Ohio.gov State Agencies  |  Online Services
Skip Ribbon Commands
Skip to main content
KeepingOhio'sEconomyMoving2014-SM.png

d52014 Construction Season Highlights for ODOT District 5

rollover or click a project area for information on a location
Visit ODOT's District 5 Site for more details on these and other projects in this area.    District 3 2014 HighlightsDistrict 11 2014 HighlightsDistrict 10 2014 HighlightsDistrict 6 2014 HighlightsInterstate 70 Bridges at Canal Road:  Replace and widen existing structures on I-70 over Canal Rd., located two miles west of the SR 79 interchange. Two lanes of traffic will be maintained at all times, eastbound traffic will experience a slight shiftSR 16 Resurfacing:  Just over 10 miles of SR 16 will be resurfaced from just Newark corp. limit to the Muskingum Co. line.I-70 Mine Subsidence east of Zanesville: Just east of Zanesville on I-70 at the SR 93/I-70 interchange and continuing East to a point shortly before the Airport Rd. exit. This project consists of drilling boreholes down into existing mine works and filling these underground voids with grout along the interstate for rehabilitation purposes of an existing mine subsidence and prevention of any future subsidence. Construction will require a significant shift in traffic with the use of a cross-over pattern, in each direction, at separate times.State Route 37 resurfacing:  Resurfacing of almost 12 miles of SR 37 from the Delaware County line through Johnsontown to SR 161U.S. Route 62 resurfacing:  Resurfacing 23 miles of US 62 through Knox County from the Licking County line to the Holmes County lineResurfacing multiple routes in Lancaster:  Resurfacing of major routes through downtown Lancaster including U.S. 22, SR 37, SR 158, and SR 188.
Project
Description
Ohio County
  
  
  
  
Project
Interstate 70 Bridges at Canal Road
Description
Replace and widen existing structures on I-70 over Canal Rd., located two miles west of the SR 79 interchange. Two lanes of traffic will be maintained at all times, eastbound traffic will experience a slight shift 
Ohio CountyLicking
Est. Construction Cost$10.5 million
Est. StartMarch-2013
Est. EndNovember-2014
 
Project
SR 16 Resurfacing
Description
Just over 10 miles of SR 16 will be resurfaced from just east of Newark corp. limit to the Muskingum Co. line.
Ohio CountyLicking
Est. Construction Cost$7.7 million
Est. StartMay-2014
Est. EndOctober-2014
 
Project
I-70 Mine Subsidence east of Zanesville
Description
Just east of Zanesville on I-70 at the SR 93/I-70 interchange and continuing East to a point shortly before the Airport Rd. exit. This project consists of drilling boreholes down into existing mine works and filling these underground voids with grout along the interstate for rehabilitation purposes of an existing mine subsidence and prevention of any future subsidence. Construction will require a significant shift in traffic with the use of a cross-over pattern, in each direction, at separate times.
Ohio CountyMuskingum
Est. Construction Cost$8.1 million
Est. StartAugust-2014
Est. EndNovember-2015
 
Project
State Route 37 resurfacing
Description
Resurfacing of almost 12 miles of SR 37 from the Delaware County line through Johnsontown to SR 161
Ohio CountyLicking
Est. Construction Cost$4.5 million
Est. StartMay-2014
Est. EndSeptember-2014
 
Project
U.S. Route 62 resurfacing
Description
Resurfacing 23 miles of US 62 through Knox County from the Licking County line to the Holmes County line
Ohio CountyKnox
Est. Construction Cost$4.7 million
Est. StartMay-2014
Est. EndOctober-2014
 
Project
Resurfacing multiple routes in Lancaster
Description
Resurfacing of major routes through downtown Lancaster including U.S. 22, SR 37, SR 158, and SR 188.
Ohio CountyFairfield
Est. Construction Cost$7.5 million
Est. StartSeptember-2013
Est. EndJuly-2014