d82012 Construction Season Highlights for ODOT District 8


rollover or click a project area for information on a location
Visit ODOT's District 8 Site for more details on these and other projects in this area. District 8 -  2011 Construction Highlights LinkDistrict 10 -  2011 Construction Highlights LinkDistrict 6 -  2011 Construction Highlights LinkU.S. 68/62 Resurfacing - Description:  Four-lane Resurfacing from northern corporation limit of Ripley to the 68/62 split near Red Oak. One lane of traffic maintained in each direction at all times. Route  U.S. Route 68 and U.S. Route 62. County:  Brown. PID:  75434. Est. Start:  April 2011. Est. End:  November 2011.U.S. 52 Resurfacing - Description:  Four-lane resurfacing from the Portsmouth/New Boston corporation limit to SR 522 at Wheelersburg. One lane of traffic maintained in each direction at all times. Route:  U.S. Route 52. County:  Scioto. PID:  80094.  Est. Start  March 2011. Est. End  November 2011.SR 220 Relocation and Extension - Description:  Relocate and extend SR 220 at its junction with Schuster Road at Zahn's Corner to SR 32. Traffic will continue to be maintained on existing routes and with the use of flaggers as needed. Route:  State Route 220. County:  Pike. PID:  81539. Est. Start  June 2011. Est. End  November 2011 District 6 LinkDistrict 9 LinkDistrict 7 LinkDistrict 08 I-71 Jeremiah Morrow Bridge Replacement Replacement of the two Jeremiah Morrow spans over the Little Miami River. One lane of traffic will be maintained in both directions.08 Waldvogel Viaduct and Sixth Street Expressway Improvement Removal of existing Waldvogel Memorial Viaduct, including four ramps to Elberon and Warsaw Avenues. Replacement of structures for the four ramps to Elberon and Warsaw and replacement of structures for the connection to the Sixth Street Expressway. Removal and replacement of roadways for the required portions of River Road, Elberon Avenue, Warsaw Avenue, State Avenue, Evans Street and Maryland Avenue. One lane of traffic maintained in each direction.District 08 Hamilton Co. I-75 Reconstruction Reconstruction of 1.2 miles of I-75 including the replacement of structures over Clifton Avenue and Mitchell Avenue;  improvement to Mitchell Avenue and interchange. Lane closures permitted during nighttime hours.
Project
Description
  
Ohio County
  
  
  
  
Project
I-71 Jeremiah Morrow Bridge Replacement
Description

Replacement of the two Jeremiah Morrow spans over the Little Miami River. One lane of traffic will be maintained in both directions.

More info at: http://www.omniproservices.com/jeremiah-morrow-bridge-replacement-project.html

RouteInterstate 71
Ohio CountyWarren
PID22950
Est. StartAugust 2010
Est. EndMay 2016 
 
Project
Hamilton Co. I-75 Reconstruction
Description

Reconstruction of 1.2 miles of I-75 including the replacement of structures over Clifton Avenue and Mitchell Avenue;  improvement to Mitchell Avenue and interchange. Lane closures permitted during nighttime hours.

More info at: http://www.dot.state.oh.us/districts/
D08/MillCreekExpress/

RouteInterstate 75
Ohio CountyHamilton
PID82278
Est. StartJune 2011
Est. EndJuly 2014
 
Project
Waldvogel Viaduct and Sixth Street Expressway Improvement
Description

Removal of existing Waldvogel Memorial Viaduct, including four ramps to Elberon and Warsaw Avenues. Replacement of structures for the four ramps to Elberon and Warsaw and replacement of structures for the connection to the Sixth Street Expressway. Removal and replacement of roadways for the required portions of River Road, Elberon Avenue, Warsaw Avenue, State Avenue, Evans Street and Maryland Avenue. One lane of traffic maintained in each direction.

RouteU.S. Route 50
Ohio CountyHamilton
PID20082
Est. StartJuly 2011
Est. EndOct. 2014