Ohio.gov State Agencies  |  Online Services
Skip Ribbon Commands
Skip to main content

d2

2011 Construction Season Highlights for ODOT District 2

D2
rollover or click a project area for information on a location
Visit ODOT's District 2 Site for more details on these and other projects in this area. I-475 Interchange and Widening. Project Description:  The project will upgrade the interchange at I-475 and I-75, construct a new interchange at ProMedica Parkway and widen portions of the existing I-475, between Douglas Road and I-75.  Expect intermittent lane and ramp restrictions along I-475 and I-75 in this area. Route:  Interstate 475. County:  Lucas. PID:  77255. Est. Start  August 2010. Est. End  Fall 2013.I-280/Wheeling Street: Widening. Description:  Widen Wheeling Street from Navarre Avenue (SR 2) to Pickle Road, including the bridge over I-280.  Through November 2011, Wheeling Street over I-280 is closed.  Lane restrictions are possible on Wheeling Street from Navarre Avenue to Brown Road.  The ramp closures are possible at I-280 and Wheeling Street.  Detours posted. Route  Interstate 280. County:  Lucas. PID:  23995. Est. Start:  June 2010. Est. End  December 2011.SR 53: Intersection Improvements and Resurfacing. Description: Expect intermittent lane restrictions on SR 53 between SR 163 and East Water Street for resurfacing and at the intersection of SR 53 and SR 163 for intersection improvements. Work will include the installation of right turn lanes, pavement markings, overhead lane signage, a new signal, and resurfacing. No lane restrictions from Memorial Day to Labor Day. Route: State Route 53:. County: Ottawa. PID: 23927. Est. Start: June 2011. Est. End: November 2012.Jones Road: Railroad Grade Separation. Description: Jones Road will be closed at the CSX Railroad in the Village of Fostoria for railroad grade separation. Detour: US 23, SR 613, SR 12. Main Street at Jones Road is open. The local access detour for Jones Road: SR 613; Main Street. Route: Jones Road. County: Seneca. PID: 23111. Est. Start: March 2010. Est. End: November 2011SR 25 Widening and Turn Lane Installation. Description: Widen SR 25 in Bowling Green, install center turn lane, sidewalk and ramps and upgrade signals. Expect intermittent lane restrictions and intersection closures on SR 25, between Poe Road and Newton Road. Route: State Route 25. County: Wood. PID: 16144. Est. Start: May 2011 June 2013.I-475/US 23 over Maumee River. Description:  I-475 over the Maumee River will be reduced to one lane in each direction for bridge repair.  Additionally, ramps to and from U.S. Route 24 will be closed. Route:  Interstate 475/U.S. Route 23  County:  Lucas; Wood. PID:  84672. Est. Start  August 2011. Est. End  July 2012.I-475/Salisbury Road-Dussel Drive:  Interchange Reconstruction/Major Widening. Description:  Interchange reconstruction of the bridge over I-475 and widening of Salisbury Road/Dussel Drive between Manley Road to Osage Drive.  Overnight intermittent lane and shoulder restrictions are possible on I-475 at the Salisbury Road/Dussel Drive Bridge. Through 2011, Salisbury Road/Dussel Drive, from Manley Road to Osage Drive, is reduced to one lane in each direction with turn lanes at intersections. Route:  Interstate 475. County:  Lucas. PID: 75937. Est. Start  May 2009. Est. End  November 2011.Hallett Avenue:  Railroad Grade Separation 
Description  Construct a new bridge over the Norfolk Southern railroad tracks, improve Hallett Avenue and intersections at Chestnut Street, Broadway Avenue and Brindley Road. Hallett Avenue at the NSRR tracks along with local intersecting roads will close in spring of 2011. Access will be maintained for local traffic. Route:  Hallett Avenue. County:  Fulton. PID  23114 Est. Start  August 2010.  Est. End  Summer 2013.State Route 34: Resurfacing and Bridge Repair. Description: Expect intermittent lane restrictions on SR 34, from CR 5 to SR 576, and between SR 191 to the Henry. County: line for resurfacing. SR 34 will be closed in four locations for a total of 120 days for bridge work. Detour: SR 49; US 6; SR 576. Estimated Cost: $5.5 million Route: State Route 34. County: Williams. PID: 86812. Est. Start: May 2011. Est. End: November 2011. U.S. 24: New Highway Construction. Description: Construct a new four-lane divided highway from Napoleon to Toledo. U.S. 24, from Dutch Road to Fallen Timbers Lane, is reduced to one lane in both directions. Local roads intersecting the project may be closed. Detours are posted. Route: U.S. Route 24. County: Henry; Lucas. PID: 80444, 80446, and 80443 (Three Projects). Est. Start: June 2008. Est. End: Open to traffic: July 2012; July 2013ODOT District 3 - 2011 Construction HighlightsODOT District 1 - 2011 Construction Highlights

Project
Description
  
County
  
  
  
  
Project
Hallett Avenue:  Railroad Grade Separation
Description
Construct a new bridge over the Norfolk Southern railroad tracks, improve Hallett Avenue and intersections at Chestnut Street, Broadway Avenue and Brindley Road. Hallett Avenue at the NSRR tracks along with local intersecting roads will close in spring of 2011. Access will be maintained for local traffic.
RouteHallett Avenue
CountyFulton
PID23114
Est. StartAugust 2010
Est. EndSummer 2013
 
Project
I-280/Wheeling Street: Widening
Description
Widen Wheeling Street from Navarre Avenue (SR 2) to Pickle Road, including the bridge over I-280.  Through November 2011, Wheeling Street over I-280 is closed.  Lane restrictions are possible on Wheeling Street from Navarre Avenue to Brown Road.  The ramp closures are possible at I-280 and Wheeling Street.  Detours posted. 
RouteInterstate 280
CountyLucas
PID23995
Est. StartJune 2010
Est. EndDecember 2011
 
Project
I-475 Interchange and Widening Project
Description
The project will upgrade the interchange at I-475 and I-75, construct a new interchange at ProMedica Parkway and widen portions of the existing I-475, between Douglas Road and I-75.  Expect intermittent lane and ramp restrictions along I-475 and I-75 in this area.
RouteInterstate 475
CountyLucas
PID77255
Est. StartAugust 2010
Est. EndFall 2013
 
Project
I-475/Salisbury Road-Dussel Drive:  Interchange Reconstruction/Major Widening
Description
Interchange reconstruction of the bridge over I-475 and widening of Salisbury Road/Dussel Drive between Manley Road to Osage Drive.  Overnight intermittent lane and shoulder restrictions are possible on I-475 at the Salisbury Road/Dussel Drive Bridge. Through 2011, Salisbury Road/Dussel Drive, from Manley Road to Osage Drive, is reduced to one lane in each direction with turn lanes at intersections.
RouteInterstate 475
CountyLucas
PID 75937
Est. StartMay 2009
Est. EndNovember 2011
 
Project
I-475/US 23 over Maumee River
Description
I-475 over the Maumee River will be reduced to one lane in each direction for bridge repair.  Additionally, ramps to and from U.S. Route 24 will be closed.
RouteInterstate 475/U.S. Route 23
CountyLucas, Wood
PID84672
Est. StartAugust 2011
Est. EndJuly 2012
 
Project
Jones Road:  Railroad Grade Separation
Description
Jones Road will be closed at the CSX Railroad in the Village of Fostoria for railroad grade separation. Detour:  US 23, SR 613, SR 12.  Main Street at Jones Road is open. The local access detour for Jones Road: SR 613; Main Street. 
RouteJones Road
CountySeneca
PID23111
Est. StartMarch 2010
Est. EndNovember 2011
 
Project
SR 25 Widening and Turn Lane Installation
Description
Widen SR 25 in Bowling Green, install center turn lane, sidewalk and ramps and upgrade signals. Expect intermittent lane restrictions and intersection closures on SR 25, between Poe Road and Newton Road.
RouteState Route 25
CountyWood
PID16144
Est. StartMay 2011
Est. EndJune  2013
 
Project
State Route 34: Resurfacing and Bridge Repair
Description

Expect intermittent lane restrictions on SR 34, from CR 5 to SR 576, and between SR 191 to the Henry County line for resurfacing. SR 34 will be closed in four locations for a total of 120 days for bridge work. Detour:  SR 49; US 6; SR 576. Estimated Cost: $5.5 million

RouteState Route 34
CountyWilliams
PID86812
Est. StartMay 2011
Est. EndNovember 2011
 
Project
SR 53: Intersection Improvements and Resurfacing
Description
Expect intermittent lane restrictions on SR 53 between SR 163 and East Water Street for resurfacing and at the intersection of SR 53 and SR 163 for intersection improvements. Work will include the installation of right turn lanes, pavement markings, overhead lane signage, a new signal, and resurfacing. No lane restrictions from Memorial Day to Labor Day.
RouteState Route 53:
CountyOttawa
PID23927
Est. StartJune 2011
Est. EndNovember 2012
 
Project
U.S. 24:  New Highway Construction
Description
Construct a new four-lane divided highway from Napoleon to Toledo.  U.S. 24, from Dutch Road to Fallen Timbers Lane, is reduced to one lane in both directions.   Local roads intersecting the project may be closed.  Detours are posted. Link for more: http://www.us24.org
RouteU.S. Route 24
CountyHenry, Lucas
PID80444, 80446, and 80443 (Three Projects)
Est. StartJune 2008
Est. EndOpen to traffic: July 2012; July 2013