89397FHWA1AllenLACRPCLIMAALL BELLEFONTAINE/MARKET CORRIDREPLACE EXISTING PEDESTAL MOUNT SIGNALS WITH DECORATIVE MAST ARM MOUNT, REPLACEMENT OF EXISTING GALVANIZED STEEL LIGHT POLES/COBRA HEADS WITH DECORATIVE STREET LIGHTING AND LANDSCAPINGBELLEFOINTAINE AVENUE FROM KIBBY ST TO WOODLAWN AVENUELightingCO$2,210,872.00CO Air Quality Exempt12012stipID0001FDCO
78999FHWA1AllenLACRPCALLEN COUNTY ENGINEERALL CR 118-0.89 Elm StreetRehabilitate bridge, Deck ReplacementALL CR 118-0.89;  Over the Ottawa RiverBridge Deck ReplacementCO$1,520,200.00CO Air Quality Exempt22012stipID0002FDCO
90190FHWA1AllenLACRPCALLEN COUNTY ENGINEERALL CR 88 LINCOLN HWY, PHASE 2CUT OUT AND FIX JOINTS, GRIND, AND PAVE 2 ASPHALT COURSESCAIRO CORP TO BEAVERDAM CORPMill and FillCO$1,250,000.00CO Air Quality Exempt32012stipID0003FDCO
90185FHWA1AllenLACRPCLIMAALL ELM STREETSTREET WIDENING AND RECONSTRUCTION  W/2 TRAVEL LANES AND ONE PARKING LANE.  WILL INCLUDE CURB AND GUTTER, SIDEWALKS AND RELATED DRAINAGE.ELM STREET BETWEEN CABLE ROAD AND WOODLAWN AVENUEMinor WideningCO$2,206,220.00CO Air Quality Exempt42012stipID0004FDCO
87556FHWA1AllenLACRPCLIMA (TCC)ALL FY 2012 Reg Trans PlngLima Allen County Regional Planning Commission SFY 2012 Regional Transportation Planning Program Supplemental Funding0Planning & ResearchSPR$237,500.0052012stipID0005FDSP
87557FHWA1AllenLACRPCLIMA (TCC)ALL FY 2013 Reg Trans PlngLima Allen County Regional Planning Commission Regional Transportation Planning Program SFY 2013 supplemental funding0Planning & ResearchSPR$237,500.0062012stipID0006FDSP
87558FHWA1AllenLACRPCLIMA (TCC)ALL FY 2014 Reg Trans PlngLima Allen County Regional Planning Commission Regional Transportation Planning Program SFY 2014 supplemental funding0Planning & ResearchSPR$237,500.0072012stipID0007FDSP
76691FHWA1AllenLACRPCODOT SPONSORING AGENCYALL IR 75 5.53Major Rehab from Interstate Plan.  IR75 reconstruction from MM 5.53 thru SR81 interchange.  Geometrics to be corrected.  Capacity needs analyzed.  Interchanges & bridges will be reconstructed. Some work that had been covered under this PID is now coveredAllen County IR 075 5.53 to 10.00Major RehabilitationCO$84,416,733.00CO Air Quality Nonexempt82012stipID0008FDCO
76691FHWA1AllenLACRPCODOT SPONSORING AGENCYALL IR 75 5.53Major Rehab from Interstate Plan.  IR75 reconstruction from MM 5.53 thru SR81 interchange.  Geometrics to be corrected.  Capacity needs analyzed.  Interchanges & bridges will be reconstructed. Some work that had been covered under this PID is now coveredAllen County IR 075 5.53 to 10.00Major RehabilitationRW$5,365,763.60CO Air Quality Nonexempt92012stipID0009FDRWUT
89029FHWA1AllenLACRPCALL IR 75-0.21MAJOR REHAB FROM INTERSTATE PLAN.  IR 75 RECONSTRUCTION FROM AUGLAIZE CO LINE THRU MM 5.53.  GEOMETRICS TO BE CORRECTED.  CAPACITY NEEDS ANALYZED.  INTERCHANGES & BRIDGES WILL BE RECONSTRUCTED.FROM AUGLAIZE CO LINE TO MM 5.53Major RehabilitationCO$79,537,496.00CO Air Quality Nonexempt102012stipID0010FDCO
89029FHWA1AllenLACRPCALL IR 75-0.21MAJOR REHAB FROM INTERSTATE PLAN.  IR 75 RECONSTRUCTION FROM AUGLAIZE CO LINE THRU MM 5.53.  GEOMETRICS TO BE CORRECTED.  CAPACITY NEEDS ANALYZED.  INTERCHANGES & BRIDGES WILL BE RECONSTRUCTED.FROM AUGLAIZE CO LINE TO MM 5.53Major RehabilitationRW$6,521,000.00CO Air Quality Nonexempt112012stipID0011FDACUT
87965FHWA1AllenLACRPCODOT SPONSORING AGENCYALL IR 75-6.11/7.85REPLACE BRIDGES OVER IR 75 ON FOURTH STREET AND RESERVOIR ROADFOURTH STREET OVER IR 75 AND RESERVOIR ROAD OVER IR 75Bridge ReplacementCO$7,928,636.00CO Air Quality Exempt122012stipID0012FDCO
90217FHWA1AllenLACRPCLIMAALL KIBBY STREET5000' OF COMBINATION STREET REHAB AND REPLACEMENT.  PROFILE TO BE ADJUSTED IN SOME AREAS.  INCLUDES CURB AND GUTTERS, SIDEWALK AND DRAINAGE WORK.  BREADTH OF SIGNAL WORK TO BE DETERMINED.SR 65 (Pine St) to the beginning of ODOT'S 88421 PROJECTMinor Rehabilitation - Pavement Gnrl SysCO$2,488,632.00CO Air Quality Exempt132012stipID0013FDCO
90948FHWA1AllenLACRPCLIMAALL Lima Elizabeth/West StreetsModify Elizabeth and West Streets to one-way, one lane operations between Elm Street and North Street.  Implement "complete streets" features.  Convert Elizabeth and West Streets to two-way operations south of Elm Street and north of North Street.   (AKABoth Elizabeth Street and West Street from Elm Street to Wayne Street.Section ImprovementPE$140,000.00CO Air Quality Exempt142012stipID0014FDDD
90948FHWA1AllenLACRPCLIMAALL Lima Elizabeth/West StreetsModify Elizabeth and West Streets to one-way, one lane operations between Elm Street and North Street.  Implement "complete streets" features.  Convert Elizabeth and West Streets to two-way operations south of Elm Street and north of North Street.   (AKABoth Elizabeth Street and West Street from Elm Street to Wayne Street.Section ImprovementRW$46,667.00CO Air Quality Exempt152012stipID0015FDAC
80441FHWA1AllenLACRPCLIMAALL Lima RR Grade SeparationStudy potential Grade separation of Indiana & Ohio Railroad between Bellefontaine Avenue and North Street. Then construct a grade separation at the chosen location.Bellefontaine Ave. to North St. along the Indiana & Ohio RailwayRailroad Grade SeparationPE$450,000.00CO Air Quality Exempt162012stipID0016FDDD
82576FHWA1AllenLACRPCLIMAALL Lima Traffic StudyStudy effectiveness of converting one way streets to two way streets, state routes thru City, and signal optimization.  Construction will follow based on results.City of LimaSection ImprovementCO$1,530,612.00CO Air Quality Exempt172012stipID0017FDCO
90949FHWA1AllenLACRPCLIMAALL Lima Wayne/High StreetsModify High Street to a one-way, one lane operation between Metcalf Street and Central Avenue.  Implement "complete streets" features.  Convert Wayne Street to a two-way operation between Jameson Avenue and Central Avenue.  (AKA - Phase 3 of the ALL-TraffHigh Street from Metcalf Street to Central Avenue AND Wayne Street from Jameson Avenue to Central Avenue.Section ImprovementPE$160,000.00CO Air Quality Exempt182012stipID0018FDDD
90949FHWA1AllenLACRPCLIMAALL Lima Wayne/High StreetsModify High Street to a one-way, one lane operation between Metcalf Street and Central Avenue.  Implement "complete streets" features.  Convert Wayne Street to a two-way operation between Jameson Avenue and Central Avenue.  (AKA - Phase 3 of the ALL-TraffHigh Street from Metcalf Street to Central Avenue AND Wayne Street from Jameson Avenue to Central Avenue.Section ImprovementRW$46,667.00CO Air Quality Exempt192012stipID0019FDAC
87190FHWA1AllenLACRPCODOT SPONSORING AGENCYALL SR 117 3.19GRIND AND RESURFACE WITH ASPHALT CONCRETEFROM THE ECL OF SPENCERVILLE TO THE WCL OF LIMAResurfacing,  Undivided SystemCO$1,631,552.00CO Air Quality Exempt202012stipID0020FDCO
75467FHWA1AllenLACRPCODOT SPONSORING AGENCYALL SR 117/309 18.65/15.17Improve safety of corridor by designing and constructing recommendations made from Corridor study. Safety improvements include, but are not limited too; signal coordination, raised concrete curb median east of I-75 along SR309, driveway definition throughSR117, from 0.02 mile west of Roschman Ave. jct. to Greely Chapel Rd. jct.; SR309, from Willard St. to Devonshire Dr.Section ImprovementCO$4,358,000.00CO Air Quality Exempt212012stipID0021FDCO
75467FHWA1AllenLACRPCODOT SPONSORING AGENCYALL SR 117/309 18.65/15.17Improve safety of corridor by designing and constructing recommendations made from Corridor study. Safety improvements include, but are not limited too; signal coordination, raised concrete curb median east of I-75 along SR309, driveway definition throughSR117, from 0.02 mile west of Roschman Ave. jct. to Greely Chapel Rd. jct.; SR309, from Willard St. to Devonshire Dr.Section ImprovementRW$675,000.00CO Air Quality Exempt222012stipID0022FDACUT
87135FHWA1AllenLACRPCODOT SPONSORING AGENCYALL SR 309 0.00GRIND AND RESURFACE WITH ASPHALT CONCRETEFrom US 30 to Pioneer Road in the Village of Elida.Resurfacing,  Undivided SystemCO$1,584,846.00CO Air Quality Exempt232012stipID0023FDCO
90849FHWA1AllenLACRPCODOT SPONSORING AGENCYALL SR 309 7.17Widen roadway to meet design standards, improve drainage, install curb and gutter, and resurface with asphalt.From Pioneer Road in Elida to 0.2 miles west of Eastown Road.Mill and FillCO$3,146,000.00CO Air Quality Exempt242012stipID0024FDCO
82036FHWA1AllenLACRPCODOT SPONSORING AGENCYALL SR 65-0.00resurfacing of 2-lane pavements with asphalt concreteOn SR65 from Auglaize CL to the SCL of LimaResurfacing,  Undivided SystemCO$780,411.00CO Air Quality Exempt252012stipID0025FDCO
88306FHWA1AllenLACRPCODOT SPONSORING AGENCYALL SR 65-6.60REPLACE 3 CONCRETE BOX BEAMS THAT ARE SPALLED AND HAVE STEEL STRANDS RUSTED THROUGHSR 65 BRIDGE OVER THE OTTAWA RIVERBridge RepairCO$695,745.00CO Air Quality Exempt262012stipID0026STCO
86634FHWA1AllenLACRPCODOT SPONSORING AGENCYALL SR 81 18.10RESURFACE PAVEMENT WITH ASPHALT CONCRETE FROM SUGAR STREET TO IR75.  ADD CURB, GUTTERS AND SIDEWALKS FROM SUGAR STREET INTERSECTION TO JUST WEST OF NUEBRECHT ROAD.SUGAR STREET TO JUST WEST OF NUEBRECHT ROADDrainage ImprovementCO$836,559.00CO Air Quality Exempt272012stipID0027FDCO
87189FHWA1AllenLACRPCODOT SPONSORING AGENCYALL SR 81 3.31GRIND AND RESURFACE WITH ASPHALT CONCRETEFrom eastern jct. with SR66 to the WCL of Lima.Resurfacing,  Undivided SystemCO$1,664,390.00CO Air Quality Exempt282012stipID0028FDCO
80492FHWA1AllenLACRPCODOT SPONSORING AGENCYALL SR 81-19.052 LANE RESURFACINGFROM SR 81 & IR75 JUNCTION TO THE HARDIN COUNTY LINEResurfacing,  Undivided SystemCO$1,783,191.00CO Air Quality Exempt292012stipID0029FDCO
88840FHWA1AllenLACRPCODOT SPONSORING AGENCYALL SR 81/117/309- 15.72/13.862 LANE RESURFACING WITH ASPHALT CONCRETESR81 FROM SR309 TO JACKSON ST; SR117 FROM RJ COLEMAN RR OVERPASS TO ELM STREET; SR309  FROM ROBB AVENUE TO SR81Resurfacing,  Undivided SystemCO$945,768.00302012stipID0030FDCO