| 3/18/2024 | | 113265 | | This project includes the rehabilitation of 1.3 miles of East 200th Street from Mohican Avenue to Lakeshore Boulevard including planing of the existing pavement surface, performing pavement repairs as required based on condition, installation of ADA compliant curb ramps, resurfacing of the roadway, replacement of pavement markings, and replacement and installation of approximately 6,500 feet of water main. | |
| 3/14/2024 | | 116845 | | Add sidewalks on State St and Church St from State St to the Library, in Kinsman Township, Trumbull County, Ohio. | |
| 3/14/2024 | | 109689 | | Removal, replacement, and installation of guardrail along Weigand Rd, Scioto Darby Rd, Old Tarlton Pike, Kingston Pike, Tarlton Road, Commercial Point Rd, Ashville Fairfield, Walnut Creek Pike, Tarlton Adelphi Road, London Road, and other work all in accordance with the plans, specifications, and bid documents. | |
| 3/13/2024 | | 117737 | | HUR-C.R.040-03.16 (Sand Hill Road) remove existing prestressed box beams and replace with cast in place concrete bridge deck. | |
| 3/13/2024 | | 114813 | | Road diet with curb extensions, median and street lighting along North Main Street from Great Miami Boulevard to Shoop Mill Road. | |
| 3/12/2024 | | 116432 | | Construct three sections of paved shared use paths along with signage, drainage, connecting walks, and site restoration. | |
| 3/11/2024 | | 103815 | | Replacement of a steel truss bridge over Bradford Creek with a single span steel or prestressed concrete bridge with composite concrete deck, also including minor approach reconstruction and guardrail installation. The total project length is 0.01 miles. Project bid documents are listed on Bid Express. | |
| 3/11/2024 | | 117488 | | Replacement of Ira Road Bridge over North Fork of Yellow Creek. | |
| 3/8/2024 | | 116373 | | This project consists of installing 3-section flashing yellow vehicular signal heads as a pilot project at 10 intersections along Hilliard Rome Road and Roberts Road. New controllers, and intersection wiring are also proposed. | |
| 3/8/2024 | | 118128 | Toledo-Lucas County Port Authority Brian Perz - Director of Facilities & Development Services BPerz@toledoport.org419-214-4172 | Project in Lucas County to mill and resurface W. Airport Service Rd. from S. Berkey Southern Rd. to Terminal Rd. and S. Berkey Southern Rd. from Airport Highway (SR-2) to W. Airport Service Rd. Other work includes pavement markings, signage upgrades, and replacement of 23 drainage structures. | |
| 3/8/2024 | | 118136 | City of Waterville Thomas H Yursta, PE tyurysra@proudfootassociates 419-865-7195 | Improvement of 0.25 miles of State Route 64 with pavement planing and resurfacing, new pavement markings and associated work. | |
| 3/7/2024 | | 111050 | | The project involves reconstruction of the intersection of Strausser St and Lake O’Springs Ave into a single lane roundabout. Improvement will include new asphalt pavement, storm sewer and curb and gutter. | |
| 3/7/2024 | | 113727 | | This project consists of the installation of sidewalk and curb ramps along Olive Street from Powell Avenue to Wayne Avenue and along Floral Avenue from Oakley Avenue to Highland Avenue. | |
| 3/7/2024 | | 115214 | | Design-build contract for the complete replacement of structure 1447165 (CLI-TR-256-0.01), Pratt Rd. over the East Fork of Todd Fork. Project included associated approach roadway work (pavements, signing, guardrail, etc.) including some horizontal and vertical realignments. | |
| 3/7/2024 | | 117328 | | Replacement of MUS-T00297-0.42 (SFN 6040241) carrying Adams Lane over Joe's Run. | |
| 3/7/2024 | | 117643 | Warren County Engineer Roy G Henson, PE, PS Roy.Henson@co,warren.oh.us 513-695-3310 | Bridge replacement on Stephens Road over a branch of Bear Run in Hamilton Township, Warren County. The project consists of replacing the bridge with a precast concrete box culvert, associated roadway improvements on each approach, and a 12 inch water main relocation. | |
| 3/7/2024 | | 113448 | | Reduction of the through lanes from four lanes to two lanes with a double left turn lane and bike lanes from South Euclid Avenue to South Edwin C. Moses Boulevard. | |
| 3/6/2024 | | 113803 | | Replacement of an existing continuous three span steel beam bridge over the Black Fork of Mohican River with a new three span continuous reinforced concrete slab on pile supported integral concrete abutments and capped pile piers. | |
| 3/6/2024 | | 115116 | | Rehabilitation of the historic Howard Vandyke Bridge (SFN 4131126) over Yellow Creek in Knox Township of Jefferson County. Work includes the complete replacement of the flooring system, repair and galvanizing of select existing members, and replacement of deficient members. | |
| 3/5/2024 | | 112405 | | Bridge railing and approach guardrail upgrades on various Fulton County Bridges. | |
| 3/5/2024 | | 118522 | | Resurfacing of McCord Road from north of Village Meadows Trail Road including necessary pavement repairs, curb ramp replacement and thermoplastic pavement markings. The project also includes the removal of existing 4' wide walk adjacent to the Strawberry Acres Park and replacing it with a 6' wide asphalt path. | |
| 3/4/2024 | | 105734 | | This project involves the widening of approximately 1.0 miles of East Broad Street from east of I-270 to west of Brice Road North. Improvements include the addition of a shared-use path along East Broad Street, Taylor Station Road, and McNaughten Road. Improvements of Taylor Station Road from East Broad Street to the entrance of Mount Carmel Medical Park include the widening of approximately 0.2 miles of road. Improvements of McNaughten Road from East Broad Street to Ganse Lane include the widening of approximately 0.19 miles of road. Improvements will be made at intersections along East Broad Street at Taylor Station Road, McNaughten Road, Blossom Field Boulevard, Outerbelt Street, and Chris Perry Lane. The project also consists of additions and improvements to sidewalks, lighting, stormwater drainage systems, signal and interconnect systems, and retaining walls. | |
| 3/4/2024 | | 114623 | | FY24 Urban Paving Project in the City of Lebanon on US-42 from Glosser to SR 123, on Main Street (SR-48) from US-42 to SR-48 interchange, and on SR-123 from SR-48 interchange to the eastern corp. limit. | |
| 3/4/2024 | | 115224 | | Pavement marking on various routes in Holmes County. | |
| 2/26/2024 | | N/A This is a MVRPC Project | Miami Valley Regional Planning Commission (MVRPC) Elizabeth Baxter, Manager of Disaster Recovery & Economic Development Planning ebaxter@mvrpc.org937-531-6538 | The Miami Valley Regional Planning Commission (MVRPC) issued a Request for Proposals seeking consultant support for the development of the Recovery Story related to the 2019 Memorial Day tornadoes for the Miami Valley Region. The complete RFP package and bid instructions can be accessed from the MVRPC website: https://www.mvrpc.org/about/contract-solicitation. Proposals are due by March 29, 2024. | |
| 2/23/2024 | | 116924 | | Replacement/upgrade of signals at 14 intersections to adaptive "smart signals" throughout the City of Hudson, Summit County, Ohio. | |
| 2/22/2024 | | 110370 | | This project consists of resurfacing 1.7 miles of County Road 12/C from US Route 6 to Townline Road and 2.1 miles of County Road D from SR 576 to Townline Road, including guardrail replacement and associated bridge waterproofing. | |
| 2/22/2024 | | 117498 | | Replace existing superstructure and modify existing abutment seat with minimal roadway work. | |
| 2/22/2024 | | 118123 | | Detroit Avenue Resurfacing: This project is a road diet project to convert the existing three lane Detroit Avenue to a two-lane roadway with separated two-way bike path. Project includes resurfacing, restriping and installation of a curbed traffic island south of Town Street. North of Town Street, the roadway will be narrowed, and a shared-use path will be installed. | |
| 2/22/2024 | | 117664 | | Repaving Christy Rd at the intersection of SR 15. | |
| 2/20/2024 | | 109284 | | Repaving Farmer Mark Rd (122) between SR 18 & SR 249 Repaving The Bend Rd (134) between CR 424 & SR 18 & SR 15 and the Defiance Williams County Line Rd | |
| 2/20/2024 | | 116460 | | Construct a pedestrian hybrid beacon and cross walk across S Main St in the City of Green, Summit County, Ohio. | |
| 2/20/2024 | | 117725 | | The project involves rehabilitation of Bridge No. PA-17-31 (Paris Avenue Bridge) over abandoned railroad. | |
| 2/14/2024 | | 117105 | | Resurfacing of S Main St (CR 50), in the City of Green, Summit County, Ohio. | |
| 2/6/2024 | | 115277 | | REPLACEMENT OF EXISTING LEGACY CTCS INTERCONNECT SYSTEM WITH A FIBER OPTIC NETWORK USING PROPOSED AND EXISTING DUCT BANKS, CONDUITS AND AERIAL UTILITY POLES. SIGNAL CONTROLLERS, NETWORK AND TRAFFIC FLOW MONITORING EQUIPMENT WILL BE UPGRADED. ADDITIONALLY, TRAFFIC SIGNAL INFRASTRUCTURE WILL BE REBUILT AT FIVE INTERSECTIONS. | |
| 2/6/2024 | | 113367 | | Resurfacing 20.15 miles of existing pavement on county roads. | |
| 2/6/2024 | | 111412 | | Construction of 0.45 miles of sidewalk along the north side of Duquesne Street beginning at the existing sidewalk on the NE corner of the intersection of Fairfield Avenue and Duquesne Street to the NW intersection of Pittsburgh Street (aka Columbiana-Waterford Road) in the City of Columbiana. Minor drainage improvements incidental to the project are included. | |
| 2/6/2024 | | 119063 | | Upgrades to various traffic signals throughout Butler County | |
| 2/6/2024 | | 110257 | | Widen Wayne Avenue from Wyoming Street to Waldo Avenue from four lanes to five lanes. The project includes new sidewalks, curbs, street pavement and street lighting. | |
| 2/6/2024 | | 114412 | | Logan County resurfacing program on various county roads. | |
| 2/5/2024 | | 117422 | | The project consists of a design-build bridge replacement on Champion Rd (CR182) in Plymouth Township, Richland County, Ohio. | |
| 2/5/2024 | | 114411 | | Upgrade existing pavement markings on various county roads. | |
| 2/2/2024 | | 114039 | | The work to be performed under this contract is located within the City of Columbiana, Ohio in the following locations and includes the following work: 1.) Along Fairfield School Road from the southern corporation limits and northerly to the intersection of Fairfield Avenue (approximately 0.83 miles) and includes pavement planing, resurfacing, full depth pavement repair, drainage improvements, and pavement markings. 2.) Along Lisbon Street from the southwestern city limits and northeasterly to the intersection of West Park Avenue (approximately 0.45 miles) and includes pavement planing, resurfacing, pavement repair, installation of curb ramps, drainage improvements, and pavement markings. | |
| 2/1/2024 | | 115358 | | Canton Road resurfacing | |
| 1/25/2024 | | 117664 | | Realignment of Banner School road and widening of TR19 and TR-N1 to prepare for local road impacts of the planned CR17D/US24 interchange. | |
| 1/25/2024 | | 113312 | | This project includes the resurfacing of 0.94 miles of Sheldon Road (CR-131) from Engle Road to Smith Road in the Cities of Brook Park and Middleburg Heights. Work tasks include the installation of new asphalt intermediate and surface courses, full and partial depth pavement repairs, curb, sidewalk, and drive apron repairs (as required), utility adjustments, ADA upgrades, new pavement markings for the length of the corridor. | |
| 1/25/2024 | | 113197 | | Improve pedestrian/passenger access at the Van Aken District (VAD) GCRTA station area by adding pedestrian connections from the station to surrounding neighborhoods and for bus riders to access the rapid transit station all in the City of Shaker Heights in Cuyahoga County. | |
| 1/25/2024 | | 112036 | | The project consists of the construction of a 12 foot wide asphalt shared use path from Clinton-Como Park to Northmoor Park, crossing the Olentangy River with new pedestrian bridges at Clinton-Como Park, Northmoor Park, and over Slyh Run. The total project length is 3014 feet. The project also consists of lighting, traffic signal, stormwater utility, and landscaping work. | |
| 1/24/2024 | | 114100 | | This project involves the replacement of the bridge superstructure with a single span, prestressed, composite, concrete box beams with semi-integral abutments. Additional work includes minor substructure modifications/repairs, as well as related roadway adjustments and restoration. | |
| 1/24/2024 | | 114543 | | Design Build project to replace Bridge #3 over Potter Creek on Randolph Road in the Randolph Township. Work includes final engineering design, new substructure, new superstructure, and minor approach work. | |
| 1/23/2024 | | 116539 | | Resurfacing of Miller Rd from Ridgewood Rd to W Market St, in the City of Akron, Summit County, Ohio. | |
| 1/23/2024 | | 102744 | | Resurfacing SUM-SR 18 in the city of Akron, includes minor bridge work to 8 structures in the City of Akron. | |
| 1/22/2024 | | 111043 | | The project involves pavement widening and resurfacing of Perry Dr from Southway St to Tuscarawas St. Work will also include minor tie in work, curb and gutter installation, ADA compliant curb ramps, sidewalk and a new flasher at 13th St. This project will also include new driveway aprons and access management, closed drainage system and BMP upgrades, minor crosswalk and traffic control upgrades and replacement of existing 8” CIP watermain with 12” dip waterline for Canton Water Department. | |
| 1/22/2024 | | 119012 | | Rehabilitation of the Township Road 2 bridge over Cartwright Run using non-composite prestressed concrete box beams and reconstruct asphalt approaches. | |
| 1/17/2024 | | 119467 | | Superstructure only replacement of Bridge No. CAR C0027 0170 (SFN 1030582), which carries CR 27 over Center Fork Drake in Lee Township of Carroll County. | |
| 1/17/2024 | | 102796 | | The general scope of the project includes construction of a 0.20- mile asphalt paved recreational trail from the Freedom Trail Middlebury Trailhead to The Portage hike and bike trail. The project includes a bridge over the CSX railroad tracks. | |
| 1/16/2024 | | N/A | Miami Valley Regional Planning Connissiom Elizabeth Baxter, Manager of Disaster Recovery & Economic Development Planning ebaxter@mvrpc.org937-531-6538 | “The Miami Valley Regional Planning Commission (MVRPC) issued a Request for Proposals seeking consultant support for the creation of a redevelopment master plan for the Turner Road Corridor in Harrison Township and City of Trotwood. The complete RFP package and bid instructions can be accessed from the MVRPC website: https://www.mvrpc.org/about/contract-solicitation. Proposals are due by February 16, 2024. | |
| 1/16/2024 | | 113927 | | Milling and resurfacing approximately 0.40 miles of Oak Street. Crosswalks and curb ramps will be upgraded to meet ADA regulations. | |
| 1/11/2024 | | 115979 | Logan County Engineer's Office Michael Kerns, P.E. mkerns@lceo.us937-592-2791 | Perform profile improvements on County Road 18 beginning approximately 1000-feet to the south of Township Road 200 thence northerly to a project termini at Township Road 200. Existing intersections in the project vicinity are to remain unchanged. | |
| 1/11/2024 | | 117876 | | Superstructure Replacement of Smith Road Bridge #12 | |
| 1/11/2024 | | 115745 | | Urban paving in the City of Xenia on a portion of US 42 from US 35 to Industrial Blvd. Full depth and catch basin repairs where necessary. | |
| 1/11/2024 | | 114417 | | Rehabilitation of Sunrise Blvd bridge over Fish Creek in the City of Kent. | |
| 1/11/2024 | | 111299 | | Install new and upgrade existing guardrail on various county roads in Muskingum County. | |
| 1/11/2024 | | 111300 | | Install new and upgrade existing pavement markings on various county roads in Muskingum County. | |
| 1/8/2024 | | 116433 | | Installation of new semi-actuated traffic signal on SR-163 at the drive entrance for Mr. Ed’s Bar and Grille. Signal components include pedestrian signal heads and pushbuttons. Project also includes extending walk along the north side of SR-163 to connect to existing walk north of the drawbridge. | |
| 1/8/2024 | | 114393 | | Widening to provide center turn lane with concrete medians and an additional southbound lane between Flaig Dr. and Resor Dr. Addition of sidewalk between Flaig Dr. and Planet Dr. Improvements to the traffic signal at Resor. Culvert replacements and storm sewer improvements. | |
| 1/5/2024 | | 118110 | | The work consists of resurfacing 1.0 miles of Wynn Road from Corduroy Road to Cedar Point Road and 1.0 miles of Corduroy Road from Wynn Road to Stadium Road. The project will also include curb ramp installation and striping. | |
| 1/4/2024 | | 116479 | | Resurfacing of Highland Rd in the City of Twinsburg, includes full and partial depth repairs, manhole and catch basin adjustments and curb repairs. | |
| 1/3/2024 | | 118929 | | Mill and Fill of Butternut Ridge Rd in Carlisle Twp from Oberlin-Elyria Rd to LaGrange Rd. | |
| 1/3/2024 | | 118925 | | Mill and Fill of Lake Ave in Elyria Twp from Elyria Ave to North Ridge Rd. | |
| 1/3/2024 | | 106932 | | Resurfacing Valley View Rd in the city of Hudson, Summit County, Ohio. Includes full and partial depth repairs. | |
| 1/3/2024 | | 1090302 | | Installing new guardrail on Apple Creek Road in Green Township. | |
| 1/2/2024 | | 119515 | | Construction of pedestrian improvements at the north approach of SR 58 and Tower Boulevard. Pedestrian facilities shall include pedestals, pedestrian signal heads, and push buttons for the existing marked crossing of SR 58.
| |
| 12/28/2023 | | 116895 | | Resurfacing of Mahoning Ave and Glamorgan St in the City of Alliance, Stark County, Ohio. Includes full and partial depth repairs and ADA ramps where needed. | |
| 12/28/2023 | | 111668 | | The project includes pavement marking updates, signal improvements, lighting improvements, sidewalk improvements, and accessibility improvements in the City of Athens. The work will take place on State Street, between Congress Street and College Street, on Mill Street, from State Street to College Street, on Washington Street, from Congress Street to College Street, and on Union Street, from Congress Street to College Street. | |
| 12/28/2023 | | 106985 | | Resurfacing and related work on Dresden Road (CR 2) from SR 60 to the Zanesville Corp Limit (0.00 to 1.04). | |
| 12/28/2023 | | 110255 | | Project involves the construction of a 5’ sidewalk from Overland Trail to Southmoor Circle, also including a gravity retaining wall and reconstruction of curb ramps. | |
| 12/26/2023 | | 110256 | | The construction of cycle track on West Third Street, between Roberts Drive and Ludlow Street. | |
| 12/26/2023 | | 117144 | | This project consists of streetscape enhancements including widened sidewalks, drainage improvements, landscaping and site amenities. | |
| 12/20/2023 | | 117130 | | The work for which proposals are invited consists of furnishing all labor, equipment and material for milling and resurfacing of Colonel Glenn Highway form the West Corporation Limit to Grange Hall Road, the installation of raised pavement markers, and all other work as may be necessary to complete the contract in accordance with the plans and specifications. | |
| 12/18/2023 | | 114768 | | Upgrading guardrail and end terminals and adding new guardrail on various county routes throughout Trumbull County. | |
| 12/18/2023 | | 114364 | | The project involves pavement resurfacing of Dressler Road from Fulton Dr. to Belden Village St and will also include pavement planning, pavement repairs and pavement markings. Project length is approximately 0.98 miles. | |
| 12/18/2023 | | 112657 | | The project involves pavement resurfacing of Dressler Road from Fulton Dr. to Belden Village St and will also include pavement planning, pavement repairs and pavement markings. Project length is approximately 0.98 miles. | |
| 12/15/2023 | | N/A | Miami Valley Regional Planning Commission (MVRPC) Elizabeth Baxter, Manager of Disaster Recovery & Economic Development Planning ebaxter@mvrpc.org 937-531-6538 | The Miami Valley Regional Planning Commission (MVRPC) issued a Request for Proposals seeking consultant support for the development of Regional Resiliency Planning tools and documents related to the 2019 Memorial Day tornadoes for the Miami Valley Region, including the development of a digital guidebook and interactive web-based toolkits to promote resiliency. The complete RFP package and bid instructions can be accessed from the MVRPC website: https://www.mvrpc.org/about/contract-solicitation. Proposals are due by January 19, 2024. | |
| 12/15/2023 | | 118120 | | The project consists of the pavement resurfacing and right-of-way rehabilitation of West Gypsy Lane Road from Sand Ridge Road to 125 West Gypsy Lane Road and East Gypsy Lane Road from I-75 to Dunbridge Road. | |
| 12/15/2023 | | 117611 | City of Findlay Jeremy Kalb jkalb@findlayohio,com 419-424-7121 | This project consists of nearly 7,100 linear feet of curb removal and replacement and/or pavement planning (approximately 28,300 SY) and resurfacing (approximately 1,571 CY) on Bigelow Avenue within the City of Findlay and Hancock County. Incidental items include necessary sidewalk or curb ramp replacement (approximately 2,405 SF), treatment of shoulders, adjustment catch basins, and grading and seeding. Other minor work is described in the details for each segment of pavement. | |
| 12/15/2023 | | 116177 | | The project consist guardrail replacement by removing existing guardrail and installing new MGS guardrail along County Road 10 and 56. | |
| 12/15/2023 | | 116040 | | The work consists of widening and resurfacing 1.43 miles of Coy Road from Fleitz Drive to Seaman Road. The project will also include sidewalk installation, storm improvements, signage, and striping. | |
| 12/15/2023 | | 114102 | | Widening of SR 31 between Elwood Ave and the US 33 overpass. Reconfiguration of the US 33 EB / SR 31 interchange ramp. Traffic signal replacement. The project will also include curb, storm sewer installation, sidewalks, shared-use path, striping, signage, and street lighting. | |
| 12/15/2023 | | 118118 | | Resurfacing of Tracy Road from Commodore Drive to Northwood Corporation. | |
| 12/13/2023 | | 110374 | | The work for which proposals are invited consists of furnishing all labor, equipment and material for installation of pedestrian facilities (8’ north side and 5’ south side with 5’ tree lawn) along both sides of Kemp Road between Grange Hall Road and the Grange Hall/Oxmoor Drive intersection along with curb and storm sewer improvements, and all other work as may be necessary to complete the contract in accordance with the plans and specifications. | |
| 12/13/2023 | | 86052 | | Construction of approximately 4 miles of the Holmes County Trail from Glenmont – CR 25 to SR 520. The Trail is typically 16 feet wide and accommodates walkers, bikers, horseback riders, and buggies. | |
| 12/12/2023 | | 118134 | | Milling and resurfacing and new pavement markings on CR 73 (McCord Road) from Sylvania Avenue to Brint Road including partial depth pavement repairs as needed. | |
| 12/12/2023 | | 118064 | | This project will resurface 0.9 miles of Laskey Road from Douglas Road to Jackman Road. This includes removing and replacing the pavement surface, pavement repairs, and minor drainage improvements. | |
| 12/12/2023 | | 110254 | | Project involves the asphalt resurfacing of E. David Road from Far Hills Ave. to Ackerman Blvd. Work shall also include the construction of a sidewalk, traffic signal reconstruction, drive approaches, and curb ramps. | |
| 12/12/2023 | | 111297 | | Install new and upgrade existing guardrail on various county roads in Licking County. | |
| 12/11/2023 | | 117014 | | Mill and resurface East Market Street with full depth repairs where necessary, sidewalk, and curb repair. | |
| 12/11/2023 | | 11308 | | The project consists of resurfacing and associated pavement repair of 0.89 miles of Grant Avenue from East 49th Street to East 71st Street. Installation of ADA compliant curb ramps and other spot improvements are included with the work for this project. | |
| 12/8/2023 | | 117602 | | Replacement of LIC CR 539A 0.50 (SFN 4536150) carrying Moots Run Road over Raccoon Creek. | |
| 12/5/2023 | | 113382 | | Resurfacing including enhanced pavement markings and an 18" aggregate berm. | |