2011 Construction Season Highlights for ODOT District 7


rollover or click a project area for information on a location
Visit ODOT's District 7 Site for more details on these and other projects in this area. Intelligent Transportation System - Provide a system to include closed circuit cameras for incident detection and verification, variable message signs, highway advisory radios using fiber optics and wireless and broadband technologies. Limits: Region wide freeway system in Clark, Greene, Miami, and Montgomery counties. Routes: Various.  PID: 77249. Est. Start:8-1-2011. Est. End: 6-30-2012U.S. 127 Celina Improvements - Resurfacing and pavement markings (reimbursement); Remove and replace all asphalt and base material, curb and gutter, new storm water drainage system.  Replace sidewalks, decorative lighting, add benches, trash receptacles, brick pavers, bury utilities and improve signals and interconnect controllers for timing coordination on USR-127.  Limits: In Celina; from Lake Shore Drive to Livingston Drive.  Signal improvements at 7 intersections.  Route : U.S. 127. County: Mercer.  PID: 80877. Start: 8-11-2010 .   Est. End:: 8-30-2011.U.S. 68 Bellefontaine - Reconstruction of roadway: widen, add lanes, curb and gutter, drainage, and full depth asphalt concrete pavement. Limits: from McKeestown Road to Lake Avenue in Bellefontaine. Route: U.S. 68.  County: Logan.  PID: 75472. Start: 5-18-2010.  Est. End:  9-22-2011I-70 Major rehabilitation of the existing mainline.  Limits: From the junction of SR-72 to the junction of USR-40 interchanges. Traffic Maintenance: Traffic Maintained. PID:  84664. County: Clark. Est. Start: 6-28-2010 . Est. End: 6-30-2012I-75/US 36 Interchange Bridge Rehab - Replace 2 bridge decks, and landscaping of infield areas. Limits: IR-75/USR-36 interchange.  Traffic maintained by either crossover or part width methods. Route: U.S. 36. County: Miami. PID: 79567. Start: 6-18-2010    Est. End: 8-15-2011I-75 Bridge Work. Replace bridge deck, paint superstructure and rehabilitate other structure components. Limits: Needmore Road over IR-75. Route: Interstate 75. County: Montgomery. PID: 82249. Est. Start: 4-1-2011. Est. End: 9-30-2011I-75 Resurfacing - Resurface the existing roadway, including minor bridge repair. Limits: Warren county line to 0.43 mile south of the north corporation limit of West Carrollton. Traffic Maintenance: Maintain two lanes of traffic. Night operation.  Route: Interstate 75. County: Montgomery.  PID:  25010. Est. Start: 6-15-2011. Est. End: 8-15-2011.I-75  Downtown Dayton Phase 1A.
Improve the northbound curve on IR-75 at SR-4- 'Malfunction Junction.' Reduce the northbound sharp 90 degree angle to a softer curve. New interstate lanes are relocated and widened over the river. Increase the overall capacity of the interstate with an additional lane in each direction. The existing IR-75 northbound lanes crossing the river are reconstructed and utilized as ramps. Widen Main Street and improve the SR-48 (Main Street) entrance and exit ramps. Provide access to SR-48 (Main Street) from southbound SR-4. Combine the Grand Avenue ramps with the improved Main Street ramps. Limits:  IR-75 and the junction of SR-4. Traffic Maintenance: Maintain 2 lanes of traffic in each direction.   County: Montgomery.  Route: Interstate 75.  PID: 75927. Start: : 10-19-2007  Est. End: 9-27-2011.I-75  Downtown Dayton Phase 1B.
Modify the USR-35 interchange to provide three continuous lanes in each direction on IR-75. Close the southbound exit ramp to Albany Street. Close the northbound entrance ramp from Albany Street. Limits: Dayton; Edwin C. Moses Boulevard at the University of Dayton Arena to the Fifth Street Bridge. County: Montgomery. Route: Interstate 75.  PID:  77245. Start: 3-1-2010. Est. End: 6-15-2013I-75  West Carrollton Interchange -
Construct 4 missing movements at the existing interchange. Southbound South Dixie to Northbound IR-75; Northbound Central Avenue to Southbound IR-75; Northbound IR-75 to Southbound South Dixie; Southbound IR-75 to Northbound South Dixie.  Limits: At Exit 47 on IR-75, South Dixie Drive / Central Avenue Interchange. County: Montgomery. Route: Interstate 75.  PID: 77248. Start: 3-1-2011. Est End: 9-30-2012ODOT District 6 - 2011 Construction Highlights LinkODOT District 8 - 2011 Construction Highlights LinkODOT District 1 - 2011 Construction Highlights Link

Project
Description
  
County
  
  
  
  
Project
I-70  Clark Co. Rehabilitation
Description
Major rehabilitation of the existing mainline.
Limits: From the junction of SR-72 to the junction of USR-40 interchanges. Traffic Maintained.
RouteInterstate 70  
CountyClark
PID84664
Est. Start6-28-2010  
Est. End6-30-2012
 
Project
I-75/Needmore Road Bridge Rehab
Description

Replace bridge deck, paint superstructure and rehabilitate other structure components. Limits: Needmore Road over IR-75. 

RouteInterstate 75 
CountyMontgomery
PID82249
Est. Start4-1-2011
Est. End9-30-2011
 
Project
I-75 Montgomery Co. Resurfacing
Description
Resurface the existing roadway, including minor bridge repair.
Limits: Warren county line to 0.43 mile south of the north corporation limit of West Carrollton. Traffic Maintenance: Maintain two lanes of traffic. Night operation.
RouteInterstate 75   
CountyMontgomery
PID25010
Est. Start6-15-2011  
Est. End8-15-2011
 
Project
I-75 West Carrollton Interchange
Description
Construct 4 missing movements at the existing interchange. Southbound South Dixie to Northbound IR-75; Northbound Central Avenue to Southbound IR-75; Northbound IR-75 to Southbound South Dixie; Southbound IR-75 to Northbound South Dixie. Limits: At Exit 47 on IR-75, South Dixie Drive / Central Avenue Interchange. Traffic maintain through project.
RouteInterstate Route 75 
CountyMontgomery
PID77248
Est. Start3-1-2011
Est. End9-30-2012
 
Project
Modernization of I-75, Dayton, Phase 1B (U.S. 35 Interchange)
Description
Downtown Dayton Phase 1B. Modify the USR-35 interchange to provide three continuous lanes in each direction on IR-75. Close the southbound exit ramp to Albany Street. Close the northbound entrance ramp from Albany Street.  Limits: Dayton; Edwin C. Moses Boulevard at the University of Dayton Arena to the Fifth Street Bridge. For more info, visit:
www.dot.state.oh.us/districts/D07/ Projects/I75Modernization/ Pages/Phase1B.aspx
RouteInterstate Route 75
CountyMontgomery
PID77245
Est. Start3-1-2010
Est. End6-15-2013
 
Project
Modernization of I-75, Dayton, Phase 1A (curve at SR 4)
Description
Downtown Dayton Phase 1A.  Improve the northbound curve on IR-75 at SR-4- "Malfunction Junction." Reduce the northbound sharp 90 degree angle to a softer curve. New interstate lanes are relocated and widened over the river. Increase the overall capacity of the interstate with an additional lane in each direction. The existing IR-75 northbound lanes crossing the river are reconstructed and utilized as ramps. Widen Main Street and improve the SR-48 (Main Street) entrance and exit ramps. Provide access to SR-48 (Main Street) from southbound SR-4. Combine the Grand Avenue ramps with the improved Main Street ramps.
Limits:  IR-75 and the junction of SR-4.
RouteInterstate Route 75
CountyMontgomery
PID75927
Est. Start10-19-2007
Est. End9-27-2011
 
Project
U.S. 127 Celina Improvements
Description
Resurfacing and pavement markings (reimbursement); Remove and replace all asphalt and base material, curb and gutter, new storm water drainage system.  Replace sidewalks, decorative lighting, add benches, trash receptacles, brick pavers, bury utilities and improve signals and interconnect controllers for timing coordination on U.S. 127.  Limits: In Celina; from Lake Shore Drive to Livingston Drive.  Signal improvements at 7 intersections. 
RouteU.S. Route 127
CountyMercer
PID80877
Est. Start8-11-2010  
Est. End8-30-2011
 
Project
I-75/US 36 Interchange Bridge Rehab
Description

Replace 2 bridge decks, and landscaping of infield areas.
Limits: IR-75/USR-36 interchange.  Traffic Maintenance: Traffic maintained by either crossover or part width methods.

RouteU.S. Route 36
CountyMiami
PID79567
Est. Start6-18-2010   
Est. End8-15-2011
 
Project
U.S. 68 Reconstruction
Description

Reconstruction of roadway: widen, add lanes, curb and gutter, drainage, and full depth asphalt concrete pavement. Limits: from McKeestown Road to Lake Avenue in Bellefontaine.
Traffic maintained.

RouteU.S. Route 68 
CountyLogan
PID75472
Est. Start5-18-2010  
Est. End9-22-2011
 
Project
Dayton Area Intelligent Transportation System (ITS)
Description
Provide a system to include closed circuit cameras for incident detection and verification, variable message signs, highway advisory radios using fiber optics and wireless and broadband technologies.  Limits: Region wide freeway system in Clark, Greene, Miami, and Montgomery counties.  Traffic maintained. Visit: www.BuckeyeTraffic.org to view information from the Dayton ITS system.
RouteVarious
CountyClark, Greene, Miami, Montgomery
PID77249
Est. Start8-1-2011
Est. End6-30-2012