ODOT's 2011 Construction Season Highlights

ODOT District Map, Click a district to visit its link. District 1District 2District 3District 4District 5District 6District 7District 8District 9District 10District 11District 12

Instructions/Text Listing

 

 

 And consider consulting:

 
  • BuckeyeTraffic.org Travel Information
 

District 1 Highlights - Click here for a District Project Map  District 1 Highlights - Click here for a District Project Map

 
Project
Description
  
County
  
  
  
  
Project
SR 309-8.35 Safety Upgrade
Description
Safety upgrade project on SR 309 from Robb Avenue to Eastown Road, west side of Lima.
RouteState Route 309
CountyAllen
PID24247
Est. StartMarch 2011
Est. EndFall 2011
 
Project
U.S. 30-21.18 Resurfacing
Description
Resurfacing of four-lane U.S. 30 from Middle Point in Van Wert County to Lincoln Highway in Allen County.
RouteU.S. Route 30
CountyAllen, Putnam, Van Wert
PID75522
Est. StartJuly 2011
Est. EndOctober 2011
 
Project
I-75-18.60 Bridge Replacement
Description
Replacement of the bridge deck over I-75 on County Road 95 (Bigelow Avenue).
RouteInterstate 75
CountyHancock
PID76369
Est. StartSpring 2011
Est. EndSeptember 2011
 
Project
I-75-22.12 Bridge Replacement
Description
Complete replacement of County Road 109 bridge over I-75 north of Findlay.
RouteInterstate 75
CountyHancock
PID82163
Est. StartSpring 2011
Est. EndSeptember 2011
 
Project
U.S. 30-11.24 Resurfacing
Description
Resurfacing of four-lane U.S. 30 from U.S. 224 to Lincoln Highway.
RouteU.S. Route 30
CountyVan Wert
PID81446
Est. StartSpring 2011
Est. EndSummer 2011
 
 

District 2 Highlights - Click here for a District Project Map  District 2 Highlights - Click here for a District Project Map

 
Project
Description
  
County
  
  
  
  
Project
Hallett Avenue:  Railroad Grade Separation
Description
Construct a new bridge over the Norfolk Southern railroad tracks, improve Hallett Avenue and intersections at Chestnut Street, Broadway Avenue and Brindley Road. Hallett Avenue at the NSRR tracks along with local intersecting roads will close in spring of 2011. Access will be maintained for local traffic.
RouteHallett Avenue
CountyFulton
PID23114
Est. StartAugust 2010
Est. EndSummer 2013
 
Project
I-280/Wheeling Street: Widening
Description
Widen Wheeling Street from Navarre Avenue (SR 2) to Pickle Road, including the bridge over I-280.  Through November 2011, Wheeling Street over I-280 is closed.  Lane restrictions are possible on Wheeling Street from Navarre Avenue to Brown Road.  The ramp closures are possible at I-280 and Wheeling Street.  Detours posted. 
RouteInterstate 280
CountyLucas
PID23995
Est. StartJune 2010
Est. EndDecember 2011
 
Project
I-475 Interchange and Widening Project
Description
The project will upgrade the interchange at I-475 and I-75, construct a new interchange at ProMedica Parkway and widen portions of the existing I-475, between Douglas Road and I-75.  Expect intermittent lane and ramp restrictions along I-475 and I-75 in this area.
RouteInterstate 475
CountyLucas
PID77255
Est. StartAugust 2010
Est. EndFall 2013
 
Project
I-475/Salisbury Road-Dussel Drive:  Interchange Reconstruction/Major Widening
Description
Interchange reconstruction of the bridge over I-475 and widening of Salisbury Road/Dussel Drive between Manley Road to Osage Drive.  Overnight intermittent lane and shoulder restrictions are possible on I-475 at the Salisbury Road/Dussel Drive Bridge. Through 2011, Salisbury Road/Dussel Drive, from Manley Road to Osage Drive, is reduced to one lane in each direction with turn lanes at intersections.
RouteInterstate 475
CountyLucas
PID 75937
Est. StartMay 2009
Est. EndNovember 2011
 
Project
I-475/US 23 over Maumee River
Description
I-475 over the Maumee River will be reduced to one lane in each direction for bridge repair.  Additionally, ramps to and from U.S. Route 24 will be closed.
RouteInterstate 475/U.S. Route 23
CountyLucas, Wood
PID84672
Est. StartAugust 2011
Est. EndJuly 2012
 
Project
Jones Road:  Railroad Grade Separation
Description
Jones Road will be closed at the CSX Railroad in the Village of Fostoria for railroad grade separation. Detour:  US 23, SR 613, SR 12.  Main Street at Jones Road is open. The local access detour for Jones Road: SR 613; Main Street. 
RouteJones Road
CountySeneca
PID23111
Est. StartMarch 2010
Est. EndNovember 2011
 
Project
SR 25 Widening and Turn Lane Installation
Description
Widen SR 25 in Bowling Green, install center turn lane, sidewalk and ramps and upgrade signals. Expect intermittent lane restrictions and intersection closures on SR 25, between Poe Road and Newton Road.
RouteState Route 25
CountyWood
PID16144
Est. StartMay 2011
Est. EndJune  2013
 
Project
State Route 34: Resurfacing and Bridge Repair
Description

Expect intermittent lane restrictions on SR 34, from CR 5 to SR 576, and between SR 191 to the Henry County line for resurfacing. SR 34 will be closed in four locations for a total of 120 days for bridge work. Detour:  SR 49; US 6; SR 576. Estimated Cost: $5.5 million

RouteState Route 34
CountyWilliams
PID86812
Est. StartMay 2011
Est. EndNovember 2011
 
Project
SR 53: Intersection Improvements and Resurfacing
Description
Expect intermittent lane restrictions on SR 53 between SR 163 and East Water Street for resurfacing and at the intersection of SR 53 and SR 163 for intersection improvements. Work will include the installation of right turn lanes, pavement markings, overhead lane signage, a new signal, and resurfacing. No lane restrictions from Memorial Day to Labor Day.
RouteState Route 53:
CountyOttawa
PID23927
Est. StartJune 2011
Est. EndNovember 2012
 
Project
U.S. 24:  New Highway Construction
Description
Construct a new four-lane divided highway from Napoleon to Toledo.  U.S. 24, from Dutch Road to Fallen Timbers Lane, is reduced to one lane in both directions.   Local roads intersecting the project may be closed.  Detours are posted. Link for more: http://www.us24.org
RouteU.S. Route 24
CountyHenry, Lucas
PID80444, 80446, and 80443 (Three Projects)
Est. StartJune 2008
Est. EndOpen to traffic: July 2012; July 2013
 
 

District 3 Highlights - Click here for a District Project Map  District 3 Highlights - Click here for a District Project Map

 
Project
Description
  
County
  
  
  
  
Project
I-76 Rehabilitation
Description
Rehabilitation of Interstate 76 from Interstate 71/U.S. Route 224 to State Route 57.  MOT: One lane maintained at all times in each direction.
RouteInterstate 76
CountyMedina
PID 77475
Est. StartApril 15, 2010
Est. EndSeptember 15, 2011
 
Project
New I-90 Interchange at Nagel Road
Description
New interchange construction on Interstate 90 at Nagel Road in the City of Avon. MOT: Traffic Maintained at all times on I-90; however, Nagel Road will have a detour.
RouteInterstate 90
CountyLorain
PID83607
Est. StartJuly 11, 2011
Est. EndOctober 31, 2012
 
Project
Lorain I-90 & SR 2 Rehabilitation
Description
Rehabilitation project on Interstate 90 from the Ohio Turnpike to the Lake Road underpass and on State Route 2 from just east of State Route 58 to I-90.  MOT: Night Work, One lane maintained in each direction.
RouteInterstate 90 and State Route 2
CountyLorain
PID77447
Est. StartMay 9, 2011
Est. EndAugust 15, 2011
 
Project
U.S. 250 Bridge Replacement
Description
Bridge replacement project on U.S. 250 over the Rattlesnake Creek, just south of the Erie County line. MOT: 180-day detour, expected to be completed in late April/early May.
RouteU.S. Route 250
CountyHuron
PID80059
Est. StartOctober 18, 2010
Est. EndJune 30, 2011
 
Project
Richland U.S. 30 Resurfacing
Description
Resurfacing project on U.S. Route 30 from Fifth Avenue to the Ashland County line, including the U.S. 30 and U.S. Route 42 interchange. MOT: One lane maintained at all times in each direction.
RouteU.S. Route 30
CountyRichland
PID79352
Est. StartMarch 21, 2011
Est. EndAugust 31, 2011
 
Project
Wayne U.S. 30 Resurfacing
Description
Resurfacing project on U.S. Route 30 from Kansas Road to the Stark County line. MOT: One lane maintained at all times on U.S. 30; 14-day detour at the State Route 172 Eastbound exit ramp.
RouteU.S. Route 30
CountyWayne
PID77449
Est. StartMay 31, 2011
Est. EndSeptember 15, 2011
 
Project
U.S. 6 Railroad Grade Separation
Description
Railroad grade separation project of U.S. Route 6 on a new alignment, 0.73 mile west of State Route 101 in the City of Sandusky MOT: Traffic will be maintained at all times; however, side road intersections will have short-duration detours.
RouteU.S. Route 6
CountyErie
PID23105
Est. StartJuly 11, 2011
Est. EndOctober 31, 2012
 
 

District 4 Highlights - Click here for a District Project Map  District 4 Highlights - Click here for a District Project Map

 
Project
Description
  
County
  
  
  
  
Project
Crain Avenue Improvements
Description
Improvements to the intersections of SR 43 and Crain Ave.; SR 43 and Fairchild Ave.; and Crain Ave., N. Water St. and Lake St. This will include the replacement and relocation of the Crain Ave. bridge over the railroad. The new bridge location will align the western end of the bridge with the intersection of Fairchild Ave. and SR 43. The eastern end of the bridge will intersect in a T alignment with N. Water St. MOT: Sections of Crain Ave., Fairchild Ave., N. Water St., Cuyahoga St., Lake St. and Stinaff St. will be closed for a portion of the project. All detours will be posted.
RouteCrain Avenue
CountyPortage
PID18466
Est. StartSeptember 2009
Est. EndDecember 2012
 
Project
Highland Road Rail Grade Separation
Description
Construction of a railroad grade separation bridge over the Norfolk-Southern railroad on Highland Road, between South Bedford Rd. and Shepard Rd. MOT: Highland Rd. will be closed at various locations near the Norfolk-Southern railroad for 540 days. All detours will be posted.
RouteHighland Road
CountySummit
PID23064
Est. StartMay 2011
Est. EndAugust 30, 2013
 
Project
Rehabilitation of 7 Bridges on I-680, Youngstown
Description
Rehabilitation to seven bridges in I-680 in the city of Youngstown. MOT: Sections of I-680 will be reduced to one lane in either or both directions for various periods of time during the project. Various ramp and side street closures will occur for a portion of the project. All detours will be posted. County: Mahoning.
RouteInterstate 680
CountyMahoning
PID25508
Est. StartApril 4, 2011
Est. EndJuly 31, 2013
 
Project
Summit I-76 Resurfacing
Description
Resurfacing of I-76 from the Kenmore Leg to Brown St. in the city of Akron. Project also includes 12 bridge deck overlays. MOT: Traffic will be maintained on I-76 during non-peak hours. I-76 between SR 59 (Akron Innerbelt) and SR 8 will be closed, including entrance and exit ramps from I-76, for a total of four weekends (two in each direction). The I-76 eastbound exit ramp to SR 59 and various other ramps will be closed for three nights between the hours of 7 p.m. and 6 a.m.  Detours for all closures will be posted.
RouteInterstate 76
CountySummit
PID83044
Est. StartMay 2011
Est. EndOctober 31, 2011.
 
Project
Portage I-76 Resurfacing
Description
Resurfacing of I-76 from SR 14 to the Mahoning County line.  This project also includes minor bridge repair to 14 bridge structures. MOT: Two lanes of traffic on I-76 in both directions will be maintained during peak hours.  During non-peak hours, one lane of traffic will be maintained in either or both directions during construction.
RouteInterstate 76
CountyPortage
PID76332
Est. StartJune 2012.
Est. EndJuly 31, 2012
 
Project
Work on 12 Bridges on I-77, Canton
Description
Interstate 77 - Miscellaneous bridge work to 12 structures on I-77 in the city of Canton. During peak traffic hours, all lanes of traffic will be maintained on I-77.  Two lanes of traffic will be maintained in each direction during non-peak hours. There will be occasional ramp and side street closures. All detours will be posted.
RouteInterstate 77
CountyStark
PID84617
Est. StartAugust 2011
Est. EndOctober 31, 2012.
 
Project
I-80 Resurfacing in Mahoning and Trumbull Counties
Description
Resurfacing of I-80 from SR 11 in Mahoning County to Shady Rd. in Trumbull County. Project includes bridge work to the structures on I-80 over US 422, SR 193, the Mosier Rd. bridge over I-80 and several other structures. MOT: Limited weekend one lane conditions on I-80 just west of US 422 for bridge work will occur. At all other times, two lanes of traffic will be maintained in each direction of I-80 during peak traffic hours.  A minimum of one lane of traffic will be maintained in each direction of I-80 during non-peak traffic hours. Various ramp and side street closures will occur for a portion of the project.
RouteInterstate 80
CountyMahoning, Trumbull
PID76359
Est. StartJuly 2011
Est. EndAugust 31, 2012
 
Project
I-90 Astabula (Conneaut) Pavement Replacement & Bridge Rehab
Description
Pavement replacement from directly east of the Conneaut River bridge to the Pennsylvania State line. The project also includes bridge rehabilitation to six bridges on I-90 and six overhead bridges. MOT: Two lanes of traffic will be maintained in each direction on I-90 during peak traffic hours. A minimum of one lane of traffic will be maintained in each direction during non-peak traffic hours. Dorman Rd., Furnace Rd., Keefus Rd., Middle Rd., Parrish Rd. and South Ridge Rd. will be closed at I-90 for approximately 30 days each. All detours will be posted.
RouteInterstate 90
CountyAshtabula
PID25869
Est. StartApril 18th, 2011.
Est. EndSeptember 30, 2013.
 
Project
I-90 Astabula (Kingsville)  Pavement Replacement & Bridge Rehab
 
Description
Pavement replacement from east of SR 11 to directly west of SR 193/SR 84. The project also includes bridge rehabilitation to four bridges on I-90 and three overhead bridges. MOT: Two lanes of traffic will be maintained in each direction on I-90 during peak traffic hours. A minimum of one lane of traffic will be maintained in each direction during non-peak traffic hours. County: Ashtabula. PID: . Start Date: . Completion:
RouteInterstate 90
CountyAshtabula
PID25199
Est. StartSpring 2010
Est. EndOctober 31, 2011
 
Project
SR 153 Improvements Louisville
Description
Reconstruction, rehabilitation, drainage work, and new sidewalks on SR 153 from SR 44 to the western Louisville corporation limit. Project also includes the widening of SR 153 west of California Ave. to SR 44, and traffic signals at California Ave. and SR 153. MOT: A minimum of one lane of traffic will be maintained in each direction during construction. Constitution Drive will be closed for approximately 30 days and various side street closures will occur for approximately five days each. Detours will be posted.
RouteState Route 153
CountyStark
PID22862
Est. StartApril 11, 2011
Est. EndSeptember 2012.
 
Project
SR 619/Arlington Road Improvements
Description
Widening and reconstruction of SR 619 (E. Turkeyfoot Lake Rd.) at the Arlington Rd. intersection as well as Arlington Rd. from SR 619 (E. Turkeyfoot Lake Rd.) to I-77 in the city of Green. Project also includes the reconfiguration and extension of Jarvis Rd. to Arlington Ridge, eliminating the current Jarvis Rd. intersection with Arlington Rd. MOT: A minimum of one lane of traffic will be maintained on Arlington Rd. in each direction during construction. Moore Rd. will be closed to eastbound traffic at Arlington Rd. for 30 days during the project. All detours will be posted.
RouteState Route 619/Arlington Road
CountySummit
PID78398
Est. StartApril 2010
Est. EndOctober 31, 2011
 
Project
New SR 8 Interchange at Boston Mills Rd. and Hines Hill Rd
Description
Construction of a new SR 8 interchange that connects the Ohio Turnpike interchange with Boston Mills Rd. and Hines Hill Rd. through the construction of frontage roads and eliminating the signalized intersections on SR 8 at Boston Mills Rd. and Hines Hill Rd. MOT: Various lane restrictions on SR 8 in either or both directions will occur during non-peak traffic hours.:
RouteState Route 8
CountySummit
PID24507
Est. StartDecember 2008
Est. EndJuly 30, 2011
 
 

District 5 Highlights - Click here for a District Project Map  District 5 Highlights - Click here for a District Project Map

 
Project
Description
  
County
  
  
  
  
Project
Fairfield & Licking  I-70 Resurfacing
Description
This project consists of night paving from the Franklin county line to SR 158.  Associated work will include new striping, Raised Pavement Markings ‘RPMs’ and rumble strips.  Traffic will be maintained by closing one lane of the 4-lane highway, with arrow boards and cones. 
RouteInterstate 70
CountyFairfield, Licking
PID82144
Est. StartJuly 2011
Est. EndOctober 2011
 
Project
Muskingum I-70 Resurfacing
Description
This is an asphalt resurfacing project with associate work on IR 70, from the US 22/US 40 interchange at Norwich to the Guernsey County line.
RouteInterstate 70
CountyMuskingum
PID20026
Est. StartJuly 2011
Est. EndOctober 2011
 
Project
SR 16 Interchange/Intersection Improvement
Description
This project consists of extending the westbound ramp at the SR 16 Interchange with Cedar Street in the City of Newark.  The work includes realignment of ramp intersections with Cedar Street and installation of signals at these locations.  The replacement of the existing bridge decks and related work on structures over Cedar Street, Ohio Central Railroad/Bike Trail and North Fork of the Licking River is also included.  One lane will be closed in both eastbound and westbound directions.    Lanes will be closed using temporary concrete barrier and arrow boards.  The off-ramp from SR 16 westbound to Cedar Street will be closed for 10 days.  Traffic will be detoured to O Bannon Avenue and East Main Street.  The Bike Trail will be closed during the replacement of the bridge deck over the Ohio Central Railroad/Bike Trail.  Traffic will be detoured to Everett Avenue, O Bannon Avenue, and East Main Street. 
RouteState Route 16
CountyLicking
PID 82757
Est. StartJune 2011
Est. EndSeptember 2012
 
Project
SR 79 Intersection Improvements/Access Control
Description
This project consists of upgrading 0.85 miles of SR 79 in the City of Heath, by widening and resurfacing the roadway, realigning the Andover/Oberlin and Putnam/Radian intersections, installing median traffic divider islands, and adding right turn lanes to improve safety, capacity and traffic flow. 
RouteState Route 79
CountyLicking
PID79015
Est. StartJune 2011
Est. EndOctober 2011
 
Project
U.S. 22/40 Resurfacing with Lighting and Signal Enhancements
Description
This project consists of the resurfacing of US 22/40 from its intersection with 5th Street in the City of Cambridge, continuing through the downtown area and following US 40 out to the IR 77 interchange.  Various enhancements in downtown Cambridge include lighting and signal upgrades, decorative sidewalks, new park benches and trash receptacles. 
RouteU.S. Route 22/40
CountyGuernsey
PID79079
Est. StartMay 2011
Est. EndOctober 2011
 
Project
U.S. 36 Resurfacing
Description
This Mill and Fill project consists of resurfacing portions of US 36 from upper Gilchrist Rd. (TR 245) to the Coshocton County Line, closing one lane of 2-lane highway using flaggers to maintain 2-way traffic.
RouteU.S. Route 36
CountyKnox
PID81229
Est. StartJune 2011
Est. EndOctober 2011
 
 

District 6 Highlights - Click here for a District Project Map  District 6 Highlights - Click here for a District Project Map

 
Project
Description
  
County
  
  
  
  
Project
Hilliard Rome Road Widening
Description
Widening of Hilliard Rome Road to five lanes between Roberts Road and Winchester Woods Blvd.
During Construction: One lane of traffic will be maintained in each direction. There will be some weekend closures of side streets.
RouteHilliard Rome Road
CountyFranklin
PID14538
Est. StartMarch 2011
Est. EndOct. 2012
 
Project
I-71 Morrow Widening
Description
Widen I-71 to three lanes in both directions between SR 95 in Morrow County to the Richland County line.
Two lanes of traffic maintained in each direction.
RouteInterstate 71
CountyMorrow
PID86916
Est. StartJuly 2011
Est. EndNovember 2013
 
Project
I-670/71 Interchange Reconstruction
Description
Reconstruct I-670/71 which includes more than 20 bridges and retaining walls, new ramps and urban avenues and cap capable bridges. During construction two lanes of traffic in each direction will be maintained. There will be some ramp and bridge closures but prior notification and posted detours will be provided. For more, see: www.buckeyetraffic.org/7071
RouteInterstates 670/71
CountyFranklin
PID77369
Est. StartJune 2011
Est. EndOct. 2013
 
Project
SR 3 Safety Upgrade
Description
Widen SR 3, construct bike lanes, improve one interchange and four intersection between SR 161 and Huber Village
During Construction one lane in each direction will be maintained on SR 3. There will be a 30 days closure of Dempsey and a 15-days closure of Paris Blvd. More details at: www.dot.state.oh.us/districts/D06/projects/SR3/
RouteState Route 3
CountyFranklin
PID76279
Est. StartMarch 2011
Est. EndJune 2012
 
 

District 7 Highlights - Click here for a District Project Map  District 7 Highlights - Click here for a District Project Map

 
Project
Description
  
County
  
  
  
  
Project
I-70  Clark Co. Rehabilitation
Description
Major rehabilitation of the existing mainline.
Limits: From the junction of SR-72 to the junction of USR-40 interchanges. Traffic Maintained.
RouteInterstate 70  
CountyClark
PID84664
Est. Start6-28-2010  
Est. End6-30-2012
 
Project
I-75/Needmore Road Bridge Rehab
Description

Replace bridge deck, paint superstructure and rehabilitate other structure components. Limits: Needmore Road over IR-75. 

RouteInterstate 75 
CountyMontgomery
PID82249
Est. Start4-1-2011
Est. End9-30-2011
 
Project
I-75 Montgomery Co. Resurfacing
Description
Resurface the existing roadway, including minor bridge repair.
Limits: Warren county line to 0.43 mile south of the north corporation limit of West Carrollton. Traffic Maintenance: Maintain two lanes of traffic. Night operation.
RouteInterstate 75   
CountyMontgomery
PID25010
Est. Start6-15-2011  
Est. End8-15-2011
 
Project
I-75 West Carrollton Interchange
Description
Construct 4 missing movements at the existing interchange. Southbound South Dixie to Northbound IR-75; Northbound Central Avenue to Southbound IR-75; Northbound IR-75 to Southbound South Dixie; Southbound IR-75 to Northbound South Dixie. Limits: At Exit 47 on IR-75, South Dixie Drive / Central Avenue Interchange. Traffic maintain through project.
RouteInterstate Route 75 
CountyMontgomery
PID77248
Est. Start3-1-2011
Est. End9-30-2012
 
Project
Modernization of I-75, Dayton, Phase 1B (U.S. 35 Interchange)
Description
Downtown Dayton Phase 1B. Modify the USR-35 interchange to provide three continuous lanes in each direction on IR-75. Close the southbound exit ramp to Albany Street. Close the northbound entrance ramp from Albany Street.  Limits: Dayton; Edwin C. Moses Boulevard at the University of Dayton Arena to the Fifth Street Bridge. For more info, visit:
www.dot.state.oh.us/districts/D07/ Projects/I75Modernization/ Pages/Phase1B.aspx
RouteInterstate Route 75
CountyMontgomery
PID77245
Est. Start3-1-2010
Est. End6-15-2013
 
Project
Modernization of I-75, Dayton, Phase 1A (curve at SR 4)
Description
Downtown Dayton Phase 1A.  Improve the northbound curve on IR-75 at SR-4- "Malfunction Junction." Reduce the northbound sharp 90 degree angle to a softer curve. New interstate lanes are relocated and widened over the river. Increase the overall capacity of the interstate with an additional lane in each direction. The existing IR-75 northbound lanes crossing the river are reconstructed and utilized as ramps. Widen Main Street and improve the SR-48 (Main Street) entrance and exit ramps. Provide access to SR-48 (Main Street) from southbound SR-4. Combine the Grand Avenue ramps with the improved Main Street ramps.
Limits:  IR-75 and the junction of SR-4.
RouteInterstate Route 75
CountyMontgomery
PID75927
Est. Start10-19-2007
Est. End9-27-2011
 
Project
U.S. 127 Celina Improvements
Description
Resurfacing and pavement markings (reimbursement); Remove and replace all asphalt and base material, curb and gutter, new storm water drainage system.  Replace sidewalks, decorative lighting, add benches, trash receptacles, brick pavers, bury utilities and improve signals and interconnect controllers for timing coordination on U.S. 127.  Limits: In Celina; from Lake Shore Drive to Livingston Drive.  Signal improvements at 7 intersections. 
RouteU.S. Route 127
CountyMercer
PID80877
Est. Start8-11-2010  
Est. End8-30-2011
 
Project
I-75/US 36 Interchange Bridge Rehab
Description

Replace 2 bridge decks, and landscaping of infield areas.
Limits: IR-75/USR-36 interchange.  Traffic Maintenance: Traffic maintained by either crossover or part width methods.

RouteU.S. Route 36
CountyMiami
PID79567
Est. Start6-18-2010   
Est. End8-15-2011
 
Project
U.S. 68 Reconstruction
Description

Reconstruction of roadway: widen, add lanes, curb and gutter, drainage, and full depth asphalt concrete pavement. Limits: from McKeestown Road to Lake Avenue in Bellefontaine.
Traffic maintained.

RouteU.S. Route 68 
CountyLogan
PID75472
Est. Start5-18-2010  
Est. End9-22-2011
 
Project
Dayton Area Intelligent Transportation System (ITS)
Description
Provide a system to include closed circuit cameras for incident detection and verification, variable message signs, highway advisory radios using fiber optics and wireless and broadband technologies.  Limits: Region wide freeway system in Clark, Greene, Miami, and Montgomery counties.  Traffic maintained. Visit: www.BuckeyeTraffic.org to view information from the Dayton ITS system.
RouteVarious
CountyClark, Greene, Miami, Montgomery
PID77249
Est. Start8-1-2011
Est. End6-30-2012
 
 

District 8 Highlights  District 8 Highlights

 
Project
Description
  
County
  
  
  
  
Project
I-71 Jeremiah Morrow Memorial Bridge Replacement
Description

Bridge replacement of the Jeremiah Morrow Memorial Bridge on Interstate 71 just north of State Route 123.  This project entails replacing the existing deck truss bridges with a concrete cast-in-place segmental box structure.  Two lanes of traffic are to be maintained in each direction through life of project, however lane closures may be scheduled, mostly during night hours. More at:
www.omniproservices.com/ jeremiah-morrow-bridge-replacement-project.html

RouteInterstate 71
CountyWarren
PID22950
Est. StartAugust 2010
Est. EndJune 2015
 
Project
I-75 Corridor Reconstruction, Phase 1
Description
Phase 1 of the I-75 corridor reconstruction and widening projects; includes reconstruction of Mitchell Avenue Interchange and bridge replacement work. More at: www.dot.state.oh.us/districts/ D08/MillCreekExpress/
RouteInterstate 75
CountyHamilton
PID82278
Est. StartApril 2011
Est. EndOctober 2013
 
Project
I-75 Warren Co Widening and Reconstruction
Description
Reconstruction and widening of I-75 through Warren County; work includes reconfiguring SR 122 interchange and bridge replacement work. Three lanes of traffic are being maintained in both directions of I-75. More at: www.dot.state.oh.us/districts/ D08/Pages/butlerwareni75.aspx
RouteInterstate 75
CountyWarren
PID10754
Est. StartMay, 2009
Est. EndJuly 2012 
 
Project
SR 4 Bypass, at SR 129
Description
Widening of State Route 4 Bypass at SR 129 to four lanes, including widening at the interchange.
RouteState Route 4
CountyButler
PID83395
Est. StartAugust 2011
Est. EndAugust 2012
 
Project
SR 4 Bypass, Hamilton-Mason Rd. Superstreet
Description
Construct superstreet intersection at Hamilton-Mason Rd. and SR 4 Bypass and  widening of bypass. In Phase 2, started Nov 2010, traffic is being maintained on new pavement on west side of SR 4 Bypass.
RouteState Route 4
CountyButler
PID83392
Est. StartMay, 2010
Est. EndAugust 2011
 
Project
SR 4 Bypass, Tylersville Rd. Superstreet
Description
Construct superstreet intersection at Tylersville Rd and SR 4 Bypass and  widening of bypass. In Phase 2, started Nov 2010, traffic is being maintained on new pavement on west side of SR 4 Bypass.
RouteState Route 4
CountyButler
PID83394
Est. StartMay, 2010
Est. EndAugust 2011
 
Project
SR 4 Bypass, Symmes Rd. Superstreet
Description
Construct superstreet  intersection at Symmes Road and State Route 4 Bypass and widening of SR 4 bypass.  In phase 2, started Nov. 2010, traffic is being maintained on new pavement on the west side of SR 4 Bypass.
RouteState Route 4
CountyButler
PID76290
Est. StartJuly 2010
Est. EndSept. 2011
 
Project
U.S. 42 Widening
Description

Widening of US 42 for dual left turn lanes through Butler County. Work may require one-lane closures with traffic maintained by flaggers during permitted hours.

RouteU.S. Route 42
CountyButler
PID77204
Est. StartApril 2011
Est. EndAugust 2012
 
 

District 9 Highlights  District 9 Highlights

 
Project
Description
  
County
  
  
  
  
Project
SR 220 Relocation and Extension
Description
Relocate and extend SR 220 at its junction with Schuster Road at Zahn's Corner to SR 32. Traffic will continue to be maintained on existing routes and with the use of flaggers as needed.
RouteState Route 220
CountyPike
PID81539
Est. StartJune 2011
Est. EndNovember 2011
 
Project
U.S. 52 Resurfacing
Description
Four-lane resurfacing from the Portsmouth/New Boston corporation limit to SR 522 at Wheelersburg. One lane of traffic maintained in each direction at all times.
RouteU.S. Route 52
CountyScioto
PID80094
Est. StartMarch 2011
Est. EndNovember 2011
 
Project
U.S. 68/62 Resurfacing
Description
Four-lane Resurfacing from northern corporation limit of Ripley to the 68/62 split near Red Oak. One lane of traffic maintained in each direction at all times.
RouteU.S. Route 68 and U.S. Route 62
CountyBrown
PID75434
Est. StartApril 2011
Est. EndNovember 2011
 
 

District 10 Highlights  District 10 Highlights

 
Project
Description
  
County
  
  
  
  
Project
SR 147 Bridges
Description

Includes the replacement of four bridges along SR 147 – begin 0.13 miles north of SR 78.  Motorists can expect lane restrictions. 

RouteState Route 147
CountyNoble
PID77653
Est. StartMay 2011 
Est. End
 
Project
SR 26 Bridge Replacement
Description

Bridge replacement project – begin 0.02 miles south of SR 537.  Motorists can expect lane restrictions. 

RouteState Route 26
CountyMonroe
PID84195
Est. StartJune 2010
Est. EndAugust 2011
 
Project
SR 329 Bridge Replacement
Description

Bridge replacement project – begin 0.07 miles north of TR 96 (Marietta Run Rd). Motorists can expect lane restrictions. 

RouteState Route 329
CountyAthens
PID77721
Est. StartApril 2011
Est. EndSeptember 2011
 
Project
SR 37 Resurfacing
Description
Two lane, eight mile resurfacing project – begin 0.05 miles west of SR 60 in the Village of McConnelsville. Motorists can expect lane restrictions. 
RouteState Route 37
CountyMorgan
PID81318
Est. StartJuly 2011 
Est. End
 
Project
SR 7 Resurfacing
Description

Two lane, fifteen mile resurfacing project of SR 7 – begin 0.03 miles south of CR 158 (Sunnyside Rd). Motorists can expect lane restrictions. 

RouteState Route 7
CountyGallia
PID82833
Est. StartJune 2011
Est. End
 
Project
SR 7 Turn Lane
Description

Construct turn lane at school entrance – begin 0.05 miles north of TR 2758 (Nething Rd). Motorists can expect lane restrictions. 

RouteState Route 7
CountyMonroe
PID88202
Est. StartMay 2011 
Est. End
 
Project
SR 7 and I-77 Interchance Upgrade
Description
State Route 7 and Interstate 77 intersection upgrade including new pavement and bridge repairs on Duck Creek Bridge – begin at SR7 / I-77 interchange.
RouteState Route 7 and Interstate 77
CountyWashington
PID84854
Est. Start June 2010
Est. EndJuly 2011
 
Project
SR 78 Realignment
Description

Realignment and intersection improvement of SR 78 near the Pilot Gas Station – begin near I-77.  Motorists can expect lane restrictions. 

RouteState Route 78
CountyNoble
PID82689
Est. StartApril 2010
Est. EndNovember 2010
 
Project
SR 850 Widening
Description
Widening 1.4 miles of SR 850 near the Dan Evans Industrial Park – begin 0.06 mi. S of TR 437 (Hickory Rd). 
RouteState Route 850
CountyGallia
PID78072
Est. StartMay 2010
Est. EndJune 2011
 
Project
U.S. 33 Nelsonville Bypass - Phase II
Description
RouteU.S. Route 33
CountyAthens, Hocking
PID23846
Est. StartOctober 2009
Est. EndJuly 2013
 
Project
U.S. 33 Nelsonville Bypass - Phase III
Description
Construction of 3.87 miles of new four-lane highway around Nelsonville. For more details, visit:  http://www.dot.state.oh.us/districts/D10/
PublicInformationOffice/nelsonvillebypass/Pages/default.aspx
 
RouteU.S. Route 33
CountyAthens, Hocking
PID79577
Est. StartOctober 2009
Est. EndJuly 2013
 
Project
U.S. 33 Meigs Co. Resurfacing
Description

Eight mile resurfacing project of US 33 – begin 0.29 miles west of CR 20 intersection. Motorists can expect lane restrictions. 

RouteU.S. Route 33
CountyMeigs
PID24701
Est. StartApril 2011
Est. EndAugust 2011
 
Project
U.S. 33 Culvert/Bridge Repair
Description

Culvert/bridge repair – begin 0.15 miles north of Skinner Street in the Village of Pomeroy. Motorists can expect lane restrictions. 

RouteU.S. Route 33
CountyMeigs
PID84189
Est. StartApril 2011
Est. EndAugust 2011
 
Project
U.S. 50 Intersection Improvements
Description
Intersection improvement at US 50 and TR 38 – begin at TR 38. Motorists can expect lane restrictions.
RouteU.S. Route 50
CountyAthens
PID86866
Est. StartAugust 2011
Est. End
 
Project
U.S. 50 Resurfacing
Description
Two lane, six mile resurfacing project of US 50 – begin at SR 683. Motorists can expect lane restrictions. 
RouteU.S. Route 50
CountyVinton
PID 82841
Est. StartMay 2011
Est. End
 
Project

U.S. 50 Bridge Replacement

Description

Bridge replacement project on US 50 over Little Hocking River – begin 0.14 miles south of SR 124. Motorists can expect lane restrictions. 

RouteU.S. Route 50
CountyWashington
PID 82996
Est. StartApril 2011
Est. End
 
 

District 11 Highlights  District 11 Highlights

 
Project
Description
  
County
  
  
  
  
Project
I-70 Belmont Co. Major Reconstruction
Description
Five miles from west of Exit 208 (SR 149/Morristown) to east of Exit 213 (U.S. 40/SR 331).
RouteInterstate 70
CountyBelmont
PID76825
Est. Start04/01/10
Est. End10/31/11
 
Project
SR 212 Bridge Replacement, Conotton Creek
Description
Over the Conotton Creek between CR 89 (Henderson School Road) and CR 90 (New Cumberland Road) near New Cumberland. 
RouteState Route 212
CountyTuscarawas
PID84014
Est. Start05/01/11
Est. End09/30/11
 
Project
SR 212 Bridge Replacement, near CR 85
Description
Just northwest of New Cumberland near CR 85 (Johnstown Road)
RouteState Route 212
CountyTuscarawas
PID84008
Est. Start05/31/11
Est. End10/15/11
 
Project
SR 7 Four-lane Resurfacing
Description
Four miles from one mile south of SR 151 to Steubenville's south corp. line.
 
RouteState Route 7
CountyJefferson
PID75418
Est. Start06/01/11
Est. End08/31/11
 
Project
SR 7 Four-lane Resurfacing
Description
Over three miles from just north of the CR 56 on-ramp to CR 47 north of Toronto.
 
RouteState Route 7
CountyJefferson
PID87025
Est. Start05/01/11
Est. End09/30/11
 
Project
SR 7 Bridge Repair
Description
Two structures south of SR 151 at Brilliant.
 
 
RouteState Route 7
CountyJefferson
PID24979
Est. Start07/01/11
Est. End06/30/12
 
Project
U.S. 30 Four-lane Resurfacing
Description

Over five miles from just south of SR 170 to SR 2 and the West Virginia state line and at East Liverpool.

RouteU.S. Route 30
CountyColumbiana
PID77351
Est. Start05/01/11
Est. End09/30/11
 
Project
U.S. 62 and CR 77 Safety/Intersection Reconstruction
Description
U.S. 62 and CR 77 Safety/Intersection Reconstruction at Bunker Hill.
RouteU.S. Route 62 and Holmes County Route 77
CountyHolmes
PID22776
Est. Start07/01/10
Est. End10/31/11
 
 

District 12 Highlights - Click here for a District Project Map  District 12 Highlights - Click here for a District Project Map

 
Project
Description
  
County
  
  
  
  
Project
Bridge Replacement: Warrensville Center Road over I-480
Description
Replace the Warrensville Center Road bridge over I-480 on the city of Warrensville Heights. One lane in each direction on Warrensville Center Road will be maintained. Overnight lane closures are expected on I-480. The I-480 ramps are expected to close for seven days. Not more than one ramp will be closed at a time.
RouteInterstate 480 at Warrensville Center Road
CountyCuyahoga
PID80558
Est. StartJuly 2011
Est. EndMay 15, 2013
 
Project
Cuyahoga I-77 Resurfacing
Description
Resurface I-77 between Rockside Road and I-490 in the cities of Independence and Cleveland and the villages of Cuyahoga Heights and Newburgh Heights. Includes partial paving of I-490 ramps and median barrier replacement between Rockside and I-480. Daily and nightly lane closures are expected. Overnight closures of each ramp are expected. Motorists will be detoured via adjacent ramps
RouteInterstate 77
CountyCuyahoga
PID18735
Est. StartApril 2011
Est. EndOctober 15, 2011
 
Project
I-77 Recon and Lane Addition
Description
Reconstruction and lane addition on I-77 between Oakes Road and Rockside Road in the cities of Broadview Heights and Independence.  Daily and nightly lane closures are expected.
RouteInterstate 77
CountyCuyahoga
PID22222
Est. StartApril 2008
Est. EndOctober 2011
 
Project
I-90 New Westbound Innerbelt Bridge
Description
Interstate 90 will remain open as crews work to construct a new Innerbelt Bridge – the first of two – which will eventually carry five lanes of westbound traffic. Motorists should expect multiple traffic pattern changes. Visit: http://www.innerbelt.org/ for more info!
RouteInterstate 90
CountyCuyahoga
PID85531
Est. StartMarch 2011
Est. EndDecember 2013
 
Project
Cuyahoga I-90 Resurfacing
Description
Resurfacing of I-90 between SR 283 and SR 2 in the cities of Cleveland and Euclid and the village of Bratenahl. Traffic will be maintained. Overnight lane closures are expected.
RouteInterstate 90
CountyCuyahoga
PID22205
Est. StartJune 2011
Est. EndOctober 15, 2011
 
Project
I-90 Pavement Rehab
Description
Major pavement reconstruction on Interstate 90 between Paine Road and the Ashtabula County Line in LeRoy Township. Traffic will be maintained using crossovers.
RouteInterstate 90
CountyLake
PID75477
Est. StartApril 2010
Est. EndJune 2012
 
Project
Intelligent Transportation System, Part 1 and 2
Description
Installation of an Intelligent Transportation System to include approximately 83 traffic cameras, 29 dynamic message boards, 26 vehicle detectors and seven highway advisory radios in Cuyahoga, Lorain, Medina, Summit, Portage and Lake Counties and 64 traffic cameras, 18 dynamic message boards, 18 vehicle detectors and two highway advisory radios in Medina, Summit, Portage and Stark Counties. Visit: www.BuckeyeTraffic.org to view information from this system!
RouteRoutes: Various
CountyCuyahoga, Lake, Lorain, Medina, Portage, Stark, Summit
PID77331
Est. StartSeptember 2009
Est. EndSeptember 2011
 
Project
SR 2 Upgrade – Phase II
Description
Major rehabilitation, lane addition and ramp replacement between State Route 91 and Newell Creek/State Route 306 in the cities of Eastlake, Willoughby and Mentor. State Route 2 traffic is maintained. Ramps throughout the project will each be closed for a period of approximately 45 days.
RouteState Route 2
CountyLake
PID13486
Est. StartApril 2009
Est. EndOctober 2011
 
Project
SR 2 Upgrade – Phase III
Description
Major rehabilitation, lane addition and noise barrier construction on State Route 2 between Newell Creek/State Route 306 and State Route 44 in the city of Mentor and Painesville Township. Two lanes of traffic in each direction will be maintained at all times.
RouteState Route 2
CountyLake
PID79545
Est. StartJuly 2010
Est. EndOctober 2012
 
Project
SR 2 Upgrade – Phase V
Description
  Minor rehabilitation of State Route 2 from Newell Street to the Grand River in the city of Painesville. Project includes work on eight bridges. SR 2 traffic will be maintained with one lane in each direction. The SR 283 (Richmond Street) entrance ramp to SR 2 eastbound will be closed during the summer of 2011. Overnight ramp closures are expected.
RouteState Route 2
CountyLake
PID87924
Est. StartApril 2011
Est. EndOctober 2011.
 
Project
U.S 422 and SR 306 Interchange Reconfiguration
Description
Reconfigure the ramps to improve traffic flow for the U.S. 422 and SR 306 (Chillicothe Road) interchange in Bainbridge Township.  SR 306 (Chillicothe Road) northbound traffic at U.S. 422 is expected to be restricted to one lane for approximately 30 days. During construction traffic will be maintained at all U.S.422 ramps at SR 306.
RouteU.S Route 422 and State Route 306
CountyGeauga
PID79932
Est. StartMay 2011
Est. EndJune 30, 2012
 
Project
Lake Road Improvements
Description
Install a new sanitary sewer main and sanitary connections to businesses and residents and a new storm sewer main with connections to businesses and residences, new catch basins and new water service for properties on the north side of Lake Road.  Lake Road between Wagar Road and Linda Street will remain closed to eastbound traffic through the completion of the project. Eastbound motorists are detoured via Detroit Road. Westbound traffic is maintained.
RouteU.S. 6 (Lake Road)
CountyCuyahoga
PID21766
Est. StartAugust 2010
Est. EndJuly 2010
 
 

 Instructions/Text Listing

 

Roll over the map to view highlights of this season's construction activities from the ODOT District serving that area. Click on a district for more information details and links. 

 

 Or use the following breakdown:

 
 
 

 Construction Overview Archive