d12014 Construction Season Highlights for ODOT District 1

rollover or click a project area for information on a location
Visit ODOT's District 1 Site for more details on these and other projects in this area.  
 
 
ODOT District 6 2014 HighlightsODOT District 3 2014 HighlightsODOT District 7 2014 HighlightsODOT District 2 2014 HighlightsODOT District 2 2014 HighlightsInterstate 75: Repair of joints and deteriorated sections of pavement from SR 235 to SR15/U.S.68.U.S. Route 224 interchange with Interstate 75: Interchange reconstruction includes replacing and widening the bridge, adding dedicated turn lanes for entrance to I-75, reconstructing all ramps and adding a sidewalk on the south side of the bridge. Part-width construction allows traffic to be maintained  on U.S. 224 throughout the majority of the project. Interstate 75 from the Auglaize County line to just north of State Route 81: Reconstruction of the existing two lanes of pavement, replacement of all mainline and overhead bridges and reconstruction of the interchanges at Breese Rd., SR 65, Fourth St., SR 117/309 and SR 81. Two lanes of traffic on I-75 maintained in each direction. 
Project
Description
Ohio County
  
  
  
  
Project
Interstate 75 from the Auglaize County line to just north of State Route 81
Description
Reconstruction of the existing two lanes of pavement, replacement of all mainline and overhead bridges and reconstruction of the interchanges at Breese Rd., SR 65, Fourth St., SR 117/309 and SR 81. Two lanes of traffic on I-75 maintained in each direction.
For more, visit www.odotlima75.org; or www.facebook.com/ODOTLima75
Ohio CountyAllen
Est. Construction Cost$132 million
Est. StartMarch 2013
Est. EndOctober 2016
 
Project
U.S. Route 224 interchange with Interstate 75
Description
Interchange reconstruction includes replacing and widening the bridge, adding dedicated turn lanes for entrance to I-75, reconstructing all ramps and adding a sidewalk on the south side of the bridge. Part-width construction allows traffic to be maintained on U.S. 224 throughout the majority of the project.
Ohio CountyHancock
Est. Construction Cost$10.6 million
Est. StartFebruary 2014
Est. EndOctober 2014
 
Project
Interstate 75
Description
Repair of joints and deteriorated sections of pavement from SR 235 to SR15/U.S.68.
Ohio CountyHancock
Est. Construction Cost$792,000
Est. StartMay 2014
Est. EndOctober 2014