d92013 Construction Season Highlights for ODOT District 12

rollover or click a project area for information on a location
Visit ODOT's District 12 Site for more details on these and other projects in this area.    ODOT D-3 2013 HighlightsODOT D-4 2013 HighlightsInterstate 90 Innerbelt, Cuyahoga County: Crews work to construct a new Innerbelt Bridge – the first of two – which will eventually carry westbound traffic. Multiple lane and ramp closures are expected. The existing I-90 bridge will remain open; however motorists are advised to Opt for the Alternate and use I-490 and I-77 to avoid the construction zone. Visit www.Innerbelt.org for more information. The new westbound bridge is expected to be open to traffic during the fall of 2013 at which time it will carry traffic in both directions while the existing bridge is demolished and the new eastbound bridge is constructed. Begin: March 2011 Complete: December 2013 (westbound bridge)/December 2016 (eastbound bridge)Interstate 90, Lake County: Crews have begun work for the major pavement reconstruction on I-90 between Morley and Paine roads. Motorists can expect the contra-flow traffic configuration through this work zone during the summer months. Lane closures are expected, but will not impact peak travel times. Begin: January 2012 Complete: August  2014.
Project
Description
  
Ohio County
  
  
  
  
Project
I-90 New WB Innerbelt Bridge
Description

Crews work to construct a new Innerbelt Bridge – the first of two – which will eventually carry westbound traffic. Multiple lane and ramp closures are expected. The existing I-90 bridge will remain open; however motorists are advised to Opt for the Alternate and use I-490 and I-77 to avoid the construction zone. The new westbound bridge is expected to be open to traffic during the fall of 2013 at which time it will carry traffic in both directions while the existing bridge is demolished and the new eastbound bridge is constructed. Begin: March 2011 Complete: December 2013 (westbound bridge)/December 2016 (eastbound bridge)

Visit: http://www.innerbelt.org/ for more info!

RouteInterstate 90
Ohio CountyCuyahoga
PID85531
Est. StartDesign Build Awarded: September 2010; Construction Began: March 2011
Est. EndDecember 2013
 
Project
Interstate 90 Reconstruction
Description

Crews have begun work for the major pavement reconstruction on I-90 between Morley and Paine roads. Motorists can expect the contra-flow traffic configuration through this work zone during the summer months. Lane closures are expected, but will not impact peak travel times.

Route Interstate 90
Ohio CountyLake
PID75479
Est. StartJanuary 2012
Est. EndAugust  2014