,000.00
2 Lane Resurfacing.  CRA-SR-103-0.00 to 2.29 Wyandot Co. line SR100 overlapCRA-100-22.18 to 22.32 Overlap section with SR103CRA-103-2.43 to 8.82 End overlap section to CRA SR 4
3
RIC888087/1/2014Minor Rehabilitation - Pavement Gnrl SysRIC SR 0095 00.007/1/2014
$4,011,000.00
2 Lane ResurfacingRIC-095-00.00-11.26 / ASD-095-00.00-1.46 RIC-603-00.00 - 04.72 (segment used to be PID:88789)
3
D03894437/1/2014Guardrail Maintenance/Repair (NEW)D03 GR FY20157/1/2014
$650,000.00
Guardrail Maintenance
3
D03894447/1/2014Pruning, Tree/Bush RemovalD03 PR FY20157/1/2014
$125,000.00
Tree/Stump Removal and prunningRequest Safety Funds for LOR 2 segment (SR 58 - IR 90)
3
LOR8107810/1/2014Bridge MaintenanceLOR IR 0090 OVERLAYS10/1/2014
$100,000.00
Reactive Maintenance Asphalt Bridge Deck OverlaysCoordinate with Minor Rehabs PID:77447 & 79853similar to PID: 79314  D03 BH FY2007 (A) - summer 2006
3
ASD8193210/1/2014Bridge Deck ReplacementASD SR 0089 10.3210/1/2014
$1,794,000.00
Deck Replacement
3
LOR8193310/1/2014Bridge Deck ReplacementLOR IR 0090 17.5310/1/2014
$1,918,000.00
Deck Replacement
3
LOR8226210/1/2014SignsLOR IR 0090 SYSSIGN FY201510/1/2014
$183,000.00
Systematic Sign Replacement
3
WAY8345310/1/2014Bridge PaintingWAY BH FY201510/1/2014
$1,873,000.00
Bridge Painting / Bridge Collision Repairadded PID:94284 WAU US 0030 11.46
3
ERI8455610/1/2014Intersection ImprovementERI US 0250 01.1410/1/2014
$2,536,000.00
Reconstruct intersection of US 250 and Perkins Avenue in accordance with the ERI-250-00.00 Corridor Study (PID:76235) The proposed improvements include intersection capacity improvements and implementation of access management techniques to reduce the num
3
D038458710/1/2014Bridge MaintenanceD03 DECK OVERLAYS FY201510/1/2014
$750,000.00
Bridge Deck Overlays / Minor backwall, expansion joint repair LOR-002-00.97 L&R / LOR-002-03.33 L&R / LOR-002-06.49
3
WAY8672810/1/2014Minor Rehabilitation - Pavement Gnrl SysWAY SR 0094 14.1610/1/2014
$3,581,000.00
Resurfacing WAY-094-14.16 to 21.48 / MED-094-00.00 to 01.16 / WAY-585-14.79 to 18.70 / WAY-585-11.96 to 13.93
3
MED8673110/1/2014Minor Rehabilitation - Pavement Gnrl SysMED SR 0094 18.7410/1/2014
$2,038,000.00
Resurfacing MED-094-18.74 to 21.56added MED-303-00.00 - 06.00 (PID:93117)
3
D038675610/1/2014SignalsD03 TSG FY201510/1/2014
$150,000.00
District Wide Traffic Signal / Electrical Installations Reconstruction
3
WAY8774510/1/2014Preventive MaintenanceWAY US 0030 09.1810/1/2014
$989,000.00
Preventive Maintenance - Surface TreatmentWAY-030-09.18 - 11.64
3
ERI8876410/1/2014Minor Rehabilitation - Pavement Gnrl SysERI US 0006 11.2510/1/2014
$1,321,000.00
Resurfacing.ERI-006-11.25 - 15.55City of Sandusky South Corp to City of Huron Full CorpHUR-547-07.13 - 08.18 - Village of Monroeville (used to be PID:92426)
3
LOR8876710/1/2014Minor Rehabilitation - Pavement Gnrl SysLOR SR 0511 13.4110/1/2014
$1,162,000.00
2 Lane ResurfacingLOR-SR-511-13.41-18.46from LOR US 20 to Oberlin Corp.
3
ASD8881110/1/2014Minor Rehabilitation - Pavement Gnrl SysASD SR 0511 14.0710/1/2014
$3,119,000.00
2 Lane Resurfacing - includes small Ashland urban segmentASD-SR-511-14.07-17.99 SR60 overlap to begin SR302 overlapASD-302-10.89 to 11.22 overlap with SR511ASD-511-18.33-27.64 end SR302 overlap to Lorain Co. Line
3
LOR8882510/1/2014Bridge RepairLOR SR 0018 12.2910/1/2014
$400,000.00
Replace Box Beam SuperstructureLOR-SR-18-12.29Design Build selected at 07/18/11 WP MeetingDesign Build
3
RIC8882710/1/2014Bridge RepairRIC US 0042 12.3410/1/2014
$413,000.00
Replace box beams on a 33' structure over Painters CreekRIC-US-42-12.34
3
D038944510/1/2014Lighting MaintenanceD03 LG FY201510/1/2014
$75,000.00
Highway Lighting maintenance - 4CP7
3
D038944610/1/2014Loop Detector RepairD03 LOOP FY201510/1/2014
$75,000.00
Loop Detector Maintenance - 2 year contract
3
MED9269110/1/2014Intersection ImprovementMED SR 0057 17.6710/1/2014
$2,437,000.00
Construct Round about at Intersection of MED SR 057/SR 252Safety project (201110D03-05)First design/acquire project in D-3.
3
ASD9289710/1/2014SignalsASD SR 0096 06.26 (Signals)10/1/2014
$286,000.00
ASD-096-06.26 (Holbrook) - Add auxiliary headASD-096-06.65 (Lee/Sloan) - Rebuild SignalASD-096-07.03 (US 250 Ramp/Bob Evans) - New SignalASD-250-16.39 (US 250 NB Ramp) - New controller(Design to be completed by DLZ under CO Safety Program Task Order contr
3
CRA9310810/1/2014Minor Rehabilitation - Pavement Gnrl SysCRA SR 0098 19.3010/1/2014
$2,111,000.00
ResurfacingCRA-098-19.30 - 23.74 / RIC-098-00.00 - 04.74
3
MED9311310/1/2014Minor Rehabilitation - Pavement Gnrl SysMED SR 0057 03.2410/1/2014
$2,742,000.00
ResurfacingMED-057-03.24 - 10.39MED-094-10.37 - 15.22 (PID:93114)
3
MED9311610/1/2014Minor Rehabilitation - Pavement Gnrl SysMED SR 0301 00.0010/1/2014
$1,587,000.00
ResurfacingMED-301-00.00 - 02.60 / MED-301-02.61 - 06.91
3
D039386410/1/2014Resurfacing,  Undivided SystemD03 Mohican SP FY201410/1/2014
$994,000.00
Asphalt Repairs/Resurfacing at the State Park campgroundsCulvert Replacements in the State Forest
3
D039386810/1/2014Resurfacing,  Undivided SystemD03 Mohican SP FY201510/1/2014
$1,100,000.00
Microsurfacing throughout the park
3
ERI9489810/1/2014Culvert Construction/Reconstr/RepairERI US 0250 09.7810/1/2014
$200,000.00
Culvert Replacement/Rehab - ERI-250-09.78Possible Boring candidate or three phase full replacement.(Design to be completed by Richland Engineering under Task Order.)
3
LOR8107810/1/2014Bridge MaintenanceLOR IR 0090 OVERLAYS10/1/2014
$100,000.00
Reactive Maintenance Asphalt Bridge Deck OverlaysCoordinate with Minor Rehabs PID:77447 & 79853similar to PID: 79314  D03 BH FY2007 (A) - summer 2006
3
ASD8193210/1/2014Bridge Deck ReplacementASD SR 0089 10.3210/1/2014
$1,794,000.00
Deck Replacement
3
LOR8193310/1/2014Bridge Deck ReplacementLOR IR 0090 17.5310/1/2014
$1,918,000.00
Deck Replacement
3
LOR8226210/1/2014SignsLOR IR 0090 SYSSIGN FY201510/1/2014
$183,000.00
Systematic Sign Replacement
3
WAY8345310/1/2014Bridge PaintingWAY BH FY201510/1/2014
$1,873,000.00
Bridge Painting / Bridge Collision Repairadded PID:94284 WAU US 0030 11.46
3
ERI8455610/1/2014Intersection ImprovementERI US 0250 01.1410/1/2014
$2,536,000.00
Reconstruct intersection of US 250 and Perkins Avenue in accordance with the ERI-250-00.00 Corridor Study (PID:76235) The proposed improvements include intersection capacity improvements and implementation of access management techniques to reduce the num
3
D038458710/1/2014Bridge MaintenanceD03 DECK OVERLAYS FY201510/1/2014
$750,000.00
Bridge Deck Overlays / Minor backwall, expansion joint repair LOR-002-00.97 L&R / LOR-002-03.33 L&R / LOR-002-06.49
3
WAY8672810/1/2014Minor Rehabilitation - Pavement Gnrl SysWAY SR 0094 14.1610/1/2014
$3,581,000.00
Resurfacing WAY-094-14.16 to 21.48 / MED-094-00.00 to 01.16 / WAY-585-14.79 to 18.70 / WAY-585-11.96 to 13.93
3
MED8673110/1/2014Minor Rehabilitation - Pavement Gnrl SysMED SR 0094 18.7410/1/2014
$2,038,000.00
Resurfacing MED-094-18.74 to 21.56added MED-303-00.00 - 06.00 (PID:93117)
3
D038675610/1/2014SignalsD03 TSG FY201510/1/2014
$150,000.00
District Wide Traffic Signal / Electrical Installations Reconstruction
3
WAY8774510/1/2014Preventive MaintenanceWAY US 0030 09.1810/1/2014
$989,000.00
Preventive Maintenance - Surface TreatmentWAY-030-09.18 - 11.64
3
ERI8876410/1/2014Minor Rehabilitation - Pavement Gnrl SysERI US 0006 11.2510/1/2014
$1,321,000.00
Resurfacing.ERI-006-11.25 - 15.55City of Sandusky South Corp to City of Huron Full CorpHUR-547-07.13 - 08.18 - Village of Monroeville (used to be PID:92426)
3
LOR8876710/1/2014Minor Rehabilitation - Pavement Gnrl SysLOR SR 0511 13.4110/1/2014
$1,162,000.00
2 Lane ResurfacingLOR-SR-511-13.41-18.46from LOR US 20 to Oberlin Corp.
3
ASD8881110/1/2014Minor Rehabilitation - Pavement Gnrl SysASD SR 0511 14.0710/1/2014
$3,119,000.00
2 Lane Resurfacing - includes small Ashland urban segmentASD-SR-511-14.07-17.99 SR60 overlap to begin SR302 overlapASD-302-10.89 to 11.22 overlap with SR511ASD-511-18.33-27.64 end SR302 overlap to Lorain Co. Line
3
LOR8882510/1/2014Bridge RepairLOR SR 0018 12.2910/1/2014
$400,000.00
Replace Box Beam SuperstructureLOR-SR-18-12.29Design Build selected at 07/18/11 WP MeetingDesign Build
3
RIC8882710/1/2014Bridge RepairRIC US 0042 12.3410/1/2014
$413,000.00
Replace box beams on a 33' structure over Painters CreekRIC-US-42-12.34
3
D038944510/1/2014Lighting MaintenanceD03 LG FY201510/1/2014
$75,000.00
Highway Lighting maintenance - 4CP7
3
D038944610/1/2014Loop Detector RepairD03 LOOP FY201510/1/2014
$75,000.00
Loop Detector Maintenance - 2 year contract
3
MED9269110/1/2014Intersection ImprovementMED SR 0057 17.6710/1/2014
$2,437,000.00
Construct Round about at Intersection of MED SR 057/SR 252Safety project (201110D03-05)First design/acquire project in D-3.
3
ASD9289710/1/2014SignalsASD SR 0096 06.26 (Signals)10/1/2014
$286,000.00
ASD-096-06.26 (Holbrook) - Add auxiliary headASD-096-06.65 (Lee/Sloan) - Rebuild SignalASD-096-07.03 (US 250 Ramp/Bob Evans) - New SignalASD-250-16.39 (US 250 NB Ramp) - New controller(Design to be completed by DLZ under CO Safety Program Task Order contr
3
CRA9310810/1/2014Minor Rehabilitation - Pavement Gnrl SysCRA SR 0098 19.3010/1/2014
$2,111,000.00
ResurfacingCRA-098-19.30 - 23.74 / RIC-098-00.00 - 04.74
3
MED9311310/1/2014Minor Rehabilitation - Pavement Gnrl SysMED SR 0057 03.2410/1/2014
$2,742,000.00
ResurfacingMED-057-03.24 - 10.39MED-094-10.37 - 15.22 (PID:93114)
3
MED9311610/1/2014Minor Rehabilitation - Pavement Gnrl SysMED SR 0301 00.0010/1/2014
$1,587,000.00
ResurfacingMED-301-00.00 - 02.60 / MED-301-02.61 - 06.91
3
D039386410/1/2014Resurfacing,  Undivided SystemD03 Mohican SP FY201410/1/2014
$994,000.00
Asphalt Repairs/Resurfacing at the State Park campgroundsCulvert Replacements in the State Forest
3
D039386810/1/2014Resurfacing,  Undivided SystemD03 Mohican SP FY201510/1/2014
$1,100,000.00
Microsurfacing throughout the park
3
ERI9489810/1/2014Culvert Construction/Reconstr/RepairERI US 0250 09.7810/1/2014
$200,000.00
Culvert Replacement/Rehab - ERI-250-09.78Possible Boring candidate or three phase full replacement.(Design to be completed by Richland Engineering under Task Order.)
3
LOR801231/1/2015Bridge ReplacementLOR SR 0162 05.771/1/2015
$450,000.00
Replace 18' structurally deficient bridge over Tributary of Charlemont Creek
3
RIC822631/1/2015SignsRIC US 0030 SYSSIGN FY20151/1/2015
$203,000.00
Systematic Sign Replacement
3
LOR862721/1/2015Resurfacing,  Undivided SystemLOR SR 0058 23.791/1/2015
$649,000.00
Urban Paving Program - Amherst
3
WAY868401/1/2015Resurfacing,  Undivided SystemWAY SR 0057 10.821/1/2015
$677,000.00
Rittman Urban Paving + general systemTentative Begin/End SLMs
3
MED868931/1/2015Intersection ImprovementMED US 0042 19.331/1/2015
$3,823,000.00
Appraisal & Acquisition to be separate Agreement as part of LOR/MED-57/42-19.42/19.33 RW Services from 9/10/12 Programmatic.  Also see PID 82645.Appraisal Review & Relocation Review to be separate Agreement as part of ERI/LOR/MED-250/57/42-0.00/19.42/19.3
3
ERI884071/1/2015Section ImprovementERI US 0250 00.001/1/2015
$1,000,000.00
Appraisal & Acquisition to be under separate Agreement from 9/10/12 Programmatic.Appraisal Review & Relocation Review to be separate Agreement as part of ERI/LOR/MED-250/57/42-0.00/19.42/19.33 RW Services from 9/10/12 Programmatic. Also see PID 82645 & PI
3
RIC887281/1/2015Resurfacing,  Undivided SystemRIC SR 0039 13.611/1/2015
$1,663,000.00
Urban Paving - MansfieldRIC-039-13.61 to 16.80 / RIC-545-00.00 - 01.44
3
D03894471/1/2015Raised Pavement MarkersD03 RPM FY20151/1/2015
$347,000.00
Raised Pavement Markers
3
HUR903621/1/2015Culvert Construction/Reconstr/RepairHUR SR 0061 15.931/1/2015
$300,000.00
Culvert Relining - HUR-061-15.93 - 0.02 miles south of Johnson Rd (CR 128)Added to this PID - Culvert Replacement - HUR-162-08.72 - 0.62 miles east of Lyon Rd (TR 103) (previously under PID 90358)
3
WAY909361/1/2015Add SidewalksD03 SRTS Creston Inf.1/1/2015
$392,000.00
Sidewalk, Multi-use path
3
HUR916571/1/2015Minor Rehabilitation - Pavement Gnrl SysHUR US 0224 06.16 Phase 41/1/2015
$1,267,000.00
removal and widening of the existing pavement, construct three, 12' lanes, new type 2 curb and gutter.  storm drainage incidental to roadway construction will be included.  intersection improvements at Neal Zick Road will include the installation of a new
3
LOR920091/1/2015Bridge RepairLOR SR 0611 03.441/1/2015
$3,292,000.00
Major Bridge Funds candidate projectLOR-611-03.44We plan to do the PE with PID:81387 also Major Bridge Funds
3
RIC937101/1/2015Culvert Construction/Reconstr/RepairRIC CULVERTS FY20151/1/2015
$527,000.00
RIC-071-18.90 - Paved InvertRIC-030-05.20 - Paved InvertRIC-030-06.60 - Paved InvertRIC-030-17.34 - Paved Invert
3
WAY949021/1/2015Culvert Construction/Reconstr/RepairWAY US 0250 13.171/1/2015
$100,000.00
WAY-250-13.17Pave Invert
3
LOR801231/1/2015Bridge ReplacementLOR SR 0162 05.771/1/2015
$450,000.00
Replace 18' structurally deficient bridge over Tributary of Charlemont Creek
3
RIC822631/1/2015SignsRIC US 0030 SYSSIGN FY20151/1/2015
$203,000.00
Systematic Sign Replacement
3
LOR862721/1/2015Resurfacing,  Undivided SystemLOR SR 0058 23.791/1/2015
$649,000.00
Urban Paving Program - Amherst
3
WAY868401/1/2015Resurfacing,  Undivided SystemWAY SR 0057 10.821/1/2015
$677,000.00
Rittman Urban Paving + general systemTentative Begin/End SLMs
3
MED868931/1/2015Intersection ImprovementMED US 0042 19.331/1/2015
$3,823,000.00
Appraisal & Acquisition to be separate Agreement as part of LOR/MED-57/42-19.42/19.33 RW Services from 9/10/12 Programmatic.  Also see PID 82645.Appraisal Review & Relocation Review to be separate Agreement as part of ERI/LOR/MED-250/57/42-0.00/19.42/19.3
3
ERI884071/1/2015Section ImprovementERI US 0250 00.001/1/2015
$1,000,000.00
Appraisal & Acquisition to be under separate Agreement from 9/10/12 Programmatic.Appraisal Review & Relocation Review to be separate Agreement as part of ERI/LOR/MED-250/57/42-0.00/19.42/19.33 RW Services from 9/10/12 Programmatic. Also see PID 82645 & PI
3
RIC887281/1/2015Resurfacing,  Undivided SystemRIC SR 0039 13.611/1/2015
$1,663,000.00
Urban Paving - MansfieldRIC-039-13.61 to 16.80 / RIC-545-00.00 - 01.44
3
D03894471/1/2015Raised Pavement MarkersD03 RPM FY20151/1/2015
$347,000.00
Raised Pavement Markers
3
HUR903621/1/2015Culvert Construction/Reconstr/RepairHUR SR 0061 15.931/1/2015
$300,000.00
Culvert Relining - HUR-061-15.93 - 0.02 miles south of Johnson Rd (CR 128)Added to this PID - Culvert Replacement - HUR-162-08.72 - 0.62 miles east of Lyon Rd (TR 103) (previously under PID 90358)
3
WAY909361/1/2015Add SidewalksD03 SRTS Creston Inf.1/1/2015
$392,000.00
Sidewalk, Multi-use path
3
HUR916571/1/2015Minor Rehabilitation - Pavement Gnrl SysHUR US 0224 06.16 Phase 41/1/2015
$1,267,000.00
removal and widening of the existing pavement, construct three, 12' lanes, new type 2 curb and gutter.  storm drainage incidental to roadway construction will be included.  intersection improvements at Neal Zick Road will include the installation of a new
3
LOR920091/1/2015Bridge RepairLOR SR 0611 03.441/1/2015
$3,292,000.00
Major Bridge Funds candidate projectLOR-611-03.44We plan to do the PE with PID:81387 also Major Bridge Funds
3
RIC937101/1/2015Culvert Construction/Reconstr/RepairRIC CULVERTS FY20151/1/2015
$527,000.00
RIC-071-18.90 - Paved InvertRIC-030-05.20 - Paved InvertRIC-030-06.60 - Paved InvertRIC-030-17.34 - Paved Invert
3
WAY949021/1/2015Culvert Construction/Reconstr/RepairWAY US 0250 13.171/1/2015
$100,000.00
WAY-250-13.17Pave Invert
3
MED813384/1/2015Minor Rehabilitation - Pavement Prmy SysMED SR 0094 03.804/1/2015
$10,230,000.00
Reconstruct and improve SR 94 to include the bridge over I 76.  Project includes Safety, NOACA and Urban Paving funding.Funds from PID:85162 MED IR 0076 09.76 ($3,880,000 Safety)  have been moved to this PID.
3
WAY846054/1/2015Culvert Construction/Reconstr/RepairWAY SR 0302 04.864/1/2015
$750,000.00
Twin Steel pipes Replacement / 11' structure replacement over Small Creek
3
MED887734/1/2015Resurfacing,  Undivided SystemMED SR 0094 01.164/1/2015
$649,000.00
Urban Paving - WadsworthMED-094-01.16-3.80 / MED-094-04.46-05.31 (used to be PID:92890)
3
D03894484/1/2015Pavement MarkingD03 PM FY20154/1/2015
$2,445,000.00
Pavement Marking
3
WAY913004/1/2015Slide RepairWAY SR 0003 01.404/1/2015
$763,000.00
FY2015 Geologic Site Management Funds ApplicationRock Slope Cutback / Both sides of SR 3WAY-003-01.40 - 0.21 miles south of Newkirk Rd (CR 104)WAY-003-02.36 - 0.26 miles south of S Funk Rd (CR 16)
3
LOR913034/1/2015Slide RepairLOR SR 0252 02.304/1/2015
$271,000.00
FY2015 Geologic Site Management Funds Application Slide repairs / west side of SR 252 LOR-252-02.30 - 0.36 miles south of SR 82 (Elyria Twinsburg Rd)Design by D03 Task Order consultant.
3
MED928834/1/2015Resurfacing,  Undivided SystemMED SR 0303 06.004/1/2015
$1,188,000.00
Brunswick Urban PavingMED-303-6.00 to 9.82
3
LOR937094/1/2015Culvert Construction/Reconstr/RepairLOR CULVERTS FY20154/1/2015
$391,000.00
Culvert Repairs/ReplacementsLOR-020-01.06 - ReplacementLOR-252-04.34 - Replacement- Ref. PID: 95264 for R/W fundingLOR-303-08.42 - Replacement- Ref. PID: 95265 for R/W funding
3
LOR949004/1/2015Culvert Construction/Reconstr/RepairLOR SR 0010 01.134/1/2015
$400,000.00
Culvert Replacement/Rehab  LOR-010-01.13 / LOR-010-02.15 / LOR-020-10.19/LOR 480 Eastbound exit ramp to Lorain Rd. (LOR-10-6.27)Possible boring/lining candidates. Spincast/ecocast technology will be considered.
3
MED813384/1/2015Minor Rehabilitation - Pavement Prmy SysMED SR 0094 03.804/1/2015
$10,230,000.00
Reconstruct and improve SR 94 to include the bridge over I 76.  Project includes Safety, NOACA and Urban Paving funding.Funds from PID:85162 MED IR 0076 09.76 ($3,880,000 Safety)  have been moved to this PID.
3
WAY846054/1/2015Culvert Construction/Reconstr/RepairWAY SR 0302 04.864/1/2015
$750,000.00
Twin Steel pipes Replacement / 11' structure replacement over Small Creek
3
MED887734/1/2015Resurfacing,  Undivided SystemMED SR 0094 01.164/1/2015
$649,000.00
Urban Paving - WadsworthMED-094-01.16-3.80 / MED-094-04.46-05.31 (used to be PID:92890)
3
D03894484/1/2015Pavement MarkingD03 PM FY20154/1/2015
$2,445,000.00
Pavement Marking
3
WAY913004/1/2015Slide RepairWAY SR 0003 01.404/1/2015
$763,000.00
FY2015 Geologic Site Management Funds ApplicationRock Slope Cutback / Both sides of SR 3WAY-003-01.40 - 0.21 miles south of Newkirk Rd (CR 104)WAY-003-02.36 - 0.26 miles south of S Funk Rd (CR 16)
3
LOR913034/1/2015Slide RepairLOR SR 0252 02.304/1/2015
$271,000.00
FY2015 Geologic Site Management Funds Application Slide repairs / west side of SR 252 LOR-252-02.30 - 0.36 miles south of SR 82 (Elyria Twinsburg Rd)Design by D03 Task Order consultant.
3
MED928834/1/2015Resurfacing,  Undivided SystemMED SR 0303 06.004/1/2015
$1,188,000.00
Brunswick Urban PavingMED-303-6.00 to 9.82
3
LOR937094/1/2015Culvert Construction/Reconstr/RepairLOR CULVERTS FY20154/1/2015
$391,000.00
Culvert Repairs/ReplacementsLOR-020-01.06 - ReplacementLOR-252-04.34 - Replacement- Ref. PID: 95264 for R/W fundingLOR-303-08.42 - Replacement- Ref. PID: 95265 for R/W funding
3
LOR949004/1/2015Culvert Construction/Reconstr/RepairLOR SR 0010 01.134/1/2015
$400,000.00
Culvert Replacement/Rehab  LOR-010-01.13 / LOR-010-02.15 / LOR-020-10.19/LOR 480 Eastbound exit ramp to Lorain Rd. (LOR-10-6.27)Possible boring/lining candidates. Spincast/ecocast technology will be considered.
3
MED929545/21/2015Section ImprovementMED US 0042 17.685/21/2015
$1,100,000.00
MED-042-17.68 (Harding St Area) to 19.15 (Fenn Rd) - was originally in a larger study under Pid 75995. Widen from 3 to 4 lanes with a median from the begining of project to Hillview Way/Ledgewood and then to 5 Lanes north of Hillview Way/Ledgewood to the
3
MED929545/21/2015Section ImprovementMED US 0042 17.685/21/2015
$1,100,000.00
MED-042-17.68 (Harding St Area) to 19.15 (Fenn Rd) - was originally in a larger study under Pid 75995. Widen from 3 to 4 lanes with a median from the begining of project to Hillview Way/Ledgewood and then to 5 Lanes north of Hillview Way/Ledgewood to the
3
MED770387/1/2015Preventive MaintenanceMED IR 0271 00.00 PM7/1/2015
$2,061,000.00
Preventive Maintenance - Surface Treatment
3
RIC797667/1/2015Minor Rehabilitation - Pavement Prmy SysRIC SR 0013 05.627/1/2015
$4,163,000.00
Minor RehabilitationRIC-013-05.62 (NCL Bellville) to 11.01 (Hanley Rd Intersection)
3
MED770387/1/2015Preventive MaintenanceMED IR 0271 00.00 PM7/1/2015
$2,061,000.00
Preventive Maintenance - Surface Treatment
3
RIC797667/1/2015Minor Rehabilitation - Pavement Prmy SysRIC SR 0013 05.627/1/2015
$4,163,000.00
Minor RehabilitationRIC-013-05.62 (NCL Bellville) to 11.01 (Hanley Rd Intersection)
3
MED770387/1/2015Preventive MaintenanceMED IR 0271 00.00 PM7/1/2015
$2,061,000.00
Preventive Maintenance - Surface Treatment
3
RIC797667/1/2015Minor Rehabilitation - Pavement Prmy SysRIC SR 0013 05.627/1/2015
$4,163,000.00
Minor RehabilitationRIC-013-05.62 (NCL Bellville) to 11.01 (Hanley Rd Intersection)
3
ASD822647/1/2015SignsASD US 0030 SYSSIGN FY20167/1/2015
$202,000.00
Systematic Sign Replacement
3
D03890057/1/2015Mill and FillD03 IR 0071 RM FY2016 (A)7/1/2015
$100,000.00
Mill and Fill of failing surface course (spot treatment of delaminated areas only).
3
MED770387/1/2015Preventive MaintenanceMED IR 0271 00.00 PM7/1/2015
$2,061,000.00
Preventive Maintenance - Surface Treatment
3
RIC797667/1/2015Minor Rehabilitation - Pavement Prmy SysRIC SR 0013 05.627/1/2015
$4,163,000.00
Minor RehabilitationRIC-013-05.62 (NCL Bellville) to 11.01 (Hanley Rd Intersection)
3
ASD822647/1/2015SignsASD US 0030 SYSSIGN FY20167/1/2015
$202,000.00
Systematic Sign Replacement
3
D03890057/1/2015Mill and FillD03 IR 0071 RM FY2016 (A)7/1/2015
$100,000.00
Mill and Fill of failing surface course (spot treatment of delaminated areas only).
4
TRU764137/29/2013Minor Rehabilitation - Pavement Prmy SysTRU SR 0082 14.087/18/2013
$3,400,000.00
Minor rehabilitation/resurfacing. Miscellaneous bridge work to six structures.
4
TRU764137/29/2013Minor Rehabilitation - Pavement Prmy SysTRU SR 0082 14.087/18/2013
$3,400,000.00
Minor rehabilitation/resurfacing. Miscellaneous bridge work to six structures.
4
TRU764137/29/2013Minor Rehabilitation - Pavement Prmy SysTRU SR 0082 14.087/18/2013
$3,400,000.00
Minor rehabilitation/resurfacing. Miscellaneous bridge work to six structures.
4
ATB846067/29/2013Minor Rehabilitation - Pavement Gnrl SysATB US/SR 322/7 8.11/18.107/18/2013
$2,400,000.00
Resurfacing. Miscellaneous bridge work to five structures.
4
POR883727/29/2013Bridge RepairPOR Rock Spring (CR 0052) 02.787/18/2013
$1,600,000.00
Bridge rehabilitation.Credit Bridge funding being utilized. MAXed at $340,650.Design Build
4
STA898767/29/2013BikewaysSTA Parks Bike Crossings7/18/2013
$41,000.00
Provide three bicycle / pedestrian crossings as part of the Hoover Connector trail. Easton Street (East of Glenoak School Drive), Schneider Street (West of Glenoak School Drive), and Marquardt Avenue (North of Devon Drive).
4
SUM927197/29/2013Mill and FillSUM State Street (CR-162-2.44)7/18/2013
$625,000.00
Resurfacing.
4
D04946007/29/2013Fencing Maintenance/Repair (New)D04 FEN FY 20147/18/2013
$350,000.00
Two year contract to repair/maintenance fence along various routes throughout the District.
4
TRU764137/29/2013Minor Rehabilitation - Pavement Prmy SysTRU SR 0082 14.087/18/2013
$3,400,000.00
Minor rehabilitation/resurfacing. Miscellaneous bridge work to six structures.
4
ATB846067/29/2013Minor Rehabilitation - Pavement Gnrl SysATB US/SR 322/7 8.11/18.107/18/2013
$2,400,000.00
Resurfacing. Miscellaneous bridge work to five structures.
4
POR883727/29/2013Bridge RepairPOR Rock Spring (CR 0052) 02.787/18/2013
$1,600,000.00
Bridge rehabilitation.Credit Bridge funding being utilized. MAXed at $340,650.Design Build
4
STA898767/29/2013BikewaysSTA Parks Bike Crossings7/18/2013
$41,000.00
Provide three bicycle / pedestrian crossings as part of the Hoover Connector trail. Easton Street (East of Glenoak School Drive), Schneider Street (West of Glenoak School Drive), and Marquardt Avenue (North of Devon Drive).
4
SUM927197/29/2013Mill and FillSUM State Street (CR-162-2.44)7/18/2013
$625,000.00
Resurfacing.
4
D04946007/29/2013Fencing Maintenance/Repair (New)D04 FEN FY 20147/18/2013
$350,000.00
Two year contract to repair/maintenance fence along various routes throughout the District.
4
ATB788838/12/2013Erosion ProtectionATB SR 0531 02.90 (Phase I & II)8/1/2013
$6,875,000.00
PHASE I and II - Permanent treatment at SLM 2.90 erosion site.PE - Detailed Design encumbered under PID#78882.PHASE III - Designed under PID# 87060. McCoy Associates.
4
ATB788838/12/2013Erosion ProtectionATB SR 0531 02.90 (Phase I & II)8/1/2013
$6,875,000.00
PHASE I and II - Permanent treatment at SLM 2.90 erosion site.PE - Detailed Design encumbered under PID#78882.PHASE III - Designed under PID# 87060. McCoy Associates.
4
ATB788838/12/2013Erosion ProtectionATB SR 0531 02.90 (Phase I & II)8/1/2013
$6,875,000.00
PHASE I and II - Permanent treatment at SLM 2.90 erosion site.PE - Detailed Design encumbered under PID#78882.PHASE III - Designed under PID# 87060. McCoy Associates.
4
MAH846018/12/2013Minor Rehabilitation - Pavement Gnrl SysMAH/POR/TRU - 224/534 - Various8/1/2013
$3,700,000.00
Resurfacing of US-224 and SR-534 in Portage, Mahoning, and Trumbull Counties, Ohio. Minor bridge work to seven structures.
4
D04945488/12/2013Guardrail Maintenance/Repair (NEW)D04 GR FY 20148/1/2013
$875,000.00
One year contract to repair and replace existing guardrail throughout six counties.
4
D04945678/12/2013LightingD04 LG FY 2014 (West)8/1/2013
$780,000.00
Lighting repair and maintenance in Portage, Stark, and Summit Counties, Ohio.
4
ATB788838/12/2013Erosion ProtectionATB SR 0531 02.90 (Phase I & II)8/1/2013
$6,875,000.00
PHASE I and II - Permanent treatment at SLM 2.90 erosion site.PE - Detailed Design encumbered under PID#78882.PHASE III - Designed under PID# 87060. McCoy Associates.
4
MAH846018/12/2013Minor Rehabilitation - Pavement Gnrl SysMAH/POR/TRU - 224/534 - Various8/1/2013
$3,700,000.00
Resurfacing of US-224 and SR-534 in Portage, Mahoning, and Trumbull Counties, Ohio. Minor bridge work to seven structures.
4
D04945488/12/2013Guardrail Maintenance/Repair (NEW)D04 GR FY 20148/1/2013
$875,000.00
One year contract to repair and replace existing guardrail throughout six counties.
4
D04945678/12/2013LightingD04 LG FY 2014 (West)8/1/2013
$780,000.00
Lighting repair and maintenance in Portage, Stark, and Summit Counties, Ohio.
4
SUM187108/26/2013Major RehabilitationSUM IR 0271 02.338/15/2013
$54,500,000.00
Major Rehabilitation Project.   Total Pavement Replacement With Bridge Work.
4
STA760078/26/2013SignalsSTA Navarre Road SW Signals8/15/2013
$1,500,000.00
Traffic signal system upgrade with a total of 14 intersections involved
4
SUM187108/26/2013Major RehabilitationSUM IR 0271 02.338/15/2013
$54,500,000.00
Major Rehabilitation Project.   Total Pavement Replacement With Bridge Work.
4
SUM187108/26/2013Major RehabilitationSUM IR 0271 02.338/15/2013
$54,500,000.00
Major Rehabilitation Project.   Total Pavement Replacement With Bridge Work.
4
STA760078/26/2013SignalsSTA Navarre Road SW Signals8/15/2013
$1,500,000.00
Traffic signal system upgrade with a total of 14 intersections involved
4
STA760078/26/2013SignalsSTA Navarre Road SW Signals8/15/2013
$1,500,000.00
Traffic signal system upgrade with a total of 14 intersections involved
4
STA845868/26/2013Minor Rehabilitation - Pavement Gnrl SysSTA US/SR 30/183 31.96/5.888/15/2013
$2,900,000.00
Resurfacing. US-30 from Minerva Western corp to Columbiana County line. SR-183 from Market Street to Alliance Southern corp.Deck overlay and painting of sfn# 7605625. Asphalt overlay of sfn# 7601204.
4
POR953578/26/2013Salt DomePOR Rootstown Salt Building8/15/2013
$620,000.00
Construction of salt storage building.
4
SUM187108/26/2013Major RehabilitationSUM IR 0271 02.338/15/2013
$54,500,000.00
Major Rehabilitation Project.   Total Pavement Replacement With Bridge Work.
4
STA760078/26/2013SignalsSTA Navarre Road SW Signals8/15/2013
$1,500,000.00
Traffic signal system upgrade with a total of 14 intersections involved
4
STA845868/26/2013Minor Rehabilitation - Pavement Gnrl SysSTA US/SR 30/183 31.96/5.888/15/2013
$2,900,000.00
Resurfacing. US-30 from Minerva Western corp to Columbiana County line. SR-183 from Market Street to Alliance Southern corp.Deck overlay and painting of sfn# 7605625. Asphalt overlay of sfn# 7601204.
4
POR953578/26/2013Salt DomePOR Rootstown Salt Building8/15/2013
$620,000.00
Construction of salt storage building.
4
SUM768499/9/2013Resurfacing, Divided SystemSUM SR 0059 00.008/29/2013
$6,900,000.00
Minor rehabilitation. Miscellaneous bridge work.
4
SUM768499/9/2013Resurfacing, Divided SystemSUM SR 0059 00.008/29/2013
$6,900,000.00
Minor rehabilitation. Miscellaneous bridge work.
4
SUM768499/9/2013Resurfacing, Divided SystemSUM SR 0059 00.008/29/2013
$6,900,000.00
Minor rehabilitation. Miscellaneous bridge work.
4
MAH845629/9/2013Mill and FillMAH 62/170 19.57/12.568/29/2013
$1,685,000.00
Resurfacing of US-62 and SR-170 in the City of Youngstown, Mahoning County, Ohio.
4
SUM768499/9/2013Resurfacing, Divided SystemSUM SR 0059 00.008/29/2013
$6,900,000.00
Minor rehabilitation. Miscellaneous bridge work.
4
MAH845629/9/2013Mill and FillMAH 62/170 19.57/12.568/29/2013
$1,685,000.00
Resurfacing of US-62 and SR-170 in the City of Youngstown, Mahoning County, Ohio.
4
D04965129/9/2013Mill and FillD04 Safety Pavement FY20149/5/2013
$215,000.00
Pavement repairs and resurfacing on ATB-SR46, MAH-IR80, and STA-IR77.
4
D04965129/9/2013Mill and FillD04 Safety Pavement FY20149/5/2013
$215,000.00
Pavement repairs and resurfacing on ATB-SR46, MAH-IR80, and STA-IR77.
4
D04927639/23/2013Bridge MaintenanceD04 BH FY 20149/12/2013
$415,000.00
Districtwide contract to repair miscellaneous structures.
4
D04927639/23/2013Bridge MaintenanceD04 BH FY 20149/12/2013
$415,000.00
Districtwide contract to repair miscellaneous structures.
4
TRU9069910/7/2013Culvert Construction/Reconstr/RepairTRU US 0062 01.189/26/2013
$160,000.00
Replace stone box culvert.
4
TRU9069910/7/2013Culvert Construction/Reconstr/RepairTRU US 0062 01.189/26/2013
$160,000.00
Replace stone box culvert.
4
SUM8462910/21/2013Bridge ReplacementSUM IR 0076 (3.62)(4.97)10/10/2013
$3,226,000.00
Replacement of two structures.
4
MAH8475410/21/2013Bridge ReplacementMAH IR 680 12.10/14.3710/10/2013
$8,500,000.00
Bridge rehabilitation and widening. Construct a Westbound right turn lane on Western Reserve Road at the intersection with the IR-680 Northbound on-ramp. Resurfacing of IR-680 from US-224 to Ohio Turnpike, with minor bridge work.Design Build
4
ATB9638710/21/2013Building DemolitionATB US 20 13.78 Building Demo10/10/2013
$100,000.00
Demolition of three structures, Ashtabula County, Ohio.
4
SUM8462910/21/2013Bridge ReplacementSUM IR 0076 (3.62)(4.97)10/10/2013
$3,226,000.00
Replacement of two structures.
4
MAH8475410/21/2013Bridge ReplacementMAH IR 680 12.10/14.3710/10/2013
$8,500,000.00
Bridge rehabilitation and widening. Construct a Westbound right turn lane on Western Reserve Road at the intersection with the IR-680 Northbound on-ramp. Resurfacing of IR-680 from US-224 to Ohio Turnpike, with minor bridge work.Design Build
4
ATB9638710/21/2013Building DemolitionATB US 20 13.78 Building Demo10/10/2013
$100,000.00
Demolition of three structures, Ashtabula County, Ohio.
4
MAH9451611/4/2013Bridge Deck ReplacementMAH US 0422 03.6210/24/2013
$1,925,000.00
Bridge re-deck of sfn# 5004434, provide repairs to slope protection, including steel retaining wall. Replace signing. In the City of Youngstown, Mahoning County, Ohio.Design Build
4
MAH9451611/4/2013Bridge Deck ReplacementMAH US 0422 03.6210/24/2013
$1,925,000.00
Bridge re-deck of sfn# 5004434, provide repairs to slope protection, including steel retaining wall. Replace signing. In the City of Youngstown, Mahoning County, Ohio.Design Build
4
STA7634011/18/2013Bridge Deck ReplacementSTA US 62/62T/173/183/225 VAR11/7/2013
$4,785,000.00
Re-Deck of 2 bridges (Beeson & Vine) and Miscellaneous bridge work to 9 structures.Design Build
4
STA7634011/18/2013Bridge Deck ReplacementSTA US 62/62T/173/183/225 VAR11/7/2013
$4,785,000.00
Re-Deck of 2 bridges (Beeson & Vine) and Miscellaneous bridge work to 9 structures.Design Build
4
STA7634011/18/2013Bridge Deck ReplacementSTA US 62/62T/173/183/225 VAR11/7/2013
$4,785,000.00
Re-Deck of 2 bridges (Beeson & Vine) and Miscellaneous bridge work to 9 structures.Design Build
4
SUM9344511/18/2013Noise WallSUM SR 0008 16.6611/7/2013
$5,300,000.00
Construction of noise wall.Design Build
4
STA7634011/18/2013Bridge Deck ReplacementSTA US 62/62T/173/183/225 VAR11/7/2013
$4,785,000.00
Re-Deck of 2 bridges (Beeson & Vine) and Miscellaneous bridge work to 9 structures.Design Build
4
SUM9344511/18/2013Noise WallSUM SR 0008 16.6611/7/2013
$5,300,000.00
Construction of noise wall.Design Build
4
TRU8151012/2/2013Bridge ReplacementTRU IR 0080 08.5611/21/2013
$12,500,000.00
Replacement over twin structures on TRU-IR80. Re-alignment of Mount Everett Road.
4
MAH8163812/2/2013Minor Rehabilitation - Pavement Prmy SysMAH SR 0011 00.0011/21/2013
$7,450,000.00
Resurfacing, with miscellaneous bridge work.
4
TRU8151012/2/2013Bridge ReplacementTRU IR 0080 08.5611/21/2013
$12,500,000.00
Replacement over twin structures on TRU-IR80. Re-alignment of Mount Everett Road.
4
MAH8163812/2/2013Minor Rehabilitation - Pavement Prmy SysMAH SR 0011 00.0011/21/2013
$7,450,000.00
Resurfacing, with miscellaneous bridge work.
4
TRU8242012/23/2013Bridge ReplacementTRU Olive St (Niles-McDonald)12/12/2013
$5,053,000.00
Structure replacement.
4
STA8457212/23/2013Minor Rehabilitation - Pavement Gnrl SysSTA SR 0241 11.29/14.6712/12/2013
$1,570,000.00
Resurfacing. Deck overlay to sfn# 7606273.Add Southbound left turn lane at Oakdale.Signal upgrade at Traphagen Street.
4
ATB9231312/23/2013Culvert Construction/Reconstr/RepairATB SR 0166 01.2512/12/2013
$475,000.00
Culvert replacement.
4
TRU9644612/23/2013Bridge Vehicle Damage Repair (NEW)TRU IR 0080 09.5612/12/2013
$150,000.00
Repair of damaged beams to structure sfn# 7804326, located in the City of Hubbard, Trumbull County, Ohio.
4
TRU8242012/23/2013Bridge ReplacementTRU Olive St (Niles-McDonald)12/12/2013
$5,053,000.00
Structure replacement.
4
STA8457212/23/2013Minor Rehabilitation - Pavement Gnrl SysSTA SR 0241 11.29/14.6712/12/2013
$1,570,000.00
Resurfacing. Deck overlay to sfn# 7606273.Add Southbound left turn lane at Oakdale.Signal upgrade at Traphagen Street.
4
ATB9231312/23/2013Culvert Construction/Reconstr/RepairATB SR 0166 01.2512/12/2013
$475,000.00
Culvert replacement.
4
TRU9644612/23/2013Bridge Vehicle Damage Repair (NEW)TRU IR 0080 09.5612/12/2013
$150,000.00
Repair of damaged beams to structure sfn# 7804326, located in the City of Hubbard, Trumbull County, Ohio.
4
TRU844761/20/2014Bridge ReplacementTRU Mayburn Corners (CR279)1/9/2014
$553,000.00
Replace existing structure
4
POR869301/20/2014Minor Rehabilitation - Pavement Gnrl SysPOR SR 43/59/261 13.21/5.86/3.511/9/2014
$1,735,000.00
Resurfacing. Miscellaneous bridge work to four structures.Urban paving segment on SR-261 from Summit Road to Kent Eastern Corp.
4
STA925261/20/2014SignalsSTA SR 0687 04.781/9/2014
$110,000.00
Replace signal.
4
ATB926981/20/2014Culvert Construction/Reconstr/RepairATB Culverts FY 2014 Various1/9/2014
$1,640,000.00
Culvert replacements.
4
TRU844761/20/2014Bridge ReplacementTRU Mayburn Corners (CR279)1/9/2014
$553,000.00
Replace existing structure
4
POR869301/20/2014Minor Rehabilitation - Pavement Gnrl SysPOR SR 43/59/261 13.21/5.86/3.511/9/2014
$1,735,000.00
Resurfacing. Miscellaneous bridge work to four structures.Urban paving segment on SR-261 from Summit Road to Kent Eastern Corp.
4
STA925261/20/2014SignalsSTA SR 0687 04.781/9/2014
$110,000.00
Replace signal.
4
ATB926981/20/2014Culvert Construction/Reconstr/RepairATB Culverts FY 2014 Various1/9/2014
$1,640,000.00
Culvert replacements.
4
STA764392/3/2014Intersection ImprovementSTA SR 0800 07.051/23/2014
$6,500,000.00
Widen to include turn lanes and improve street identification of side streets and driveway definition employing access management.
4
SUM830362/3/2014Minor Rehabilitation - Pavement Prmy SysSUM 8/76/77/764 Various1/23/2014
$5,000,000.00
Minor rehabilitation. With miscellaneous bridge work.
4
STA764392/3/2014Intersection ImprovementSTA SR 0800 07.051/23/2014
$6,500,000.00
Widen to include turn lanes and improve street identification of side streets and driveway definition employing access management.
4
STA764392/3/2014Intersection ImprovementSTA SR 0800 07.051/23/2014
$6,500,000.00
Widen to include turn lanes and improve street identification of side streets and driveway definition employing access management.
4
POR845922/3/2014Minor Rehabilitation - Pavement Gnrl SysPOR/TRU SR 82 10.68/0.001/23/2014
$3,175,000.00
Resurfacing. Miscellaneous bridge and culvert work.
4
TRU945652/3/2014Herbicidal SprayingTRU HS - FY 20141/23/2014
$100,000.00
Herbicidal spraying in Trumbull County, Ohio.
4
D04946042/3/2014Pavement MarkingD04 PM FY 2014 (LL-East)1/23/2014
$500,000.00
Long line pavement markings in Ashtabula, Mahoning, and Trumbull Counties, Ohio.
4
STA764392/3/2014Intersection ImprovementSTA SR 0800 07.051/23/2014
$6,500,000.00
Widen to include turn lanes and improve street identification of side streets and driveway definition employing access management.
4
SUM830362/3/2014Minor Rehabilitation - Pavement Prmy SysSUM 8/76/77/764 Various1/23/2014
$5,000,000.00
Minor rehabilitation. With miscellaneous bridge work.
4
POR845922/3/2014Minor Rehabilitation - Pavement Gnrl SysPOR/TRU SR 82 10.68/0.001/23/2014
$3,175,000.00
Resurfacing. Miscellaneous bridge and culvert work.
4
TRU945652/3/2014Herbicidal SprayingTRU HS - FY 20141/23/2014
$100,000.00
Herbicidal spraying in Trumbull County, Ohio.
4
D04946042/3/2014Pavement MarkingD04 PM FY 2014 (LL-East)1/23/2014
$500,000.00
Long line pavement markings in Ashtabula, Mahoning, and Trumbull Counties, Ohio.
4
SUM929322/17/2014Culvert Construction/Reconstr/RepairSUM Culverts FY 2014 Various2/6/2014
$265,000.00
Culvert replacements.SUM-21-4.05, SUM-21-4.70, SUM-21-5.39, SUM-21-7.28
4
D04946012/17/2014Pavement MarkingD04 PM FY 2014 (Aux-East)2/6/2014
$100,000.00
Auxilary pavement markings throughout Ashtabula, Mahoning, and Trumbull Counties, Ohio.
4
SUM929322/17/2014Culvert Construction/Reconstr/RepairSUM Culverts FY 2014 Various2/6/2014
$265,000.00
Culvert replacements.SUM-21-4.05, SUM-21-4.70, SUM-21-5.39, SUM-21-7.28
4
D04946012/17/2014Pavement MarkingD04 PM FY 2014 (Aux-East)2/6/2014
$100,000.00
Auxilary pavement markings throughout Ashtabula, Mahoning, and Trumbull Counties, Ohio.
4
MAH240732/28/2014Bridge RepairMAH US 0062 18.232/18/2014
$19,500,000.00
Re-Deck, Spot Painting Of Structural Steel With System Ozeu.    Minor Rehab Of Pavement On Either Side Of Structure.
4
MAH240732/28/2014Bridge RepairMAH US 0062 18.232/18/2014
$19,500,000.00
Re-Deck, Spot Painting Of Structural Steel With System Ozeu.    Minor Rehab Of Pavement On Either Side Of Structure.
4
MAH240732/28/2014Bridge RepairMAH US 0062 18.232/18/2014
$19,500,000.00
Re-Deck, Spot Painting Of Structural Steel With System Ozeu.    Minor Rehab Of Pavement On Either Side Of Structure.
4
MAH810552/28/2014Design AestheticsMAH SR 0193 01.172/18/2014
$380,000.00
Install planted center median.  It will also include a traffic study to determine if number of lanes should be reduced from 4 to 2.  May include on-street parking.
4
POR845962/28/2014Minor Rehabilitation - Pavement Gnrl SysPOR SR 0005 04.932/18/2014
$3,620,000.00
Resurfacing. Miscellaneous bridge work to six structures.
4
MAH240732/28/2014Bridge RepairMAH US 0062 18.232/18/2014
$19,500,000.00
Re-Deck, Spot Painting Of Structural Steel With System Ozeu.    Minor Rehab Of Pavement On Either Side Of Structure.
4
MAH810552/28/2014Design AestheticsMAH SR 0193 01.172/18/2014
$380,000.00
Install planted center median.  It will also include a traffic study to determine if number of lanes should be reduced from 4 to 2.  May include on-street parking.
4
POR845962/28/2014Minor Rehabilitation - Pavement Gnrl SysPOR SR 0005 04.932/18/2014
$3,620,000.00
Resurfacing. Miscellaneous bridge work to six structures.
4
SUM763883/24/2014Minor Rehabilitation - Pavement Prmy SysSUM SR 0021 19.343/13/2014
$1,500,000.00
Minor rehabilitation asphalt resurfacing from IR-77 to IR-80 Turnpike. Total concrete pavement from IR-80 Turnpike to Cuyahoga County line.
4
MAH933043/24/2014SignalsMAH/POR TSG FY2014 (UPS)3/13/2014
$360,000.00
Adding battery back-up power to signalized intersections throughout Mahoning and Portage Counties.
4
SUM763883/24/2014Minor Rehabilitation - Pavement Prmy SysSUM SR 0021 19.343/13/2014
$1,500,000.00
Minor rehabilitation asphalt resurfacing from IR-77 to IR-80 Turnpike. Total concrete pavement from IR-80 Turnpike to Cuyahoga County line.
4
SUM763883/24/2014Minor Rehabilitation - Pavement Prmy SysSUM SR 0021 19.343/13/2014
$1,500,000.00
Minor rehabilitation asphalt resurfacing from IR-77 to IR-80 Turnpike. Total concrete pavement from IR-80 Turnpike to Cuyahoga County line.
4
STA829273/24/2014Resurfacing,  Undivided SystemSTA SR 0241 03.643/13/2014
$1,300,000.00
Resurfacing and work on 3 structures, STA-241-0397 (SFN 7606087), STA-241-0422 (SFN 7606125), and STA-241-0767 (SFN 7606176).
4
TRU844573/24/2014Bridge ReplacementTRU Parkman Meso. Rd (CH313)3/13/2014
$574,000.00
Replacing  structure
4
ATB869423/24/2014Minor Rehabilitation - Pavement Gnrl SysATB SR 0045 24.103/13/2014
$775,000.00
Resurfacing. Deck overlays to two structures.
4
MAH928383/24/2014Culvert Construction/Reconstr/RepairMAH Culverts FY 2014 Various3/13/2014
$550,000.00
Culvert replacements.
4
SUM763883/24/2014Minor Rehabilitation - Pavement Prmy SysSUM SR 0021 19.343/13/2014
$1,500,000.00
Minor rehabilitation asphalt resurfacing from IR-77 to IR-80 Turnpike. Total concrete pavement from IR-80 Turnpike to Cuyahoga County line.
4
STA829273/24/2014Resurfacing,  Undivided SystemSTA SR 0241 03.643/13/2014
$1,300,000.00
Resurfacing and work on 3 structures, STA-241-0397 (SFN 7606087), STA-241-0422 (SFN 7606125), and STA-241-0767 (SFN 7606176).
4
TRU844573/24/2014Bridge ReplacementTRU Parkman Meso. Rd (CH313)3/13/2014
$574,000.00
Replacing  structure
4
ATB869423/24/2014Minor Rehabilitation - Pavement Gnrl SysATB SR 0045 24.103/13/2014
$775,000.00
Resurfacing. Deck overlays to two structures.
4
MAH928383/24/2014Culvert Construction/Reconstr/RepairMAH Culverts FY 2014 Various3/13/2014
$550,000.00
Culvert replacements.
4
MAH933043/24/2014SignalsMAH/POR TSG FY2014 (UPS)3/13/2014
$360,000.00
Adding battery back-up power to signalized intersections throughout Mahoning and Portage Counties.
4
MAH250624/7/2014Mill and FillMAH SR 0289 03.713/27/2014
$2,800,000.00
Resurfacing. Structure replacement.
4
MAH250624/7/2014Mill and FillMAH SR 0289 03.713/27/2014
$2,800,000.00
Resurfacing. Structure replacement.
4
SUM830154/7/2014Slide RepairSUM IR 0480 04.093/27/2014
$300,000.00
Correction of embankment slide location.
4
MAH250624/7/2014Mill and FillMAH SR 0289 03.713/27/2014
$2,800,000.00
Resurfacing. Structure replacement.
4
MAH903734/7/2014SignalsMAH US 62/224 Canfield Signals3/27/2014
$442,000.00
Signal upgrades.
4
TRU910074/7/2014Mill and FillTRU Park Avenue CH1433/27/2014
$698,000.00
Resurfacing.
4
SUM927214/7/2014Mill and FillSUM State Street (CR-667-0.00)3/27/2014
$367,000.00
Resurfacing.
4
TRU928394/7/2014Culvert Construction/Reconstr/RepairTRU Culverts FY 2014 Various3/27/2014
$360,000.00
Culvert replacements.
4
MAH938874/7/2014Noise WallMAH IR 0076 00.53 Noise Wall3/27/2014
$1,600,000.00
Construction of five retrofit noise walls along Interstate 76 in the Lake Milton area, Milton Township.
4
MAH250624/7/2014Mill and FillMAH SR 0289 03.713/27/2014
$2,800,000.00
Resurfacing. Structure replacement.
4
SUM830154/7/2014Slide RepairSUM IR 0480 04.093/27/2014
$300,000.00
Correction of embankment slide location.
4
MAH903734/7/2014SignalsMAH US 62/224 Canfield Signals3/27/2014
$442,000.00
Signal upgrades.
4
TRU910074/7/2014Mill and FillTRU Park Avenue CH1433/27/2014
$698,000.00
Resurfacing.
4
SUM927214/7/2014Mill and FillSUM State Street (CR-667-0.00)3/27/2014
$367,000.00
Resurfacing.
4
TRU928394/7/2014Culvert Construction/Reconstr/RepairTRU Culverts FY 2014 Various3/27/2014
$360,000.00
Culvert replacements.
4
MAH938874/7/2014Noise WallMAH IR 0076 00.53 Noise Wall3/27/2014
$1,600,000.00
Construction of five retrofit noise walls along Interstate 76 in the Lake Milton area, Milton Township.
4
D04954484/1/2014Guardrail upgrade/replaceD04 GR FY2014A4/1/2014
$400,000.00
Top 100 Guardrail End Terminal treatment upgrade, through all six counties.
4
D04954484/1/2014Guardrail upgrade/replaceD04 GR FY2014A4/1/2014
$400,000.00
Top 100 Guardrail End Terminal treatment upgrade, through all six counties.
4
ATB252274/21/2014Culvert Construction/Reconstr/RepairATB US 0006 31.594/10/2014
$250,000.00
REPLACEMENT OF CULVERT OVER BRANCH OF ASHTABULA RIVER. SLM 31.59
4
ATB252274/21/2014Culvert Construction/Reconstr/RepairATB US 0006 31.594/10/2014
$250,000.00
REPLACEMENT OF CULVERT OVER BRANCH OF ASHTABULA RIVER. SLM 31.59
4
ATB252274/21/2014Culvert Construction/Reconstr/RepairATB US 0006 31.594/10/2014
$250,000.00
REPLACEMENT OF CULVERT OVER BRANCH OF ASHTABULA RIVER. SLM 31.59
4
SUM861544/21/2014Bridge ReplacementSUM - Akron Cleveland Road4/10/2014
$2,550,000.00
Bridge replacement. SFN# 7768141.
4
SUM869234/21/2014Turn Lane AdditionSUM 31st Street (CR17)4/10/2014
$3,210,000.00
Widening 31st street from Wooster Road to Shannon Avenue for the addition of a TWLTL including signal upgrade for the Shannon Avenue intersection.
4
SUM927294/21/2014Mill and FillSUM Wooster Road West CR-964/10/2014
$387,000.00
Resurfacing.
4
D04946244/21/2014Pavement MarkingD04 PM FY 2014 (Aux-West)4/10/2014
$150,000.00
Auxilary pavement markings on various routes in Portage, Stark, and Summit counties, Ohio.
4
ATB252274/21/2014Culvert Construction/Reconstr/RepairATB US 0006 31.594/10/2014
$250,000.00
REPLACEMENT OF CULVERT OVER BRANCH OF ASHTABULA RIVER. SLM 31.59
4
SUM861544/21/2014Bridge ReplacementSUM - Akron Cleveland Road4/10/2014
$2,550,000.00
Bridge replacement. SFN# 7768141.
4
SUM869234/21/2014Turn Lane AdditionSUM 31st Street (CR17)4/10/2014
$3,210,000.00
Widening 31st street from Wooster Road to Shannon Avenue for the addition of a TWLTL including signal upgrade for the Shannon Avenue intersection.
4
SUM927294/21/2014Mill and FillSUM Wooster Road West CR-964/10/2014
$387,000.00
Resurfacing.
4
D04946244/21/2014Pavement MarkingD04 PM FY 2014 (Aux-West)4/10/2014
$150,000.00
Auxilary pavement markings on various routes in Portage, Stark, and Summit counties, Ohio.
4
POR829135/5/2014Minor Rehabilitation - Pavement Gnrl SysPOR SR 0044 19.164/24/2014
$1,561,000.00
Minor rehabilitation with bridge work.
4
TRU844605/5/2014Bridge ReplacementTRU Curtis Middlefield (TH227)4/24/2014
$900,000.00
Replace existing structure
4
STA929475/5/2014Culvert Construction/Reconstr/RepairSTA Culverts FY 2014 Various4/24/2014
$575,000.00
Culvert replacements.
4
POR829135/5/2014Minor Rehabilitation - Pavement Gnrl SysPOR SR 0044 19.164/24/2014
$1,561,000.00
Minor rehabilitation with bridge work.
4
TRU844605/5/2014Bridge ReplacementTRU Curtis Middlefield (TH227)4/24/2014
$900,000.00
Replace existing structure
4
STA929475/5/2014Culvert Construction/Reconstr/RepairSTA Culverts FY 2014 Various4/24/2014
$575,000.00
Culvert replacements.
4
ATB775635/19/2014WideningATB US 0020 13.785/8/2014
$3,150,000.00
Widen for TWLTL from Ridgewood to Cook Road. SLM 14.28 to 14.68Resurfacing / Drainage / and Sidewalk improvements through section SLM 13.78 to 14.68QUANTITY SPLITS REQUIRED
4
ATB775635/19/2014WideningATB US 0020 13.785/8/2014
$3,150,000.00
Widen for TWLTL from Ridgewood to Cook Road. SLM 14.28 to 14.68Resurfacing / Drainage / and Sidewalk improvements through section SLM 13.78 to 14.68QUANTITY SPLITS REQUIRED
4
ATB775635/19/2014WideningATB US 0020 13.785/8/2014
$3,150,000.00
Widen for TWLTL from Ridgewood to Cook Road. SLM 14.28 to 14.68Resurfacing / Drainage / and Sidewalk improvements through section SLM 13.78 to 14.68QUANTITY SPLITS REQUIRED
4
POR883395/19/2014Slide RepairPOR SR 0088 14.42 Slide5/8/2014
$200,000.00
Erosion correction.
4
D04946255/19/2014Pavement MarkingD04 PM FY 2014 (LL-West)5/8/2014
$300,000.00
Long line pavement markings in Portage, Stark, and Summit Counties, Ohio.
4
TRU951105/19/2014Add SidewalksTRU McDonald Sidewalks5/8/2014
$300,000.00
The project will construct pedestrian facilities that access McDonald City School properties throughout the Village of McDonald, Trumbull County, Ohio.
4
ATB775635/19/2014WideningATB US 0020 13.785/8/2014
$3,150,000.00
Widen for TWLTL from Ridgewood to Cook Road. SLM 14.28 to 14.68Resurfacing / Drainage / and Sidewalk improvements through section SLM 13.78 to 14.68QUANTITY SPLITS REQUIRED
4
POR883395/19/2014Slide RepairPOR SR 0088 14.42 Slide5/8/2014
$200,000.00
Erosion correction.
4
D04946255/19/2014Pavement MarkingD04 PM FY 2014 (LL-West)5/8/2014
$300,000.00
Long line pavement markings in Portage, Stark, and Summit Counties, Ohio.
4
TRU951105/19/2014Add SidewalksTRU McDonald Sidewalks5/8/2014
$300,000.00
The project will construct pedestrian facilities that access McDonald City School properties throughout the Village of McDonald, Trumbull County, Ohio.
4
STA795146/2/2014BikewaysSTA Ohio & Erie Canal Towpath Tr5/22/2014
$709,000.00
Construction of a 2,500 foot towpath trail parallel to State Route 21 in the City of Massillon, Stark County, Ohio.
4
STA795146/2/2014BikewaysSTA Ohio & Erie Canal Towpath Tr5/22/2014
$709,000.00
Construction of a 2,500 foot towpath trail parallel to State Route 21 in the City of Massillon, Stark County, Ohio.
4
STA795146/2/2014BikewaysSTA Ohio & Erie Canal Towpath Tr5/22/2014
$709,000.00
Construction of a 2,500 foot towpath trail parallel to State Route 21 in the City of Massillon, Stark County, Ohio.
4
POR829166/2/2014Minor Rehabilitation - Pavement Gnrl SysPOR SR 0014 11.225/22/2014
$2,150,000.00
Minor rehabilitation with bridge work in Ravenna and Edinburg Townships, Portage County, Ohio.
4
TRU846216/2/2014Turn Lane AdditionTRU High / Main Street5/22/2014
$1,895,000.00
Replacement of East Main Street bridge and addition of left turn lane East Main and North High Streets
4
MAH874086/2/2014SignalsMAH South Avenue Signals5/22/2014
$1,800,000.00
Traffic signal upgrades. ADA ramps and crosswalks.
4
TRU910066/2/2014Mill and FillTRU Austintown Warren CR-675/22/2014
$698,000.00
Resurfacing.
4
TRU910286/2/2014Mill and FillTRU Marshall Road CR-605/22/2014
$585,000.00
Resurfacing. Curb ramps, drainage, signage, and pavement markings.
4
STA795146/2/2014BikewaysSTA Ohio & Erie Canal Towpath Tr5/22/2014
$709,000.00
Construction of a 2,500 foot towpath trail parallel to State Route 21 in the City of Massillon, Stark County, Ohio.
4
POR829166/2/2014Minor Rehabilitation - Pavement Gnrl SysPOR SR 0014 11.225/22/2014
$2,150,000.00
Minor rehabilitation with bridge work in Ravenna and Edinburg Townships, Portage County, Ohio.
4
TRU846216/2/2014Turn Lane AdditionTRU High / Main Street5/22/2014
$1,895,000.00
Replacement of East Main Street bridge and addition of left turn lane East Main and North High Streets
4
MAH874086/2/2014SignalsMAH South Avenue Signals5/22/2014
$1,800,000.00
Traffic signal upgrades. ADA ramps and crosswalks.
4
TRU910066/2/2014Mill and FillTRU Austintown Warren CR-675/22/2014
$698,000.00
Resurfacing.
4
TRU910286/2/2014Mill and FillTRU Marshall Road CR-605/22/2014
$585,000.00
Resurfacing. Curb ramps, drainage, signage, and pavement markings.
4
TRU836296/16/2014Turn Lane AdditionTRU US 0422 09.346/5/2014
$4,000,000.00
Install left turn storage lanes at Coit Road intersection, intersection realigning intersection, and bank driveway. Install TWLTL from Southern Boulevard to Coit Road.
4
POR928326/16/2014Culvert Construction/Reconstr/RepairPOR Culverts FY 2014 Various6/5/2014
$425,000.00
Culvert replacements.
4
TRU836296/16/2014Turn Lane AdditionTRU US 0422 09.346/5/2014
$4,000,000.00
Install left turn storage lanes at Coit Road intersection, intersection realigning intersection, and bank driveway. Install TWLTL from Southern Boulevard to Coit Road.
4
POR928326/16/2014Culvert Construction/Reconstr/RepairPOR Culverts FY 2014 Various6/5/2014
$425,000.00
Culvert replacements.
4
STA869347/1/2014Minor Rehabilitation - Pavement Gnrl SysSTA SR 0093 05.847/1/2014
$1,400,000.00
Resurfacing. Miscellaneous bridge work to three structures. Radii improvement on east approach to Elton Street if Village secures OPWC funding and no Right of Way impacts.
4
TRU869397/1/2014Minor Rehabilitation - Pavement Gnrl SysTRU SR 5/7/87 Various7/1/2014
$4,385,000.00
Resurfacing. Miscellaneous bridge work to two structures.
4
TRU869417/1/2014Minor Rehabilitation - Pavement Gnrl SysTRU SR/US 169/422 1.87/12.327/1/2014
$2,200,000.00
Resurfacing. Minor bridge work to two structures.
4
STA889037/1/2014Minor Rehabilitation - Pavement Gnrl SysSTA SR 0297 00.667/1/2014
$750,000.00
Resurfacing.
4
TRU901887/1/2014Bridge ReplacementTRU SR 0534 18.847/1/2014
$1,400,000.00
Replacement of two structures. SFN#7807597 and SFN#7807627.
4
STA869347/1/2014Minor Rehabilitation - Pavement Gnrl SysSTA SR 0093 05.847/1/2014
$1,400,000.00
Resurfacing. Miscellaneous bridge work to three structures. Radii improvement on east approach to Elton Street if Village secures OPWC funding and no Right of Way impacts.
4
TRU869397/1/2014Minor Rehabilitation - Pavement Gnrl SysTRU SR 5/7/87 Various7/1/2014
$4,385,000.00
Resurfacing. Miscellaneous bridge work to two structures.
4
TRU869417/1/2014Minor Rehabilitation - Pavement Gnrl SysTRU SR/US 169/422 1.87/12.327/1/2014
$2,200,000.00
Resurfacing. Minor bridge work to two structures.
4
STA889037/1/2014Minor Rehabilitation - Pavement Gnrl SysSTA SR 0297 00.667/1/2014
$750,000.00
Resurfacing.
4
TRU901887/1/2014Bridge ReplacementTRU SR 0534 18.847/1/2014
$1,400,000.00
Replacement of two structures. SFN#7807597 and SFN#7807627.
4
ATB8359910/1/2014Bridge ReplacementATB US 0020 21.6010/1/2014
$12,500,000.00
Bridge replacement.
4
ATB8359910/1/2014Bridge ReplacementATB US 0020 21.6010/1/2014
$12,500,000.00
Bridge replacement.
4
ATB933061/1/2015SignalsATB/TRU TSG FY2015 (UPS)1/1/2015
$340,000.00
Adding battery backup power to signalized intersections throughout Ashtabula and Trumbull Counties.
4
SUM816561/1/2015Major WideningSUM SR 0082 04.651/1/2015
$5,444,000.00
Widening improvement that consists of widening existing 2 and 3 lane roadway to 4 lanes with left turn lanes where warranted. Also, included are the reconstruction of bike lanes.
4
SUM829561/1/2015Bridge ReplacementSUM SR 0091 11.831/1/2015
$2,910,000.00
Replace existing three span bridge over hike/bike trail with pre-cast structure.Widen SR91 to install a southbound left turn lane and a westbound right turn lane.
4
TRU844581/1/2015Bridge ReplacementTRU Chestnut Ridge Rd (CH12)1/1/2015
$991,000.00
Replace structure, SFN# 7840373, TRU-CR12-4.24, over Little Yankee Run, Trumbull County, Ohio.
4
TRU844591/1/2015Bridge ReplacementTRU Palmyra Road (CH81)1/1/2015
$446,000.00
Replace structure SFN# 7831005, TRU-CR81-3.64 over Little Duck Creek, Trumbull County, Ohio.
4
TRU844611/1/2015Bridge ReplacementTRU Newton Falls Bailey (CH92)1/1/2015
$510,000.00
Replace structure SFN# 7830602, TRU-CR92-3.88, over Duck Creek, Trumbull County, Ohio.
4
TRU844631/1/2015Bridge ReplacementTRU Messick South Rd (TH235)1/1/2015
$574,000.00
Replace existing structure
4
SUM845631/1/2015Mill and FillSUM SR 0082 00.141/1/2015
$3,085,000.00
Resurfacing.Includes widening section from Holzhauer (1.56) to Boyden (2.14).Quantity splits required.
4
MAH845971/1/2015Minor Rehabilitation - Pavement Gnrl SysMAH US 0422 07.611/1/2015
$1,200,000.00
Resurfacing. Miscellaneous bridge work.
4
MAH852451/1/2015Turn Lane AdditionMAH US 0224 13.641/1/2015
$6,300,000.00
US-224 improvements at SR-11 interchange. Superstructure replacement/widening of MAH-224-13.75 structure over SR-11. Add right turn lanes and lengthen left turn lanes on both Raccoon Road approaches. Install additional lane on SR-11 southbound off ramp to
4
SUM869791/1/2015Bridge Deck ReplacementSUM IR 76/77 11.27/12.221/1/2015
$18,000,000.00
Relocation of Johnston Street between Spicer Street and Brown Street to facilitate the improvement of IR-76 by removing three structures over Johnston Street.
4
SUM869961/1/2015Bridge Deck ReplacementSUM SR 0018 13.02 / Brittian Rd.1/1/2015
$1,628,000.00
Deck replacement and paint of structure. Project includes superstructure replacement of sfn# 7760043, Brittain Road over Wheeling & Lake Erie railroad.
4
STA910461/1/2015Bridge RepairSTA US 0062 18.82R1/1/2015
$2,000,000.00
Concrete overlay. Expansion joint repair. Sealing.
4
TRU913501/1/2015Bridge ReplacementTRU SR 5 (6.88)(7.79)(9.23)1/1/2015
$6,000,000.00
Bridge rehabilitation to three structures.
4
D04924441/1/2015Culvert Construction/Reconstr/RepairD04 BH FY 20151/1/2015
$150,000.00
Districtwide contract to repair miscellaneous structures.STA-SR172-7.55, sfn# 7600755STA-SR800-8.33, sfn# 7606753STA-SR627-4.32, sfn# 7606516STA-SR212-1.34, sfn# 7605889
4
SUM926531/1/2015Bridge ReplacementSUM SR 0018 00.541/1/2015
$1,800,000.00
Structure replacement.To be sold with PID# 81633, SUM-SR18-0.00
4
POR938251/1/2015Add SidewalksPOR Hiram Village Sidewalks1/1/2015
$284,000.00
Provide improve pedestrian access along State Route 82, State Route 305, State Route 700 in Hiram Village by installing sidewalks.
4
TRU938751/1/2015SignalsTRU US 0062 04.85 Signal1/1/2015
$75,000.00
Signal replacement on US-62 at Hubbard-Masury Road in Hubbard Township, Trumbull County, Ohio.
4
TRU938891/1/2015SignalsTRU SR 0305 10.73 Signal1/1/2015
$50,000.00
Signal replacement on State Route 305 at North Park Avenue in Champion Township, Trumbull County, Ohio.
4
TRU939001/1/2015Mill and FillTRU Highland Avenue1/1/2015
$1,188,000.00
Resurfacing of County Route 98 from Mahoning County Line to Warren Township Line, in the Village of Lordstown, Trumbull County, Ohio. Includes guardrail, signing, striping.
4
TRU951041/1/2015Mill and FillTRU Palmyra Road (CR-81)1/1/2015
$735,000.00
Resurfacing of Palmyra Road, including guardrail, signing, and pavement markings, in the Village of Lordstown, Trumbull County, Ohio.
4
SUM816561/1/2015Major WideningSUM SR 0082 04.651/1/2015
$5,444,000.00
Widening improvement that consists of widening existing 2 and 3 lane roadway to 4 lanes with left turn lanes where warranted. Also, included are the reconstruction of bike lanes.
4
SUM829561/1/2015Bridge ReplacementSUM SR 0091 11.831/1/2015
$2,910,000.00
Replace existing three span bridge over hike/bike trail with pre-cast structure.Widen SR91 to install a southbound left turn lane and a westbound right turn lane.
4
TRU844581/1/2015Bridge ReplacementTRU Chestnut Ridge Rd (CH12)1/1/2015
$991,000.00
Replace structure, SFN# 7840373, TRU-CR12-4.24, over Little Yankee Run, Trumbull County, Ohio.
4
TRU844591/1/2015Bridge ReplacementTRU Palmyra Road (CH81)1/1/2015
$446,000.00
Replace structure SFN# 7831005, TRU-CR81-3.64 over Little Duck Creek, Trumbull County, Ohio.
4
TRU844611/1/2015Bridge ReplacementTRU Newton Falls Bailey (CH92)1/1/2015
$510,000.00
Replace structure SFN# 7830602, TRU-CR92-3.88, over Duck Creek, Trumbull County, Ohio.
4
TRU844631/1/2015Bridge ReplacementTRU Messick South Rd (TH235)1/1/2015
$574,000.00
Replace existing structure
4
SUM845631/1/2015Mill and FillSUM SR 0082 00.141/1/2015
$3,085,000.00
Resurfacing.Includes widening section from Holzhauer (1.56) to Boyden (2.14).Quantity splits required.
4
MAH845971/1/2015Minor Rehabilitation - Pavement Gnrl SysMAH US 0422 07.611/1/2015
$1,200,000.00
Resurfacing. Miscellaneous bridge work.
4
MAH852451/1/2015Turn Lane AdditionMAH US 0224 13.641/1/2015
$6,300,000.00
US-224 improvements at SR-11 interchange. Superstructure replacement/widening of MAH-224-13.75 structure over SR-11. Add right turn lanes and lengthen left turn lanes on both Raccoon Road approaches. Install additional lane on SR-11 southbound off ramp to
4
SUM869791/1/2015Bridge Deck ReplacementSUM IR 76/77 11.27/12.221/1/2015
$18,000,000.00
Relocation of Johnston Street between Spicer Street and Brown Street to facilitate the improvement of IR-76 by removing three structures over Johnston Street.
4
SUM869961/1/2015Bridge Deck ReplacementSUM SR 0018 13.02 / Brittian Rd.1/1/2015
$1,628,000.00
Deck replacement and paint of structure. Project includes superstructure replacement of sfn# 7760043, Brittain Road over Wheeling & Lake Erie railroad.
4
STA910461/1/2015Bridge RepairSTA US 0062 18.82R1/1/2015
$2,000,000.00
Concrete overlay. Expansion joint repair. Sealing.
4
TRU913501/1/2015Bridge ReplacementTRU SR 5 (6.88)(7.79)(9.23)1/1/2015
$6,000,000.00
Bridge rehabilitation to three structures.
4
D04924441/1/2015Culvert Construction/Reconstr/RepairD04 BH FY 20151/1/2015
$150,000.00
Districtwide contract to repair miscellaneous structures.STA-SR172-7.55, sfn# 7600755STA-SR800-8.33, sfn# 7606753STA-SR627-4.32, sfn# 7606516STA-SR212-1.34, sfn# 7605889
4
SUM926531/1/2015Bridge ReplacementSUM SR 0018 00.541/1/2015
$1,800,000.00
Structure replacement.To be sold with PID# 81633, SUM-SR18-0.00
4
ATB933061/1/2015SignalsATB/TRU TSG FY2015 (UPS)1/1/2015
$340,000.00
Adding battery backup power to signalized intersections throughout Ashtabula and Trumbull Counties.
4
POR938251/1/2015Add SidewalksPOR Hiram Village Sidewalks1/1/2015
$284,000.00
Provide improve pedestrian access along State Route 82, State Route 305, State Route 700 in Hiram Village by installing sidewalks.
4
TRU938751/1/2015SignalsTRU US 0062 04.85 Signal1/1/2015
$75,000.00
Signal replacement on US-62 at Hubbard-Masury Road in Hubbard Township, Trumbull County, Ohio.
4
TRU938891/1/2015SignalsTRU SR 0305 10.73 Signal1/1/2015
$50,000.00
Signal replacement on State Route 305 at North Park Avenue in Champion Township, Trumbull County, Ohio.
4
TRU939001/1/2015Mill and FillTRU Highland Avenue1/1/2015
$1,188,000.00
Resurfacing of County Route 98 from Mahoning County Line to Warren Township Line, in the Village of Lordstown, Trumbull County, Ohio. Includes guardrail, signing, striping.
4
TRU951041/1/2015Mill and FillTRU Palmyra Road (CR-81)1/1/2015
$735,000.00
Resurfacing of Palmyra Road, including guardrail, signing, and pavement markings, in the Village of Lordstown, Trumbull County, Ohio.
4
POR782784/1/2015Intersection ImprovementPOR SR 0014 12.554/1/2015
$5,000,000.00
Terminate Newton Falls Road at Woodbine Avenue to eliminate 5th leg of intersection, extend Peck Road to SR-59, and cul-de-sac Gladys Road at SR-14. Pavement work on SR-59 from SLM 9.09 to SLM 9.63, Ravenna Township, Portage County, Ohio.  Resurfacing on
4
POR782784/1/2015Intersection ImprovementPOR SR 0014 12.554/1/2015
$5,000,000.00
Terminate Newton Falls Road at Woodbine Avenue to eliminate 5th leg of intersection, extend Peck Road to SR-59, and cul-de-sac Gladys Road at SR-14. Pavement work on SR-59 from SLM 9.09 to SLM 9.63, Ravenna Township, Portage County, Ohio.  Resurfacing on
4
POR782784/1/2015Intersection ImprovementPOR SR 0014 12.554/1/2015
$5,000,000.00
Terminate Newton Falls Road at Woodbine Avenue to eliminate 5th leg of intersection, extend Peck Road to SR-59, and cul-de-sac Gladys Road at SR-14. Pavement work on SR-59 from SLM 9.09 to SLM 9.63, Ravenna Township, Portage County, Ohio.  Resurfacing on
4
TRU839684/1/2015Bridge ReplacementTRU IR 0080 01.684/1/2015
$28,250,000.00
Replacement two structures. Total pavement replacement from SLM 1.68 to SLM 2.18.
4
SUM850784/1/2015WideningSUM SR 0091 21.114/1/2015
$4,577,000.00
New capacity and safety improvement.Phase II to be constructed under PID#92032, SUM-SR91-21.65
4
POR869324/1/2015Minor Rehabilitation - Pavement Gnrl SysPOR SR 0303 08.724/1/2015
$1,300,000.00
Resurfacing. Structure replacement.
4
STA869334/1/2015Minor Rehabilitation - Pavement Gnrl SysSTA SR 0043 19.304/1/2015
$1,900,000.00
Resurfacing of State Route 43 from Applegrove to State Route 619. Plain Township, Stark County, Ohio.
4
STA869354/1/2015Minor Rehabilitation - Pavement Gnrl SysSTA SR 0619 04.664/1/2015
$1,100,000.00
Resurfacing. Deck overlay.
4
STA869364/1/2015Minor Rehabilitation - Pavement Gnrl SysSTA SR 0627 00.154/1/2015
$2,600,000.00
Resurfacing. Deck overlay #7606524. Miscellaneous bridge work #7606516.
4
SUM869374/1/2015Minor Rehabilitation - Pavement Gnrl SysSUM SR 0008 20.274/1/2015
$500,000.00
Resurfacing.
4
SUM869384/1/2015Minor Rehabilitation - Pavement Gnrl SysSUM SR 93/619 0.00/3.184/1/2015
$2,100,000.00
Resurfacing. Miscellaneous bridge work to four structures.
4
ATB869434/1/2015Minor Rehabilitation - Pavement Gnrl SysATB SR 0534 13.504/1/2015
$1,650,000.00
Resurfacing. Miscellaneous work to three structures. During scoping, check drainage on NW corner of SFN# 0407089 (SLM ATB-SR534-18.32) over the Grand River.
4
STA869454/1/2015Minor Rehabilitation - Pavement Gnrl SysSTA SR 0183 00.004/1/2015
$850,000.00
Resurfacing. Minor bridge work to one structure.
4
MAH869494/1/2015Mill and FillMAH US 0422 00.004/1/2015
$2,200,000.00
Resurfacing. Miscellaneous bridge work to three structures.
4
SUM869544/1/2015Mill and FillSUM SR 0091 17.214/1/2015
$1,400,000.00
Resurfacing. Miscelleneous bridge work to two structures.
4
TRU869564/1/2015Mill and FillTRU SR 0304 0.004/1/2015
$250,000.00
Resurfacing.
4
TRU869594/1/2015Mill and FillTRU SR 46/169 (3.18)(4.74)/3.424/1/2015
$850,000.00
Resurfacing.
4
TRU938694/1/2015SignalsTRU IR 0080 02.20 Signals4/1/2015
$150,000.00
Replacement of two traffic signals.
4
MAH945294/1/2015Culvert Construction/Reconstr/RepairMAH Culverts FY 2015 Various4/1/2015
$600,000.00
Culvert replacements in Mahoning County, Ohio.
4
MAH951334/1/2015Culvert Construction/Reconstr/RepairATB Culverts FY 2015 Various4/1/2015
$350,000.00
Culvert replacements on various routes, Ashtabula County, Ohio.
4
STA952484/1/2015Culvert Construction/Reconstr/RepairSTA Culverts FY2015 Various4/1/2015
$480,000.00
Culvert replacements on STA-SR43, STA-SR44, STA-SR93, STA-SR172, STA-SR183. and STA-SR212, in Stark County, Ohio.
4
TRU952504/1/2015Culvert Construction/Reconstr/RepairTRU Culverts FY 2015 Various4/1/2015
$450,000.00
Culvert replacements on TRU-SR5-34.04, TRU-SR88-6.92, and TRU-SR305-18.93, in Trumbull County, Ohio.
4
POR782784/1/2015Intersection ImprovementPOR SR 0014 12.554/1/2015
$5,000,000.00
Terminate Newton Falls Road at Woodbine Avenue to eliminate 5th leg of intersection, extend Peck Road to SR-59, and cul-de-sac Gladys Road at SR-14. Pavement work on SR-59 from SLM 9.09 to SLM 9.63, Ravenna Township, Portage County, Ohio.  Resurfacing on
4
TRU839684/1/2015Bridge ReplacementTRU IR 0080 01.684/1/2015
$28,250,000.00
Replacement two structures. Total pavement replacement from SLM 1.68 to SLM 2.18.
4
SUM850784/1/2015WideningSUM SR 0091 21.114/1/2015
$4,577,000.00
New capacity and safety improvement.Phase II to be constructed under PID#92032, SUM-SR91-21.65
4
POR869324/1/2015Minor Rehabilitation - Pavement Gnrl SysPOR SR 0303 08.724/1/2015
$1,300,000.00
Resurfacing. Structure replacement.
4
STA869334/1/2015Minor Rehabilitation - Pavement Gnrl SysSTA SR 0043 19.304/1/2015
$1,900,000.00
Resurfacing of State Route 43 from Applegrove to State Route 619. Plain Township, Stark County, Ohio.
4
STA869354/1/2015Minor Rehabilitation - Pavement Gnrl SysSTA SR 0619 04.664/1/2015
$1,100,000.00
Resurfacing. Deck overlay.
4
STA869364/1/2015Minor Rehabilitation - Pavement Gnrl SysSTA SR 0627 00.154/1/2015
$2,600,000.00
Resurfacing. Deck overlay #7606524. Miscellaneous bridge work #7606516.
4
SUM869374/1/2015Minor Rehabilitation - Pavement Gnrl SysSUM SR 0008 20.274/1/2015
$500,000.00
Resurfacing.
4
SUM869384/1/2015Minor Rehabilitation - Pavement Gnrl SysSUM SR 93/619 0.00/3.184/1/2015
$2,100,000.00
Resurfacing. Miscellaneous bridge work to four structures.
4
ATB869434/1/2015Minor Rehabilitation - Pavement Gnrl SysATB SR 0534 13.504/1/2015
$1,650,000.00
Resurfacing. Miscellaneous work to three structures. During scoping, check drainage on NW corner of SFN# 0407089 (SLM ATB-SR534-18.32) over the Grand River.
4
STA869454/1/2015Minor Rehabilitation - Pavement Gnrl SysSTA SR 0183 00.004/1/2015
$850,000.00
Resurfacing. Minor bridge work to one structure.
4
MAH869494/1/2015Mill and FillMAH US 0422 00.004/1/2015
$2,200,000.00
Resurfacing. Miscellaneous bridge work to three structures.
4
SUM869544/1/2015Mill and FillSUM SR 0091 17.214/1/2015
$1,400,000.00
Resurfacing. Miscelleneous bridge work to two structures.
4
TRU869564/1/2015Mill and FillTRU SR 0304 0.004/1/2015
$250,000.00
Resurfacing.
4
TRU869594/1/2015Mill and FillTRU SR 46/169 (3.18)(4.74)/3.424/1/2015
$850,000.00
Resurfacing.
4
TRU938694/1/2015SignalsTRU IR 0080 02.20 Signals4/1/2015
$150,000.00
Replacement of two traffic signals.
4
MAH945294/1/2015Culvert Construction/Reconstr/RepairMAH Culverts FY 2015 Various4/1/2015
$600,000.00
Culvert replacements in Mahoning County, Ohio.
4
MAH951334/1/2015Culvert Construction/Reconstr/RepairATB Culverts FY 2015 Various4/1/2015
$350,000.00
Culvert replacements on various routes, Ashtabula County, Ohio.
4
STA952484/1/2015Culvert Construction/Reconstr/RepairSTA Culverts FY2015 Various4/1/2015
$480,000.00
Culvert replacements on STA-SR43, STA-SR44, STA-SR93, STA-SR172, STA-SR183. and STA-SR212, in Stark County, Ohio.
4
TRU952504/1/2015Culvert Construction/Reconstr/RepairTRU Culverts FY 2015 Various4/1/2015
$450,000.00
Culvert replacements on TRU-SR5-34.04, TRU-SR88-6.92, and TRU-SR305-18.93, in Trumbull County, Ohio.
4
ATB830377/1/2015Minor Rehabilitation - Pavement Prmy SysATB SR 0011 08.107/1/2015
$6,250,000.00
Minor rehabilitation. With miscellaneous bridge work.
4
STA889077/1/2015Minor Rehabilitation - Pavement Gnrl SysSTA US 0030 19.167/1/2015
$650,000.00
Resurfacing.
4
POR938547/1/2015Culvert Construction/Reconstr/RepairPOR SR 0303 00.677/1/2015
$515,000.00
Culvert replacement.
4
ATB954727/1/2015LightingATB IR 90/SR11 Lighting7/1/2015
$1,000,000.00
Installation of tower interchange lighting at IR-90 and SR-11 interchange, in Plymouth Township, Ashtabula County, Ohio.
4
MAH958517/1/2015Mill and FillMAH Warhurst Rd / Tenney Ave7/1/2015
$570,000.00
Resurfacing of Warhurst Road (CR-573) from SLM 0.00 to SLM 0.34 and Tenney Avenue from SLM 0.00 to SLM 0.95, in the City of Campbell, Mahoning County, Ohio.
4
ATB830377/1/2015Minor Rehabilitation - Pavement Prmy SysATB SR 0011 08.107/1/2015
$6,250,000.00
Minor rehabilitation. With miscellaneous bridge work.
4
STA889077/1/2015Minor Rehabilitation - Pavement Gnrl SysSTA US 0030 19.167/1/2015
$650,000.00
Resurfacing.
4
POR938547/1/2015Culvert Construction/Reconstr/RepairPOR SR 0303 00.677/1/2015
$515,000.00
Culvert replacement.
4
ATB954727/1/2015LightingATB IR 90/SR11 Lighting7/1/2015
$1,000,000.00
Installation of tower interchange lighting at IR-90 and SR-11 interchange, in Plymouth Township, Ashtabula County, Ohio.
4
MAH958517/1/2015Mill and FillMAH Warhurst Rd / Tenney Ave7/1/2015
$570,000.00
Resurfacing of Warhurst Road (CR-573) from SLM 0.00 to SLM 0.34 and Tenney Avenue from SLM 0.00 to SLM 0.95, in the City of Campbell, Mahoning County, Ohio.
5
D05875887/29/2013Crack SealD05 CS FY2014 (B)7/18/2013
$418,000.00
Crack Sealing of various routes in Fairfield, Licking, Muskingum, and Perry Counties for FY 2014
5
D05875887/29/2013Crack SealD05 CS FY2014 (B)7/18/2013
$418,000.00
Crack Sealing of various routes in Fairfield, Licking, Muskingum, and Perry Counties for FY 2014
5
LIC925517/29/2013HVACD05 HQ HVAC7/19/2013
$1,906,000.00
Project to upgrade the District 5 HVAC SystemDistrict 5 Facilities Project Number is F20511
5
LIC925517/29/2013HVACD05 HQ HVAC7/19/2013
$1,906,000.00
Project to upgrade the District 5 HVAC SystemDistrict 5 Facilities Project Number is F20511
5
GUE929558/12/2013Rest AreaGUE IR 77 00.36/02.938/1/2013
$640,000.00
Installation of sanitary sewer at the IR 77 North Bound and South Bound Rest Areas.Facilities Project # F20514
5
GUE929558/12/2013Rest AreaGUE IR 77 00.36/02.938/1/2013
$640,000.00
Installation of sanitary sewer at the IR 77 North Bound and South Bound Rest Areas.Facilities Project # F20514
5
D05879388/26/2013Bridge MaintenanceD05 BH FY2014(B)8/15/2013
$321,000.00
This project consists of the rehabilitation of 8 bridges by means of pile encasements. The following are the bridges:  Lic-SR 79 at 01.15 (SFN 4504607); 23.89 (SFN 4505085); 24.21 (SFN 4505115); 25.04 (SFN 4505158); 26.18 (SFN 4505174); Cos-SR 83 at 19.56
5
LIC908688/26/2013Add SidewalksLIC CR 26 00.20 (Summit St SRTS)8/15/2013
$162,000.00
Installation of flashing school speed signs, bike racks, sidewalks, crosswalks, curb ramps and signage.Non Infrastructure approval for student incentives, promotional materials, enforcement, education material and surveys.
5
GUE960988/15/2013Bridge Vehicle Damage Repair (NEW)GUE IR 70 09.43 L&A8/15/2013
$380,000.00
Collision repair and heat straightening of damaged girders including replacement of damaged cross frames, spot painting and related work. Repaire of the overheight vehicle detection system.
5
D05879388/26/2013Bridge MaintenanceD05 BH FY2014(B)8/15/2013
$321,000.00
This project consists of the rehabilitation of 8 bridges by means of pile encasements. The following are the bridges:  Lic-SR 79 at 01.15 (SFN 4504607); 23.89 (SFN 4505085); 24.21 (SFN 4505115); 25.04 (SFN 4505158); 26.18 (SFN 4505174); Cos-SR 83 at 19.56
5
LIC908688/26/2013Add SidewalksLIC CR 26 00.20 (Summit St SRTS)8/15/2013
$162,000.00
Installation of flashing school speed signs, bike racks, sidewalks, crosswalks, curb ramps and signage.Non Infrastructure approval for student incentives, promotional materials, enforcement, education material and surveys.
5
GUE960988/15/2013Bridge Vehicle Damage Repair (NEW)GUE IR 70 09.43 L&A8/15/2013
$380,000.00
Collision repair and heat straightening of damaged girders including replacement of damaged cross frames, spot painting and related work. Repaire of the overheight vehicle detection system.
5
D05875869/23/2013Crack SealD05 CS FY2014 (A)9/12/2013
$303,000.00
Crack Sealing of various routes in Coshocton, Guernsey, and Knox Counties for FY 2014
5
KNO930319/12/2013Erosion ProtectionKNO SR 229 14.809/12/2013
$198,000.00
Slope stabilization project to stop the ongoing erosion of approximately 400 feet of the river bank.
5
D05875869/23/2013Crack SealD05 CS FY2014 (A)9/12/2013
$303,000.00
Crack Sealing of various routes in Coshocton, Guernsey, and Knox Counties for FY 2014
5
KNO930319/12/2013Erosion ProtectionKNO SR 229 14.809/12/2013
$198,000.00
Slope stabilization project to stop the ongoing erosion of approximately 400 feet of the river bank.
5
FAI8303010/21/2013Mill and FillFAI SR 664 - FAI/PER/HOC SR 31210/10/2013
$3,773,000.00
5% Repairs, Item 422 Single Chip Seal and 1" Item 448 Asphalt Concrete Intermediate Course and 1 1/4" Item 448 Asphalt Concrete Surface Course.  ADA Ramps in Bremen. In Bremen milling 2 1/4" and place Item 448 Intermediate and Surface only, no Chip Seal.
5
LIC9507510/21/2013Rock Slope Maintenance (NEW)LIC IR 70 19.86/21.44 CUY SR 1710/10/2013
$523,000.00
Part 1: Lic-IR 70-19.86 EB & 19.88 WB: rock scaling project in D05 Part 2: Lic-IR 70-21.44 EB rock barrier project in D05Part 3: Cuy-SR 17-15.30 Rock scaling project in D12 along Granger Road (SR-17) in Garfield Hts, Cuyahoga County.  FY 2014 GSM Program
5
FAI8303010/21/2013Mill and FillFAI SR 664 - FAI/PER/HOC SR 31210/10/2013
$3,773,000.00
5% Repairs, Item 422 Single Chip Seal and 1" Item 448 Asphalt Concrete Intermediate Course and 1 1/4" Item 448 Asphalt Concrete Surface Course.  ADA Ramps in Bremen. In Bremen milling 2 1/4" and place Item 448 Intermediate and Surface only, no Chip Seal.
5
LIC9507510/21/2013Rock Slope Maintenance (NEW)LIC IR 70 19.86/21.44 CUY SR 1710/10/2013
$523,000.00
Part 1: Lic-IR 70-19.86 EB & 19.88 WB: rock scaling project in D05 Part 2: Lic-IR 70-21.44 EB rock barrier project in D05Part 3: Cuy-SR 17-15.30 Rock scaling project in D12 along Granger Road (SR-17) in Garfield Hts, Cuyahoga County.  FY 2014 GSM Program
5
LIC8924511/18/2013Minor Rehabilitation - Pavement Gnrl SysLIC SR 79 15.6911/7/2013
$4,721,000.00
Treatment Revised: 5% repairs (mostly from 21.00 MM to the North), In City of Newark (Cedar St.) milling 3" from Main St. Intersection to end of curb section, milling surface only in other areas. placing 1 3/4" Item 448 Asph. Conc. Inter. Course, Type2, P
5
D059249511/18/2013SignalsD05 FY2014 Signal Upgrade11/7/2013
$1,000,000.00
District wide Signal Uograde Project to replace back plates; tethers; UPS and other upgrades to reach current standards.
5
COS9296911/18/2013Minor Rehabilitation - Pavement Gnrl SysCOS SR 206 00.0011/7/2013
$3,337,000.00
5% repairs, Item 422 Single Chip Seal, 1" Item 448 Asphalt Concrete Intermediate Course and 1 1/4" Item 448 Asphalt Concrete Surface Course. Skip Overlap section with SR751. Utilize "Safety Edge" if warranted.
5
LIC8924511/18/2013Minor Rehabilitation - Pavement Gnrl SysLIC SR 79 15.6911/7/2013
$4,721,000.00
Treatment Revised: 5% repairs (mostly from 21.00 MM to the North), In City of Newark (Cedar St.) milling 3" from Main St. Intersection to end of curb section, milling surface only in other areas. placing 1 3/4" Item 448 Asph. Conc. Inter. Course, Type2, P
5
D059249511/18/2013SignalsD05 FY2014 Signal Upgrade11/7/2013
$1,000,000.00
District wide Signal Uograde Project to replace back plates; tethers; UPS and other upgrades to reach current standards.
5
COS9296911/18/2013Minor Rehabilitation - Pavement Gnrl SysCOS SR 206 00.0011/7/2013
$3,337,000.00
5% repairs, Item 422 Single Chip Seal, 1" Item 448 Asphalt Concrete Intermediate Course and 1 1/4" Item 448 Asphalt Concrete Surface Course. Skip Overlap section with SR751. Utilize "Safety Edge" if warranted.
5
KNO9297012/2/2013Minor Rehabilitation - Pavement Gnrl SysKNO US 62 00.0011/21/2013
$4,930,000.00
5% repairs, mill 1 1/4" and place 1" Item 448 Asphalt Concrete Intermediate Course and 1 1/4" Item 448 Asphalt Concrete Surface Course. Verify ADA ramps in Martinsburg and Danville meet current standards. Utilize "Safety Edge" if warranted.
5
KNO9297012/2/2013Minor Rehabilitation - Pavement Gnrl SysKNO US 62 00.0011/21/2013
$4,930,000.00
5% repairs, mill 1 1/4" and place 1" Item 448 Asphalt Concrete Intermediate Course and 1 1/4" Item 448 Asphalt Concrete Surface Course. Verify ADA ramps in Martinsburg and Danville meet current standards. Utilize "Safety Edge" if warranted.
5
GUE2587412/23/2013Minor Rehabilitation - Pavement Prmy SysGUE IR 70/SR 265 17.50/00.0012/12/2013
$5,185,000.00
Resurfacing with related work of the East Bound IR 70 from 0.09 miles east of CR 73 to Gue/Bel County Line and the West Bound Passing Lane.  (West Bound Driving Lane  was milled and thin overlayed under PID 83671 in early FY 2009) Mill 2" and fill 1-3/4"
5
GUE2587412/23/2013Minor Rehabilitation - Pavement Prmy SysGUE IR 70/SR 265 17.50/00.0012/12/2013
$5,185,000.00
Resurfacing with related work of the East Bound IR 70 from 0.09 miles east of CR 73 to Gue/Bel County Line and the West Bound Passing Lane.  (West Bound Driving Lane  was milled and thin overlayed under PID 83671 in early FY 2009) Mill 2" and fill 1-3/4"
5
GUE2587412/23/2013Minor Rehabilitation - Pavement Prmy SysGUE IR 70/SR 265 17.50/00.0012/12/2013
$5,185,000.00
Resurfacing with related work of the East Bound IR 70 from 0.09 miles east of CR 73 to Gue/Bel County Line and the West Bound Passing Lane.  (West Bound Driving Lane  was milled and thin overlayed under PID 83671 in early FY 2009) Mill 2" and fill 1-3/4"
5
GUE2587412/23/2013Minor Rehabilitation - Pavement Prmy SysGUE IR 70/SR 265 17.50/00.0012/12/2013
$5,185,000.00
Resurfacing with related work of the East Bound IR 70 from 0.09 miles east of CR 73 to Gue/Bel County Line and the West Bound Passing Lane.  (West Bound Driving Lane  was milled and thin overlayed under PID 83671 in early FY 2009) Mill 2" and fill 1-3/4"
5
GUE918601/20/2014Culvert Construction/Reconstr/RepairGUE SR 83 0732/SR 146 02.56/03.41/9/2014
$732,000.00
Revised work per scope: Replace all 3 single span slabs with concrete box culverts.Bridge replacements.  SFN3002349 located 0.51 miles west of CR 1256 (Marplatt Rd) carrying SR 83 over a Branch of Flat Run; SFN 3003574 located at MR 225 (Maple Street in C
5
GUE922541/20/2014Resurfacing,  Undivided SystemGUE SR 513/761 00.00/00.001/9/2014
$4,101,000.00
Treatment Revised/Updated: Provide leveling course to improve profile at problem locations prior to Item 422 Single Chip Seal, and 1" Item 448 Asphalt Conc. Interm. Course Type 1 PG64-22, and 1 1/4" Item 448 Asphalt Conc. Surrface Course Type 1 PG70-22M.
5
GUE918601/20/2014Culvert Construction/Reconstr/RepairGUE SR 83 0732/SR 146 02.56/03.41/9/2014
$732,000.00
Revised work per scope: Replace all 3 single span slabs with concrete box culverts.Bridge replacements.  SFN3002349 located 0.51 miles west of CR 1256 (Marplatt Rd) carrying SR 83 over a Branch of Flat Run; SFN 3003574 located at MR 225 (Maple Street in C
5
GUE922541/20/2014Resurfacing,  Undivided SystemGUE SR 513/761 00.00/00.001/9/2014
$4,101,000.00
Treatment Revised/Updated: Provide leveling course to improve profile at problem locations prior to Item 422 Single Chip Seal, and 1" Item 448 Asphalt Conc. Interm. Course Type 1 PG64-22, and 1 1/4" Item 448 Asphalt Conc. Surrface Course Type 1 PG70-22M.
5
LIC822112/3/2014Mill and FillLIC CR 134 00.331/23/2014
$522,000.00
Resurfacing and turn lane/widening of Thornwood Drive from CR134A to Heath/Newark Corp line.
5
LIC894772/3/2014Mill and FillLIC CR 539 03.771/23/2014
$1,098,000.00
Mill an resurface East Broadway from Pearl Street to Granger Street. (2 1/2 overlay)Mill an resurface Newark-Granville Rd from College Street  to the East Corp line.(2 1/2 overlay)Mill an resurface West Broadway from Main Street to the Western Corp Limit.
5
MUS918102/3/2014Bridge Deck ReplacementMUS SR 83 01.381/23/2014
$1,146,000.00
Revied work per scope:  Replace deck, expansion  joints, backwalls, parapets  and approach slabs.  Paint bridge. Make minor profile correction at approach slab ends to ensure smooth ride. Coordinate Traffic control with the Village of New Concord.Coordina
5
LIC822112/3/2014Mill and FillLIC CR 134 00.331/23/2014
$522,000.00
Resurfacing and turn lane/widening of Thornwood Drive from CR134A to Heath/Newark Corp line.
5
LIC894772/3/2014Mill and FillLIC CR 539 03.771/23/2014
$1,098,000.00
Mill an resurface East Broadway from Pearl Street to Granger Street. (2 1/2 overlay)Mill an resurface Newark-Granville Rd from College Street  to the East Corp line.(2 1/2 overlay)Mill an resurface West Broadway from Main Street to the Western Corp Limit.
5
MUS918102/3/2014Bridge Deck ReplacementMUS SR 83 01.381/23/2014
$1,146,000.00
Revied work per scope:  Replace deck, expansion  joints, backwalls, parapets  and approach slabs.  Paint bridge. Make minor profile correction at approach slab ends to ensure smooth ride. Coordinate Traffic control with the Village of New Concord.Coordina
5
LIC764252/17/2014Resurfacing, Divided SystemLIC/MUS SR 16 23.76/00.002/6/2014
$8,787,000.00
Treatment Revised/Updated: 2 % repairs, mill existing surface, place 1 3/4" Item 442 Asphalt Conc. Intermediate Course, 19mm Type A (446) and 1 1/4" Item 442 Asphalt Conc. Surface Course, 12.5mm, Type A (446). Include mill/fill of shoulders and ramps.Resu
5
LIC764252/17/2014Resurfacing, Divided SystemLIC/MUS SR 16 23.76/00.002/6/2014
$8,787,000.00
Treatment Revised/Updated: 2 % repairs, mill existing surface, place 1 3/4" Item 442 Asphalt Conc. Intermediate Course, 19mm Type A (446) and 1 1/4" Item 442 Asphalt Conc. Surface Course, 12.5mm, Type A (446). Include mill/fill of shoulders and ramps.Resu
5
LIC764252/17/2014Resurfacing, Divided SystemLIC/MUS SR 16 23.76/00.002/6/2014
$8,787,000.00
Treatment Revised/Updated: 2 % repairs, mill existing surface, place 1 3/4" Item 442 Asphalt Conc. Intermediate Course, 19mm Type A (446) and 1 1/4" Item 442 Asphalt Conc. Surface Course, 12.5mm, Type A (446). Include mill/fill of shoulders and ramps.Resu
5
LIC831112/17/2014Minor Rehabilitation - Pavement Gnrl SysLIC SR 37 00.00/16.592/6/2014
$4,134,000.00
Resurfacing with associated work on a portion of SR 37 in Licking from the Delaware Co Line to York Rd (CR 39) and from SR 661 to IR 70.  Treatment will consist of: Lic-37-(0.00-4.31): 5% repairs, milling existing surface 1 1/2", and place 1 1/2" Item 448
5
LIC929772/17/2014Minor Rehabilitation - Pavement Gnrl SysLIC US 62 10.572/6/2014
$2,692,000.00
Treatment revised/Updated: 5% repairs, mill 1 ¼” and place 1 ¾” Item 448 Asphalt Concrete Intermediate Course Type 1 PG64-22 and 1 ¼” Item 448 Asphalt Concrete Surface Course Type 1 PG70-22M. Verify ADA ramps in Utica meet current standards. Utilize “Safe
5
LIC764252/17/2014Resurfacing, Divided SystemLIC/MUS SR 16 23.76/00.002/6/2014
$8,787,000.00
Treatment Revised/Updated: 2 % repairs, mill existing surface, place 1 3/4" Item 442 Asphalt Conc. Intermediate Course, 19mm Type A (446) and 1 1/4" Item 442 Asphalt Conc. Surface Course, 12.5mm, Type A (446). Include mill/fill of shoulders and ramps.Resu
5
LIC831112/17/2014Minor Rehabilitation - Pavement Gnrl SysLIC SR 37 00.00/16.592/6/2014
$4,134,000.00
Resurfacing with associated work on a portion of SR 37 in Licking from the Delaware Co Line to York Rd (CR 39) and from SR 661 to IR 70.  Treatment will consist of: Lic-37-(0.00-4.31): 5% repairs, milling existing surface 1 1/2", and place 1 1/2" Item 448
5
LIC929772/17/2014Minor Rehabilitation - Pavement Gnrl SysLIC US 62 10.572/6/2014
$2,692,000.00
Treatment revised/Updated: 5% repairs, mill 1 ¼” and place 1 ¾” Item 448 Asphalt Concrete Intermediate Course Type 1 PG64-22 and 1 ¼” Item 448 Asphalt Concrete Surface Course Type 1 PG70-22M. Verify ADA ramps in Utica meet current standards. Utilize “Safe
5
D05876103/24/2014Pavement MarkingD05 PM FY2014(A) Fast Dry3/13/2014
$300,000.00
Annual District wide project for striping with Fast Dry Paint for centerlines and auxillary markings
5
LIC955473/24/2014SignalsLIC Newark Signal Upgrade3/13/2014
$75,000.00
Safety funded signal upgrade project in the City of Newark at 2 locations to add Backing plates; tethers; and backup power supply.  Location 1 is the intersection of SR 16 and Dayton Road (CR 260).  Location 2 is the intersection of Wesat Main Street (CR
5
D05876103/24/2014Pavement MarkingD05 PM FY2014(A) Fast Dry3/13/2014
$300,000.00
Annual District wide project for striping with Fast Dry Paint for centerlines and auxillary markings
5
LIC955473/24/2014SignalsLIC Newark Signal Upgrade3/13/2014
$75,000.00
Safety funded signal upgrade project in the City of Newark at 2 locations to add Backing plates; tethers; and backup power supply.  Location 1 is the intersection of SR 16 and Dayton Road (CR 260).  Location 2 is the intersection of Wesat Main Street (CR
5
D05876064/7/2014Raised Pavement MarkersD05 RPM FY20143/27/2014
$200,000.00
District wide project for the replacement of RPM's on a three year cycle
5
D05876064/7/2014Raised Pavement MarkersD05 RPM FY20143/27/2014
$200,000.00
District wide project for the replacement of RPM's on a three year cycle
5
COS892514/21/2014Bridge Deck ReplacementCOS Walhonding Foot Bridge4/10/2014
$675,000.00
Rehabilitation of the Aqueduct Bridge within Coshocton Lake Park over the Walhonding River. Replacment of deck and abutment and pier repair.
5
COS918074/21/2014Bridge Deck ReplacementCOS SR 60 20.074/10/2014
$1,084,000.00
Revised work per scope: Replace bridge deck, backwalls, new expansion joint; make structural repairs (5 beams) and new approach slab.  Bridge to be painted.Deck replacement and painting of the structure carrying SR 60 over Killbuck Creek.
5
COS892514/21/2014Bridge Deck ReplacementCOS Walhonding Foot Bridge4/10/2014
$675,000.00
Rehabilitation of the Aqueduct Bridge within Coshocton Lake Park over the Walhonding River. Replacment of deck and abutment and pier repair.
5
COS918074/21/2014Bridge Deck ReplacementCOS SR 60 20.074/10/2014
$1,084,000.00
Revised work per scope: Replace bridge deck, backwalls, new expansion joint; make structural repairs (5 beams) and new approach slab.  Bridge to be painted.Deck replacement and painting of the structure carrying SR 60 over Killbuck Creek.
5
KNO960574/15/2014Buildings - Mix Shed,etc.KNO US 36 15.81 (Pole Building)4/15/2014
$150,000.00
At existing Knox County Garage Site - Construction of a 40'x60' Pole Building
5
KNO960574/15/2014Buildings - Mix Shed,etc.KNO US 36 15.81 (Pole Building)4/15/2014
$150,000.00
At existing Knox County Garage Site - Construction of a 40'x60' Pole Building
5
D05214925/5/2014Pavement MarkingD05 PM FY2014(C) Spray Thermo4/24/2014
$600,000.00
Annual application of Spray Thermo striping District wide
5
D05214925/5/2014Pavement MarkingD05 PM FY2014(C) Spray Thermo4/24/2014
$600,000.00
Annual application of Spray Thermo striping District wide
5
D05214925/5/2014Pavement MarkingD05 PM FY2014(C) Spray Thermo4/24/2014
$600,000.00
Annual application of Spray Thermo striping District wide
5
GUE812545/5/2014Culvert Construction/Reconstr/RepairGUE IR 70 13.21/13.344/24/2014
$676,000.00
Culvert/bridge Repairs, SFN 3001598 (Gue-70-13.21) on IR 70 in Guernsey, Repairs culvert under TR 55.Revised work per scope: Line both culverts if hydraulics allow.  Option to utilize concrete spray on liner to pipe arch and culvert.
5
FAI818715/5/2014Culvert Construction/Reconstr/RepairFAI US 22 22.924/24/2014
$353,000.00
Replacement of an 84" CMP (Corrugated Metal Pipe) culvert on US 22 in Fairfield County with an 84" conduit and perform other related work.
5
D05214925/5/2014Pavement MarkingD05 PM FY2014(C) Spray Thermo4/24/2014
$600,000.00
Annual application of Spray Thermo striping District wide
5
GUE812545/5/2014Culvert Construction/Reconstr/RepairGUE IR 70 13.21/13.344/24/2014
$676,000.00
Culvert/bridge Repairs, SFN 3001598 (Gue-70-13.21) on IR 70 in Guernsey, Repairs culvert under TR 55.Revised work per scope: Line both culverts if hydraulics allow.  Option to utilize concrete spray on liner to pipe arch and culvert.
5
FAI818715/5/2014Culvert Construction/Reconstr/RepairFAI US 22 22.924/24/2014
$353,000.00
Replacement of an 84" CMP (Corrugated Metal Pipe) culvert on US 22 in Fairfield County with an 84" conduit and perform other related work.
5
D05812145/19/2014Bridge MaintenanceD05 BH FY20145/8/2014
$395,000.00
Revised work per scope: Seal the following concrete  bridge deck with Item 512 HMWM: Cos-36-2988L(1600575), Cos-93-0404(1601792), Gue-77-0900L/R(3002942,3002977), Gue-77-0926L/R(3003000,3003035)  Gue-146-0390(3003647), Gue-209-14.48(303004325), Kno-3-2440
5
LIC918655/19/2014Bridge Deck ReplacementLIC IR 70 18.625/8/2014
$795,000.00
Revised work per scope: Replace existing deck on Steel Stringers with new deck.  Paint Beams, cut Abutments off at footer and rebuild with new expansion joints and approach slabs.  Repair Piers with 519 patching, Add new bearings at abutments only.  Resur
5
D05812145/19/2014Bridge MaintenanceD05 BH FY20145/8/2014
$395,000.00
Revised work per scope: Seal the following concrete  bridge deck with Item 512 HMWM: Cos-36-2988L(1600575), Cos-93-0404(1601792), Gue-77-0900L/R(3002942,3002977), Gue-77-0926L/R(3003000,3003035)  Gue-146-0390(3003647), Gue-209-14.48(303004325), Kno-3-2440
5
LIC918655/19/2014Bridge Deck ReplacementLIC IR 70 18.625/8/2014
$795,000.00
Revised work per scope: Replace existing deck on Steel Stringers with new deck.  Paint Beams, cut Abutments off at footer and rebuild with new expansion joints and approach slabs.  Repair Piers with 519 patching, Add new bearings at abutments only.  Resur
5
MUS842926/2/2014Rock Slope Maintenance (NEW)MUS SR 60 06.725/22/2014
$1,821,000.00
Existing 800 feet of eastern rock cut slope re-facing and slope protection with anchored wire mesh.   previous description: Realignment of approximately 1000' of SR 60 away from a rock cut slope  Placement of a drilled shaft wall with lagging panels.  Sel
5
LIC848846/2/2014Bridge ReplacementLIC CR 39 02.20 (York Road)5/22/2014
$2,042,000.00
Replace existing bridge, SFN 4535685 (Lic-CR 39-02.20) carrying York Rd (CR 39) over the South Fork of Licking River.  (CREDIT BRIDGE)
5
D05879026/2/2014Guardrail upgrade/replaceD05 GR FY 20145/22/2014
$1,215,000.00
District wide project to upgrade guardrail
5
GUE918136/2/2014Bridge ReplacementGUE SR 265 07.295/22/2014
$170,000.00
Gue-265-0729, Replace existing single span concrete slab with a concrete box culvert. (Ex. Br. is Posted);
5
MUS918246/2/2014Bridge ReplacementMUS SR 208 05.54/10.415/22/2014
$1,010,000.00
Revised work per Scope: Mus-208-0554 is a single span concrete.  Replace with a concrete box culvert.  The bridge is surrounded by the Dresden Wildlife Area.  Mus-208-1041 is a single span concrete T-beam.  Replace with a three span concrete slab.Replacem
5
PER918516/2/2014Bridge ReplacementPER SR 13 14.54/15.35 SR 37-18.05/22/2014
$758,000.00
Revised work per scope: Per-13-14.54 – Existing Slab Bridge with 10 foot span to be replaced with 10 x 4 box culvert (Preliminary Size), The PH shall be taken later to determine the PH for protection to be added.Per-13-15.35 – Existing Slab Bridge with 14
5
GUE960586/2/2014Bridge ReplacementGUE SR 265 08.61/09.455/22/2014
$499,000.00
Gue-265-0861, Replace existing single span concrete slab with a concrete box culvert. Gue-265-0945, Replace existing single span concrete slab with a concrete box culvert. (Ex. Br. is Posted)
5
MUS842926/2/2014Rock Slope Maintenance (NEW)MUS SR 60 06.725/22/2014
$1,821,000.00
Existing 800 feet of eastern rock cut slope re-facing and slope protection with anchored wire mesh.   previous description: Realignment of approximately 1000' of SR 60 away from a rock cut slope  Placement of a drilled shaft wall with lagging panels.  Sel
5
LIC848846/2/2014Bridge ReplacementLIC CR 39 02.20 (York Road)5/22/2014
$2,042,000.00
Replace existing bridge, SFN 4535685 (Lic-CR 39-02.20) carrying York Rd (CR 39) over the South Fork of Licking River.  (CREDIT BRIDGE)
5
D05879026/2/2014Guardrail upgrade/replaceD05 GR FY 20145/22/2014
$1,215,000.00
District wide project to upgrade guardrail
5
GUE918136/2/2014Bridge ReplacementGUE SR 265 07.295/22/2014
$170,000.00
Gue-265-0729, Replace existing single span concrete slab with a concrete box culvert. (Ex. Br. is Posted);
5
MUS918246/2/2014Bridge ReplacementMUS SR 208 05.54/10.415/22/2014
$1,010,000.00
Revised work per Scope: Mus-208-0554 is a single span concrete.  Replace with a concrete box culvert.  The bridge is surrounded by the Dresden Wildlife Area.  Mus-208-1041 is a single span concrete T-beam.  Replace with a three span concrete slab.Replacem
5
PER918516/2/2014Bridge ReplacementPER SR 13 14.54/15.35 SR 37-18.05/22/2014
$758,000.00
Revised work per scope: Per-13-14.54 – Existing Slab Bridge with 10 foot span to be replaced with 10 x 4 box culvert (Preliminary Size), The PH shall be taken later to determine the PH for protection to be added.Per-13-15.35 – Existing Slab Bridge with 14
5
GUE960586/2/2014Bridge ReplacementGUE SR 265 08.61/09.455/22/2014
$499,000.00
Gue-265-0861, Replace existing single span concrete slab with a concrete box culvert. Gue-265-0945, Replace existing single span concrete slab with a concrete box culvert. (Ex. Br. is Posted)
5
KNO214786/16/2014Resurfacing,  Undivided SystemKNO SR 13 20.68/KNO SR 95 05.696/5/2014
$2,317,000.00
Revised/Updated:  Kno-13-(20.68-23.10): Begin work just south of Zolman Rd. and end at Richland County Line. Mill 1 ¼”, place 1” Item 448 Asphalt Conc. Intermediate Course, Type 1, PG64-22 and 1 ¼” Item 448 Asphalt Conc. Surface Course, Type 1, PG70-22M.
5
KNO214786/16/2014Resurfacing,  Undivided SystemKNO SR 13 20.68/KNO SR 95 05.696/5/2014
$2,317,000.00
Revised/Updated:  Kno-13-(20.68-23.10): Begin work just south of Zolman Rd. and end at Richland County Line. Mill 1 ¼”, place 1” Item 448 Asphalt Conc. Intermediate Course, Type 1, PG64-22 and 1 ¼” Item 448 Asphalt Conc. Surface Course, Type 1, PG70-22M.
5
KNO214786/16/2014Resurfacing,  Undivided SystemKNO SR 13 20.68/KNO SR 95 05.696/5/2014
$2,317,000.00
Revised/Updated:  Kno-13-(20.68-23.10): Begin work just south of Zolman Rd. and end at Richland County Line. Mill 1 ¼”, place 1” Item 448 Asphalt Conc. Intermediate Course, Type 1, PG64-22 and 1 ¼” Item 448 Asphalt Conc. Surface Course, Type 1, PG70-22M.
5
LIC892796/16/2014BikewaysLIC Raccoon Valley Bridge6/5/2014
$967,000.00
Construction of bike/ped bridge with connecting path over Racoon Creek from the TJ Evans Recreational Trail to the Raccoon Valley Park.
5
KNO214786/16/2014Resurfacing,  Undivided SystemKNO SR 13 20.68/KNO SR 95 05.696/5/2014
$2,317,000.00
Revised/Updated:  Kno-13-(20.68-23.10): Begin work just south of Zolman Rd. and end at Richland County Line. Mill 1 ¼”, place 1” Item 448 Asphalt Conc. Intermediate Course, Type 1, PG64-22 and 1 ¼” Item 448 Asphalt Conc. Surface Course, Type 1, PG70-22M.
5
LIC892796/16/2014BikewaysLIC Raccoon Valley Bridge6/5/2014
$967,000.00
Construction of bike/ped bridge with connecting path over Racoon Creek from the TJ Evans Recreational Trail to the Raccoon Valley Park.
5
MUS876077/1/2014Slide RepairMUS IR 70 15.317/1/2014
$5,000,000.00
Address 15 subsidence locations indicating potential mine site around the 15.3 (158.1) mm
5
D05876127/1/2014MowingD05 MOW FY2014/20157/1/2014
$400,000.00
Two year contract for District wide mowing on the Interstates and Interstate look-a-likes.
5
LIC893027/1/2014Minor Rehabilitation - Pavement Gnrl Sys LIC/KNO SR 661 00.00/00.007/1/2014
$6,160,000.00
Treatment Updated 2/26/13: The section of roadway between the point curbing ends and the bridge at 1.58 should not be milled so that the roadway elevation can be increased in this area to improve drainage from the edge of pavement through the shoulder are
5
FAI918697/1/2014Bridge RepairFAI SR 256 09.95/13.337/1/2014
$1,848,000.00
Location 1 (SFN #2303183) - Replace the deck and bearings; repair backwalls and beam seats; and paint structure: Location 2 (SFN 2303213) - Backwall rehabilitation project Revised as per scope:Fai-256-9.95 – Deck Replacement on existing steel beams, Repla
5
COS918817/1/2014Resurfacing,  Undivided SystemCOS SR 541 18.727/1/2014
$1,395,000.00
Revised/Updated Treatment: 5% Repairs, mill existing surface (1 1/4"-1 1/2"), 3" milling in curbed sections of Coshocton, place 1 3/4" Item 448, and 1 1/4" Item 448 Surface Type 1 PG70-22M.  Coordinate work with Coshocton Schools turn lane construction on
5
LIC927947/1/2014Resurfacing,  Undivided SystemLIC CR 539BU 00.267/1/2014
$197,000.00
Resurfacing and related work to Cherrry Street from Broadway to Corp Limit
5
COS940647/1/2014ParksCOS Woodbury Wildlife Area7/1/2014
$100,000.00
Asphalt and aggregate resurfacing within the wildlife area
5
LIC940857/1/2014Hazardous WasteLIC Williams St Garage Phase 37/1/2014
$959,000.00
Phase 3 of the Williams Street project consists of final mitigation studies; acquistion of the affected properties; demolition of the properties; and site cleanup. Facilities Project Number F30521
5
MUS876077/1/2014Slide RepairMUS IR 70 15.317/1/2014
$5,000,000.00
Address 15 subsidence locations indicating potential mine site around the 15.3 (158.1) mm
5
D05876127/1/2014MowingD05 MOW FY2014/20157/1/2014
$400,000.00
Two year contract for District wide mowing on the Interstates and Interstate look-a-likes.
5
LIC893027/1/2014Minor Rehabilitation - Pavement Gnrl Sys LIC/KNO SR 661 00.00/00.007/1/2014
$6,160,000.00
Treatment Updated 2/26/13: The section of roadway between the point curbing ends and the bridge at 1.58 should not be milled so that the roadway elevation can be increased in this area to improve drainage from the edge of pavement through the shoulder are
5
FAI918697/1/2014Bridge RepairFAI SR 256 09.95/13.337/1/2014
$1,848,000.00
Location 1 (SFN #2303183) - Replace the deck and bearings; repair backwalls and beam seats; and paint structure: Location 2 (SFN 2303213) - Backwall rehabilitation project Revised as per scope:Fai-256-9.95 – Deck Replacement on existing steel beams, Repla
5
COS918817/1/2014Resurfacing,  Undivided SystemCOS SR 541 18.727/1/2014
$1,395,000.00
Revised/Updated Treatment: 5% Repairs, mill existing surface (1 1/4"-1 1/2"), 3" milling in curbed sections of Coshocton, place 1 3/4" Item 448, and 1 1/4" Item 448 Surface Type 1 PG70-22M.  Coordinate work with Coshocton Schools turn lane construction on
5
LIC927947/1/2014Resurfacing,  Undivided SystemLIC CR 539BU 00.267/1/2014
$197,000.00
Resurfacing and related work to Cherrry Street from Broadway to Corp Limit
5
COS940647/1/2014ParksCOS Woodbury Wildlife Area7/1/2014
$100,000.00
Asphalt and aggregate resurfacing within the wildlife area
5
LIC940857/1/2014Hazardous WasteLIC Williams St Garage Phase 37/1/2014
$959,000.00
Phase 3 of the Williams Street project consists of final mitigation studies; acquistion of the affected properties; demolition of the properties; and site cleanup. Facilities Project Number F30521
5
MUS2568410/1/2014Resurfacing, Divided SystemMUS IR 70 00.7610/1/2014
$4,646,000.00
Resurfacing with related work on IR 70Treatment Revised/Updated: 5% Repairs, use of GeoGrid , milling 1 3/4" placing 1 3/4" Item 442 Asphalt Concrete Intermediate Course 19mm (446) and 1 1/2" Item 442 Asphalt Concrete Surface Course 12.5mm. Include inside
5
GUE7643310/1/2014Resurfacing, Divided SystemGUE IR 70 00.0010/1/2014
$5,570,000.00
Treatment Revised/Updated: 2% repairs, joint repair a.p.p. use of Geo-Grid, Milling 1 3/4" and placing 1 3/4" Item 442 Asphalt Concrete Intermediate Course, 19mm, Type A (446) and 1 1/2" Item 442 Asphalt Concrete Surface Course, 12.5mm, Type A (446)Resurf
5
GUE7645110/1/2014Resurfacing,  Undivided SystemGUE SR 209/SR 821 8.46/4.9710/1/2014
$2,839,000.00
7/8/13 Update: Gue-821-(4.97-5.94) is being added to this project, it was previously on PID 89453. Treatment will be milling full depth, 3" in curbed segments and placing 1 ¾” Item 448 Asphalt Concrete Intermediate Course, Type 1 PG64-22 and 1 ¼” Item 448
5
MUS2568410/1/2014Resurfacing, Divided SystemMUS IR 70 00.7610/1/2014
$4,646,000.00
Resurfacing with related work on IR 70Treatment Revised/Updated: 5% Repairs, use of GeoGrid , milling 1 3/4" placing 1 3/4" Item 442 Asphalt Concrete Intermediate Course 19mm (446) and 1 1/2" Item 442 Asphalt Concrete Surface Course 12.5mm. Include inside
5
GUE7643310/1/2014Resurfacing, Divided SystemGUE IR 70 00.0010/1/2014
$5,570,000.00
Treatment Revised/Updated: 2% repairs, joint repair a.p.p. use of Geo-Grid, Milling 1 3/4" and placing 1 3/4" Item 442 Asphalt Concrete Intermediate Course, 19mm, Type A (446) and 1 1/2" Item 442 Asphalt Concrete Surface Course, 12.5mm, Type A (446)Resurf
5
GUE7645110/1/2014Resurfacing,  Undivided SystemGUE SR 209/SR 821 8.46/4.9710/1/2014
$2,839,000.00
7/8/13 Update: Gue-821-(4.97-5.94) is being added to this project, it was previously on PID 89453. Treatment will be milling full depth, 3" in curbed segments and placing 1 ¾” Item 448 Asphalt Concrete Intermediate Course, Type 1 PG64-22 and 1 ¼” Item 448
5
MUS2568410/1/2014Resurfacing, Divided SystemMUS IR 70 00.7610/1/2014
$4,646,000.00
Resurfacing with related work on IR 70Treatment Revised/Updated: 5% Repairs, use of GeoGrid , milling 1 3/4" placing 1 3/4" Item 442 Asphalt Concrete Intermediate Course 19mm (446) and 1 1/2" Item 442 Asphalt Concrete Surface Course 12.5mm. Include inside
5
GUE7643310/1/2014Resurfacing, Divided SystemGUE IR 70 00.0010/1/2014
$5,570,000.00
Treatment Revised/Updated: 2% repairs, joint repair a.p.p. use of Geo-Grid, Milling 1 3/4" and placing 1 3/4" Item 442 Asphalt Concrete Intermediate Course, 19mm, Type A (446) and 1 1/2" Item 442 Asphalt Concrete Surface Course, 12.5mm, Type A (446)Resurf
5
GUE7645110/1/2014Resurfacing,  Undivided SystemGUE SR 209/SR 821 8.46/4.9710/1/2014
$2,839,000.00
7/8/13 Update: Gue-821-(4.97-5.94) is being added to this project, it was previously on PID 89453. Treatment will be milling full depth, 3" in curbed segments and placing 1 ¾” Item 448 Asphalt Concrete Intermediate Course, Type 1 PG64-22 and 1 ¼” Item 448
5
PER8895110/1/2014Bridge RepairPER US 22 07.63/12.0210/1/2014
$956,000.00
Scope revision for Per-22-1202 (4-8-2013) Change from a concrete overlay to a complete superstructure replacement with new pier piling and bridge profile correction. Revised as per scope:Per-22-07.63 – Overlay, Backwall  Repair (Abutment in Front), Minima
5
MUS9087710/1/2014Add SidewalksMUS SRTS New Concord10/1/2014
$173,000.00
The addition of sidewalks, crosswalks, and signalized intersection upgrades on various village streets
5
PER9225810/1/2014Resurfacing,  Undivided SystemPER SR 13/37 16.98/15.0210/1/2014
$1,959,000.00
6/26/13 Update: Coordination needed with PID 93150, bridge project. Treatment as described below.9/19/12 Update: Per-13-(16.98-19.83), Per-37-(15.02-20.69): 5% repairs, Milling 1 ¼” (full depth Milling in curbed sections) and placing 1 ¾” Item 448 Asphalt
5
MUS2568410/1/2014Resurfacing, Divided SystemMUS IR 70 00.7610/1/2014
$4,646,000.00
Resurfacing with related work on IR 70Treatment Revised/Updated: 5% Repairs, use of GeoGrid , milling 1 3/4" placing 1 3/4" Item 442 Asphalt Concrete Intermediate Course 19mm (446) and 1 1/2" Item 442 Asphalt Concrete Surface Course 12.5mm. Include inside
5
GUE7643310/1/2014Resurfacing, Divided SystemGUE IR 70 00.0010/1/2014
$5,570,000.00
Treatment Revised/Updated: 2% repairs, joint repair a.p.p. use of Geo-Grid, Milling 1 3/4" and placing 1 3/4" Item 442 Asphalt Concrete Intermediate Course, 19mm, Type A (446) and 1 1/2" Item 442 Asphalt Concrete Surface Course, 12.5mm, Type A (446)Resurf
5
GUE7645110/1/2014Resurfacing,  Undivided SystemGUE SR 209/SR 821 8.46/4.9710/1/2014
$2,839,000.00
7/8/13 Update: Gue-821-(4.97-5.94) is being added to this project, it was previously on PID 89453. Treatment will be milling full depth, 3" in curbed segments and placing 1 ¾” Item 448 Asphalt Concrete Intermediate Course, Type 1 PG64-22 and 1 ¼” Item 448
5
PER8895110/1/2014Bridge RepairPER US 22 07.63/12.0210/1/2014
$956,000.00
Scope revision for Per-22-1202 (4-8-2013) Change from a concrete overlay to a complete superstructure replacement with new pier piling and bridge profile correction. Revised as per scope:Per-22-07.63 – Overlay, Backwall  Repair (Abutment in Front), Minima
5
MUS9087710/1/2014Add SidewalksMUS SRTS New Concord10/1/2014
$173,000.00
The addition of sidewalks, crosswalks, and signalized intersection upgrades on various village streets
5
PER9225810/1/2014Resurfacing,  Undivided SystemPER SR 13/37 16.98/15.0210/1/2014
$1,959,000.00
6/26/13 Update: Coordination needed with PID 93150, bridge project. Treatment as described below.9/19/12 Update: Per-13-(16.98-19.83), Per-37-(15.02-20.69): 5% repairs, Milling 1 ¼” (full depth Milling in curbed sections) and placing 1 ¾” Item 448 Asphalt
5
FAI7693812/22/2014Interchange, NewFAI US 33 05.08(Carroll Area)12/11/2014
$5,104,000.00
Intersection upgrade from an at grade crossing at Winchester Road and High Street to a limited access Split diamond interchange over US 33 in the vicinity of the Village of Carroll.  The project will include four signalized intersections.
5
FAI7693812/22/2014Interchange, NewFAI US 33 05.08(Carroll Area)12/11/2014
$5,104,000.00
Intersection upgrade from an at grade crossing at Winchester Road and High Street to a limited access Split diamond interchange over US 33 in the vicinity of the Village of Carroll.  The project will include four signalized intersections.
5
FAI7693812/22/2014Interchange, NewFAI US 33 05.08(Carroll Area)12/11/2014
$5,104,000.00
Intersection upgrade from an at grade crossing at Winchester Road and High Street to a limited access Split diamond interchange over US 33 in the vicinity of the Village of Carroll.  The project will include four signalized intersections.
5
FAI7693812/22/2014Interchange, NewFAI US 33 05.08(Carroll Area)12/11/2014
$5,104,000.00
Intersection upgrade from an at grade crossing at Winchester Road and High Street to a limited access Split diamond interchange over US 33 in the vicinity of the Village of Carroll.  The project will include four signalized intersections.
5
PER226331/1/2015Minor Rehabilitation - Pavement Gnrl SysPER SR 13 00.001/1/2015
$3,980,000.00
5% Repair, 1 1/4" Milling, 1" Item 448 Asphalt Concrete Inter. Course and 1 1/4" Item 448 Asphalt Concrete Surface Course. Utilize "Safety Edge" were applicable.
5
PER226331/1/2015Minor Rehabilitation - Pavement Gnrl SysPER SR 13 00.001/1/2015
$3,980,000.00
5% Repair, 1 1/4" Milling, 1" Item 448 Asphalt Concrete Inter. Course and 1 1/4" Item 448 Asphalt Concrete Surface Course. Utilize "Safety Edge" were applicable.
5
PER226331/1/2015Minor Rehabilitation - Pavement Gnrl SysPER SR 13 00.001/1/2015
$3,980,000.00
5% Repair, 1 1/4" Milling, 1" Item 448 Asphalt Concrete Inter. Course and 1 1/4" Item 448 Asphalt Concrete Surface Course. Utilize "Safety Edge" were applicable.
5
GUE855491/1/2015Bridge Deck ReplacementGUE IR 70 17.471/1/2015
$1,203,000.00
Revised as per the PIP:Gue-70-17.30– Deck Replacement, Painting of Beams, Reset or Replace Rockers on Abutment, Replace Backwalls, New Parapet, New Expansion joint or modify to Integral Design, New Guardrail (tie into existing run), New Approach Slabs, an
5
LIC869831/1/2015Add SidewalksLIC CR 79 0.89 (High St Enhance)1/1/2015
$896,000.00
Addition of sidewalks and Bikepath
5
D05875871/1/2015Preventive MaintenanceD05 PCS FY 20151/1/2015
$235,000.00
districtwide priority system crackseal
5
D05875891/1/2015Preventive MaintenanceD05 GCS FY20151/1/2015
$431,000.00
districtwide general crackseal FY 2015
5
D05876291/1/2015Pavement MarkingD05 RPM FY20151/1/2015
$231,000.00
District wide project for the replacement of Raised Pavement Markers (RPM's) which are on a three year cycle.
5
D05876351/1/2015Guardrail RebuildingD05 GR FY2015/20161/1/2015
$600,000.00
Two year District wide Ding N Dent contract as well as guard rail repair contract
5
FAI883331/1/2015Add SidewalksFAI Lancaster SRTS1/1/2015
$503,000.00
Various improvements sidewalk and roadway improvements at Cedar Heights, South, West and East Elementary Schools.Various improvements sidewalk and roadway improvements at Medill Elementry, Talmadge Elementry, General Sherman Junior High and Thomas Ewing J
5
D05889641/1/2015Culvert Construction/Reconstr/RepairD05 CUL FY20151/1/2015
$726,000.00
Revised as per scope:Gue-70-6.59 – Tunnel Liner or Bore and Jack for a 42” x 586’ CMP Pipe.  Possible Channel Easement at culvert Inlet.  Possible Wetlands at Outlet. Utilities Possible Gas Line at Outlet.Gue-70-11.70 – Tunnel Liner or Spray Liner  for a
5
MUS922561/1/2015Resurfacing,  Undivided SystemMUS US 22/SR 719 00.00/00.001/1/2015
$4,183,000.00
06/19/13 Update: Review striping on SR 719 for possible changes. Treatment remains as shown below.10/19/12 Revision: 5% Repairs, milling 1 ½” (3”, full depth milling in curbed sections) and placing 1 ¾” Item 448 Asphalt Concrete Intermediate Course Type1
5
MUS923341/1/2015Add SidewalksMUS Downtown Enhancement1/1/2015
$852,000.00
Installation of sidewalk and decorative lighiting from Shinnick Street from 6th to 4th / 4th Street from Shinnick to Market Street
5
KNO924121/1/2015BikewaysKNO Downtown Connector Trail1/1/2015
$761,000.00
Downtown trail connection of former railroad bridge crossing the Kokosing River and former railroad bridge over Dry Creek and connecting pathways.
5
FAI924581/1/2015WideningFAI SR 256 00.50 Safety1/1/2015
$4,381,000.00
Add through lanes, upgrade signal equipment and add medians and sidewalks along SR256 within the City of Pickerington from I-70 to the Kroger/Giant Eagle Signal.
5
LIC929721/1/2015Minor Rehabilitation - Pavement Gnrl SysLIC/KNO SR 657 00.00/00.001/1/2015
$5,042,000.00
Treatment revised/updated: Kno-657-(0.00-4.93), Lic-657-(0.00-14.91): 5% Repairs, Item 422 Single Chip Seal, 1" Item 448 Asphalt Concrete Intermediate Course and 1 1/4" Item 448 Asphalt Concrete Surface Course. Use “Safety Edge” where warranted. May need
5
MUS940611/1/2015Slide RepairMUS Dillon Park Rd 19 Slip1/1/2015
$180,000.00
Slide repair along Park Road 19 in Dillon State Park
5
PER226331/1/2015Minor Rehabilitation - Pavement Gnrl SysPER SR 13 00.001/1/2015
$3,980,000.00
5% Repair, 1 1/4" Milling, 1" Item 448 Asphalt Concrete Inter. Course and 1 1/4" Item 448 Asphalt Concrete Surface Course. Utilize "Safety Edge" were applicable.
5
GUE855491/1/2015Bridge Deck ReplacementGUE IR 70 17.471/1/2015
$1,203,000.00
Revised as per the PIP:Gue-70-17.30– Deck Replacement, Painting of Beams, Reset or Replace Rockers on Abutment, Replace Backwalls, New Parapet, New Expansion joint or modify to Integral Design, New Guardrail (tie into existing run), New Approach Slabs, an
5
LIC869831/1/2015Add SidewalksLIC CR 79 0.89 (High St Enhance)1/1/2015
$896,000.00
Addition of sidewalks and Bikepath
5
D05875871/1/2015Preventive MaintenanceD05 PCS FY 20151/1/2015
$235,000.00
districtwide priority system crackseal
5
D05875891/1/2015Preventive MaintenanceD05 GCS FY20151/1/2015
$431,000.00
districtwide general crackseal FY 2015
5
D05876291/1/2015Pavement MarkingD05 RPM FY20151/1/2015
$231,000.00
District wide project for the replacement of Raised Pavement Markers (RPM's) which are on a three year cycle.
5
D05876351/1/2015Guardrail RebuildingD05 GR FY2015/20161/1/2015
$600,000.00
Two year District wide Ding N Dent contract as well as guard rail repair contract
5
FAI883331/1/2015Add SidewalksFAI Lancaster SRTS1/1/2015
$503,000.00
Various improvements sidewalk and roadway improvements at Cedar Heights, South, West and East Elementary Schools.Various improvements sidewalk and roadway improvements at Medill Elementry, Talmadge Elementry, General Sherman Junior High and Thomas Ewing J
5
D05889641/1/2015Culvert Construction/Reconstr/RepairD05 CUL FY20151/1/2015
$726,000.00
Revised as per scope:Gue-70-6.59 – Tunnel Liner or Bore and Jack for a 42” x 586’ CMP Pipe.  Possible Channel Easement at culvert Inlet.  Possible Wetlands at Outlet. Utilities Possible Gas Line at Outlet.Gue-70-11.70 – Tunnel Liner or Spray Liner  for a
5
MUS922561/1/2015Resurfacing,  Undivided SystemMUS US 22/SR 719 00.00/00.001/1/2015
$4,183,000.00
06/19/13 Update: Review striping on SR 719 for possible changes. Treatment remains as shown below.10/19/12 Revision: 5% Repairs, milling 1 ½” (3”, full depth milling in curbed sections) and placing 1 ¾” Item 448 Asphalt Concrete Intermediate Course Type1
5
MUS923341/1/2015Add SidewalksMUS Downtown Enhancement1/1/2015
$852,000.00
Installation of sidewalk and decorative lighiting from Shinnick Street from 6th to 4th / 4th Street from Shinnick to Market Street
5
KNO924121/1/2015BikewaysKNO Downtown Connector Trail1/1/2015
$761,000.00
Downtown trail connection of former railroad bridge crossing the Kokosing River and former railroad bridge over Dry Creek and connecting pathways.
5
FAI924581/1/2015WideningFAI SR 256 00.50 Safety1/1/2015
$4,381,000.00
Add through lanes, upgrade signal equipment and add medians and sidewalks along SR256 within the City of Pickerington from I-70 to the Kroger/Giant Eagle Signal.
5
LIC929721/1/2015Minor Rehabilitation - Pavement Gnrl SysLIC/KNO SR 657 00.00/00.001/1/2015
$5,042,000.00
Treatment revised/updated: Kno-657-(0.00-4.93), Lic-657-(0.00-14.91): 5% Repairs, Item 422 Single Chip Seal, 1" Item 448 Asphalt Concrete Intermediate Course and 1 1/4" Item 448 Asphalt Concrete Surface Course. Use “Safety Edge” where warranted. May need
5
MUS940611/1/2015Slide RepairMUS Dillon Park Rd 19 Slip1/1/2015
$180,000.00
Slide repair along Park Road 19 in Dillon State Park
5
LIC807043/1/2015Interchange, NewLIC SR 16 16.50 (Cherry Val Int)3/1/2015
$4,988,000.00
Intersection upgrade from an at grade crossing to a Limited Access interchange on S.R. 16 approximately 0.4 MI east of the existing Cherry Valley Road (C.R. 128) intersection.  The project will include full depth pavement rehabilitation on S.R. 16 and the
5
LIC807043/1/2015Interchange, NewLIC SR 16 16.50 (Cherry Val Int)3/1/2015
$4,988,000.00
Intersection upgrade from an at grade crossing to a Limited Access interchange on S.R. 16 approximately 0.4 MI east of the existing Cherry Valley Road (C.R. 128) intersection.  The project will include full depth pavement rehabilitation on S.R. 16 and the
5
PER853504/1/2015Add SidewalksPER SR 13 18.67 (Enhancement)4/1/2015
$1,600,000.00
Enhancement of New Lexington downtown area by the installation of new sidewalks with decorative brick pavers, decorative lighting and various other enhancements.
5
LIC860284/1/2015BikewaysLIC US 62 03.50 Raccon Creek Ped4/1/2015
$487,000.00
Construction of a bike/ped facility within the Village of Johnstown which includes a bridge and trail construction along US 62 from the Kroger entrance to Westgate Drive.
5
MUS872164/1/2015Bridge ReplacementMUS CR 45 01.714/1/2015
$463,000.00
Replace deficient bridge structure.
5
D05876304/1/2015Pavement MarkingD05 PM FY2015(A) Fast Dry4/1/2015
$347,000.00
District wide project for the annual striping with Fast Dry for Centerlines and Auxillary Markings
5
GUE889614/1/2015Bridge ReplacementGUE US 22 20.904/1/2015
$471,000.00
After review of project cost and R/W cost Option 1 was determined to be the prefered Design by David Slatzer May 15,2012.Because of R/W project will be to have 4th quarter sale.Revised per scope:Replace existing 16’-6” span concrete slab bridge with new p
5
MUS889664/1/2015Bridge ReplacementMUS SR 146 17.98/27.734/1/2015
$704,000.00
Bridge replacement of a structure over a ditch and the second over a Branch of the Buffalo ForkRevised as per the scope:Mus-146-17.98 - Replace existing 10’x5’ box culvert with new box culvert.  Preliminary size 8’x4’.Mus-146-27.73 – Replace existing 16’x
5
PER893444/1/2015Add SidewalksPER SR 13 26.88 (Streetscape)4/1/2015
$951,000.00
Upgrade the streetscape throughout the historic district by installing antique looking streetlights and installing brick sidewalk pavers, and by enhancing access for people with disabilities.
5
MUS894534/1/2015Preventive MaintenanceMUS/GUE SR 209 00.00/00.004/1/2015
$2,833,000.00
7/8/13: Gue-821-(4.97-5.94) portion will be moved to PID 76451, treatment for Gue-209 will remain as stated below.4/23/13: updated locations on Gue-821-(4.97-5.94), treatment is the same.8/23/12 Revision: 5% repairs, milling existing surface 1 ¼” ( 2 ¼” f
5
LIC894784/1/2015Intersection ImprovementLIC CR 804 00.90 (30th & Church)4/1/2015
$698,000.00
Improve turn lanes, widen radius of roadway, upgrade traffic signal, replace sidewalk & curb ramps, repair and resurface pavement at intersection.
5
FAI908674/1/2015Add SidewalksFAI TR 222 Long Rd SRTS4/1/2015
$230,000.00
Construction of multi-use path from Long Rd to Janice Lane, the connection from multi-use path to school, sidewalk from Diley Rod onto the Pickerington Elementray School and School zone flashers.
5
GUE918114/1/2015Bridge Deck ReplacementGUE IR 70 12.32 L&R4/1/2015
$6,787,000.00
As per scope:Widen Bridge Structure allowing 10 foot shoulders on each side (for MOT now and in the future per Tim Keller) and Replace Deck on existing structure, New Backwalls, New Approach Slab and Approach Resurfacing, repair or replace splice plates,
5
COS918524/1/2015Bridge ReplacementCOS SR 79 01.60/03.94/08.34/9.554/1/2015
$2,524,000.00
As scope or PIP: Cos-79-1.60 – Replace Bridge with a 3 span slab (estimated 32’-40’-32’) including resurfacing approximately 200 feet each direction and related work.Cos-79-3.94 – Replace Bridge with a 3 span slab (estimated 20’-25’-20’) including resurfa
5
MUS918914/1/2015Minor Rehabilitation - Pavement Prmy SysMUS SR 16 0.294/1/2015
$5,237,000.00
Treatment revised/updated: 5% repairs, Mill 1 1/2" and place 1 1/2" Item 442 Asphalt Concrete Surface Course, 12.5mm, Type A (446). Begin work at the Fwd. approach slab of Mus-16-0029 L & R Structures and end work at the rear app. slab of the Mus-16-0641
5
FAI920664/1/2015Intersection ImprovementFAI CR 54 04.00 Pierce & Fair4/1/2015
$546,000.00
Mill and fill asphalt resurfacing, curb replacement/add within the project limits, ADA ramps and upgrade of traffic signal equipment to current ADA standards for the visually impaired.
5
COS924364/1/2015Bridge ReplacementCOS SR 751 06.58/09.054/1/2015
$720,000.00
As per the PIP/scope:  Cos-751-6.58 – Replace existing 20’ span x 30’-4” wide x7.25’ height slab (10’ to grade) with Box Culvert 20’ x 8’ x 50’. Design Exception for Horizontal Curve.  Right of Way needed.   Guardrail three type T and one type A;  Cos-751
5
PER928714/1/2015Bridge ReplacementPER TR 79 00.024/1/2015
$379,000.00
Replacement of deficent bridge on Township Road 79
5
FAI929604/1/2015Minor Rehabilitation - Pavement Gnrl SysFAI SR 256 00.004/1/2015
$1,522,000.00
5% Repairs, Milling 1 1/4" to 3" (3" in curbed areas), placing 1 3/4" Item 448 Asphalt Concrete Intermediate Course and 1 1/4" Item 448 Asphalt Concrete Surface Course. Verification of ADA ramps to current standards. NOTE: City of Pickerington is performi
5
MUS929634/1/2015Minor Rehabilitation - Pavement Gnrl SysMUS/PER/MRG SR 555 Various4/1/2015
$4,061,000.00
6/18/13 Revision: Project coordination needed with PID 93149.  Resurfacing treatment to remain as stated below.5% Repair, Item 422 Single Chip Seal place 1" Item 448 Asphalt Concrete Intermediate Course and 1 1/4" Item 448 Asphalt Concrete Surface Course.
5
LIC931194/1/2015Bridge ReplacementLIC SR 661 01.58/08.814/1/2015
$1,224,000.00
Revised as per scope:Lic-661-1.58 – Superstructure Replacement, Cut Abutments off at footer and rebuild with new integral design, Replace with TST Rail, Replace approach slab and approach guardrail, Minimal Resurfacing 100 foot +/-.Location 1 (SFN 4506367
5
D05931244/1/2015Guardrail upgrade/replaceD05 GR FY 20154/1/2015
$500,000.00
Part of the District 5 system wide guardrail upgrade effort
5
MUS931614/1/2015Bridge Deck ReplacementMUS IR 70 04.604/1/2015
$1,182,000.00
Replace bridge deck, painting, repair beam seats, replace backwalls and expansion joints, new parapets, new approach slabs.
5
D05934114/1/2015Pavement MarkingD05 PM FY 2015 (C) Spray Thermo4/1/2015
$260,000.00
District wide project for the application of Spray Thermo Striping
5
LIC935854/1/2015Add SidewalksLIC Hanover SRTS4/1/2015
$227,000.00
Addition of sidewalks at Licking Valley Schools
5
PER944144/1/2015Bridge ReplacementPER TR 131 01.354/1/2015
$468,000.00
Replacement of the Little Monday Creek/TR 131 Bridge (SFN 6434681).  The existing timber cap and timber pile abutment bridge will be replaced with stub abutments and a precast stressed concrete box beam bridge.
5
PER853504/1/2015Add SidewalksPER SR 13 18.67 (Enhancement)4/1/2015
$1,600,000.00
Enhancement of New Lexington downtown area by the installation of new sidewalks with decorative brick pavers, decorative lighting and various other enhancements.
5
LIC860284/1/2015BikewaysLIC US 62 03.50 Raccon Creek Ped4/1/2015
$487,000.00
Construction of a bike/ped facility within the Village of Johnstown which includes a bridge and trail construction along US 62 from the Kroger entrance to Westgate Drive.
5
MUS872164/1/2015Bridge ReplacementMUS CR 45 01.714/1/2015
$463,000.00
Replace deficient bridge structure.
5
D05876304/1/2015Pavement MarkingD05 PM FY2015(A) Fast Dry4/1/2015
$347,000.00
District wide project for the annual striping with Fast Dry for Centerlines and Auxillary Markings
5
GUE889614/1/2015Bridge ReplacementGUE US 22 20.904/1/2015
$471,000.00
After review of project cost and R/W cost Option 1 was determined to be the prefered Design by David Slatzer May 15,2012.Because of R/W project will be to have 4th quarter sale.Revised per scope:Replace existing 16’-6” span concrete slab bridge with new p
5
MUS889664/1/2015Bridge ReplacementMUS SR 146 17.98/27.734/1/2015
$704,000.00
Bridge replacement of a structure over a ditch and the second over a Branch of the Buffalo ForkRevised as per the scope:Mus-146-17.98 - Replace existing 10’x5’ box culvert with new box culvert.  Preliminary size 8’x4’.Mus-146-27.73 – Replace existing 16’x
5
PER893444/1/2015Add SidewalksPER SR 13 26.88 (Streetscape)4/1/2015
$951,000.00
Upgrade the streetscape throughout the historic district by installing antique looking streetlights and installing brick sidewalk pavers, and by enhancing access for people with disabilities.
5
MUS894534/1/2015Preventive MaintenanceMUS/GUE SR 209 00.00/00.004/1/2015
$2,833,000.00
7/8/13: Gue-821-(4.97-5.94) portion will be moved to PID 76451, treatment for Gue-209 will remain as stated below.4/23/13: updated locations on Gue-821-(4.97-5.94), treatment is the same.8/23/12 Revision: 5% repairs, milling existing surface 1 ¼” ( 2 ¼” f
5
LIC894784/1/2015Intersection ImprovementLIC CR 804 00.90 (30th & Church)4/1/2015
$698,000.00
Improve turn lanes, widen radius of roadway, upgrade traffic signal, replace sidewalk & curb ramps, repair and resurface pavement at intersection.
5
FAI908674/1/2015Add SidewalksFAI TR 222 Long Rd SRTS4/1/2015
$230,000.00
Construction of multi-use path from Long Rd to Janice Lane, the connection from multi-use path to school, sidewalk from Diley Rod onto the Pickerington Elementray School and School zone flashers.
5
GUE918114/1/2015Bridge Deck ReplacementGUE IR 70 12.32 L&R4/1/2015
$6,787,000.00
As per scope:Widen Bridge Structure allowing 10 foot shoulders on each side (for MOT now and in the future per Tim Keller) and Replace Deck on existing structure, New Backwalls, New Approach Slab and Approach Resurfacing, repair or replace splice plates,
5
COS918524/1/2015Bridge ReplacementCOS SR 79 01.60/03.94/08.34/9.554/1/2015
$2,524,000.00
As scope or PIP: Cos-79-1.60 – Replace Bridge with a 3 span slab (estimated 32’-40’-32’) including resurfacing approximately 200 feet each direction and related work.Cos-79-3.94 – Replace Bridge with a 3 span slab (estimated 20’-25’-20’) including resurfa
5
MUS918914/1/2015Minor Rehabilitation - Pavement Prmy SysMUS SR 16 0.294/1/2015
$5,237,000.00
Treatment revised/updated: 5% repairs, Mill 1 1/2" and place 1 1/2" Item 442 Asphalt Concrete Surface Course, 12.5mm, Type A (446). Begin work at the Fwd. approach slab of Mus-16-0029 L & R Structures and end work at the rear app. slab of the Mus-16-0641
5
FAI920664/1/2015Intersection ImprovementFAI CR 54 04.00 Pierce & Fair4/1/2015
$546,000.00
Mill and fill asphalt resurfacing, curb replacement/add within the project limits, ADA ramps and upgrade of traffic signal equipment to current ADA standards for the visually impaired.
5
COS924364/1/2015Bridge ReplacementCOS SR 751 06.58/09.054/1/2015
$720,000.00
As per the PIP/scope:  Cos-751-6.58 – Replace existing 20’ span x 30’-4” wide x7.25’ height slab (10’ to grade) with Box Culvert 20’ x 8’ x 50’. Design Exception for Horizontal Curve.  Right of Way needed.   Guardrail three type T and one type A;  Cos-751
5
PER928714/1/2015Bridge ReplacementPER TR 79 00.024/1/2015
$379,000.00
Replacement of deficent bridge on Township Road 79
5
FAI929604/1/2015Minor Rehabilitation - Pavement Gnrl SysFAI SR 256 00.004/1/2015
$1,522,000.00
5% Repairs, Milling 1 1/4" to 3" (3" in curbed areas), placing 1 3/4" Item 448 Asphalt Concrete Intermediate Course and 1 1/4" Item 448 Asphalt Concrete Surface Course. Verification of ADA ramps to current standards. NOTE: City of Pickerington is performi
5
MUS929634/1/2015Minor Rehabilitation - Pavement Gnrl SysMUS/PER/MRG SR 555 Various4/1/2015
$4,061,000.00
6/18/13 Revision: Project coordination needed with PID 93149.  Resurfacing treatment to remain as stated below.5% Repair, Item 422 Single Chip Seal place 1" Item 448 Asphalt Concrete Intermediate Course and 1 1/4" Item 448 Asphalt Concrete Surface Course.
5
LIC931194/1/2015Bridge ReplacementLIC SR 661 01.58/08.814/1/2015
$1,224,000.00
Revised as per scope:Lic-661-1.58 – Superstructure Replacement, Cut Abutments off at footer and rebuild with new integral design, Replace with TST Rail, Replace approach slab and approach guardrail, Minimal Resurfacing 100 foot +/-.Location 1 (SFN 4506367
5
D05931244/1/2015Guardrail upgrade/replaceD05 GR FY 20154/1/2015
$500,000.00
Part of the District 5 system wide guardrail upgrade effort
5
MUS931614/1/2015Bridge Deck ReplacementMUS IR 70 04.604/1/2015
$1,182,000.00
Replace bridge deck, painting, repair beam seats, replace backwalls and expansion joints, new parapets, new approach slabs.
5
D05934114/1/2015Pavement MarkingD05 PM FY 2015 (C) Spray Thermo4/1/2015
$260,000.00
District wide project for the application of Spray Thermo Striping
5
LIC935854/1/2015Add SidewalksLIC Hanover SRTS4/1/2015
$227,000.00
Addition of sidewalks at Licking Valley Schools
5
PER944144/1/2015Bridge ReplacementPER TR 131 01.354/1/2015
$468,000.00
Replacement of the Little Monday Creek/TR 131 Bridge (SFN 6434681).  The existing timber cap and timber pile abutment bridge will be replaced with stub abutments and a precast stressed concrete box beam bridge.
5
KNO960614/15/2015Buildings - Mix Shed,etc.KNO US 36 15.80 (Knox Wash-Bay)4/15/2015
$225,000.00
Construction of a wash bay at the existing Knox County Garage.
5
KNO960614/15/2015Buildings - Mix Shed,etc.KNO US 36 15.80 (Knox Wash-Bay)4/15/2015
$225,000.00
Construction of a wash bay at the existing Knox County Garage.
5
LIC960605/15/2015Facility RenovationLIC SR 13 02.12 (D-05 Sanitary)5/15/2015
$563,000.00
D-05 Complex will be taping in to new Sanitary Sewer Sytem being installed by Licking County Water/Wastewater Dept.
5
LIC960605/15/2015Facility RenovationLIC SR 13 02.12 (D-05 Sanitary)5/15/2015
$563,000.00
D-05 Complex will be taping in to new Sanitary Sewer Sytem being installed by Licking County Water/Wastewater Dept.
5
MUS890956/1/2015Bridge ReplacementMUS CR 6 14.25 (Grantcliff Bridg6/1/2015
$2,473,000.00
Replacement of Deficient Bridge over Jonathan Creek.  District 5 to complete design and enviornmental for bridge.  County to secure funding for contruction through the CEAO.
5
MUS890956/1/2015Bridge ReplacementMUS CR 6 14.25 (Grantcliff Bridg6/1/2015
$2,473,000.00
Replacement of Deficient Bridge over Jonathan Creek.  District 5 to complete design and enviornmental for bridge.  County to secure funding for contruction through the CEAO.
5
FAI918836/16/2015Resurfacing,  Undivided SystemFAI/PER SR 204 11.16/10.006/5/2015
$4,543,000.00
Treatment Updated/Revised: 5-10% Repairs, Milling 1 1/4", full depth milling in curbed section of Millersport. ADA Ramps need upgraded in Millersport, R/W will be needed for this work.  Place 1 3/4" Item 448 Asphalt Concrte Intermediate Course Type1, PG64
5
FAI918836/16/2015Resurfacing,  Undivided SystemFAI/PER SR 204 11.16/10.006/5/2015
$4,543,000.00
Treatment Updated/Revised: 5-10% Repairs, Milling 1 1/4", full depth milling in curbed section of Millersport. ADA Ramps need upgraded in Millersport, R/W will be needed for this work.  Place 1 3/4" Item 448 Asphalt Concrte Intermediate Course Type1, PG64
5
FAI932657/1/2015Bridge RepairFAI SR 664 04.657/1/2015
$727,000.00
Revised as per PIP: Fai-664-4.65 – Overlay, Replace Approach Slab, New TST Rail, Remove abutment to footer and replace with integral design, Pier Encasements and related resurfacing. Replace superstructure, encase piles, rehab abutments
5
LIC848107/1/2015Culvert Construction/Reconstr/RepairLIC IR 70 Culverts Repairs7/1/2015
$592,000.00
Revised per the PIP:Lic-70-25.82 - Liner in existing 96"x202' CMP under CR 288 (Midland Oil Rd)Lic-70-25.98 – Field Pave existing twin corrugated metal circular pipes (12’ x 386’)Lic-70-24.23 – 48” x 234’ – Existing CMP – Line with 36” Smooth Pipe.Lic-70-
5
MUS892477/1/2015Minor Rehabilitation - Pavement Gnrl SysMUS SR 666 00.007/1/2015
$1,567,000.00
10/19/12 Revision: Mus-666-(0.00-14.17): Perform 10% repairs and spot leveling.Note: we need to inform the city of possible participation: Need some repairs in city limits, move centerline over approaching the turn lane to get people off the edge.  Note:
5
KNO929737/1/2015Minor Rehabilitation - Pavement Gnrl SysKNO US 36/SR 314 00.00/00.007/1/2015
$4,122,000.00
Treatment revised/updated: Kno-36-(0.00-10.71): 5% Repairs, Milling 1 1/4" and placing 1 3/4" Item 448 Asphalt Concrete Intermediate Course and 1 1/4" Item 448 Asphalt Concrete Surface Course. ADA Raps in Centerburg, use of “Safety Edge” where warranted.
5
MUS929817/1/2015Minor Rehabilitation - Pavement Gnrl SysMUS US 22/SR 797 09.76/00.007/1/2015
$3,292,000.00
2/13/13: R/W may be needed to replace curb and catchbasins.10/19/12 revision:Mus-22-(9.76-18.14), Mus-719-(0.00-0.67), Mus-797-(0.00-0.39): 5-10% Repairs, milling 1 ¼” (3” in curbed section), placing 1 ¼” Item 448 Asphalt Concrete Type 1 Intermediate Cour
5
MUS931577/1/2015Bridge Deck ReplacementMUS IR 70 25.907/1/2015
$1,461,000.00
Revised as per PIP: Mus-70-25.90– Deck Replacement, Repair Beam Ends, Painting of Beams, Reset or Replace Rockers on Abutment, Replace Backwalls, New Parapet, New Expansion joint or modify to Integral Design, New Guardrail (tie into existing run), New App
5
LIC848107/1/2015Culvert Construction/Reconstr/RepairLIC IR 70 Culverts Repairs7/1/2015
$592,000.00
Revised per the PIP:Lic-70-25.82 - Liner in existing 96"x202' CMP under CR 288 (Midland Oil Rd)Lic-70-25.98 – Field Pave existing twin corrugated metal circular pipes (12’ x 386’)Lic-70-24.23 – 48” x 234’ – Existing CMP – Line with 36” Smooth Pipe.Lic-70-
5
MUS892477/1/2015Minor Rehabilitation - Pavement Gnrl SysMUS SR 666 00.007/1/2015
$1,567,000.00
10/19/12 Revision: Mus-666-(0.00-14.17): Perform 10% repairs and spot leveling.Note: we need to inform the city of possible participation: Need some repairs in city limits, move centerline over approaching the turn lane to get people off the edge.  Note:
5
KNO929737/1/2015Minor Rehabilitation - Pavement Gnrl SysKNO US 36/SR 314 00.00/00.007/1/2015
$4,122,000.00
Treatment revised/updated: Kno-36-(0.00-10.71): 5% Repairs, Milling 1 1/4" and placing 1 3/4" Item 448 Asphalt Concrete Intermediate Course and 1 1/4" Item 448 Asphalt Concrete Surface Course. ADA Raps in Centerburg, use of “Safety Edge” where warranted.
5
MUS929817/1/2015Minor Rehabilitation - Pavement Gnrl SysMUS US 22/SR 797 09.76/00.007/1/2015
$3,292,000.00
2/13/13: R/W may be needed to replace curb and catchbasins.10/19/12 revision:Mus-22-(9.76-18.14), Mus-719-(0.00-0.67), Mus-797-(0.00-0.39): 5-10% Repairs, milling 1 ¼” (3” in curbed section), placing 1 ¼” Item 448 Asphalt Concrete Type 1 Intermediate Cour
5
MUS931577/1/2015Bridge Deck ReplacementMUS IR 70 25.907/1/2015
$1,461,000.00
Revised as per PIP: Mus-70-25.90– Deck Replacement, Repair Beam Ends, Painting of Beams, Reset or Replace Rockers on Abutment, Replace Backwalls, New Parapet, New Expansion joint or modify to Integral Design, New Guardrail (tie into existing run), New App
5
FAI932657/1/2015Bridge RepairFAI SR 664 04.657/1/2015
$727,000.00
Revised as per PIP: Fai-664-4.65 – Overlay, Replace Approach Slab, New TST Rail, Remove abutment to footer and replace with integral design, Pier Encasements and related resurfacing. Replace superstructure, encase piles, rehab abutments
6
FRA860137/1/2015Mill and FillFRA US 62 11.690
$700,000.00
Columbus urban paving on Harrisburg Pike, Central Ave, Town St, Glenwood Ave, Rich St and Main St.FRA-62-11.69 - 14.79Designer: City of Columbus
6
UNI862097/1/2015Bridge ReplacementUNI SR 47 7.330
$1,950,000.00
SLM 7.33:   Rehab - hydro and overlay deck w/ abutment replacement bridge over Bokes Creek.SLM 9.16:  Replace timber slab bridge over Lindsey Ditch.SLM 10.37  Replace structure over Fulton Creek.In-house Designer: Toni Turowski.    Probable R/W
6
MAD862931/1/2015Bridge ReplacementMAD SR 323 2.800
$707,000.00
Bridge replacement over Sugar Creek - concrete slab structure.Design consultant is CCI Tom Evans is consultant PM
6
MRW862941/1/2015Bridge Deck ReplacementMRW US 42 21.270
$250,000.00
Deck replacement over North Branch of Kokosing River - concrete slab structure
6
FAY866457/1/2015Resurfacing,  Undivided SystemFRA US 40 10.550
$700,000.00
Columbus urban paving projectDesigner: City of Columbus
6
FRA910547/1/2015Resurfacing,  Undivided SystemFRA US 62D 0.000
$500,000.00
Urban system resurfacing project.SLM 0.00-1.28
6
MAR913307/1/2015Resurfacing,  Undivided SystemMAR SR 529 0.000
$1,600,000.00
Urban (SLM 0.00-0.46) and rural resurfacing.
6
MRW913397/1/2015Resurfacing,  Undivided SystemMRW SR 288 0.000
$1,200,000.00
Rural two lane resurfacing
6
D06916247/1/2015Mill and FillD06 SP FY16
$2,000,000.00
Spot paving repairs on priority system.
6
FRA917697/1/2015Bridge RepairFRA IR 71 18.540
$2,000,000.00
Deck overlay of I-71 bridge over I-670 and RR yards.
6
FAY924387/1/2015Minor Rehabilitation - Pavement Gnrl SysFAY SR 435 0.970
$4,701,000.00
The scope of this project is pavement rehabilitation, intersection improvements, erosion control improvements, bridge repair, and drainage improvements  on FAY-435 from 0.97 (0.5 miles west of IR71) to 2.37 (0.1 miles east of US35). Erosion locations: FAY
6
FRA934964/1/2015Major RehabilitationFRA IR 71 0.000
$28,000,000.00
Major rehabilitation of IR-71.Investigate addition of third lane from US-62 to SR-665.Re-deck 3 pairs of mainline structures.
6
FRA935391/9/2014Salt DomeFRA West Broad Salt Building
$130,000.00
Remove timber salt building & construct a new salt buildingFacility # F121913
6
FRA939131/1/2015Add SidewalksFRA Gahanna SRTS Inf FY15
$209,000.00
Gahanna SRTS Infrastructure ProjectMulti-use path on East Johnstown Rd from Colony Pl to Cherry Bottom Rd.  Upgrade signal at Johnstown/Cherry Bottom to include ped crossing and ped signals.  Sidewalk on Cherry Bottom Rd from Johnstown Rd to Springbrook D
6
PIC964651/1/2015Intersection ImprovementPIC South Court St Connector
$2,395,000.00
Relocate Pickaway Crossings intersection 250' south on US-23.   500' of new roads constructed.Connector will intersect S Court St near south edge of elementary school on east side of US-23 and south of Taco Bell on west side of US-23.Relocate existing sig
6
FRA860137/1/2015Mill and FillFRA US 62 11.690
$700,000.00
Columbus urban paving on Harrisburg Pike, Central Ave, Town St, Glenwood Ave, Rich St and Main St.FRA-62-11.69 - 14.79Designer: City of Columbus
6
UNI862097/1/2015Bridge ReplacementUNI SR 47 7.330
$1,950,000.00
SLM 7.33:   Rehab - hydro and overlay deck w/ abutment replacement bridge over Bokes Creek.SLM 9.16:  Replace timber slab bridge over Lindsey Ditch.SLM 10.37  Replace structure over Fulton Creek.In-house Designer: Toni Turowski.    Probable R/W
6
MAD862931/1/2015Bridge ReplacementMAD SR 323 2.800
$707,000.00
Bridge replacement over Sugar Creek - concrete slab structure.Design consultant is CCI Tom Evans is consultant PM
6
MRW862941/1/2015Bridge Deck ReplacementMRW US 42 21.270
$250,000.00
Deck replacement over North Branch of Kokosing River - concrete slab structure
6
FAY866457/1/2015Resurfacing,  Undivided SystemFRA US 40 10.550
$700,000.00
Columbus urban paving projectDesigner: City of Columbus
6
FRA910547/1/2015Resurfacing,  Undivided SystemFRA US 62D 0.000
$500,000.00
Urban system resurfacing project.SLM 0.00-1.28
6
MAR913307/1/2015Resurfacing,  Undivided SystemMAR SR 529 0.000
$1,600,000.00
Urban (SLM 0.00-0.46) and rural resurfacing.
6
MRW913397/1/2015Resurfacing,  Undivided SystemMRW SR 288 0.000
$1,200,000.00
Rural two lane resurfacing
6
D06916247/1/2015Mill and FillD06 SP FY16
$2,000,000.00
Spot paving repairs on priority system.
6
FRA917697/1/2015Bridge RepairFRA IR 71 18.540
$2,000,000.00
Deck overlay of I-71 bridge over I-670 and RR yards.
6
FAY924387/1/2015Minor Rehabilitation - Pavement Gnrl SysFAY SR 435 0.970
$4,701,000.00
The scope of this project is pavement rehabilitation, intersection improvements, erosion control improvements, bridge repair, and drainage improvements  on FAY-435 from 0.97 (0.5 miles west of IR71) to 2.37 (0.1 miles east of US35). Erosion locations: FAY
6
FRA934964/1/2015Major RehabilitationFRA IR 71 0.000
$28,000,000.00
Major rehabilitation of IR-71.Investigate addition of third lane from US-62 to SR-665.Re-deck 3 pairs of mainline structures.
6
FRA935391/9/2014Salt DomeFRA West Broad Salt Building
$130,000.00
Remove timber salt building & construct a new salt buildingFacility # F121913
6
FRA939131/1/2015Add SidewalksFRA Gahanna SRTS Inf FY15
$209,000.00
Gahanna SRTS Infrastructure ProjectMulti-use path on East Johnstown Rd from Colony Pl to Cherry Bottom Rd.  Upgrade signal at Johnstown/Cherry Bottom to include ped crossing and ped signals.  Sidewalk on Cherry Bottom Rd from Johnstown Rd to Springbrook D
6
PIC964651/1/2015Intersection ImprovementPIC South Court St Connector
$2,395,000.00
Relocate Pickaway Crossings intersection 250' south on US-23.   500' of new roads constructed.Connector will intersect S Court St near south edge of elementary school on east side of US-23 and south of Taco Bell on west side of US-23.Relocate existing sig
6
DEL780417/29/2013Turn Lane AdditionDEL SR 315 1.307/18/2013
$3,884,000.00
Provide east bound and west bound left turn lanes on SR 750 (at SR 315) by widening the west leg and restriping the bridge over the Olentangy River.  Provide left turn lanes NB and SB on SR-315 with retaining walls.  Replace 3 culverts under SR-315.  Curb
6
UNI932867/29/2013Resurfacing,  Undivided SystemUNI SR 37 10.1007/18/2013
$2,013,000.00
General system resurfacing projectUNI-37 from SR-4 to Delaware County LineDEL-37 from Union County Line to just W of enter Delaware City Corp
6
DEL780417/29/2013Turn Lane AdditionDEL SR 315 1.307/18/2013
$3,884,000.00
Provide east bound and west bound left turn lanes on SR 750 (at SR 315) by widening the west leg and restriping the bridge over the Olentangy River.  Provide left turn lanes NB and SB on SR-315 with retaining walls.  Replace 3 culverts under SR-315.  Curb
6
DEL780417/29/2013Turn Lane AdditionDEL SR 315 1.307/18/2013
$3,884,000.00
Provide east bound and west bound left turn lanes on SR 750 (at SR 315) by widening the west leg and restriping the bridge over the Olentangy River.  Provide left turn lanes NB and SB on SR-315 with retaining walls.  Replace 3 culverts under SR-315.  Curb
6
FRA817467/29/2013Major WideningFRA US 23 22.2307/18/2013
$71,117,000.00
Part 1:  North Central Outerbelt:  Construction Project #4, B & B1.New const. of two NB express lanes, replace/widen US-23 over I-270 bridge.Realign York Temple Rd to tie into West Campus View Blvd.   Environmental & PE under PID 77319.Two new structures
6
MAR948937/29/2013Resurfacing,  Undivided SystemMAR SR 37 0.0007/18/2013
$456,000.00
Two lane resurfacing of MAR-37 from Wyandot/Marion County line to SR-309, minor bridge work on 2 structures
6
DEL780417/29/2013Turn Lane AdditionDEL SR 315 1.307/18/2013
$3,884,000.00
Provide east bound and west bound left turn lanes on SR 750 (at SR 315) by widening the west leg and restriping the bridge over the Olentangy River.  Provide left turn lanes NB and SB on SR-315 with retaining walls.  Replace 3 culverts under SR-315.  Curb
6
FRA817467/29/2013Major WideningFRA US 23 22.2307/18/2013
$71,117,000.00
Part 1:  North Central Outerbelt:  Construction Project #4, B & B1.New const. of two NB express lanes, replace/widen US-23 over I-270 bridge.Realign York Temple Rd to tie into West Campus View Blvd.   Environmental & PE under PID 77319.Two new structures
6
UNI932867/29/2013Resurfacing,  Undivided SystemUNI SR 37 10.1007/18/2013
$2,013,000.00
General system resurfacing projectUNI-37 from SR-4 to Delaware County LineDEL-37 from Union County Line to just W of enter Delaware City Corp
6
MAR948937/29/2013Resurfacing,  Undivided SystemMAR SR 37 0.0007/18/2013
$456,000.00
Two lane resurfacing of MAR-37 from Wyandot/Marion County line to SR-309, minor bridge work on 2 structures
6
FRA944608/12/2013Section ImprovementFRA IR 70/Hilliard Rome Int8/1/2013
$5,305,000.00
FRA-70/Hilliard Rome Rd interflush projectNew Signal at N side of interchang with ramp realigments and wideningAdd lane both directions between I-70 & Meijer DriveAdd NB dual left turn lanes on Hilliard Rome at Renner RdDesign Build
6
FRA944608/12/2013Section ImprovementFRA IR 70/Hilliard Rome Int8/1/2013
$5,305,000.00
FRA-70/Hilliard Rome Rd interflush projectNew Signal at N side of interchang with ramp realigments and wideningAdd lane both directions between I-70 & Meijer DriveAdd NB dual left turn lanes on Hilliard Rome at Renner RdDesign Build
6
FRA781528/26/2013Mill and FillFRA IR 71 28.738/15/2013
$3,673,000.00
Pavement preservation project - pavement repair, 1.5" milling and 1.5" resurfacingSigns and pavement markings at I-71 NB merge ramp from GeminiReplace fence on Polaris bridge, Replace various damaged noise wall panels, Seal median barrier with epoxy.Part
6
FRA781528/26/2013Mill and FillFRA IR 71 28.738/15/2013
$3,673,000.00
Pavement preservation project - pavement repair, 1.5" milling and 1.5" resurfacingSigns and pavement markings at I-71 NB merge ramp from GeminiReplace fence on Polaris bridge, Replace various damaged noise wall panels, Seal median barrier with epoxy.Part
6
FRA781528/26/2013Mill and FillFRA IR 71 28.738/15/2013
$3,673,000.00
Pavement preservation project - pavement repair, 1.5" milling and 1.5" resurfacingSigns and pavement markings at I-71 NB merge ramp from GeminiReplace fence on Polaris bridge, Replace various damaged noise wall panels, Seal median barrier with epoxy.Part
6
MAD810818/26/2013Resurfacing,  Undivided SystemMAD SR142 11.458/15/2013
$2,689,000.00
Urban and General system resurfacing project.MAD-142 from US-40 to I-70 (all general paving)MAD-665 from 38/56 in London to Franklin County Line (urban and general paving)
6
PIC924068/26/2013Resurfacing,  Undivided SystemPIC SR 316 0.0008/15/2013
$1,932,000.00
Two lane resurfacing project from SR-56 to SR-104Safety edge along entire project except curbed areasCurve warning signing  at 6 locationsIn-House Designer: Mark Katona
6
PIC925758/26/2013Major WideningPIC SR 762 13.3708/15/2013
$5,890,000.00
Widen Ashville Pike to 3 lanes and construct roundabouts at intersection of new SR 762 extension and at intersection with Rickenbacker PkwyRW & Construction of Phase 1BEnv & DD under PID 83666
6
FRA781528/26/2013Mill and FillFRA IR 71 28.738/15/2013
$3,673,000.00
Pavement preservation project - pavement repair, 1.5" milling and 1.5" resurfacingSigns and pavement markings at I-71 NB merge ramp from GeminiReplace fence on Polaris bridge, Replace various damaged noise wall panels, Seal median barrier with epoxy.Part
6
MAD810818/26/2013Resurfacing,  Undivided SystemMAD SR142 11.458/15/2013
$2,689,000.00
Urban and General system resurfacing project.MAD-142 from US-40 to I-70 (all general paving)MAD-665 from 38/56 in London to Franklin County Line (urban and general paving)
6
PIC924068/26/2013Resurfacing,  Undivided SystemPIC SR 316 0.0008/15/2013
$1,932,000.00
Two lane resurfacing project from SR-56 to SR-104Safety edge along entire project except curbed areasCurve warning signing  at 6 locationsIn-House Designer: Mark Katona
6
PIC925758/26/2013Major WideningPIC SR 762 13.3708/15/2013
$5,890,000.00
Widen Ashville Pike to 3 lanes and construct roundabouts at intersection of new SR 762 extension and at intersection with Rickenbacker PkwyRW & Construction of Phase 1BEnv & DD under PID 83666
6
DEL950649/9/2013Turn Lane AdditionDEL SR 750 5.8808/29/2013
$532,000.00
Part 1 - Construct a WB right turn lane on SR-750Part 2 - Add a second SB left turn lane on US 23Safety project
6
DEL950649/9/2013Turn Lane AdditionDEL SR 750 5.8808/29/2013
$532,000.00
Part 1 - Construct a WB right turn lane on SR-750Part 2 - Add a second SB left turn lane on US 23Safety project
6
MAR891939/23/2013Intersection ImprovementMAR SR 423 4.2109/12/2013
$390,000.00
Improve sight distance on the north leg of the intersection by lowering the road profile.Replace culvert north of intersection (District funding)Design by M-E Companies under Central Office Task Order
6
FRA905989/23/2013Bridge Deck ReplacementFRA IR 270 3.0909/12/2013
$1,160,000.00
Replace deck on 4 span steel beam bridge.  Big Run South Rd over I-270.Project to be corrdinated with FRA-270-2.60 major rehab project.
6
MAR891939/23/2013Intersection ImprovementMAR SR 423 4.2109/12/2013
$390,000.00
Improve sight distance on the north leg of the intersection by lowering the road profile.Replace culvert north of intersection (District funding)Design by M-E Companies under Central Office Task Order
6
FRA905989/23/2013Bridge Deck ReplacementFRA IR 270 3.0909/12/2013
$1,160,000.00
Replace deck on 4 span steel beam bridge.  Big Run South Rd over I-270.Project to be corrdinated with FRA-270-2.60 major rehab project.
6
UNI1698710/7/2013Resurfacing,  Undivided SystemUNI SR 736 0.009/26/2013
$1,324,000.00
Urban and general system resurfacing project.
6
FAY7635310/7/2013Minor Rehabilitation - Pavement Prmy SysFAY IR 71 9.459/26/2013
$6,338,000.00
MINOR PAVEMENT REHABILITATIONPart 1: FAY-71-9.45 to 14.66 / MAD-71-0.00 to 4.56Part 2: FAY-35-7.51 to 12.05 / FAY-435-1.26 to 1.32 & 1.50 to 1.67(Plan development for Part 2 under PID 91785)
6
UNI1698710/7/2013Resurfacing,  Undivided SystemUNI SR 736 0.009/26/2013
$1,324,000.00
Urban and general system resurfacing project.
6
UNI1698710/7/2013Resurfacing,  Undivided SystemUNI SR 736 0.009/26/2013
$1,324,000.00
Urban and general system resurfacing project.
6
FAY7635310/7/2013Minor Rehabilitation - Pavement Prmy SysFAY IR 71 9.459/26/2013
$6,338,000.00
MINOR PAVEMENT REHABILITATIONPart 1: FAY-71-9.45 to 14.66 / MAD-71-0.00 to 4.56Part 2: FAY-35-7.51 to 12.05 / FAY-435-1.26 to 1.32 & 1.50 to 1.67(Plan development for Part 2 under PID 91785)
6
FAY7635310/7/2013Minor Rehabilitation - Pavement Prmy SysFAY IR 71 9.459/26/2013
$6,338,000.00
MINOR PAVEMENT REHABILITATIONPart 1: FAY-71-9.45 to 14.66 / MAD-71-0.00 to 4.56Part 2: FAY-35-7.51 to 12.05 / FAY-435-1.26 to 1.32 & 1.50 to 1.67(Plan development for Part 2 under PID 91785)
6
UNI1698710/7/2013Resurfacing,  Undivided SystemUNI SR 736 0.009/26/2013
$1,324,000.00
Urban and general system resurfacing project.
6
FAY7635310/7/2013Minor Rehabilitation - Pavement Prmy SysFAY IR 71 9.459/26/2013
$6,338,000.00
MINOR PAVEMENT REHABILITATIONPart 1: FAY-71-9.45 to 14.66 / MAD-71-0.00 to 4.56Part 2: FAY-35-7.51 to 12.05 / FAY-435-1.26 to 1.32 & 1.50 to 1.67(Plan development for Part 2 under PID 91785)
6
DEL9082110/1/2013BikewaysDEL US 23 Graphics Way Trail10/1/2013
$2,048,000.00
Graphics Way Trail at US-23Multi-use path and new bridge crossing US-23 between Orange and Home Roads.Orange Township is local sponsor
6
DEL9082110/1/2013BikewaysDEL US 23 Graphics Way Trail10/1/2013
$2,048,000.00
Graphics Way Trail at US-23Multi-use path and new bridge crossing US-23 between Orange and Home Roads.Orange Township is local sponsor
6
DEL8395310/21/2013Bridge RepairDEL SR 605 1.90010/10/2013
$850,000.00
Replace bridge over Duncan Run.Design Build
6
FRA9303010/21/2013LightingFRA IR 71 19.430 (Lighting)10/10/2013
$444,000.00
Upgrade lighting at RR overpassSafety funded project
6
DEL8395310/21/2013Bridge RepairDEL SR 605 1.90010/10/2013
$850,000.00
Replace bridge over Duncan Run.Design Build
6
FRA9303010/21/2013LightingFRA IR 71 19.430 (Lighting)10/10/2013
$444,000.00
Upgrade lighting at RR overpassSafety funded project
6
D069191911/18/2013Electrical MaintenanceD06 ELEC FY1411/7/2013
$700,000.00
1 year electrical maintenance contract.
6
D069191911/18/2013Electrical MaintenanceD06 ELEC FY1411/7/2013
$700,000.00
1 year electrical maintenance contract.
6
D069192012/23/2013Guardrail RebuildingD06 GR FY1412/12/2013
$400,000.00
2 year (FY14 - FY15) district wide guardrail ding and dent contractIn-House Designer: Dave Rankin
6
FRA9621012/23/2013Spot SafetyFRA SR 161 15.24012/12/2013
$103,000.00
Install a pedestrian crosswalk along the eastern leg of the intersection of SR161 and Strawberry Farms Blvd.
6
D069192012/23/2013Guardrail RebuildingD06 GR FY1412/12/2013
$400,000.00
2 year (FY14 - FY15) district wide guardrail ding and dent contractIn-House Designer: Dave Rankin
6
FRA9621012/23/2013Spot SafetyFRA SR 161 15.24012/12/2013
$103,000.00
Install a pedestrian crosswalk along the eastern leg of the intersection of SR161 and Strawberry Farms Blvd.
6
D06843821/20/2014Preventive MaintenanceD06 Crackseal PPM FY141/9/2014
$500,000.00
District Six preventive maintenance contract for FY 14
6
FRA923811/20/2014Traffic Management SystemFRA RAMP METER UPGRADE1/9/2014
$850,000.00
Upgrade existing ramp meter equipment and install new side-fired vehicle detection equipment for the Columbus Freeway Management system.
6
D06843821/20/2014Preventive MaintenanceD06 Crackseal PPM FY141/9/2014
$500,000.00
District Six preventive maintenance contract for FY 14
6
FRA923811/20/2014Traffic Management SystemFRA RAMP METER UPGRADE1/9/2014
$850,000.00
Upgrade existing ramp meter equipment and install new side-fired vehicle detection equipment for the Columbus Freeway Management system.
6
FRA894902/3/2014Noise WallFRA IR 70 18.670 (Noise Wall)1/23/2014
$4,000,000.00
Construct noise wall on north side of IR-70 from US-33 to Big Walnut Creek.FY14 Noise Wall funding.
6
FRA894902/3/2014Noise WallFRA IR 70 18.670 (Noise Wall)1/23/2014
$4,000,000.00
Construct noise wall on north side of IR-70 from US-33 to Big Walnut Creek.FY14 Noise Wall funding.
6
FRA763572/28/2014Minor Rehabilitation - Pavement Prmy SysFRA SR 104 8.022/18/2014
$2,851,000.00
Minor pavement rehabilition (mill & fill with repair)FRA-104-0929 structure now listed under PID 79944
6
FRA763572/28/2014Minor Rehabilitation - Pavement Prmy SysFRA SR 104 8.022/18/2014
$2,851,000.00
Minor pavement rehabilition (mill & fill with repair)FRA-104-0929 structure now listed under PID 79944
6
FRA763572/28/2014Minor Rehabilitation - Pavement Prmy SysFRA SR 104 8.022/18/2014
$2,851,000.00
Minor pavement rehabilition (mill & fill with repair)FRA-104-0929 structure now listed under PID 79944
6
DEL928722/28/2014Culvert Construction/Reconstr/RepairDEL CULVERT FY142/18/2014
$350,000.00
DEL 36-9.03 - Remove existing headwall and last sec. of pipe.  Replace manhole and extend pipe.DEL-521-5.99 - Replace existing box culvert, establish safety grading on eastern side of roadway.
6
FRA763572/28/2014Minor Rehabilitation - Pavement Prmy SysFRA SR 104 8.022/18/2014
$2,851,000.00
Minor pavement rehabilition (mill & fill with repair)FRA-104-0929 structure now listed under PID 79944
6
DEL928722/28/2014Culvert Construction/Reconstr/RepairDEL CULVERT FY142/18/2014
$350,000.00
DEL 36-9.03 - Remove existing headwall and last sec. of pipe.  Replace manhole and extend pipe.DEL-521-5.99 - Replace existing box culvert, establish safety grading on eastern side of roadway.
6
FRA796633/24/2014Resurfacing, Divided SystemFRA IR 70 11.2103/13/2014
$5,248,000.00
FOUR LANE MILL & FILL RESURFACING PROJECT with partial depth pavement repairs and asphalt overlay of mainline bridges.
6
FRA796633/24/2014Resurfacing, Divided SystemFRA IR 70 11.2103/13/2014
$5,248,000.00
FOUR LANE MILL & FILL RESURFACING PROJECT with partial depth pavement repairs and asphalt overlay of mainline bridges.
6
FRA796633/24/2014Resurfacing, Divided SystemFRA IR 70 11.2103/13/2014
$5,248,000.00
FOUR LANE MILL & FILL RESURFACING PROJECT with partial depth pavement repairs and asphalt overlay of mainline bridges.
6
FRA924783/24/2014Noise WallFRA IR 270 7.040 (Noise Wall)3/13/2014
$1,600,000.00
Construct a Type II noise wall on west side of I-270 from West Broad St north to RR tracks.
6
FRA796633/24/2014Resurfacing, Divided SystemFRA IR 70 11.2103/13/2014
$5,248,000.00
FOUR LANE MILL & FILL RESURFACING PROJECT with partial depth pavement repairs and asphalt overlay of mainline bridges.
6
FRA924783/24/2014Noise WallFRA IR 270 7.040 (Noise Wall)3/13/2014
$1,600,000.00
Construct a Type II noise wall on west side of I-270 from West Broad St north to RR tracks.
6
FRA801084/7/2014Minor Rehabilitation - Pavement Prmy SysFRA US 23 0.003/27/2014
$3,343,000.00
Rural and Columbus urban mill and fill resurfacing project with pavement repairs, upgrade substandard guardrail
6
D06916224/7/2014Mill and FillD06 SP FY143/27/2014
$2,000,000.00
Spot paving repairs on priority system.
6
FRA801084/7/2014Minor Rehabilitation - Pavement Prmy SysFRA US 23 0.003/27/2014
$3,343,000.00
Rural and Columbus urban mill and fill resurfacing project with pavement repairs, upgrade substandard guardrail
6
D06916224/7/2014Mill and FillD06 SP FY143/27/2014
$2,000,000.00
Spot paving repairs on priority system.
6
FRA956284/1/2014Minor WideningFRA Sawmill Rd NB Lane4/1/2014
$1,739,000.00
Construct a NB lane on Sawmill Road from Billingsley to Hard RoadRamp Clear unfunded project - tentatively in FY14Design Build
6
MAR960024/1/2014RR Crossing ProtectionMAR Campbell St CSX Preemption4/1/2014
$175,000.00
Improvements to the warning devices at the CSX grade crossing on Campbell Street and traffic signal preemption/interconnection with the Marion Agosta Road/Campbell Street traffic signal. Traffic signal work includes replacing exisiting traffic signal util
6
FRA956284/1/2014Minor WideningFRA Sawmill Rd NB Lane4/1/2014
$1,739,000.00
Construct a NB lane on Sawmill Road from Billingsley to Hard RoadRamp Clear unfunded project - tentatively in FY14Design Build
6
MAR960024/1/2014RR Crossing ProtectionMAR Campbell St CSX Preemption4/1/2014
$175,000.00
Improvements to the warning devices at the CSX grade crossing on Campbell Street and traffic signal preemption/interconnection with the Marion Agosta Road/Campbell Street traffic signal. Traffic signal work includes replacing exisiting traffic signal util
6
MAD856864/21/2014Culvert Construction/Reconstr/RepairMAD SR 142 4.3004/10/2014
$400,000.00
SLM 4.30 Replace 6' x 4' box culvert over Sylvia Wilson Ditch with a 8' x 6' box culvert.  Associated tile work.SLM 5.65  Replace existing joints in deck, seal deck with SRS.
6
D06879264/21/2014Culvert Construction/Reconstr/RepairD06 Culvert Replacements4/10/2014
$1,320,000.00
Replace 5 culverts:  FAY-753-4.63,  MAR-4-2.53, DEL-605-3.14, PIC-22-20.00, MAR-23-6.14Line 1 culverts:  UNI-739-0.26.  PM is Bob Dreyer.
6
FRA955304/21/2014Freeway SurveillanceFRA Columbus Camera Upgrade4/10/2014
$1,963,000.00
Install new traffic surveillance cameras at 40 locations (new 75' tall pole, new camera, and communication path to camera)11 locations - 70% MORPC/30% ODOT funding29 locations - 70% MORPC/30% Columbus funding
6
MAD856864/21/2014Culvert Construction/Reconstr/RepairMAD SR 142 4.3004/10/2014
$400,000.00
SLM 4.30 Replace 6' x 4' box culvert over Sylvia Wilson Ditch with a 8' x 6' box culvert.  Associated tile work.SLM 5.65  Replace existing joints in deck, seal deck with SRS.
6
D06879264/21/2014Culvert Construction/Reconstr/RepairD06 Culvert Replacements4/10/2014
$1,320,000.00
Replace 5 culverts:  FAY-753-4.63,  MAR-4-2.53, DEL-605-3.14, PIC-22-20.00, MAR-23-6.14Line 1 culverts:  UNI-739-0.26.  PM is Bob Dreyer.
6
FRA955304/21/2014Freeway SurveillanceFRA Columbus Camera Upgrade4/10/2014
$1,963,000.00
Install new traffic surveillance cameras at 40 locations (new 75' tall pole, new camera, and communication path to camera)11 locations - 70% MORPC/30% ODOT funding29 locations - 70% MORPC/30% Columbus funding
6
FRA862925/5/2014Bridge Deck ReplacementFRA SR 710 3.7604/24/2014
$4,825,000.00
Superstructure replacement of steel beam structure over I-270.Various ramp improvement at Cleveland/270 interchange
6
MAD909825/5/2014BikewaysMAD London SRTS Inf4/24/2014
$166,000.00
SRTS Infrastructure funding of $272,000 for Env, DD, CO.Crosswalk upgrade at 9 locations - signage with LED flashers, pvmt markings, curb ramps, lighting10' wide Bike path from Brooks Edge Subdivision/Thomas Lane  to middle schoolInstallation of 2 radar b
6
FRA909845/5/2014SignsFRA New Albany SRTS Inf4/24/2014
$259,000.00
SRTS Infrastructure amount = $350,000 for DD, RW, COUpgrade Traffic control devicesInstall 6 variable speed limit signs at 3 locationsShorten school zone length at 3 locationsReplace existing ped signal indicator at 2 locationsSignage/markings at 2 locati
6
FRA862925/5/2014Bridge Deck ReplacementFRA SR 710 3.7604/24/2014
$4,825,000.00
Superstructure replacement of steel beam structure over I-270.Various ramp improvement at Cleveland/270 interchange
6
MAD909825/5/2014BikewaysMAD London SRTS Inf4/24/2014
$166,000.00
SRTS Infrastructure funding of $272,000 for Env, DD, CO.Crosswalk upgrade at 9 locations - signage with LED flashers, pvmt markings, curb ramps, lighting10' wide Bike path from Brooks Edge Subdivision/Thomas Lane  to middle schoolInstallation of 2 radar b
6
FRA909845/5/2014SignsFRA New Albany SRTS Inf4/24/2014
$259,000.00
SRTS Infrastructure amount = $350,000 for DD, RW, COUpgrade Traffic control devicesInstall 6 variable speed limit signs at 3 locationsShorten school zone length at 3 locationsReplace existing ped signal indicator at 2 locationsSignage/markings at 2 locati
6
FRA946705/19/2014Slide RepairFRA IR 270 24.4605/8/2014
$500,000.00
Geotech project to repair slope failureRegrade slope, stabilize with lauched soil nails, install horizontal drains
6
FRA950855/19/2014Noise WallFRA IR 270 22.350 (Noise Wall)5/8/2014
$1,100,000.00
Noise wall at NW quadrant of I-270/Linworth RdLakes of Worthington communityAsssoc with Project C, PID 81747
6
FRA946705/19/2014Slide RepairFRA IR 270 24.4605/8/2014
$500,000.00
Geotech project to repair slope failureRegrade slope, stabilize with lauched soil nails, install horizontal drains
6
FRA950855/19/2014Noise WallFRA IR 270 22.350 (Noise Wall)5/8/2014
$1,100,000.00
Noise wall at NW quadrant of I-270/Linworth RdLakes of Worthington communityAsssoc with Project C, PID 81747
6
DEL961926/2/2014Minor Rehabilitation - Pavement Gnrl SysDEL US 42 3.1505/22/2014
$250,000.00
Replace asphalt pavement with concrete at the intersection of US42 and S. Section Line Rd. in Delaware County.
6
DEL961926/2/2014Minor Rehabilitation - Pavement Gnrl SysDEL US 42 3.1505/22/2014
$250,000.00
Replace asphalt pavement with concrete at the intersection of US42 and S. Section Line Rd. in Delaware County.
6
PIC856877/7/2014Bridge ReplacementPIC SR 56 31.5906/26/2014
$1,252,000.00
Replace historic Pony Truss structure over Salt Creek.
6
PIC856877/7/2014Bridge ReplacementPIC SR 56 31.5906/26/2014
$1,252,000.00
Replace historic Pony Truss structure over Salt Creek.
6
FRA762827/1/2014Resurfacing (safety related)FRA US 40 4.717/1/2014
$9,945,000.00
Widening, median curb, signal relocations, modify driveways, resurfacing, and drainage.MORPC/Prairie Twp streetscape enhancement items- isolated street lighting, street furniture, median improvements, landscaping, mast arm signals.Consultant Project Manag
6
FRA764657/1/2014Minor Rehabilitation - Pavement Prmy SysFRA IR 670 0.007/1/2014
$3,585,000.00
Pavement repair and 1.5" planing and resurfacing.Deck sealing of 18 structures.
6
FRA762827/1/2014Resurfacing (safety related)FRA US 40 4.717/1/2014
$9,945,000.00
Widening, median curb, signal relocations, modify driveways, resurfacing, and drainage.MORPC/Prairie Twp streetscape enhancement items- isolated street lighting, street furniture, median improvements, landscaping, mast arm signals.Consultant Project Manag
6
FRA764657/1/2014Minor Rehabilitation - Pavement Prmy SysFRA IR 670 0.007/1/2014
$3,585,000.00
Pavement repair and 1.5" planing and resurfacing.Deck sealing of 18 structures.
6
FRA762827/1/2014Resurfacing (safety related)FRA US 40 4.717/1/2014
$9,945,000.00
Widening, median curb, signal relocations, modify driveways, resurfacing, and drainage.MORPC/Prairie Twp streetscape enhancement items- isolated street lighting, street furniture, median improvements, landscaping, mast arm signals.Consultant Project Manag
6
FRA764657/1/2014Minor Rehabilitation - Pavement Prmy SysFRA IR 670 0.007/1/2014
$3,585,000.00
Pavement repair and 1.5" planing and resurfacing.Deck sealing of 18 structures.
6
FRA860677/1/2014Major RehabilitationFRA IR 270 36.947/1/2014
$58,340,000.00
Multilane funded major rehabilitation project.SLM 36.94-40.45Pvmt Replacement.  Upgrade shoulder widths.  Upgrade interchange ramp geometrics.  Provide vertical and horizontal clearance on bridges.Upgrade guardrail, overhead signs, lighting, drainage. Con
6
FRA862917/1/2014Bridge RepairFRA SR 315 0.3307/1/2014
$350,000.00
Deck overlay on steel beam bridge.Ramp DA - 70 WB to 315 NB over 315 NB mainline
6
FRA866497/1/2014Resurfacing,  Undivided SystemFRA US 40 17.5707/1/2014
$754,000.00
Columbus urban paving:   SLM 17.57-18.63, 21.40-22.45  Designer: District 6 Production Curb Ramp Design: City of Columbus
6
D06919467/1/2014Pavement MarkingD06 PMA FY157/1/2014
$100,000.00
2 year (FY15-FY16) auxilliary pavement marking contract
6
D06919477/1/2014Pavement MarkingD06 PMF FY157/1/2014
$1,400,000.00
1 year fast dry pavement marking contract
6
D06919487/1/2014Raised Pavement MarkersD06 RPM FY157/1/2014
$150,000.00
1 year Rasied Pavement Marker contract
6
FRA919527/1/2014Guardrail Maintenance/Repair (NEW)FRA GR FY157/1/2014
$800,000.00
1 year Franklin County guardrail ding and dent contract
6
MAD928777/1/2014Bridge ReplacementMAD Toland Street Bridge7/1/2014
$636,000.00
Replace bridge on Toland Street over Oak Run
6
MAR949797/1/2014Mill and FillMAR Marion City Resurfacing7/1/2014
$2,100,000.00
City of Marion resurfacing projectMain St, Madison, Ave, Olney Ave, Jefferson St, Leader St, Kensington Pl, Vernon Hts. Blvd, Church St, Fairground St, Bennett St, Delaware AveProject will include curb ramps, base repairs, casting replacements, striping,
6
UNI960937/1/2014Resurfacing,  Undivided SystemUNI SR 47 13.5507/1/2014
$1,300,000.00
Full depth brick pavement replacement in Richwood to repair rutting, base failures and drainage.
6
FRA762827/1/2014Resurfacing (safety related)FRA US 40 4.717/1/2014
$9,945,000.00
Widening, median curb, signal relocations, modify driveways, resurfacing, and drainage.MORPC/Prairie Twp streetscape enhancement items- isolated street lighting, street furniture, median improvements, landscaping, mast arm signals.Consultant Project Manag
6
FRA764657/1/2014Minor Rehabilitation - Pavement Prmy SysFRA IR 670 0.007/1/2014
$3,585,000.00
Pavement repair and 1.5" planing and resurfacing.Deck sealing of 18 structures.
6
FRA860677/1/2014Major RehabilitationFRA IR 270 36.947/1/2014
$58,340,000.00
Multilane funded major rehabilitation project.SLM 36.94-40.45Pvmt Replacement.  Upgrade shoulder widths.  Upgrade interchange ramp geometrics.  Provide vertical and horizontal clearance on bridges.Upgrade guardrail, overhead signs, lighting, drainage. Con
6
FRA862917/1/2014Bridge RepairFRA SR 315 0.3307/1/2014
$350,000.00
Deck overlay on steel beam bridge.Ramp DA - 70 WB to 315 NB over 315 NB mainline
6
FRA866497/1/2014Resurfacing,  Undivided SystemFRA US 40 17.5707/1/2014
$754,000.00
Columbus urban paving:   SLM 17.57-18.63, 21.40-22.45  Designer: District 6 Production Curb Ramp Design: City of Columbus
6
D06919467/1/2014Pavement MarkingD06 PMA FY157/1/2014
$100,000.00
2 year (FY15-FY16) auxilliary pavement marking contract
6
D06919477/1/2014Pavement MarkingD06 PMF FY157/1/2014
$1,400,000.00
1 year fast dry pavement marking contract
6
D06919487/1/2014Raised Pavement MarkersD06 RPM FY157/1/2014
$150,000.00
1 year Rasied Pavement Marker contract
6
FRA919527/1/2014Guardrail Maintenance/Repair (NEW)FRA GR FY157/1/2014
$800,000.00
1 year Franklin County guardrail ding and dent contract
6
MAD928777/1/2014Bridge ReplacementMAD Toland Street Bridge7/1/2014
$636,000.00
Replace bridge on Toland Street over Oak Run
6
MAR949797/1/2014Mill and FillMAR Marion City Resurfacing7/1/2014
$2,100,000.00
City of Marion resurfacing projectMain St, Madison, Ave, Olney Ave, Jefferson St, Leader St, Kensington Pl, Vernon Hts. Blvd, Church St, Fairground St, Bennett St, Delaware AveProject will include curb ramps, base repairs, casting replacements, striping,
6
UNI960937/1/2014Resurfacing,  Undivided SystemUNI SR 47 13.5507/1/2014
$1,300,000.00
Full depth brick pavement replacement in Richwood to repair rutting, base failures and drainage.
6
FRA2573510/1/2014Minor Rehabilitation - Pavement Prmy SysFRA SR 315 5.1810/1/2014
$7,700,000.00
FY 15 District Pavement Program.  Minor rehab from Ackerman Road to Hard Road.
6
MAD7757210/10/2014Bridge ReplacementMAD SR 665 3.95010/1/2014
$1,325,000.00
REPLACE STRUCTURE OVER DEER CREEK. No R/W is anticipated.
6
FRA2573510/1/2014Minor Rehabilitation - Pavement Prmy SysFRA SR 315 5.1810/1/2014
$7,700,000.00
FY 15 District Pavement Program.  Minor rehab from Ackerman Road to Hard Road.
6
MAD7757210/10/2014Bridge ReplacementMAD SR 665 3.95010/1/2014
$1,325,000.00
REPLACE STRUCTURE OVER DEER CREEK. No R/W is anticipated.
6
FRA2573510/1/2014Minor Rehabilitation - Pavement Prmy SysFRA SR 315 5.1810/1/2014
$7,700,000.00
FY 15 District Pavement Program.  Minor rehab from Ackerman Road to Hard Road.
6
MAD7757210/10/2014Bridge ReplacementMAD SR 665 3.95010/1/2014
$1,325,000.00
REPLACE STRUCTURE OVER DEER CREEK. No R/W is anticipated.
6
D068717910/1/2014Preventive MaintenanceD06 Crackseal PPM FY1510/1/2014
$500,000.00
District Six preventive maintenance contract for FY 15
6
DEL8726210/1/2014Bridge RepairDEL SR 37 4.53010/1/2014
$450,000.00
4.53: Concrete deck overlay on structure over the Scioto River22.13: Deck overlay and abutment repair on structure over Prairie Run
6
FRA9064910/1/2014Add SidewalksFRA SR 3 24.47 Sidewalks10/1/2014
$2,220,000.00
Addition of sidewalks to reduce pedestrian accident rateCorrect draginage issue at concrete median on FRA-3 just S of I-270
6
D06918091/1/2015Culvert Construction/Reconstr/RepairD06 Culvert FY1510/1/2014
$1,350,000.00
FY15 culvert replacement project. FAY-753-3.20 - replace culvert, guardrail, fix pipe at wingwallFAY-753-3.90 - replace both pipesFAY-753-4.00 - replace with headwallMRW-288-4.61, MRW-288-3.90, PIC-22-23.40 - replace culvertIn-House Designer: Toni Turowsk
6
D069194910/1/2014Electrical MaintenanceD06 ELEC FY1510/1/2014
$400,000.00
1 year Electrical Maintenance contract
6
D069415510/1/2014SignsD06 Extrusign S10/1/2014
$4,000,000.00
Systematic replacement of extrusheet signs on various routes in District Six. Design for PID 94156 and 89303 also included in this PID
6
FRA2573510/1/2014Minor Rehabilitation - Pavement Prmy SysFRA SR 315 5.1810/1/2014
$7,700,000.00
FY 15 District Pavement Program.  Minor rehab from Ackerman Road to Hard Road.
6
MAD7757210/10/2014Bridge ReplacementMAD SR 665 3.95010/1/2014
$1,325,000.00
REPLACE STRUCTURE OVER DEER CREEK. No R/W is anticipated.
6
D068717910/1/2014Preventive MaintenanceD06 Crackseal PPM FY1510/1/2014
$500,000.00
District Six preventive maintenance contract for FY 15
6
DEL8726210/1/2014Bridge RepairDEL SR 37 4.53010/1/2014
$450,000.00
4.53: Concrete deck overlay on structure over the Scioto River22.13: Deck overlay and abutment repair on structure over Prairie Run
6
FRA9064910/1/2014Add SidewalksFRA SR 3 24.47 Sidewalks10/1/2014
$2,220,000.00
Addition of sidewalks to reduce pedestrian accident rateCorrect draginage issue at concrete median on FRA-3 just S of I-270
6
D06918091/1/2015Culvert Construction/Reconstr/RepairD06 Culvert FY1510/1/2014
$1,350,000.00
FY15 culvert replacement project. FAY-753-3.20 - replace culvert, guardrail, fix pipe at wingwallFAY-753-3.90 - replace both pipesFAY-753-4.00 - replace with headwallMRW-288-4.61, MRW-288-3.90, PIC-22-23.40 - replace culvertIn-House Designer: Toni Turowsk
6
D069194910/1/2014Electrical MaintenanceD06 ELEC FY1510/1/2014
$400,000.00
1 year Electrical Maintenance contract
6
D069415510/1/2014SignsD06 Extrusign S10/1/2014
$4,000,000.00
Systematic replacement of extrusheet signs on various routes in District Six. Design for PID 94156 and 89303 also included in this PID
6
FRA9024611/4/2014Bridge ReplacementFRA US 40 21.3510/24/2014
$3,453,000.00
Replace 236 foot structure over Big Walnut Creek in Whitehall.
6
FRA9024611/4/2014Bridge ReplacementFRA US 40 21.3510/24/2014
$3,453,000.00
Replace 236 foot structure over Big Walnut Creek in Whitehall.
6
DEL874077/1/2015Major WideningDEL SR 750 1.23011/13/2014
$3,275,000.00
Widen SR 750 to a five lane section including a separated multi use path on north side of SR-750Construct NB dual left turn lanes on Sawmill Pkwy at SR-750, incidental widening of SB Sawmill Pkwy at SR-750This work previously under PID 81219. PE and NEPA
6
DEL874077/1/2015Major WideningDEL SR 750 1.23011/13/2014
$3,275,000.00
Widen SR 750 to a five lane section including a separated multi use path on north side of SR-750Construct NB dual left turn lanes on Sawmill Pkwy at SR-750, incidental widening of SB Sawmill Pkwy at SR-750This work previously under PID 81219. PE and NEPA
6
UNI925661/1/2015Erosion ProtectionUNI SR 31 10.50012/23/2014
$514,000.00
Replace existing retaining wall supporting SR 31 adjacent to Bokes Creek.  PM is Steve Koch.
6
UNI925661/1/2015Erosion ProtectionUNI SR 31 10.50012/23/2014
$514,000.00
Replace existing retaining wall supporting SR 31 adjacent to Bokes Creek.  PM is Steve Koch.
6
FRA856881/1/2015Bridge Deck ReplacementFRA IR 71 21.26012/24/2014
$1,620,000.00
Replace deck on Hudson Street over I-71. Paint structural steel.Coordination with Columbus for sidewalk and deck widths.PM is Greg Boyer.
6
FRA856881/1/2015Bridge Deck ReplacementFRA IR 71 21.26012/24/2014
$1,620,000.00
Replace deck on Hudson Street over I-71. Paint structural steel.Coordination with Columbus for sidewalk and deck widths.PM is Greg Boyer.
6
PIC859711/1/2015Minor Rehabilitation - Pavement Gnrl SysPIC US 22 14.3601/1/2015
$552,000.00
Two lane resurfacing
6
FRA862121/1/2015Bridge MaintenanceFRA SR 104 5.6301/1/2015
$525,000.00
SR 104 over IR 270 - concrete deck patching and asphalt overlay to hold condition until future project.
6
FRA864531/1/2015Bridge RepairFRA IR 270 34.8701/1/2015
$840,000.00
Deck overlay - Steel beam structure/Agler Rd over I-270.In-house design.
6
FRA866611/1/2015Resurfacing,  Undivided SystemFRA US 23 10.5101/1/2015
$4,404,000.00
Columbus urban paving on 23R/Fourth and 23D/Summit. Safety project (3 to 2 lanes, ped phase atSummit/7th signal, signing, bike lanes)SLM 10.51-10.65,  STP-Urban SLM 10.72-11.19,  NHS SLM 11.19-15.31,  STP-Urban (FRA-23, SLM 10.65-10.72 is on PID 86652) De
6
DEL894871/1/2015Rock Slope Maintenance (NEW)DEL SR 257 0.0001/1/2015
$1,280,000.00
Vertical rock face failure/shoulder eroding, construct retaining wall, approximately 400' long.  R/W acquisition is planned.In-house designer Anthony Turowski.
6
FRA903831/1/2015SignalsFRA Whitehall Signals1/1/2015
$5,679,000.00
Whitehall signals, signalization, upgrade traffic control equipment and hardware at various existing signalized intersections. Install bicycle detection equipment. Upgrade pedestrian traffic control devices at each intersection. PM Joe Ridgeway/Dave Samue
6
D06916231/1/2015Mill and FillD06 SP FY151/1/2015
$1,000,000.00
Spot paving repairs on priority system.
6
MRW925631/1/2015Erosion ProtectionMRW SR 529 8.2001/1/2015
$141,000.00
Geotechnical projectReplace existing retaining wall, supports hillisde with cemetery
6
FRA933591/1/2015Noise WallFRA IR 270 39.530 (Noise Wall)1/1/2015
$3,000,000.00
Construct noise wall on I-270 from Broad St to Noe-BixbyFY15 noise wall funding
6
MAR939141/1/2015Add SidewalksMAR Marion City SRTS Inf1/1/2015
$283,000.00
City of Marion Safe Routes to School Infrastructure ProjectAdd missing sidewalk on Richmond Ave with 8' wide pedestrian bridge over Blum RunAdd sidewalk on Bermuda AveCurb ramp and crosswalk improvements at Bahama Dr/Richmond Ave
6
MAR964741/1/2015Bridge Deck ReplacementMAR US 23 12.6501/1/2015
$2,000,000.00
Rehabilitate and raise Marion-Williamsport Road structure over US23
6
PIC859711/1/2015Minor Rehabilitation - Pavement Gnrl SysPIC US 22 14.3601/1/2015
$552,000.00
Two lane resurfacing
6
FRA862121/1/2015Bridge MaintenanceFRA SR 104 5.6301/1/2015
$525,000.00
SR 104 over IR 270 - concrete deck patching and asphalt overlay to hold condition until future project.
6
FRA864531/1/2015Bridge RepairFRA IR 270 34.8701/1/2015
$840,000.00
Deck overlay - Steel beam structure/Agler Rd over I-270.In-house design.
6
FRA866611/1/2015Resurfacing,  Undivided SystemFRA US 23 10.5101/1/2015
$4,404,000.00
Columbus urban paving on 23R/Fourth and 23D/Summit. Safety project (3 to 2 lanes, ped phase atSummit/7th signal, signing, bike lanes)SLM 10.51-10.65,  STP-Urban SLM 10.72-11.19,  NHS SLM 11.19-15.31,  STP-Urban (FRA-23, SLM 10.65-10.72 is on PID 86652) De
6
DEL894871/1/2015Rock Slope Maintenance (NEW)DEL SR 257 0.0001/1/2015
$1,280,000.00
Vertical rock face failure/shoulder eroding, construct retaining wall, approximately 400' long.  R/W acquisition is planned.In-house designer Anthony Turowski.
6
FRA903831/1/2015SignalsFRA Whitehall Signals1/1/2015
$5,679,000.00
Whitehall signals, signalization, upgrade traffic control equipment and hardware at various existing signalized intersections. Install bicycle detection equipment. Upgrade pedestrian traffic control devices at each intersection. PM Joe Ridgeway/Dave Samue
6
D06916231/1/2015Mill and FillD06 SP FY151/1/2015
$1,000,000.00
Spot paving repairs on priority system.
6
MRW925631/1/2015Erosion ProtectionMRW SR 529 8.2001/1/2015
$141,000.00
Geotechnical projectReplace existing retaining wall, supports hillisde with cemetery
6
FRA933591/1/2015Noise WallFRA IR 270 39.530 (Noise Wall)1/1/2015
$3,000,000.00
Construct noise wall on I-270 from Broad St to Noe-BixbyFY15 noise wall funding
6
MAR939141/1/2015Add SidewalksMAR Marion City SRTS Inf1/1/2015
$283,000.00
City of Marion Safe Routes to School Infrastructure ProjectAdd missing sidewalk on Richmond Ave with 8' wide pedestrian bridge over Blum RunAdd sidewalk on Bermuda AveCurb ramp and crosswalk improvements at Bahama Dr/Richmond Ave
6
MAR964741/1/2015Bridge Deck ReplacementMAR US 23 12.6501/1/2015
$2,000,000.00
Rehabilitate and raise Marion-Williamsport Road structure over US23
6
FAY924532/13/2015Culvert Construction/Reconstr/RepairFAY SR 41 3.4002/4/2015
$332,000.00
Replace culvert with 14' concrete box,  1 mile north of Ghormley RdR/W will be needed. Previously under PID 87926, now under new PID.Stream reloaction required.
6
FAY924532/13/2015Culvert Construction/Reconstr/RepairFAY SR 41 3.4002/4/2015
$332,000.00
Replace culvert with 14' concrete box,  1 mile north of Ghormley RdR/W will be needed. Previously under PID 87926, now under new PID.Stream reloaction required.
6
FRA862062/28/2015Bridge ReplacementFRA SR 317 11.9002/18/2015
$1,436,000.00
Replace box structure over Miller Ditch.Consultant P.M. Ronald Bonnette, Chris Selvaggio
6
FRA862062/28/2015Bridge ReplacementFRA SR 317 11.9002/18/2015
$1,436,000.00
Replace box structure over Miller Ditch.Consultant P.M. Ronald Bonnette, Chris Selvaggio
6
MAD810863/24/2015Resurfacing,  Undivided SystemMAD SR 56 8.463/13/2015
$2,282,000.00
General system resurfacing project on SR-56Leave London corp to PIC County Line
6
MAD810863/24/2015Resurfacing,  Undivided SystemMAD SR 56 8.463/13/2015
$2,282,000.00
General system resurfacing project on SR-56Leave London corp to PIC County Line
6
MAD167074/1/2015Bridge ReplacementMAD TR 24 02.7504/1/2015
$1,351,000.00
Replacement of deficient narrow structure over Little Darby CreekDesign Build
6
FRA255944/1/2015Major RehabilitationFRA IR 70 3.414/1/2015
$21,200,000.00
SLM 3.41-5.27:  Resurfacing of I-70SLM 5.27-7.60:  Major rehabilitation from Rome Hilliard to W of Wilson, study addition of auxilliary lanes.Overlay one pair of bridges. Redeck and / or widen 3 pairs of mainline structures.
6
FRA763524/1/2015Minor Rehabilitation - Pavement Prmy SysFRA IR 270 40.454/1/2015
$4,000,000.00
Minor pavement rehabilitation.  Pavement repairs and overlay.
6
FRA764694/1/2015Minor Rehabilitation - Pavement Prmy SysFRA IR 270 9.624/1/2015
$41,000,000.00
Minor rehabilitation of I-270 from noth of I-70 to US-33 interchange.One additional travel lane will be added in each direction with concrete median. Work will also include drainage improvements and minor widening on 5 pairs of mainline structures
6
DEL793664/1/2015Intersection ImprovementDEL US 23 8.7704/1/2015
$936,000.00
Improve safety and congestion of intersection of US 23 and SR 315/Stratford Rd.City of Delaware to be lead for the preliminary engineering through construction plans.  ODOT will be lead for right of way and construction.Earmark (OH 333)  and HSP funded pr
6
MAD167074/1/2015Bridge ReplacementMAD TR 24 02.7504/1/2015
$1,351,000.00
Replacement of deficient narrow structure over Little Darby CreekDesign Build
6
MAD167074/1/2015Bridge ReplacementMAD TR 24 02.7504/1/2015
$1,351,000.00
Replacement of deficient narrow structure over Little Darby CreekDesign Build
6
FRA255944/1/2015Major RehabilitationFRA IR 70 3.414/1/2015
$21,200,000.00
SLM 3.41-5.27:  Resurfacing of I-70SLM 5.27-7.60:  Major rehabilitation from Rome Hilliard to W of Wilson, study addition of auxilliary lanes.Overlay one pair of bridges. Redeck and / or widen 3 pairs of mainline structures.
6
FRA763524/1/2015Minor Rehabilitation - Pavement Prmy SysFRA IR 270 40.454/1/2015
$4,000,000.00
Minor pavement rehabilitation.  Pavement repairs and overlay.
6
FRA764694/1/2015Minor Rehabilitation - Pavement Prmy SysFRA IR 270 9.624/1/2015
$41,000,000.00
Minor rehabilitation of I-270 from noth of I-70 to US-33 interchange.One additional travel lane will be added in each direction with concrete median. Work will also include drainage improvements and minor widening on 5 pairs of mainline structures
6
DEL793664/1/2015Intersection ImprovementDEL US 23 8.7704/1/2015
$936,000.00
Improve safety and congestion of intersection of US 23 and SR 315/Stratford Rd.City of Delaware to be lead for the preliminary engineering through construction plans.  ODOT will be lead for right of way and construction.Earmark (OH 333)  and HSP funded pr
6
FRA255944/1/2015Major RehabilitationFRA IR 70 3.414/1/2015
$21,200,000.00
SLM 3.41-5.27:  Resurfacing of I-70SLM 5.27-7.60:  Major rehabilitation from Rome Hilliard to W of Wilson, study addition of auxilliary lanes.Overlay one pair of bridges. Redeck and / or widen 3 pairs of mainline structures.
6
FRA763524/1/2015Minor Rehabilitation - Pavement Prmy SysFRA IR 270 40.454/1/2015
$4,000,000.00
Minor pavement rehabilitation.  Pavement repairs and overlay.
6
FRA764694/1/2015Minor Rehabilitation - Pavement Prmy SysFRA IR 270 9.624/1/2015
$41,000,000.00
Minor rehabilitation of I-270 from noth of I-70 to US-33 interchange.One additional travel lane will be added in each direction with concrete median. Work will also include drainage improvements and minor widening on 5 pairs of mainline structures
6
DEL793664/1/2015Intersection ImprovementDEL US 23 8.7704/1/2015
$936,000.00
Improve safety and congestion of intersection of US 23 and SR 315/Stratford Rd.City of Delaware to be lead for the preliminary engineering through construction plans.  ODOT will be lead for right of way and construction.Earmark (OH 333)  and HSP funded pr
6
FRA848684/1/2015Major RehabilitationFRA IR 71 5.294/1/2015
$19,000,000.00
Major Rehabilitation of I-71 from SR-665 to Stringtown Road.Additional third lane widened to the median.Re-deck and widen structures over White Road. PM Brent Downing.
6
FRA873014/15/2015Bridge Deck ReplacementFRA US 62 0.340/0.5104/1/2015
$2,871,000.00
SLM 0.34 over Big Darby Creek Overflow:  replace slab superstructure and approach slabs. Widen to 32' from 30', replace abutment down to footing, patch piers caps and paint pier columns.SLM 0.51 over Big Darby Creek:  replace deck and approach slabs, wide
6
DEL922304/1/2015Bridge Deck ReplacementDEL IR 71 13.0704/1/2015
$8,000,000.00
Rehab and raise six structures over I-71 in DEL and MRW counties to obtain a minimum 16' 6" vertical clearance.
6
FRA934974/1/2015Major RehabilitationFRA IR 71 9.7804/1/2015
$49,000,000.00
Major Rehabilitation of IR-71 from Stringtown Road to SR-315.Investiage need for auxilliary lanes on I-71.Re-deck and rehab 5 pairs of mainline structures. Jim Prevost, Randy McClellan
6
FRA943034/1/2015Drainage ImprovementFRA IR 70 13.62 (Storm Sewer)4/1/2015
$4,000,000.00
Construct new outfall storm sewer and manufactured BMP system along FRA-70 from E of Concrail Crossing near Scioto River to W of Front StPE & RW under PID 77370, 2nd 70/71 project
6
MAD167074/1/2015Bridge ReplacementMAD TR 24 02.7504/1/2015
$1,351,000.00
Replacement of deficient narrow structure over Little Darby CreekDesign Build
6
FRA255944/1/2015Major RehabilitationFRA IR 70 3.414/1/2015
$21,200,000.00
SLM 3.41-5.27:  Resurfacing of I-70SLM 5.27-7.60:  Major rehabilitation from Rome Hilliard to W of Wilson, study addition of auxilliary lanes.Overlay one pair of bridges. Redeck and / or widen 3 pairs of mainline structures.
6
FRA763524/1/2015Minor Rehabilitation - Pavement Prmy SysFRA IR 270 40.454/1/2015
$4,000,000.00
Minor pavement rehabilitation.  Pavement repairs and overlay.
6
FRA764694/1/2015Minor Rehabilitation - Pavement Prmy SysFRA IR 270 9.624/1/2015
$41,000,000.00
Minor rehabilitation of I-270 from noth of I-70 to US-33 interchange.One additional travel lane will be added in each direction with concrete median. Work will also include drainage improvements and minor widening on 5 pairs of mainline structures
6
DEL793664/1/2015Intersection ImprovementDEL US 23 8.7704/1/2015
$936,000.00
Improve safety and congestion of intersection of US 23 and SR 315/Stratford Rd.City of Delaware to be lead for the preliminary engineering through construction plans.  ODOT will be lead for right of way and construction.Earmark (OH 333)  and HSP funded pr
6
FRA848684/1/2015Major RehabilitationFRA IR 71 5.294/1/2015
$19,000,000.00
Major Rehabilitation of I-71 from SR-665 to Stringtown Road.Additional third lane widened to the median.Re-deck and widen structures over White Road. PM Brent Downing.
6
FRA873014/15/2015Bridge Deck ReplacementFRA US 62 0.340/0.5104/1/2015
$2,871,000.00
SLM 0.34 over Big Darby Creek Overflow:  replace slab superstructure and approach slabs. Widen to 32' from 30', replace abutment down to footing, patch piers caps and paint pier columns.SLM 0.51 over Big Darby Creek:  replace deck and approach slabs, wide
6
DEL922304/1/2015Bridge Deck ReplacementDEL IR 71 13.0704/1/2015
$8,000,000.00
Rehab and raise six structures over I-71 in DEL and MRW counties to obtain a minimum 16' 6" vertical clearance.
6
FRA934974/1/2015Major RehabilitationFRA IR 71 9.7804/1/2015
$49,000,000.00
Major Rehabilitation of IR-71 from Stringtown Road to SR-315.Investiage need for auxilliary lanes on I-71.Re-deck and rehab 5 pairs of mainline structures. Jim Prevost, Randy McClellan
6
FRA943034/1/2015Drainage ImprovementFRA IR 70 13.62 (Storm Sewer)4/1/2015
$4,000,000.00
Construct new outfall storm sewer and manufactured BMP system along FRA-70 from E of Concrail Crossing near Scioto River to W of Front StPE & RW under PID 77370, 2nd 70/71 project
6
UNI957767/1/2015Bridge Deck ReplacementUNI SR 736 1.1606/15/2015
$1,000,000.00
Replace slabs (superstructure) on two 3 span structures (UNI-736-1.16 and 1.99) over Robinson Run. Reuse existing piers but replace abutments down to top of footing and converet to semi integral.R/W is not anticipated.
6
UNI957767/1/2015Bridge Deck ReplacementUNI SR 736 1.1606/15/2015
$1,000,000.00
Replace slabs (superstructure) on two 3 span structures (UNI-736-1.16 and 1.99) over Robinson Run. Reuse existing piers but replace abutments down to top of footing and converet to semi integral.R/W is not anticipated.
6
PIC764627/1/2015Minor Rehabilitation - Pavement Prmy SysPIC US 23 0.007/1/2015
$4,050,000.00
PAVEMENT MINOR REHABILITATION
6
MRW772407/1/2015Bridge ReplacementMRW CR 146 0.2807/1/2015
$1,704,000.00
Replacement of existing bridge on a modified alignment including relocation/reconstruction of 0.24 miles of CR146 (Claypool Road)Consultant Project Manager: Brooks Vogel
6
PIC764627/1/2015Minor Rehabilitation - Pavement Prmy SysPIC US 23 0.007/1/2015
$4,050,000.00
PAVEMENT MINOR REHABILITATION
6
MRW772407/1/2015Bridge ReplacementMRW CR 146 0.2807/1/2015
$1,704,000.00
Replacement of existing bridge on a modified alignment including relocation/reconstruction of 0.24 miles of CR146 (Claypool Road)Consultant Project Manager: Brooks Vogel
6
PIC764627/1/2015Minor Rehabilitation - Pavement Prmy SysPIC US 23 0.007/1/2015
$4,050,000.00
PAVEMENT MINOR REHABILITATION
6
MRW772407/1/2015Bridge ReplacementMRW CR 146 0.2807/1/2015
$1,704,000.00
Replacement of existing bridge on a modified alignment including relocation/reconstruction of 0.24 miles of CR146 (Claypool Road)Consultant Project Manager: Brooks Vogel
6
D06893037/1/2015SigningD06 ExtruSign Cities7/1/2015
$1,500,000.00
Systematic replacement of extrusheet signs inside various cities in District Six. Design under PID 94155.
6
DEL945277/1/2015Intersection ImprovementDEL US 23 Penn/Sandusky Ext7/1/2015
$2,413,000.00
Extend N Sandusky St from the Pennsylvania Ave intersection to US-23. Provide a new signalized intersection with US-23 to allow SB on and NB off access to US-23.  Also includes SB right turn lane and removal of SB US-23 off rampPlanning Studies and Env-PD
6
PIC764627/1/2015Minor Rehabilitation - Pavement Prmy SysPIC US 23 0.007/1/2015
$4,050,000.00
PAVEMENT MINOR REHABILITATION
6
MRW772407/1/2015Bridge ReplacementMRW CR 146 0.2807/1/2015
$1,704,000.00
Replacement of existing bridge on a modified alignment including relocation/reconstruction of 0.24 miles of CR146 (Claypool Road)Consultant Project Manager: Brooks Vogel
6
D06893037/1/2015SigningD06 ExtruSign Cities7/1/2015
$1,500,000.00
Systematic replacement of extrusheet signs inside various cities in District Six. Design under PID 94155.
6
DEL945277/1/2015Intersection ImprovementDEL US 23 Penn/Sandusky Ext7/1/2015
$2,413,000.00
Extend N Sandusky St from the Pennsylvania Ave intersection to US-23. Provide a new signalized intersection with US-23 to allow SB on and NB off access to US-23.  Also includes SB right turn lane and removal of SB US-23 off rampPlanning Studies and Env-PD
7
CHP866847/29/2013Resurfacing,  Undivided SystemCHP CR 468 0.007/18/2013
$1,389,000.00
OVERLAY ASPHALTIC CONCRETE ON 17.55 MILES OF COUNTY ROADS.  (ROADS ARE RURAL MINOR COLLECTORS. FUNDING IS CONTINGENT ON INCLUDING RURAL MINOR COLLECTORS FOR FEDERAL FUNDS IN THE NEXT TRANSPORTATION BILL).
7
MOT883287/29/2013Design AestheticsMOT IR 75 6.667/18/2013
$443,000.00
Interchange Gateway which will add city logos on an undulating concrete wall that "wave" in both horizontal and vertical directions to represent the strong influence of water on the community.
7
CHP887687/29/2013Bridge RepairCHP SR560 1.48/1.567/18/2013
$325,000.00
Replace deteriorating wearing surface (2 bridges) with no approach work except approach slabs.  Asphalt overlay precluded by legal load rating.
7
AUG887997/29/2013Bridge MaintenanceAUG VAR Bridges7/18/2013
$2,401,000.00
Seal bridge deck with SRS, and painting existing structural steel beams.
7
SHE895597/29/2013Reactive MaintenanceMIA/SHE IR 75 14.16/0.007/18/2013
$807,000.00
Spot paving and resurfacing.
7
CHP866847/29/2013Resurfacing,  Undivided SystemCHP CR 468 0.007/18/2013
$1,389,000.00
OVERLAY ASPHALTIC CONCRETE ON 17.55 MILES OF COUNTY ROADS.  (ROADS ARE RURAL MINOR COLLECTORS. FUNDING IS CONTINGENT ON INCLUDING RURAL MINOR COLLECTORS FOR FEDERAL FUNDS IN THE NEXT TRANSPORTATION BILL).
7
MOT883287/29/2013Design AestheticsMOT IR 75 6.667/18/2013
$443,000.00
Interchange Gateway which will add city logos on an undulating concrete wall that "wave" in both horizontal and vertical directions to represent the strong influence of water on the community.
7
CHP887687/29/2013Bridge RepairCHP SR560 1.48/1.567/18/2013
$325,000.00
Replace deteriorating wearing surface (2 bridges) with no approach work except approach slabs.  Asphalt overlay precluded by legal load rating.
7
AUG887997/29/2013Bridge MaintenanceAUG VAR Bridges7/18/2013
$2,401,000.00
Seal bridge deck with SRS, and painting existing structural steel beams.
7
SHE895597/29/2013Reactive MaintenanceMIA/SHE IR 75 14.16/0.007/18/2013
$807,000.00
Spot paving and resurfacing.
7
MIA847568/12/2013BikewaysMIA GREAT MIAMI BRIDGE CONN8/1/2013
$1,729,000.00
CONSTRUCT A 14' WIDE BIKEWAY/PEDESTRIAN BRIDGE OVER THE GREAT MIAMI RIVER TO CONNECT SECTIONS FIVE AND SIX IN MIAMI COUNTY'S TRAIL SYSTEM.  CONSTRUCT A SEGMENT OF BIKEWAY RUNNING NORTH ON THE EAST SIDE OF THE RIVER TO CONNECT SECTIONS FIVE AND SIX IN MIAM
7
MIA847568/12/2013BikewaysMIA GREAT MIAMI BRIDGE CONN8/1/2013
$1,729,000.00
CONSTRUCT A 14' WIDE BIKEWAY/PEDESTRIAN BRIDGE OVER THE GREAT MIAMI RIVER TO CONNECT SECTIONS FIVE AND SIX IN MIAMI COUNTY'S TRAIL SYSTEM.  CONSTRUCT A SEGMENT OF BIKEWAY RUNNING NORTH ON THE EAST SIDE OF THE RIVER TO CONNECT SECTIONS FIVE AND SIX IN MIAM
7
SHE935698/8/2013Building DemolitionD7 HQ Radio Demo/Garage New Cons8/2/2013
$702,000.00
Demolish the back section of the Annex (Concrete block & steel portion attached to the back of the Annex, Radio Room Area).  Add new area onto the District Garage to house the demolished Radio Room.
7
SHE935698/8/2013Building DemolitionD7 HQ Radio Demo/Garage New Cons8/2/2013
$702,000.00
Demolish the back section of the Annex (Concrete block & steel portion attached to the back of the Annex, Radio Room Area).  Add new area onto the District Garage to house the demolished Radio Room.
7
MIA882228/26/2013Environmental/ScenicMIA US 36 11.558/15/2013
$572,000.00
REPLACE RW FENCE WITH DECORATIVE FENCE, INSTALL CURBING AROUND EXISTING GRASS MEDIAN AREA TO THE WEST OF IR75 BRIDGE; EXCAVATE THE PAINTED MEDIAN EAST OF THE BRIDGE AND ADD CURBING AND TOPSOIL TO CREATE A PLANTING AREA;  INSTALL CURB AT THE PAVEMENT EDGE
7
MIA882228/26/2013Environmental/ScenicMIA US 36 11.558/15/2013
$572,000.00
REPLACE RW FENCE WITH DECORATIVE FENCE, INSTALL CURBING AROUND EXISTING GRASS MEDIAN AREA TO THE WEST OF IR75 BRIDGE; EXCAVATE THE PAINTED MEDIAN EAST OF THE BRIDGE AND ADD CURBING AND TOPSOIL TO CREATE A PLANTING AREA;  INSTALL CURB AT THE PAVEMENT EDGE
7
MOT934509/23/2013Bridge RepairMOT 35/40/741 VAR9/12/2013
$1,873,000.00
Bridge structural steel painting.5701554 MOT 35 0871; 5701899 MOT 35 1566; 5701953 MOT 35 1607 L; 5701988 MOT 35 1607 R; 5701945 MOT 35 1607 N; 5702372 MOT 35 1669;5703409 MOT 40 1442; 5703425 MOT 40 1698; 5710510 MOT 741 0841
7
MOT934509/23/2013Bridge RepairMOT 35/40/741 VAR9/12/2013
$1,873,000.00
Bridge structural steel painting.5701554 MOT 35 0871; 5701899 MOT 35 1566; 5701953 MOT 35 1607 L; 5701988 MOT 35 1607 R; 5701945 MOT 35 1607 N; 5702372 MOT 35 1669;5703409 MOT 40 1442; 5703425 MOT 40 1698; 5710510 MOT 741 0841
7
AUG7955910/7/2013Bridge Deck ReplacementAUG SR 67 3.459/26/2013
$3,666,000.00
Replace bridge deck, repair and paint structural steel, and rehabilitate substructures with minimal approach work.
7
AUG7955910/7/2013Bridge Deck ReplacementAUG SR 67 3.459/26/2013
$3,666,000.00
Replace bridge deck, repair and paint structural steel, and rehabilitate substructures with minimal approach work.
7
AUG7955910/7/2013Bridge Deck ReplacementAUG SR 67 3.459/26/2013
$3,666,000.00
Replace bridge deck, repair and paint structural steel, and rehabilitate substructures with minimal approach work.
7
MIA8876210/7/2013Bridge Deck ReplacementMIA SR 202 8.499/26/2013
$764,000.00
Replace deteriorating concrete deck. Include rehabilitation/replacement of bearings, backwalls and Expansion Joints.
7
AUG7955910/7/2013Bridge Deck ReplacementAUG SR 67 3.459/26/2013
$3,666,000.00
Replace bridge deck, repair and paint structural steel, and rehabilitate substructures with minimal approach work.
7
MIA8876210/7/2013Bridge Deck ReplacementMIA SR 202 8.499/26/2013
$764,000.00
Replace deteriorating concrete deck. Include rehabilitation/replacement of bearings, backwalls and Expansion Joints.
7
SHE2499910/21/2013Minor Rehabilitation - Pavement Prmy SysSHE IR 75 8.8810/10/2013
$6,548,000.00
Minor Rehab of existing pavement, pavement markings and deep joint repair on bridge.
7
SHE2499910/21/2013Minor Rehabilitation - Pavement Prmy SysSHE IR 75 8.8810/10/2013
$6,548,000.00
Minor Rehab of existing pavement, pavement markings and deep joint repair on bridge.
7
SHE2499910/21/2013Minor Rehabilitation - Pavement Prmy SysSHE IR 75 8.8810/10/2013
$6,548,000.00
Minor Rehab of existing pavement, pavement markings and deep joint repair on bridge.
7
CHP9346110/21/2013Bridge RepairD07 BRDG Deck Sealing10/10/2013
$352,000.00
Districtwide bridge deck sealer treatments.  Part 1
7
SHE2499910/21/2013Minor Rehabilitation - Pavement Prmy SysSHE IR 75 8.8810/10/2013
$6,548,000.00
Minor Rehab of existing pavement, pavement markings and deep joint repair on bridge.
7
CHP9346110/21/2013Bridge RepairD07 BRDG Deck Sealing10/10/2013
$352,000.00
Districtwide bridge deck sealer treatments.  Part 1
7
D079466611/4/2013Herbicidal SprayingD07 FY 2014 Herbicidal Spray10/24/2013
$150,000.00
Applying herbicides alon roadsides for noxious week control.
7
D079466611/4/2013Herbicidal SprayingD07 FY 2014 Herbicidal Spray10/24/2013
$150,000.00
Applying herbicides alon roadsides for noxious week control.
7
MOT9320711/14/2013Bridge RepairMOT IR 75 16.3611/7/2013
$611,000.00
Remove and replace deck overlay and patch large spalls on abutment using annodes.
7
MOT9320711/14/2013Bridge RepairMOT IR 75 16.3611/7/2013
$611,000.00
Remove and replace deck overlay and patch large spalls on abutment using annodes.
7
DAR7955012/2/2013Bridge ReplacementDAR SR 118 8.4911/21/2013
$1,007,000.00
REPLACE ONE DETERIORATED STRUCTURE WITH MINIMAL APPROACH WORK.  THREE SPAN. LENGTH = 82'. LEVEL 1 DESIGN.  Pipe removal and copper service branch requested by the Village of Ansonia. Central Office Production for PE.
7
DAR7955012/2/2013Bridge ReplacementDAR SR 118 8.4911/21/2013
$1,007,000.00
REPLACE ONE DETERIORATED STRUCTURE WITH MINIMAL APPROACH WORK.  THREE SPAN. LENGTH = 82'. LEVEL 1 DESIGN.  Pipe removal and copper service branch requested by the Village of Ansonia. Central Office Production for PE.
7
DAR7955012/2/2013Bridge ReplacementDAR SR 118 8.4911/21/2013
$1,007,000.00
REPLACE ONE DETERIORATED STRUCTURE WITH MINIMAL APPROACH WORK.  THREE SPAN. LENGTH = 82'. LEVEL 1 DESIGN.  Pipe removal and copper service branch requested by the Village of Ansonia. Central Office Production for PE.
7
AUG9376912/2/2013Bridge RepairAUG SR 65 13.1911/21/2013
$93,000.00
Reface abutments using annodes and place pier piling encasements on all piles.
7
SHE9584312/2/2013Reactive MaintenanceMIA/SHE IR 75 14.15/0.0011/21/2013
$400,000.00
Spot paving and resurfacing to repair damaged pavement from the winter season.
7
DAR7955012/2/2013Bridge ReplacementDAR SR 118 8.4911/21/2013
$1,007,000.00
REPLACE ONE DETERIORATED STRUCTURE WITH MINIMAL APPROACH WORK.  THREE SPAN. LENGTH = 82'. LEVEL 1 DESIGN.  Pipe removal and copper service branch requested by the Village of Ansonia. Central Office Production for PE.
7
AUG9376912/2/2013Bridge RepairAUG SR 65 13.1911/21/2013
$93,000.00
Reface abutments using annodes and place pier piling encasements on all piles.
7
SHE9584312/2/2013Reactive MaintenanceMIA/SHE IR 75 14.15/0.0011/21/2013
$400,000.00
Spot paving and resurfacing to repair damaged pavement from the winter season.
7
MOT7666712/23/2013Major ReconstructionMOT IR 70 10.7912/12/2013
$51,911,000.00
Full depth removal and replacement of the existing IR 70 mainline pavement, including interchange ramps; Addition of a third lane in each direction as a result of MOT operations; rehabilitation or replacement of various bridges; and, other roadway improveDesign Build
7
MOT7666712/23/2013Major ReconstructionMOT IR 70 10.7912/12/2013
$51,911,000.00
Full depth removal and replacement of the existing IR 70 mainline pavement, including interchange ramps; Addition of a third lane in each direction as a result of MOT operations; rehabilitation or replacement of various bridges; and, other roadway improveDesign Build
7
MOT7666712/23/2013Major ReconstructionMOT IR 70 10.7912/12/2013
$51,911,000.00
Full depth removal and replacement of the existing IR 70 mainline pavement, including interchange ramps; Addition of a third lane in each direction as a result of MOT operations; rehabilitation or replacement of various bridges; and, other roadway improveDesign Build
7
MER9054012/23/2013Culvert Construction/Reconstr/RepairMER SR 29 1.6212/12/2013
$258,000.00
Replace deteriorated and distorted culvert type bridge with minimal roadwork.
7
MOT7666712/23/2013Major ReconstructionMOT IR 70 10.7912/12/2013
$51,911,000.00
Full depth removal and replacement of the existing IR 70 mainline pavement, including interchange ramps; Addition of a third lane in each direction as a result of MOT operations; rehabilitation or replacement of various bridges; and, other roadway improveDesign Build
7
MER9054012/23/2013Culvert Construction/Reconstr/RepairMER SR 29 1.6212/12/2013
$258,000.00
Replace deteriorated and distorted culvert type bridge with minimal roadwork.
7
MIA887721/20/2014Bridge RepairMIA SR 721 3.931/9/2014
$526,000.00
Rehabilitate structure by replacing bearings, deck edge repair, painting structural steel, encase piers, and replace end diaphragm cross frame bracing.
7
DAR924151/20/2014Preventive MaintenanceDAR Shawnee Prairie Reserve1/9/2014
$28,000.00
Pavement repairs, resurfacing with asphalt concrete.
7
MOT937631/20/2014Bridge RepairMOT SR 4 22.64 L/R1/9/2014
$405,000.00
1) Overlay bridge decks with latex modified concrete overlay; 2) reface abutments using anodes and catch floor spalls along abutment with refacing with haunches or additional facing width, use anodes in this area also.
7
LOG937661/20/2014Bridge RepairLOG US 33 15.21 L/R1/9/2014
$213,000.00
Reface abutments with anodes and upper haunch to catch deck spalls at abutment, patch wingwalls with anodes.<