d32014 Construction Season Highlights for ODOT District 3

rollover or click a project area for information on a location
Visit ODOT's District 3 Site for more details on these and other projects in this area.   ODOT District 4 2014 HighlightsODOT District 5 2014 HighlightsODOT District 1 2014 HighlightsODOT District 12 2014 HighlightsODOT District 11 2014 HighlightsODOT District 6 2014 HighlightsODOT District 2 2014 HighlightsState Route 57 Major Rehabilitation  Widening and rehabilitation of SR 57 between the Ohio Turnpike and I-90 in the city of Elyria. The project will also include reconfiguration of the SR 57 and I-90 interchange and removal of the 49th St. bridge. Two lanes will be maintained on SR 57 during constructiever, 49th St. will be closed indefinitely. Midway Mall Blvd. and Griswold Rd. will be closed during construction.
Project
Description
Ohio County
  
  
  
  
Project
State Route 57 Major Rehabilitation
Description
Widening and rehabilitation of SR 57 between the Ohio Turnpike and I-90 in the city of Elyria. The project will also include reconfiguration of the SR 57 and I-90 interchange and removal of the 49th St. bridge. Two lanes will be maintained on SR 57 during construction; however, 49th St. will be closed indefinitely. Midway Mall Blvd. and Griswold Rd. will be closed during construction. Click here for more info.
Ohio CountyLorain
Est. Construction Cost$22.4 million
Est. StartMay-2014
Est. EndSummer 2016
 
Project
U.S. Route 250 and Strub Rd. Intersection Improvement
Description
Reconstruction of the U.S. 250 and Strub Rd. intersection in Perkins Twp. The project will widen and improve the intersection with curbs, sidewalks, traffic signal upgrades and traffic control signage. This project is a precursor to the U.S. 250 TRAC project and will attract a lot of attention as U.S. 250 is the main gateway to the Lake Erie Shores & Islands area in the summer months.   Lane closures should be expected on U.S. 250 and a 30-day detour on the west leg of Strub Rd. will be in effect for a portion of the construction. Click here for more info.
Ohio CountyErie
Est. Construction Cost$1.6 million
Est. StartApril-2014
Est. EndOctober-2014
 
Project
State Route 58 Railroad Grade Separation
Description
Railroad grade separation project on SR 58 in the village of Wellington, just north of SR 18. The project will construct an underpass at the CSX railroad tracks on a new roadway alignment. SR 18 will be closed for two weeks later in the summer, and SR 58 will require a 30-day closure.  Click here for more info.
Ohio CountyLorain
Est. Construction Cost$12.3 million
Est. StartApril-2013
Est. EndOctober-2014
 
Project
State Route 611 and Interstate 90 Bridge Rehabilitation
Description
The project includes widening and rehabilitation of the existing SR 611 bridge over I-90 in the City of Avon. The project includes widening for a bike lane and sidewalk on both sides, new bridge deck and resurfacing a portion of SR 611. This area has seen an extreme growth in recent years and is becoming heavily congested.  SR 611 is reduced to one lane of traffic and I-90 to two narrowed lanes in each direction.
Ohio CountyLorain
Est. Construction Cost$4.8 million
Est. StartAugust-2013
Est. EndJune-2015