d32012 Construction Season Highlights for ODOT District 3

rollover or click a project area for information on a location
Visit ODOT's District 3 Site for more details on these and other projects in this area.  District 4 LinkDistrict 5 LinkDistrict 1 LinkDistrict 12 LinkDistrict 11 LinkDistrict 6 LinkDistrict 2 LinkLorain Co. I-90 Bridge Replacements Replacement of twin structures on Interstate 90 in Lorain County over the Black River and Ford Rd.  The project will include deck and superstructure replacement, bridge deck widening to maintain two lanes, replacement and widening of pier abutments, pavement replacement between the two structures.  The project will also include paving Ford Rd. from the project limits to Gulf Rd. Two lanes of traffic will be maintained in each direction.  Lane width will be eleven feet.​I-76 Pavement Improvement and Cable Barrier Installation Full depth replacement of asphalt, including repairs to the concrete base, from SR 57 to the Summit County line.  New underdrains, guardrails, signing, and striping.  Includes ramp improvements of the SR 57 and SR 94 entrance ramps to I-76 eastbound.  Cable median barrier will be installed from I-71 to the Summit County line. One lane of traffic in each direction will be maintained throughout construction.  During construction of the ramp improvements at SR 57 and SR 94, traffic traveling east will transition to the westbound side of I-76 (crossover traffic), with one lane of traffic in each direction traveling in the westbound lanes.Morrow Co. I-71 Lane Addition and Pavement Replacement Full depth pavement replacement with addition of third lane in each direction from the Richland County line to approximately one mile south of SR 95 in Morrow County.  Two lanes of traffic will be maintained in each direction throughout construction.​
Project
Description
  
Ohio County
  
  
  
  
Project
Morrow Co. I-71 Lane Addition and Pavement Replacement
Description

Full depth pavement replacement with addition of third lane in each direction from the Richland County line to approximately one mile south of SR 95 in Morrow County.  Two lanes of traffic will be maintained in each direction throughout construction.

Project is located in ODOT District
​ 6, but is being administered through ODOT District 3

RouteInterstate 71
Ohio CountyMorrow
PID86916
Est. StartMarch 2012
Est. EndOctober 2013
 
Project
I-76 Pavement Improvement and Cable Barrier Installation
Description

Full depth replacement of asphalt, including repairs to the concrete base, from SR 57 to the Summit County line.  New underdrains, guardrails, signing, and striping.  Includes ramp improvements of the SR 57 and SR 94 entrance ramps to I-76 eastbound.  Cable median barrier will be installed from I-71 to the Summit County line. One lane of traffic in each direction will be maintained throughout construction.  During construction of the ramp improvements at SR 57 and SR 94, traffic traveling east will transition to the westbound side of I-76 (crossover traffic), with one lane of traffic in each direction traveling in the westbound lanes.

RouteInterstate 76
Ohio CountyMedina
PID77474
Est. StartApril 2012
Est. EndSeptember 2013 
 
Project
Lorain Co. I-90 Bridge Replacements
Description

Replacement of twin structures on Interstate 90 in Lorain County over the Black River and Ford Rd.  The project will include deck and superstructure replacement, bridge deck widening to maintain two lanes, replacement and widening of pier abutments, pavement replacement between the two structures.  The project will also include paving Ford Rd. from the project limits to Gulf Rd. Two lanes of traffic will be maintained in each direction.  Lane width will be eleven feet.

RouteInterstate 90
Ohio CountyLorain
PID25734
Est. StartMarch 2012
Est. EndOctober 2013