Project
Description
  
County
  
  
  
  
  
District 01
I-75-18.60 Bridge Replacement
Replacement of the bridge deck over I-75 on County Road 95 (Bigelow Avenue).
  
Hancock76369Spring 2011September 2011
3
District 01
I-75-22.12 Bridge Replacement
Complete replacement of County Road 109 bridge over I-75 north of Findlay.
  
Hancock82163Spring 2011September 2011
4
District 01
SR 309-8.35 Safety Upgrade
Safety upgrade project on SR 309 from Robb Avenue to Eastown Road, west side of Lima.
  
Allen24247March 2011Fall 2011
1
District 01
U.S. 30-11.24 Resurfacing
Resurfacing of four-lane U.S. 30 from U.S. 224 to Lincoln Highway.
  
Van Wert81446Spring 2011Summer 2011
5
District 01
U.S. 30-21.18 Resurfacing
Resurfacing of four-lane U.S. 30 from Middle Point in Van Wert County to Lincoln Highway in Allen County.
  
Allen, Putnam, Van Wert75522July 2011October 2011
2
District 02
Hallett Avenue:  Railroad Grade Separation
Construct a new bridge over the Norfolk Southern railroad tracks, improve Hallett Avenue and intersections at Chestnut Street, Broadway Avenue and Brindley Road. Hallett Avenue at the NSRR tracks along with local intersecting roads will close in spring of 2011. Access will be maintained for local traffic.
  
Fulton23114August 2010 Summer 2013
District 02
I-280/Wheeling Street: Widening
Widen Wheeling Street from Navarre Avenue (SR 2) to Pickle Road, including the bridge over I-280.  Through November 2011, Wheeling Street over I-280 is closed.  Lane restrictions are possible on Wheeling Street from Navarre Avenue to Brown Road.  The ramp closures are possible at I-280 and Wheeling Street.  Detours posted. 
  
Lucas23995June 2010December 2011
District 02
I-475 Interchange and Widening Project
The project will upgrade the interchange at I-475 and I-75, construct a new interchange at ProMedica Parkway and widen portions of the existing I-475, between Douglas Road and I-75.  Expect intermittent lane and ramp restrictions along I-475 and I-75 in this area.
  
Lucas77255August 2010Fall 2013
1
District 02
I-475/Salisbury Road-Dussel Drive:  Interchange Reconstruction/Major Widening
Interchange reconstruction of the bridge over I-475 and widening of Salisbury Road/Dussel Drive between Manley Road to Osage Drive.  Overnight intermittent lane and shoulder restrictions are possible on I-475 at the Salisbury Road/Dussel Drive Bridge. Through 2011, Salisbury Road/Dussel Drive, from Manley Road to Osage Drive, is reduced to one lane in each direction with turn lanes at intersections.
  
Lucas 75937May 2009November 2011
District 02
I-475/US 23 over Maumee River
I-475 over the Maumee River will be reduced to one lane in each direction for bridge repair.  Additionally, ramps to and from U.S. Route 24 will be closed.
  
Lucas, Wood84672August 2011July 2012
District 02
Jones Road:  Railroad Grade Separation
Jones Road will be closed at the CSX Railroad in the Village of Fostoria for railroad grade separation. Detour:  US 23, SR 613, SR 12.  Main Street at Jones Road is open. The local access detour for Jones Road: SR 613; Main Street. 
  
Seneca23111March 2010November 2011
District 02
SR 25 Widening and Turn Lane Installation
Widen SR 25 in Bowling Green, install center turn lane, sidewalk and ramps and upgrade signals. Expect intermittent lane restrictions and intersection closures on SR 25, between Poe Road and Newton Road.
  
Wood16144May 2011June  2013
District 02
State Route 34: Resurfacing and Bridge Repair

Expect intermittent lane restrictions on SR 34, from CR 5 to SR 576, and between SR 191 to the Henry County line for resurfacing. SR 34 will be closed in four locations for a total of 120 days for bridge work. Detour:  SR 49; US 6; SR 576. Estimated Cost: $5.5 million

  
Williams86812May 2011November 2011
District 02
SR 53: Intersection Improvements and Resurfacing
Expect intermittent lane restrictions on SR 53 between SR 163 and East Water Street for resurfacing and at the intersection of SR 53 and SR 163 for intersection improvements. Work will include the installation of right turn lanes, pavement markings, overhead lane signage, a new signal, and resurfacing. No lane restrictions from Memorial Day to Labor Day.
  
Ottawa23927June 2011November 2012
District 02
U.S. 24:  New Highway Construction
Construct a new four-lane divided highway from Napoleon to Toledo.  U.S. 24, from Dutch Road to Fallen Timbers Lane, is reduced to one lane in both directions.   Local roads intersecting the project may be closed.  Detours are posted. Link for more: http://www.us24.org
  
Henry, Lucas80444, 80446, and 80443 (Three Projects)June 2008Open to traffic: July 2012; July 2013
District 03
I-76 Rehabilitation
Rehabilitation of Interstate 76 from Interstate 71/U.S. Route 224 to State Route 57.  MOT: One lane maintained at all times in each direction.
  
Medina 77475April 15, 2010September 15, 2011
District 03
New I-90 Interchange at Nagel Road
New interchange construction on Interstate 90 at Nagel Road in the City of Avon. MOT: Traffic Maintained at all times on I-90; however, Nagel Road will have a detour.
  
Lorain83607July 11, 2011October 31, 2012
District 03
Lorain I-90 & SR 2 Rehabilitation
Rehabilitation project on Interstate 90 from the Ohio Turnpike to the Lake Road underpass and on State Route 2 from just east of State Route 58 to I-90.  MOT: Night Work, One lane maintained in each direction.
  
Lorain77447May 9, 2011August 15, 2011
District 03
U.S. 250 Bridge Replacement
Bridge replacement project on U.S. 250 over the Rattlesnake Creek, just south of the Erie County line. MOT: 180-day detour, expected to be completed in late April/early May.
  
Huron80059October 18, 2010June 30, 2011
District 03
Richland U.S. 30 Resurfacing
Resurfacing project on U.S. Route 30 from Fifth Avenue to the Ashland County line, including the U.S. 30 and U.S. Route 42 interchange. MOT: One lane maintained at all times in each direction.
  
Richland79352March 21, 2011August 31, 2011
District 03
Wayne U.S. 30 Resurfacing
Resurfacing project on U.S. Route 30 from Kansas Road to the Stark County line. MOT: One lane maintained at all times on U.S. 30; 14-day detour at the State Route 172 Eastbound exit ramp.
  
Wayne77449 May 31, 2011September 15, 2011
District 03
U.S. 6 Railroad Grade Separation
Railroad grade separation project of U.S. Route 6 on a new alignment, 0.73 mile west of State Route 101 in the City of Sandusky MOT: Traffic will be maintained at all times; however, side road intersections will have short-duration detours.
  
Erie23105July 11, 2011October 31, 2012
District 04
Crain Avenue Improvements
Improvements to the intersections of SR 43 and Crain Ave.; SR 43 and Fairchild Ave.; and Crain Ave., N. Water St. and Lake St. This will include the replacement and relocation of the Crain Ave. bridge over the railroad. The new bridge location will align the western end of the bridge with the intersection of Fairchild Ave. and SR 43. The eastern end of the bridge will intersect in a T alignment with N. Water St. MOT: Sections of Crain Ave., Fairchild Ave., N. Water St., Cuyahoga St., Lake St. and Stinaff St. will be closed for a portion of the project. All detours will be posted.
  
Portage18466September 2009December 2012
6
District 04
Highland Road Rail Grade Separation
Construction of a railroad grade separation bridge over the Norfolk-Southern railroad on Highland Road, between South Bedford Rd. and Shepard Rd. MOT: Highland Rd. will be closed at various locations near the Norfolk-Southern railroad for 540 days. All detours will be posted.
  
Summit23064May 2011August 30, 2013
11
District 04
Rehabilitation of 7 Bridges on I-680, Youngstown
Rehabilitation to seven bridges in I-680 in the city of Youngstown. MOT: Sections of I-680 will be reduced to one lane in either or both directions for various periods of time during the project. Various ramp and side street closures will occur for a portion of the project. All detours will be posted. County: Mahoning.
  
Mahoning25508April 4, 2011July 31, 2013
7
District 04
Summit I-76 Resurfacing
Resurfacing of I-76 from the Kenmore Leg to Brown St. in the city of Akron. Project also includes 12 bridge deck overlays. MOT: Traffic will be maintained on I-76 during non-peak hours. I-76 between SR 59 (Akron Innerbelt) and SR 8 will be closed, including entrance and exit ramps from I-76, for a total of four weekends (two in each direction). The I-76 eastbound exit ramp to SR 59 and various other ramps will be closed for three nights between the hours of 7 p.m. and 6 a.m.  Detours for all closures will be posted.
  
Summit83044May 2011October 31, 2011.
4
District 04
Portage I-76 Resurfacing
Resurfacing of I-76 from SR 14 to the Mahoning County line.  This project also includes minor bridge repair to 14 bridge structures. MOT: Two lanes of traffic on I-76 in both directions will be maintained during peak hours.  During non-peak hours, one lane of traffic will be maintained in either or both directions during construction.
  
Portage76332June 2012.July 31, 2012
10
District 04
Work on 12 Bridges on I-77, Canton
Interstate 77 - Miscellaneous bridge work to 12 structures on I-77 in the city of Canton. During peak traffic hours, all lanes of traffic will be maintained on I-77.  Two lanes of traffic will be maintained in each direction during non-peak hours. There will be occasional ramp and side street closures. All detours will be posted.
  
Stark84617August 2011October 31, 2012.
8
District 04
I-80 Resurfacing in Mahoning and Trumbull Counties
Resurfacing of I-80 from SR 11 in Mahoning County to Shady Rd. in Trumbull County. Project includes bridge work to the structures on I-80 over US 422, SR 193, the Mosier Rd. bridge over I-80 and several other structures. MOT: Limited weekend one lane conditions on I-80 just west of US 422 for bridge work will occur. At all other times, two lanes of traffic will be maintained in each direction of I-80 during peak traffic hours.  A minimum of one lane of traffic will be maintained in each direction of I-80 during non-peak traffic hours. Various ramp and side street closures will occur for a portion of the project.
  
Mahoning, Trumbull76359July 2011August 31, 2012
5
District 04
I-90 Astabula (Conneaut) Pavement Replacement & Bridge Rehab
Pavement replacement from directly east of the Conneaut River bridge to the Pennsylvania State line. The project also includes bridge rehabilitation to six bridges on I-90 and six overhead bridges. MOT: Two lanes of traffic will be maintained in each direction on I-90 during peak traffic hours. A minimum of one lane of traffic will be maintained in each direction during non-peak traffic hours. Dorman Rd., Furnace Rd., Keefus Rd., Middle Rd., Parrish Rd. and South Ridge Rd. will be closed at I-90 for approximately 30 days each. All detours will be posted.
  
Ashtabula25869April 18th, 2011.September 30, 2013.
1