Visit ODOT's District 4 Site for more details on these and other projects in this area.   District 3 LinkDistrict 1 LinkDistrict 11 LinkDistrict 12 LinkTrumbull Co. I-80 Resurfacing and Bridges Resurfacing and bridge replacement project along I-80 from SR 193 to Shady Rd. This project will include resurfacing of I-80 and some bridge repairs. Traffic will be maintained on I-80.I-277/I-76/US 224 reconstruction Reconstruction of the I-277/U.S. 224 pavement from I-76 to I-77 in the city of Akron. This project will also reconstruct a small portion of the Kenmore Leg in Akron. The Kenmore Leg will be closed for a seven day period in each direction and I-277/U.S. 224 will also be closed for 28 days in each directions. (All closures will not occur at the same time).Ashtabula Co. I-90 Reconstruction Reconstruction of I-90 from the Pennsylvania state line to just east of SR 193, roughly six miles of pavement. During this project, two lane of traffic will be maintained on I-90 east and west, but we will be using the contraflow traffic pattern. Project also includes six bridge reconstructions.
Project
Description
  
Ohio County
  
  
  
  
Project
I-277/I-76/US 224 reconstruction
Description

Reconstruction of the I-277/U.S. 224 pavement from I-76 to I-77 in the city of Akron. This project will also reconstruct a small portion of the Kenmore Leg in Akron. The Kenmore Leg will be closed for a seven day period in each direction and I-277/U.S. 224 will also be closed for 28 days in each directions. (All closures will not occur at the same time).

RouteInterstate 277 & U.S. Route 224
Ohio CountySummit
PID76351
Est. StartApril 2012
Est. EndJune 2013
 
Project
Trumbull Co. I-80 Resurfacing and Bridges
Description

Resurfacing and bridge replacement project along I-80 from SR 193 to Shady Rd. This project will include resurfacing of I-80 and some bridge repairs. Traffic will be maintained on I-80.

RouteInterstate 80
Ohio CountyTrumbull
PID76359
Est. StartNovember 2010
Est. EndAugust 2012
 
Project
Ashtabula Co. I-90 Reconstruction
Description

Reconstruction of I-90 from the Pennsylvania state line to just east of SR 193, roughly six miles of pavement. During this project, two lane of traffic will be maintained on I-90 east and west, but we will be using the contraflow traffic pattern. Project also includes six bridge reconstructions.

RouteInterstate 90
Ohio CountyAshtabula
PID25869
Est. StartSeptember 2011
Est. EndNovember 2013