d32012 Construction Season Highlights for ODOT District 9

 
rollover or click a project area for information on a location
Visit ODOT's District 9 Site for more details on these and other projects in this area. District 8 -  2011 Construction Highlights LinkDistrict 10 -  2011 Construction Highlights LinkDistrict 6 -  2011 Construction Highlights LinkU.S. 68/62 Resurfacing - Description:  Four-lane Resurfacing from northern corporation limit of Ripley to the 68/62 split near Red Oak. One lane of traffic maintained in each direction at all times. Route  U.S. Route 68 and U.S. Route 62. County:  Brown. PID:  75434. Est. Start:  April 2011. Est. End:  November 2011.U.S. 52 Resurfacing - Description:  Four-lane resurfacing from the Portsmouth/New Boston corporation limit to SR 522 at Wheelersburg. One lane of traffic maintained in each direction at all times. Route:  U.S. Route 52. County:  Scioto. PID:  80094.  Est. Start  March 2011. Est. End  November 2011.SR 220 Relocation and Extension - Description:  Relocate and extend SR 220 at its junction with Schuster Road at Zahn's Corner to SR 32. Traffic will continue to be maintained on existing routes and with the use of flaggers as needed. Route:  State Route 220. County:  Pike. PID:  81539. Est. Start  June 2011. Est. End  November 2011District 8 LinkDistrict 10 LinkDistrict 6 LinkDistrict 09 Ross Co. U.S. 23 Resurfacing A four-lane resurfacing project on U.S. Route 23 between the Three Locks Rd./S.R. 104 exit and the Scioto River Bridge, just north of the Main St. exit at Chillicothe.​
 U.S. Route 23District 09 SR 32 Resurfacing  Three separate resurfacing projects and a preventive maintenance (overlay) project in three counties that are scheduled to be completed during the 2012 season.District 09 SR 32 Resurfacing  Three separate resurfacing projects and a preventive maintenance (overlay) project in three counties that are scheduled to be completed during the 2012 season.District 09 Jackson Co. U.S. 35 Resurfacing A four-lane resurfacing project on U.S. Route 35, between C.R. 41 (Dixon Run Rd.) and the Jackson-Gallia County line.​District 09 Ironton-Russell Bridge Replacement A project to replace the existing bridge across the Ohio River between Ironton, Ohio and Russell, Kentucky. Built on a new alignment, the structure will be a two-tower, cable-stayed bridge that will touchdown at Second and 
Jefferson streets in downtown Ironton and at the U.S. 23 viaduct just south (east) of Russell.
Project
Description
  
Ohio County
  
  
  
  
Project
SR 32 Resurfacing
Description

Three separate resurfacing projects and a preventive maintenance (overlay) project in three counties that are scheduled to be completed during the 2012 season. 

  • Adams-32 – Between the Adams-Brown County line and S.R. 247 at Seaman;
  •  Brown-32 – Between C.R. 76 (Purdy Rd.) near Sardinia and T.R. 171 (Freeh Rd.);
  • Pike-32 – Between the route’s junction with S.R. 104 and S.R. 220.
  • Pike-32 – Between C.R. 87 (Goff Rd.) and T.R. 338 (Gleason Rd.)
RouteState Route 32
Ohio CountyAdams, Brown, Pike
PID75448, 75450, 76457, and 79973
Est. Startvarious
Est. Endduring the 2012 season
 
Project
Ironton-Russell Bridge Replacement
Description

A project to replace the existing bridge across the Ohio River between Ironton, Ohio and Russell, Kentucky. Built on a new alignment, the structure will be a two-tower, cable-stayed bridge that will touchdown at Second and Jefferson streets in downtown Ironton and at the U.S. 23 viaduct just south (east) of Russell.

RouteU.S. Route 23
Ohio CountyLawrence
PID81595
Est. StartMarch 2012
Est. EndNovember 2016
 
Project
Ross Co. U.S. 23 Resurfacing
Description

A four-lane resurfacing project on U.S. Route 23 between the Three Locks Rd./S.R. 104 exit and the Scioto River Bridge, just north of the Main St. exit at Chillicothe.​

RouteU.S. Route 23
Ohio CountyRoss
PID76477
Est. StartMay 2012
Est. EndNovember 2012
 
Project
Jackson Co. U.S. 35 Resurfacing
Description

A four-lane resurfacing project on U.S. Route 35, between C.R. 41 (Dixon Run Rd.) and the Jackson-Gallia County line.​

RouteU.S. Route 35
Ohio County
PID87807
Est. StartApril 2012
Est. EndNovember 2012