Pooled Fund Active Projects

Project
Description
  
  
  
  
  
  
  
collapse ODOT District : District 01 ‎(3)
Fourth St. and Reservoir Rd. Bridge Replacements over Interstate 75, Allen County
 

Replacement of the Fourth St. and Reservoir Rd. bridges over I-75 is the first of three projects which will reconstruct I-75 from the Auglaize County line to just north of SR 81 through Allen County and the city of Lima. The project was largely completed last year but finish work will take place this season. Begin: February 2012 Complete: May 2013

More info at: http://www.dot.state.oh.us/
districts/D01/Pages/I75-Reconstruction.aspx

Interstate 75Allen87965February 2012December 20121
I-75 Reconstruction, Fourth Street to SR 81
 

Reconstruction of the existing two lanes of pavement, replacement of all mainline and overhead bridges and reconstruction of the interchanges at Fourth St., SR 81 and SR 309 is the second of three projects which will reconstruct I-75 from the Auglaize County line to SR 81 through Allen County and the city of Lima.

More info at: http://www.dot.state.oh.us/
districts/D01/Pages/I75-Reconstruction.aspx

Interstate 75Allen76691March 2013 October 201517
State Route 117/309 @ I-75    
 
Safety upgrade project which includes installation of a raised curb median, construction of roadside curb and installation of drainage from the interchange with Interstate 75 to Bowman Rd. on the east side of Lima.
 
State Route 117/309Allen75467March 2013  November 201518
collapse ODOT District : District 02 ‎(4)
Interstate 75/475 Interchange Upgrade

Lane restrictions in both directions on I-475, from I-75 to Monroe St. for reconstruction. Various ramps are closed within the project. Detours are posted.

More info at: http://www.dot.state.oh.us/districts/
D02/Pages/
Interstate75475InterchangeUpgradeProject.aspx

Interstate 75/475Lucas77255June 2010 November 20135
SR 2 Anthony Wayne Bridge

Rehabilitation of the Anthony Wayne Bridge (SR 2) bridge over the Maumee River. Intermittent lane restrictions will be possible on the structure this year. SR 2 between Broadway St. and Clark St. will be closed for approximately 19 months. Date will be announced. This closure will be announced. Intermittent lane restrictions are also possible on Miami St. between Greenwood Ave. and Nevada St.

More info at: http://www.dot.state.oh.us/districts
/D02/High%20Level%20Bridge%20Project/

State Route 2Lucas80551Spring 2013November 201519
I-475  Bridge Widening 

Widen and reconstruct surface of the I-475 bridge over the Ohio Turnpike (I-80/I-90). Overnight and weekend lane restrictions are possible on I-475 at the Ohio Turnpike and on Ohio Turnpike (I-80/I-90) at I-475. Two lanes will be maintained during peak travel times.

I-475 Lucas80695Summer 2013 December 2014 ​20
Interstate 475: Corey & Talmadge Road Ramp Improvements, Lucas County

Lane restrictions at the intersection of Corey & Whiteford roads and Sylvania Ave. for turn lane and signal installation. Expect a traffic shift on the ramp from eastbound I-475 to Corey Rd. for signal and turn lane installation. Expect traffic shifts on westbound I-475 from Woodley Rd. to Talmadge Rd. and on the ramp from westbound I-475 to Talmadge Rd. for ramp improvement.

Interstate 475Lucas94619Summer 2013November 201321
collapse ODOT District : District 03 ‎(4)
I-76 Pavement Replacement

Full-depth replacement of asphalt, including repairs to the concrete base, from SR 57 to the Summit County line. New drainage, guardrails, signing and striping. Cable median barrier will be installed from I-71 to the Summit County line. One lane of traffic in each direction will be maintained throughout construction. During construction of the ramp improvements at SR 57 and SR 94, traffic traveling west will transition to the eastbound side of I-76 (using crossovers), with one lane of traffic in each direction traveling in the eastbound lanes.

Interstate 76Medina77474April 2012 September 2013  7
I-71 Widening
 

Three projects on I-71 will add a third lane in each direction to the only two-lane section of roadway between Columbus and Cleveland. The first project, from SR 95 to the Richland County line, began last year and is expected to be complete this fall. Project 2, from just north of U.S. 36 to north of SR 61, began in March of this year and Project 3, from SR 61 to SR 95, will begin in April. Projects 2 and 3 are expected to be complete in 2015. Two lanes of traffic will be maintained in each direction. Project is located in ODOT District ​ 6, but is partially administered through ODOT District 3

Interstate 71Delaware; Morrow86916 +March 2012 October 20158
I-90 Bridge Replacements

Replacement of twin bridges on I-90 in Lorain County over the Black River and Ford Rd. The project includes bridge widening to maintain two lanes and paving Ford Rd. from the project limits to Gulf Rd. Two lanes of traffic will be maintained in each direction. Lane width will be 11 feet.

Interstate 90Lorain25734March 2012 October 2013  9
State Route 58, Lorain County
 

Railroad grade separation project on SR 58, just north of SR 18, in the village of Wellington. The project will construct an underpass at the CSX railroad tracks on a new roadway alignment. Short-duration detours will be necessary throughout construction. ​

State Route 58Lorain23104April 2013 September 201422
collapse ODOT District : District 04 ‎(5)
I- 90 Reconstruction

Reconstruction of I-90 from the Pennsylvania state line to just east of SR 193, approximately six miles of pavement. During this project, two lanes of traffic will be maintained on I-90 east and west. Project also includes six bridge reconstructions.

Interstate 90Ashtabula25869September 2011November 201310
Interstate 271, Summit County

Pavement replacement on I-271 from Broadview Rd. to the Ohio Turnpike. Project also includes repairs to nine bridges along I-271. A minimum of two lanes of traffic will be maintained in each direction during peak traffic times. The ramp from I-271 northbound to I-77 northbound will be closed for 90 days.

Interstate 271Summit18710May 2013  November 201524
Interstate 90, Ashtabula County
 

Reconstruction of I-90 from just east of Clay St. to the Penn Central railroad. This project also includes bridge replacements and modifications to the I-90/SR 11 interchange. Two lanes of traffic will be maintained on I-90 during peak traffic times. Various side streets will be closed during the project.

Interstate 90Ashtabula76747February 2013 November 201625
Interstate 77, Stark County
 

Resurfacing of I-77 from the Tuscarawas County line to the southern Canton corporation limit. Project also includes bridge repairs to ten structures. Two lanes of traffic will be maintained in each direction of I-77 during peak traffic hours. Dueber Ave. will be closed for 75 days.

Interstate 77Stark77885 August 2012 June 201526
Interstate 80, Trumbull County
 

Resurfacing and bridge replacement project along I-80 from SR 193 to Mt. Everett Rd. This project will include the widening and re-decking of the I-80 bridges over Logan Way and Sampson Rd. Traffic will be maintained on I-80.

Interstate 80Trumbull76411January 2013 October 201327
collapse ODOT District : District 05 ‎(6)
SR 158/I-70 Interchange Upgrade

Bridge replacement and road widening as part of interchange upgrade. The eastbound entrance and exit ramp closures will occur on alternating ramps for a maximum of 19 days, weather permitting. Short duration closures will occur on I-70 during specific project activities. SR 158 traffic will be maintained at all times. Resurfacing of I-70 in the area of the interchange will be performed at night with one lane maintained in each direction at all times.

State Route 158 and Interstate 70Licking84700May 2012 October 2013 15
I-70 Bridge Rehabs

Bridge rehabilitation work will be performed at three separate locations on I-70 (Blacklick Trail, SR 256 and Palmer Road). Closure dates and detour information will be communicated by message boards and media releases.

•    Blacklick Trail and  SR 256
One lane will be maintained in each direction, with work being performed on four separate weekends, closing I-70 from Friday at 7 p.m. to Monday at 4 a.m. 
     Palmer Road
One lane will be maintained in each direction, with work being performed on two separate weekends, closing I-70 from Friday at 7 p.m. to Monday at 4 a.m.
Interstate 70Fairfield; Licking88957 June 2013 September 201331
I-70 Resurfacing

Resurfacing and associated work on the section of I-70 extending from the SR 513 interchange to the Belmont County line. Two lanes of traffic will be maintained in each direction from 2 p.m. to 6 p.m., Monday through Thursday, and 11 a.m. through 6 p.m., Friday through Sunday, for the duration of the project. Work requiring a lane closure will be performed outside of those hours.

Interstate 70Guernsey87595 June 2013November 201332
I-70 Bridges at Canal Road

Replace and widen existing structures on I-70 over Canal Rd., located two miles west of the SR 79 interchange. Two lanes of traffic will be maintained at all times, with the exception of intermittent lane restrictions. Canal Rd. will be closed for 30 days beginning in mid-March. The Park Trail, beneath the structures will be closed for a total of 10 weeks.

Interstate 70Licking85540 March 2013November 201433
I-70/SR 79 Interchange Reconfiguration

Reconfiguration of ramps at the I-70/SR 79 interchange. Work on I-70 and SR 79 will create various lane and ramp closures. Closure dates and detour information will be communicated by message boards and media releases.

 Interstate 70, Licking CountyLicking84695 May 2013 September 201334
I-70 Bridge Replacement

Replace bridge, just west of the village of Gratiot. Two lanes of traffic will be maintained at all times.

Interstate 70Licking81253 June 2013 November 201356
collapse ODOT District : District 06 ‎(5)
I-71/670 Columbus Crossroads - Phase I

Reconstruction of the I-71/670 interchange began in 2011. This $200 million project includes 22 bridges, 38 retaining walls and the first-ever cultural wall in the State of Ohio. All travel lanes are expected to open this fall, however, final completion for the project is in the fall of 2014.

More info at: http://www.ODOT71670.org

Interstates 71/670 Franklin77369September 2011September 201423
Interstate 270/U.S. Route 23 (The North Side Fix), Franklin County

Widen U.S. 23 from four to six lanes between I-270 and Lazelle Road. The project will also reconfigure two ramps at the I-270/US 23 interchange and construct two northbound express lanes on U.S. 23 called “the trench” because they will travel below the surface of the road.

 Interstate 270/U.S. Route 23Franklin81739, 81746, 81747, 81748July 2013October 201535
Interstate 270 Widening, Franklin County

Widen I-270 from two to four lanes between I-71 and U.S. 23 on the south side of Franklin County. Two lanes of I-270 will be maintained in each direction with one-lane closures during overnight hours.

 Interstate 270Franklin92610August 2013 September 201436
I-71 Widening

Three projects on I-71 will add a third lane in each direction to the only two-lane section of roadway between Columbus and Cleveland. The first project, from SR 95 to the Richland County line, began last year and is expected to be complete this fall. Project 2, from just north of U.S. 36 to north of SR 61, began in March of this year and Project 3, from SR 61 to SR 95, will begin in April. Projects 2 and 3 are expected to be complete in 2015. Two lanes of traffic will be maintained in each direction. Project is located in ODOT District ​ 6, but is partial being administered through ODOT District 3​

Interstate 71Delaware; Morrow86916 +March 2012October 201557
Pickaway East-West Connector -  (Phase 1A)

New interchange on U.S. 23 and connector to Rickenbacker Airport​. This phase includes widening and realignment of Duvall Road to a total of three lanes from U.S. 23 to Ashville Pike and building a bridge over the railroad on Duvall Road. More details on D-6's Pickaway East West Connector Page.

U.S. Route 23Pickaway83666November 2012 201458
collapse ODOT District : District 07 ‎(2)
SR 185 Realignment

SR 185 (Jackson St.) in Versailles will be realigned between Catalpa Dr. and SR 47 (Greenlawn Ave.). This will create a new intersection at SR 185 and SR 47. The proposed work will include a new three lane roadway, curb and gutter, sidewalk and utility relocation work. Motorists will encounter temporary road closures at each end of the new realignment on SR 185.

State Route 185, Darke County Darke93852May 2013October 201351
SR 794 Realignment

SR 794 will be realigned between Peacock Rd. and Sparrow Rd. (between U.S. 69 and SR 72) in Springfield. This area is adjacent to the Ohio Air National Guard and Army National Guard facilities. Motorists will encounter temporary road closures at each end of the new realignment of SR 794.​

State Route 794Clark78677March 2013October 201352
collapse ODOT District : District 08 ‎(5)
I-71 Jeremiah Morrow Bridge Replacement

Replacement of the two Jeremiah Morrow spans over the Little Miami River. One lane of traffic will be maintained in both directions.

More info on the Jeremiah Morrow Bridge Project site

Interstate 71Warren22950August 2010 May 2016  29
Hamilton Co. I-75 Reconstruction

Reconstruction of 1.2 miles of I-75 including the replacement of structures over Clifton Avenue and Mitchell Avenue;  improvement to Mitchell Avenue and interchange. Lane closures permitted during nighttime hours.

More info at: http://www.dot.state.oh.us/districts/
D08/MillCreekExpress/

Interstate 75Hamilton82278June 2011July 2014 30
Waldvogel Viaduct and Sixth Street Expressway Improvement

Removal of existing Waldvogel Memorial Viaduct, including four ramps to Elberon and Warsaw Avenues. Replacement of structures for the four ramps to Elberon and Warsaw and replacement of structures for the connection to the Sixth Street Expressway. Removal and replacement of roadways for the required portions of River Road, Elberon Avenue, Warsaw Avenue, State Avenue, Evans Street and Maryland Avenue. One lane of traffic maintained in each direction.

U.S. Route 50Hamilton20082July 2011Oct. 201450
Interstate 71, Hamilton County
I-71 at Pfeiffer Road Improvement

Improve approximately one mile of I-71 by adding a northbound auxiliary lane between Pfeiffer Rd. and I-275, and add dual left turn lanes on Pfeiffer Rd. Traffic will be maintained.​

 Interstate 71Hamilton83077January 2013June 201454
I-75/Hopple Street Interchange Improvement

Reconstruction and improvement of the I-75/Hopple St. (exit 3) interchange. Four lanes of traffic will be maintained in both directions.​

Interstate 75Hamilton76257March 2013June 201655
collapse ODOT District : District 09 ‎(1)
U.S. 52 Bridge Rehab and Pavement Resurfacing

The “Spaghetti Bowl” project is the bridge rehabilitation and resurfacing of U.S. 52 between the  SR 239 interchange and the Scioto River bridges at the Portsmouth corporation limit. The $12 million project includes the rehabilitation of 14 bridges and resurfacing approximately 12 lane miles in a design-build format. It will be phased out over two construction seasons, with the majority of bridge work being completed this year and resurfacing in the next.​

U.S. Route 52Scioto80094March 2013September 201453
collapse ODOT District : District 10 ‎(2)
Nelsonville Bypass - Phases III

The Nelsonville Bypass is a more than $150 million project consisting of 8.5 miles of new four lane highway of U.S. 33 near Nelsonville, Ohio.  Motorists traveling through the eastside of Nelsonville on U.S. 33 may encounter short term lane closures with traffic being maintained by a flagger.  Construction crews will be finalizing bridge work and paving of the eastside of the bypass.

For more details, visit the Nelsonville Bypass Site 

U.S. Route 33Athens; Hocking23846 and 79577September 2009  Phase III: November 2013.48
U.S. Route 33/SR 664 Interchange Reconstruction

The reconstruction of U.S. 33 and SR 664 intersection includes the state’s first-ever double roundabout interchange.  Motorists traveling through the U.S. 33 and SR 664 interchange in Hocking County will encounter possible lane closures on US 33.  Although two lanes of traffic will be maintained on SR 664 during the duration of the project, motorists can expect traffic pattern changes.  Visit ODOT’s Official US 33/SR 664 Double Roundabout website for more information.​

U.S. Route 33/SR 664 Interchange Reconstruction Hocking80912March 2013 November 201349
collapse ODOT District : District 11 ‎(7)
Interstate 77 Resurfacing 

Four-lane resurfacing from Guernsey County line to just south of Newcomerstown​.

Interstate 77Tuscarawas78245May 2013July 201337
Interstate 77 Resurfacing

Four-lane resurfacing from New Philadelphia to Strasburg.

Interstate 77Tuscarawas81725May 2013October 201338
Interstate 70 Bridge Replacement

Bridge replacement at SR 9 Interchange in St. Clairsville.

Interstate 70Belmont25510March 2013​August 201439
Interstate 70 Resurfacing

Four-lane resurfacing between exit 213 and exit 218.​

Interstate 70Belmont77355May 2013August 201340
Interstate 70 Bridge Repair
Bridge repair about a mile west of exit 213.
Interstate 70Belmont88897July 2013October 201341
SR 7 Landslide Repair

Landslide repair at Rush Run.

State Route 7Jefferson81015June 2012July 201442
Interstate 70 Bridge Work

Bridge deck replacement about a mile west of exit 208. ​

Interstate 70Belmont91548July 2013December 201343
collapse ODOT District : District 12 ‎(2)
I-90 New WB Innerbelt Bridge

Crews work to construct a new Innerbelt Bridge – the first of two – which will eventually carry westbound traffic. Multiple lane and ramp closures are expected. The existing I-90 bridge will remain open; however motorists are advised to Opt for the Alternate and use I-490 and I-77 to avoid the construction zone. The new westbound bridge is expected to be open to traffic during the fall of 2013 at which time it will carry traffic in both directions while the existing bridge is demolished and the new eastbound bridge is constructed. Begin: March 2011 Complete: December 2013 (westbound bridge)/December 2016 (eastbound bridge)

Visit: http://www.innerbelt.org/ for more info!

Interstate 90Cuyahoga85531Design Build Awarded: September 2010; Construction Began: March 2011December 201346
Interstate 90 Reconstruction

Crews have begun work for the major pavement reconstruction on I-90 between Morley and Paine roads. Motorists can expect the contra-flow traffic configuration through this work zone during the summer months. Lane closures are expected, but will not impact peak travel times.

 Interstate 90Lake75479January 2012 August  201447