Visit ODOT's District 4 Site for more details on these and other projects in this area. State Route 153 - Reconstruction, rehabilitation, drainage work, and new sidewalks on SR 153 from SR 44 to the western Louisville corporation limit. Project also includes the widening of SR 153 west of California Ave. to SR 44, and traffic signals at California Ave. and SR 153. MOT: A minimum of one lane of traffic will be maintained in each direction during construction. Constitution Drive will be closed for approximately 30 days and various side street closures will occur for approximately five days each. Detours will be posted PID: 22862. County: Stark. Start Date: April 11, 2011. Completion Date: September 2012.Interstate 76 - Resurfacing of I-76 from SR 14 to the Mahoning County line.  This project also includes minor bridge repair to 14 bridge structures. MOT: Two lanes of traffic on I-76 in both directions will be maintained during peak hours.  During non-peak hours, one lane of traffic will be maintained in either or both directions during construction. PID: 76332. County: Portage. Start Date: June 2012. Completion Date: July 31, 2012.Interstate 77 - Miscellaneous bridge work to 12 structures on I-77 in the city of Canton. During peak traffic hours, all lanes of traffic will be maintained on I-77.  Two lanes of traffic will be maintained in each direction during non-peak hours. There will be occasional ramp and side street closures. All detours will be posted. County: Stark. PID: 84617. Start Date: August 2011. Completion Date: October 31, 2012.Interstate 680 - Rehabilitation to seven bridges in I-680 in the city of Youngstown. MOT: Sections of I-680 will be reduced to one lane in either or both directions for various periods of time during the project. Various ramp and side street closures will occur for a portion of the project. All detours will be posted. County: Mahoning. PID: 25508. Start date: April 4, 2011. Completion Date: July 31, 2013.Crain Avenue - Improvements to the intersections of SR 43 and Crain Ave.; SR 43 and Fairchild Ave.; and Crain Ave., N. Water St. and Lake St. This will include the replacement and relocation of the Crain Ave. bridge over the railroad. The new bridge location will align the western end of the bridge with the intersection of Fairchild Ave. and SR 43. The eastern end of the bridge will intersect in a T alignment with N. Water St. MOT: Sections of Crain Ave., Fairchild Ave., N. Water St., Cuyahoga St., Lake St. and Stinaff St. will be closed for a portion of the project. All detours will be posted. PID: 18466. County: Portage. Start Date: September 2009. Completion Date: December 2012.State Route 619/Arlington Road - Widening and reconstruction of SR 619 (E. Turkeyfoot Lake Rd.) at the Arlington Rd. intersection as well as Arlington Rd. from SR 619 (E. Turkeyfoot Lake Rd.) to I-77 in the city of Green. Project also includes the reconfiguration and extension of Jarvis Rd. to Arlington Ridge, eliminating the current Jarvis Rd. intersection with Arlington Rd. MOT: A minimum of one lane of traffic will be maintained on Arlington Rd. in each direction during construction. Moore Rd. will be closed to eastbound traffic at Arlington Rd. for 30 days during the project. All detours will be posted. PID: 78398. County: Summit. Start Date: April 2010. Completion Date: October 31, 2011.Interstate 80 - Resurfacing of I-80 from SR 11 in Mahoning County to Shady Rd. in Trumbull County. Project includes bridge work to the structures on I-80 over US 422, SR 193, the Mosier Rd. bridge over I-80 and several other structures. MOT: Limited weekend one lane conditions on I-80 just west of US 422 for bridge work will occur. At all other times, two lanes of traffic will be maintained in each direction of I-80 during peak traffic hours.  A minimum of one lane of traffic will be maintained in each direction of I-80 during non-peak traffic hours. Various ramp and side street closures will occur for a portion of the project. PID: 76359. County: Trumbull. Start Date: July 2011. Completion: August 31, 2012.Highland Road Rail Grade Separation - Construction of a railroad grade separation bridge over the Norfolk-Southern railroad on Highland Road, between South Bedford Rd. and Shepard Rd. MOT: Highland Rd. will be closed at various locations near the Norfolk-Southern railroad for 540 days. All detours will be posted. PID: 23064. County: Summit. Start Date: May 2011. Completion Date: August 30, 2013.Interstate 76 - : Resurfacing of I-76 from the Kenmore Leg to Brown St. in the city of Akron. Project also includes 12 bridge deck overlays. MOT: Traffic will be maintained on I-76 during non-peak hours. I-76 between SR 59 (Akron Innerbelt) and SR 8 will be closed, including entrance and exit ramps from I-76, for a total of four weekends (two in each direction). The I-76 eastbound exit ramp to SR 59 and various other ramps will be closed for three nights between the hours of 7 p.m. and 6 a.m.  Detours for all closures will be posted.  County: Summit. PID: 83044. Start Date: May 2011. Completion Date: October 31, 2011.State Route 8 - Construction of a new SR 8 interchange that connects the Ohio Turnpike interchange with Boston Mills Rd. and Hines Hill Rd. through the construction of frontage roads and eliminating the signalized intersections on SR 8 at Boston Mills Rd. and Hines Hill Rd. MOT: Various lane restrictions on SR 8 in either or both directions will occur during non-peak traffic hours. County: Summit. PID: 24507. Start Date: December 2008. Completion Date: July 30, 2011.Interstate 90 - Pavement replacement from east of SR 11 to directly west of SR 193/SR 84. The project also includes bridge rehabilitation to four bridges on I-90 and three overhead bridges. MOT: Two lanes of traffic will be maintained in each direction on I-90 during peak traffic hours. A minimum of one lane of traffic will be maintained in each direction during non-peak traffic hours. County: Ashtabula. PID: 25199. Start Date: Spring 2010. Completion: October 31, 2011.Interstate 90 - Pavement replacement from directly east of the Conneaut River bridge to the Pennsylvania State line. The project also includes bridge rehabilitation to six bridges on I-90 and six overhead bridges. MOT: Two lanes of traffic will be maintained in each direction on I-90 during peak traffic hours. A minimum of one lane of traffic will be maintained in each direction during non-peak traffic hours. Dorman Rd., Furnace Rd., Keefus Rd., Middle Rd., Parrish Rd. and South Ridge Rd. will be closed at I-90 for approximately 30 days each. All detours will be posted. County: Ashtabula. PID: 25869. Start Date: April 18th, 2011. Completion Date: September 30, 2013.District 3 -  2011 Construction Highlights LinkDistrict 1 -  2011 Construction Highlights LinkDistrict 11 -  2011 Construction Highlights LinkDistrict 12 -  2011 Construction Highlights Link

Project
Description
  
County
  
  
  
  
Project
Crain Avenue Improvements
Description
Improvements to the intersections of SR 43 and Crain Ave.; SR 43 and Fairchild Ave.; and Crain Ave., N. Water St. and Lake St. This will include the replacement and relocation of the Crain Ave. bridge over the railroad. The new bridge location will align the western end of the bridge with the intersection of Fairchild Ave. and SR 43. The eastern end of the bridge will intersect in a T alignment with N. Water St. MOT: Sections of Crain Ave., Fairchild Ave., N. Water St., Cuyahoga St., Lake St. and Stinaff St. will be closed for a portion of the project. All detours will be posted.
RouteCrain Avenue
CountyPortage
PID18466
Est. StartSeptember 2009
Est. EndDecember 2012
 
Project
Highland Road Rail Grade Separation
Description
Construction of a railroad grade separation bridge over the Norfolk-Southern railroad on Highland Road, between South Bedford Rd. and Shepard Rd. MOT: Highland Rd. will be closed at various locations near the Norfolk-Southern railroad for 540 days. All detours will be posted.
RouteHighland Road
CountySummit
PID23064
Est. StartMay 2011
Est. EndAugust 30, 2013
 
Project
Rehabilitation of 7 Bridges on I-680, Youngstown
Description
Rehabilitation to seven bridges in I-680 in the city of Youngstown. MOT: Sections of I-680 will be reduced to one lane in either or both directions for various periods of time during the project. Various ramp and side street closures will occur for a portion of the project. All detours will be posted. County: Mahoning.
RouteInterstate 680
CountyMahoning
PID25508
Est. StartApril 4, 2011
Est. EndJuly 31, 2013
 
Project
Summit I-76 Resurfacing
Description
Resurfacing of I-76 from the Kenmore Leg to Brown St. in the city of Akron. Project also includes 12 bridge deck overlays. MOT: Traffic will be maintained on I-76 during non-peak hours. I-76 between SR 59 (Akron Innerbelt) and SR 8 will be closed, including entrance and exit ramps from I-76, for a total of four weekends (two in each direction). The I-76 eastbound exit ramp to SR 59 and various other ramps will be closed for three nights between the hours of 7 p.m. and 6 a.m.  Detours for all closures will be posted.
RouteInterstate 76
CountySummit
PID83044
Est. StartMay 2011
Est. EndOctober 31, 2011.
 
Project
Portage I-76 Resurfacing
Description
Resurfacing of I-76 from SR 14 to the Mahoning County line.  This project also includes minor bridge repair to 14 bridge structures. MOT: Two lanes of traffic on I-76 in both directions will be maintained during peak hours.  During non-peak hours, one lane of traffic will be maintained in either or both directions during construction.
RouteInterstate 76
CountyPortage
PID76332
Est. StartJune 2012.
Est. EndJuly 31, 2012
 
Project
Work on 12 Bridges on I-77, Canton
Description
Interstate 77 - Miscellaneous bridge work to 12 structures on I-77 in the city of Canton. During peak traffic hours, all lanes of traffic will be maintained on I-77.  Two lanes of traffic will be maintained in each direction during non-peak hours. There will be occasional ramp and side street closures. All detours will be posted.
RouteInterstate 77
CountyStark
PID84617
Est. StartAugust 2011
Est. EndOctober 31, 2012.
 
Project
I-80 Resurfacing in Mahoning and Trumbull Counties
Description
Resurfacing of I-80 from SR 11 in Mahoning County to Shady Rd. in Trumbull County. Project includes bridge work to the structures on I-80 over US 422, SR 193, the Mosier Rd. bridge over I-80 and several other structures. MOT: Limited weekend one lane conditions on I-80 just west of US 422 for bridge work will occur. At all other times, two lanes of traffic will be maintained in each direction of I-80 during peak traffic hours.  A minimum of one lane of traffic will be maintained in each direction of I-80 during non-peak traffic hours. Various ramp and side street closures will occur for a portion of the project.
RouteInterstate 80
CountyMahoning, Trumbull
PID76359
Est. StartJuly 2011
Est. EndAugust 31, 2012
 
Project
I-90 Astabula (Conneaut) Pavement Replacement & Bridge Rehab
Description
Pavement replacement from directly east of the Conneaut River bridge to the Pennsylvania State line. The project also includes bridge rehabilitation to six bridges on I-90 and six overhead bridges. MOT: Two lanes of traffic will be maintained in each direction on I-90 during peak traffic hours. A minimum of one lane of traffic will be maintained in each direction during non-peak traffic hours. Dorman Rd., Furnace Rd., Keefus Rd., Middle Rd., Parrish Rd. and South Ridge Rd. will be closed at I-90 for approximately 30 days each. All detours will be posted.
RouteInterstate 90
CountyAshtabula
PID25869
Est. StartApril 18th, 2011.
Est. EndSeptember 30, 2013.
 
Project
I-90 Astabula (Kingsville)  Pavement Replacement & Bridge Rehab
 
Description
Pavement replacement from east of SR 11 to directly west of SR 193/SR 84. The project also includes bridge rehabilitation to four bridges on I-90 and three overhead bridges. MOT: Two lanes of traffic will be maintained in each direction on I-90 during peak traffic hours. A minimum of one lane of traffic will be maintained in each direction during non-peak traffic hours. County: Ashtabula. PID: . Start Date: . Completion:
RouteInterstate 90
CountyAshtabula
PID25199
Est. StartSpring 2010
Est. EndOctober 31, 2011
 
Project
SR 153 Improvements Louisville
Description
Reconstruction, rehabilitation, drainage work, and new sidewalks on SR 153 from SR 44 to the western Louisville corporation limit. Project also includes the widening of SR 153 west of California Ave. to SR 44, and traffic signals at California Ave. and SR 153. MOT: A minimum of one lane of traffic will be maintained in each direction during construction. Constitution Drive will be closed for approximately 30 days and various side street closures will occur for approximately five days each. Detours will be posted.
RouteState Route 153
CountyStark
PID22862
Est. StartApril 11, 2011
Est. EndSeptember 2012.
 
Project
SR 619/Arlington Road Improvements
Description
Widening and reconstruction of SR 619 (E. Turkeyfoot Lake Rd.) at the Arlington Rd. intersection as well as Arlington Rd. from SR 619 (E. Turkeyfoot Lake Rd.) to I-77 in the city of Green. Project also includes the reconfiguration and extension of Jarvis Rd. to Arlington Ridge, eliminating the current Jarvis Rd. intersection with Arlington Rd. MOT: A minimum of one lane of traffic will be maintained on Arlington Rd. in each direction during construction. Moore Rd. will be closed to eastbound traffic at Arlington Rd. for 30 days during the project. All detours will be posted.
RouteState Route 619/Arlington Road
CountySummit
PID78398
Est. StartApril 2010
Est. EndOctober 31, 2011
 
Project
New SR 8 Interchange at Boston Mills Rd. and Hines Hill Rd
Description
Construction of a new SR 8 interchange that connects the Ohio Turnpike interchange with Boston Mills Rd. and Hines Hill Rd. through the construction of frontage roads and eliminating the signalized intersections on SR 8 at Boston Mills Rd. and Hines Hill Rd. MOT: Various lane restrictions on SR 8 in either or both directions will occur during non-peak traffic hours.:
RouteState Route 8
CountySummit
PID24507
Est. StartDecember 2008
Est. EndJuly 30, 2011