Ohio.gov State Agencies  |  Online Services
Skip Ribbon Commands
Skip to main content
Navigate Up
Sign In
​​​​​​​​​​​​​
Division of Planning
Systems Planning & Program Management
Major Rehababilitation
 

 Contact

 
Shane Deer
(614) 752-5578

The purpose of the Priority System Major Rehabilitation Program, MR, is to provide funding for major rehabilitation projects on the priority system which restore the structural integrity and functional characteristics of the pavement. Acceptable strategies for pavement treatment include full depth pavement replacement (with rigid or flexible pavement), rubblize and roll, crack and seat, and un-bonded concrete overlays. 

Eligible Activities

MR funds can be used for preliminary engineering, environmental, detailed design, right-of-way, and construction phases.

Project costs may include rehabilitation activities along mainline bridges, overhead bridges, right of way, utilities, and roadway elements.

District 12 Jocelyn Clemmings District 12 construction. Photo courtesy of Jocelyn Clemmings.
 

 Related Documents

 
 

 Active Major Rehab Projects

 
​​​​​​​​​​​​​​