Date_of_Authority

3/20/2013

CNTY-RTE-SECT

HAN - Findlay Street Improvements

PID

93050

LPA_Contact

City of Findlay
Paul E. Schmelzer
419-424-7137

Description

(1) ON Western Ave, between Lima Ave and Lima St: Mill & Fill with asphalt concrete, replace as needed existing curb and gutter, replace as needed exist sidewalk and repair drive approaches.
 
(2) On East Main Cross St from Main St thru the East St intersection: Mill & Filll with asphalt concrete, partial replacement of existing curb and gutter, and sidewalks as needed, repair drive approaches and update ADA curb ramps.
 
(3) On West Sandusky St between Emma St and Glessner Ave: Mill & Fill with asphalt concrete.
 
(4) On Bigelow Ave from Crystal Ave to Bright Rd.: Mill & Fill with asphalt concrete.