Ohio.gov State Agencies  |  Online Services
Skip Ribbon Commands
Skip to main content
  
  
  
Description
  
July 2015 Standard Drawing Revision.pdf
  
58 KB
• HW-2.1 Half-Height Headwalls For Corrugated Metal Pipe and Plastic
Revised the requirements for the anchor cable to something more readily available. Provided an eye bolt as another option to securing anchor cable to headwall.
• HW-2.2 Half-Height Headwalls For Concrete Pipe
Switched the tables of span/rise to rise/span for elliptical concrete pipe.
7/17/2015
1-16-2015 Hyd SCD Revisions.pdf
  
30 KB
DM-1.4 Conduit Installation - Drawing Removed
1/16/2015
Revision_document_July2014.pdf
  
52 KB
Standard Drawing DM 1.3 Slotted Drain – trapezoidal grate only
7/18/2014
1-17-2014 Hyd SCD Changes.pdf
  
13 KB
The following SCDs have been revised: CB-2.2, I-2.1, I-2.2, I-2.3, & I-2.4
1/17/2014
July 2013 Hyd SCD Changes.pdf
  
10 KB
The following Standard Construction Drawings have been changed: DM-4.1 & DM-4.3.
7/19/2013
SCD_1-18-2013_Transmittal.pdf
  
13 KB
All Standard Drawings have been updated.
1/18/2013
SCD_7-20-12_transmittal.pdf
  
54 KB
All Standard Drawings have been updated
7/20/2012
SCD_10-21-11_transmittal.pdf
  
163 KB
The following Standard Construction Drawings have been changed:  DM-4.1, DM-5.1, I-2.1 and I-2.4
10/21/2011
SCD_7-15-11_transmittal.pdf
  
58 KB
The following Standard Construction Drawings have been changed: DM-1.4
7/15/2011
SCD_1-21-11_transmittal.pdf
  
16 KB
The following drawings have been modified: DM-1.1, DM-4.1
1/21/2011