All revisions and updates to Bridge Design Manual, Bridge Standard Drawings and Location, Design Manual (Volume 2) & Hydraulic Standard Construction Drawings, will be done through this web site.

          Bridge         

 Bridge Design Manual

January 15, 20102010 First Quarter Revisions-BDM2004BDM2004 Cover Letter_01-15-10.pdf136 KBBridge Design Manual
January 15, 20102010 First Quarter Revisions-BDM2007BDM2007 Cover Letter_01-15-10.pdf156 KBBridge Design Manual
July 17, 20092009 Third Quarter Revisions-BDM2004BDM2004 Cover Letter_07-17-09.pdf485 KBBridge Design Manual
July 17, 20092009 Third Quarter Revisions-BDM2007BDM2007 Cover Letter_07-17-09.pdf748 KBBridge Design Manual
April 17, 20092009 Second Quarter Revisions-BDM2004BDM2004 Cover Letter_04-17-09.pdf654 KBBridge Design Manual
April 17, 20092009 Second Quarter Revisions-BDM2007BDM2007 Cover Letter_04-17-09.pdf630 KBBridge Design Manual
January 16, 20092009 First Quarter Revisions-BDM2007Cover Letter_01-16-09BDM2007.pdf201 KBBridge Design Manual
January 16, 20092009 First Quarter Revisions-BDM2004Cover Letter_01-16-09BDM2004.pdf57 KBBridge Design Manual
July 18, 20082008 Third Quarter Revisions-BDM 2004Cover Letter_07-18-08BDM2004.pdf787 KBBridge Design Manual
July 18, 20082008 Third Quarter Revisions-BDM2007Cover Letter_07-18-08BDM2007.pdf708 KBBridge Design Manual
January 18, 20082008 First Quarter RevisionsCover Letter_01-18-08BDM2004.pdf87 KBBridge Design Manual
October 19, 20072007 Fourth Quarter RevisionsCover Letter_10-19-07BDM2004.pdf807 KBBridge Design Manual
October 19, 20072007 Fourth Quarter RevisionsCover Letter_10-19-07BDM2007.pdf655 KBBridge Design Manual
July 20, 2007Bridge Design Manual 2007Cover Letter_07-20-07BDM2007.pdf17 KBBridge Design Manual
July 21, 20062006 Third Quarter RevisionsCover Letter_07-21-06BDM2004.pdf687 KBBridge Design Manual
January 20, 20062006 First Quarter RevisionsCover Letter_01-20-06BDM2004.pdf92 KBBridge Design Manual
October 23, 20052005 Fourth Quarter RevisionsCover Letter_10-21-05BDM2004.pdf178 KBBridge Design Manual
July 15, 20052005 Third Quarter RevisionsCover Letter_07-15-05BDM2004.pdf313 KBBridge Design Manual
April 15, 20052005 Second Quarter RevisionsCover Letter_04-15-05BDM2004.pdf452 KBBridge Design Manual
January 28, 2005Errata (2005 first quarter revisions)Errata_01-28-05BDM2004.pdf61 KBBridge Design Manual
January 27, 20052005 First Quarter RevisionsCover Letter_01-21-05BDM2004.pdf998 KBBridge Design Manual
July 16, 20042004 Third Quarter RevisionsCover Letter_07-16-04BDM2004.pdf502 KBBridge Design Manual
January 16, 2004Bridge Design Manual 2004Cover Letter_01-16-04BDM2004.pdf39 KBBridge Design Manual

 Standard Bridge Drawings

July 17, 2009Revised NBS-1-09coverletter_07-17-09.pdf3759 KBStandard Bridge Drawings
January 16, 2009NBS-1-09, NBSDD-1-09coverletter_01-16-09.pdf5669 KBStandard Bridge Drawings
July 18, 2008CPA-1-08, CPP-1-08, CS-1-08, SB-1-08, Revised PSID-1-99STDcoverletter_07-18-08.pdf4246 KBStandard Bridge Drawings
April 18-2008TST-1-99STDcoverletter_04-18-08.pdf693 KBStandard Bridge Drawings
October 19, 2007PSBD-2-07, PSBDD-2-07STDcover letter_10-19-07.pdf2277 KBStandard Bridge Drawings
April 20, 2007Revised PSBD-1-93, Revised PSID-1-99, CRHSSTDcover letter_04-20-07.pdf10585 KBStandard Bridge Drawings

            Hydraulics         

 Location & Design Manual, Volume 2

DescriptionFilter
July 17, 2009
· Section 1007.1 Clarification to pipe removal policy.
· Section 1008.8 Revision to scour and foundation undercut policy.
· Appendix B Plan Note D118 added
distribute_letter_July 09.pdf12 KBLocation & Design Manual, Volume 2
April 17, 2009
· Section 1002.3 Minor revisions for clarity and use of Type F conduit.
· Section 1008.7 Minor revisions for clarity.
· Section 1008.8 Clarity a nd correction of errors in the Scour equations.
· Section 1009.2 Removal of redundant language.
· Figure 1008-13 Revise title to reference rigid pipe rather than concrete.
· Section 1102.3 Revise ditch lining language for clarity and add direction for
use with catch basins
· Section 1103.4 Clarify equation variables.
· Section 1104 Add language for Type F, Broken Back Culverts and storm
sewer design.
· Section 1105.1 Add language for Ordinary High Water Mark
· Section 1105.6.13 New section added to address Ordinary High Water Mark.
· Figure 1104-1 New figure for Type F, Broken Back culvert.
· Appendix B Plan Note D122 deleted.
distribute_letter_April 09.pdf13 KBLocation & Design Manual, Volume 2
April 18, 2008
• Section 1002.3.2 Guidance added on conduit placed through MSE walls
• Section 1008.7 Design guidance and criteria for Precast Concrete Arch sections clarified
• 1008.8 Foundations revised based on scour calculation criteria
• 1008.11 Clarification on when to design wingwalls
• 1102.3.2 Clarifications to Ditch Protection
• Table 1103-1 Clarification on design speeds
• 1104.2.1 Clarification on Storm Sewer Depth, added Table 1104-1
distribute_letter_April 2008.pdf12 KBLocation & Design Manual, Volume 2
January 18, 2008
• Section 1105 - multiple updates and revisions with respect to post-construction BMP policy
• Section 1112 - multiple updates and revisions with respect to post-construction BMP policy
• Section 1115 - multiple updates and revisions with respect to post-construction BMP policy
• Section 1116 - multiple updates and revisions with respect to post-construction BMP policy
• Section 1117 - multiple updates and revisions with respect to post-construction BMP policy, has been combined with Section 1118
• Section 1118 - combined with Section 1117 and removed
• Figures - multiple updates and revisions with respect to post-construction BMP policy 
implementation_jan2008.pdf31 KBLocation & Design Manual, Volume 2
October 19, 2007
• Section 1002.1 has been revised and Sections 1002.1.1 and 1002.1.2 have been added to clarify the pipe policy.
• Section 1002.3.7 Liner Pipe has been added.
• Various sections have been revised regarding design loading requirement updates.
distribute_letter_October 2007.pdf12 KBLocation & Design Manual, Volume 2
January 19, 2007
• Post Construction Stormwater Quality BMPs have been revised (sections 1115 through 1118).
• Figure 1118-4 has been revised and Figures 1118-13 through 1118-19 have been added.
• The Sample Plan Note index in Appendix B has been revised.
distribute_letter_January 2007.pdf12 KBLocation & Design Manual, Volume 2
October 20, 2006
• Section 1002.2.4 Structure File Number has been added.
• Plan notes D110 and D111 have been added.
• Plan notes D115 and D116 have been revised
distribute_letter_October 2006.pdf12 KBLocation & Design Manual, Volume 2
July 21, 2006
• Guidance for SWPPP was revised to reference supplemental specification 832 (section 1114).
• Plan note D122 has been revised.
distribute_letter_July 2006.pdf67 KBLocation & Design Manual, Volume 2
April 21, 2006
• Material alternatives are now required for pipe uinderdrains (section 1009.2.1).
• Guidance for SWPPP was revised to reference supplemental specification 832 (section 1114).
• A design flow chart was added for required stream protection at culverts (figure 1105-4).
• Plan notes D110& D111 have been deleted.
• Plan note D122 has been added for precast headwalls, wingwalls, or footers.
• Appendix B, Directive 22A has been deleted.
• Plan notes are now located in Appendix B.
• Design charts and nomographs are now located in Appendix C.
distribute_letter_April 2006.pdf67 KBLocation & Design Manual, Volume 2
January, 20, 2006
• Tied Concrete Block Mat design criteria has been revised to use allowable shear stress.
• Stream protection design criteria has been added.
• Revisions have been made to section 1112.2 Maintenance Projects.
• The Post Construction Storm Water Structural Best Management Practices sections 1115-1118 have been revised.
• Figures for section 1115-1118 have been added and or revised.
• Plan note W100 was deleted.
• The LD35 form has been revised.
distribute_letter_January 2006.pdf67 KBLocation & Design Manual, Volume 2
October 20, 2005
October 20, 2005
• Ephemeral stream have been excluded from bankfull culvert design (section 1105.1)
• Post Construction Storm Water Management Practices have been modified (sections 1115-1118)
• The LD35 form has been revised
• Ephemeral stream have been excluded from bankfull culvert design (section 1105.1)
• Post Construction Storm Water Management Practices have been modified (sections 1115-1118)
• The LD35 form has been revised
distribute_letter_October2005.pdf67 KBLocation & Design Manual, Volume 2
April 15, 2005
• Section 1008.11 has been added to address design of culvert wingwalls
• Figure 1008-14 (maximum height of cover for reinforced box culverts) has been revised
• Ditch design has been revised to utilize an allowable shear stress in lieu of an allowable velocity
• Clarifications to section 1115.1 have been added to address maintenance projects
• Clarifications to section 1115.2 have been added to allow for rehabilitation and non-rehabilitation areas within one project
• Guidance for Vegetated Filter Strips has been added
• Figure 1105 has been revised
• The LD35 form has been revised
distribute_letter_April2005.pdf68 KBLocation & Design Manual, Volume 2
January 21, 2005
• Added Section 1008.10 to address the design of Precast Reinforced Concrete Flat Slap Tops, Catch Basin Tops, and Inlet Tops.
• Revised Section 1009.2.1 to define types of pipe underdrain.
• Allowable ditch velocities (table 1102-1) have been revised.
• The Post Construction Storm Water Structural Best Management Practices section and figures have been revised.
• The LD35 Form has been revised.
• Plan Note W103 has been added for Manufactured Systems
distribute_letter_January2005.pdf68 KBLocation & Design Manual, Volume 2
July 16, 2004
• Metric units and figures have been removed.
• The definition for the Area (A) variable used in the Water Quality Volume (Wqv) equation has been further defined in section 1115.
• The height of cover table for corrugated steel pipe has been revised due to a change in specifications 707.01 & 707.02 in the 2002 CMS. Through a boiler plate addition, these items will require lock or welded seams in lieu of riveted seams.
• Plan notes W99-W102 have been revised.
distribute_letter_July2004.pdf59 KBLocation & Design Manual, Volume 2
April 16, 2004
• Incorporated the Post Construction Storm Water Management Interim Policy into the manual.
• Added a Concordance to the manual 
• Added Plan Notes for Storm Water Management Items
distribute_letter_April2004.pdf60 KBLocation & Design Manual, Volume 2
January 26, 2004
• Management controls for projects ranging from 1-5 acres or not meeting the thresholds have been addressed.
• The impervious ratio has been redefined. 
• Bioretention cells are now required to store 100% of the WQv.
distribute_letter_Jan26-2004.pdf62 KBLocation & Design Manual, Volume 2
January 16, 2004
 
• Added several glossary terms
• Added Section 1005.2.3 Down Stream Impacts 
• Added Section 1006.2.3 Local Floodplain Coordinator
• Made minor corrections throughout the document
distribute_letter_Jan2004.pdf62 KBLocation & Design Manual, Volume 2
April 18, 2003
• Revised Section 1112 Notice of Intent (NOI)
• Added Section 1112.2 Maintenance Project to provide guidance for determining if a project is classified as maintenance.
• Revised Section 1114 to clarify guidance for the SWPPP development.
• Revised the NOI Calculator (Figure 1112-1)
• Revised form LD-35 in the appendix
• Revised plan notes D101 and D102 in the appendix
distribute_letter_April2003.pdf62 KBLocation & Design Manual, Volume 2
January 17, 2003
• Added section 1008.9 Waterproofing Membrane
• Revised guidance for rock channel protection
• Replaced section 1112 Temporary Sediment and Erosion Control with 1112 Notice of Intent (NOI).
• Revised and relocated section 1112.3 Storm Water Pollution Prevention Plan (SWPPP) to 1114.  Revisions reflect Departmental changes of requiring the Contractor to provide the SWPPP.
• Plan notes D109 and D107 were revised and plan notes E106 through E109 were deleted from the appendix.
• Revised From LD-35 in the appendix.
distribute_letter_Jan2003.pdf62 KBLocation & Design Manual, Volume 2

 Hydraulic Standard Construction Drawings

DescriptionFilter
April 17, 2009
The following drawings have been modified:  DM-4.3, DM-4.4.
SCD_4-17-09_transmittal.pdf12 KBHydraulic Standard Construction Drawings
April 21, 2006
The following drawings have been modified:  HW-2.1, HW-2.2, DM-1.1, DM-1.4, WQ-1.2.
SCD-4-21-06-transmittal.pdf87 KBHydraulic Standard Construction Drawings
January 20, 2006
The following drawings have been modified:  HW-2.1, MH-1.2, WQ-1.2
SCD-1-20-06-transmittal.pdf90 KBHydraulic Standard Construction Drawings
October 20, 2005
The following drawings have been modified:  DM-1.1, DM-1.2, WQ-1.2.
SCD-10-21-05-transmittal.pdf90 KBHydraulic Standard Construction Drawings
July 15, 2005
The following drawings have been modified:  CB-1.1, CB-1.2, CB-1.3, CB-2.1, CB-2.2, CB-2.3, CB-3.1,CB-3.2, CB-3.3, CB-3.4, MH-1.2, I-1.1, I-1.2, I-2.1, I-2.2, I-2.3, I-2.4, HW-2.1, HW-2.2, WQ-1.2
SCD-7-15-05-Transmittal.pdf91 KBHydraulic Standard Construction Drawings
ODOT Zephyr The Ohio Department of Transportation
1980 West Broad Street, Columbus Ohio, 43223
Ted Strickland, Governor | Jolene M. Molitoris, ODOT Director
Privacy Statement | Advanced Search | Feedback