d92013 Construction Season Highlights for ODOT District 9

rollover or click a project area for information on a location
Visit ODOT's District 9 Site for more details on these and other projects in this area.    ODOT D-8 2013 HighlightsODOT D-10 2013 HighlightsODOT D-6 2013 HighlightsU.S. Route 52, Scioto County: The 'Spaghetti Bowl' project is the bridge rehabilitation and resurfacing of U.S. 52 between the  SR 239 interchange and the Scioto River bridges at the Portsmouth corporation limit. The $12 million project includes the rehabilitation of 14 bridges and resurfacing approximately 12 lane miles in a design-build format. It will be phased out over two construction seasons, with the majority of bridge work being completed this year and resurfacing in the next. Begin: March 2013 Complete: September 2014
Project
Description
  
Ohio County
  
  
  
  
Project
U.S. 52 Bridge Rehab and Pavement Resurfacing
Description

The “Spaghetti Bowl” project is the bridge rehabilitation and resurfacing of U.S. 52 between the  SR 239 interchange and the Scioto River bridges at the Portsmouth corporation limit. The $12 million project includes the rehabilitation of 14 bridges and resurfacing approximately 12 lane miles in a design-build format. It will be phased out over two construction seasons, with the majority of bridge work being completed this year and resurfacing in the next.​

RouteU.S. Route 52
Ohio CountyScioto
PID80094
Est. StartMarch 2013
Est. EndSeptember 2014