Visit ODOT's District 3 Site for more details on these and other projects in this area.   ODOT District 4 2013 HighlightsODOT District 5 2013 HighlightsODOT District 1 2013 HighlightsODOT District 12 2013 HighlightsODOT District 11 2013 HighlightsODOT District 6 2013 HighlightsODOT District 2 2013 HighlightsState Route 58, Lorain County - Railroad grade separation project on SR 58, 

just north of SR 18, in the village of Wellington. The project will construct an underpass at the CSX railroad tracks on a new roadway alignment. Short-duration detours will be necessary throughout construction. 

Begin: April 2013 Complete: September 2014 Interstate 90, Lorain County - Replacement of twin bridges on I-90 in Lorain County over the Black River and Ford Rd. The project includes bridge widening to maintain two lanes and paving Ford Rd. from the project limits to Gulf Rd. Two lanes of traffic will be maintained in each direction. Lane width will be 11 feet. Begin: March 2012 Complete: October 2013Interstate 71, Morrow County - Full-depth pavement replacement with addition of third lane in each direction from the Richland County line to approximately one mile south of SR 95 in Morrow County. Work this season will focus on widening the northbound lanes, and traffic traveling north will transition to the southbound lanes (using crossovers). Two lanes of traffic will be maintained in each direction throughout construction. Begin: March 2012 Complete: October 2013
Project
Description
  
Ohio County
  
  
  
  
Project
I-76 Pavement Replacement
Description

Full-depth replacement of asphalt, including repairs to the concrete base, from SR 57 to the Summit County line. New drainage, guardrails, signing and striping. Cable median barrier will be installed from I-71 to the Summit County line. One lane of traffic in each direction will be maintained throughout construction. During construction of the ramp improvements at SR 57 and SR 94, traffic traveling west will transition to the eastbound side of I-76 (using crossovers), with one lane of traffic in each direction traveling in the eastbound lanes.

RouteInterstate 76
Ohio CountyMedina
PID77474
Est. StartApril 2012
Est. EndSeptember 2013 
 
Project
I-71 Widening
 
Description

Three projects on I-71 will add a third lane in each direction to the only two-lane section of roadway between Columbus and Cleveland. The first project, from SR 95 to the Richland County line, began last year and is expected to be complete this fall. Project 2, from just north of U.S. 36 to north of SR 61, began in March of this year and Project 3, from SR 61 to SR 95, will begin in April. Projects 2 and 3 are expected to be complete in 2015. Two lanes of traffic will be maintained in each direction. Project is located in ODOT District ​ 6, but is partially administered through ODOT District 3

RouteInterstate 71
Ohio CountyDelaware, Morrow
PID86916 +
Est. StartMarch 2012
Est. EndOctober 2015
 
Project
I-90 Bridge Replacements
Description

Replacement of twin bridges on I-90 in Lorain County over the Black River and Ford Rd. The project includes bridge widening to maintain two lanes and paving Ford Rd. from the project limits to Gulf Rd. Two lanes of traffic will be maintained in each direction. Lane width will be 11 feet.

RouteInterstate 90
Ohio CountyLorain
PID25734
Est. StartMarch 2012
Est. EndOctober 2013 
 
Project
State Route 58, Lorain County
 
Description

Railroad grade separation project on SR 58, just north of SR 18, in the village of Wellington. The project will construct an underpass at the CSX railroad tracks on a new roadway alignment. Short-duration detours will be necessary throughout construction. ​

RouteState Route 58
Ohio CountyLorain
PID23104
Est. StartApril 2013
Est. EndSeptember 2014