Ohio.gov State Agencies  |  Online Services
Skip Ribbon Commands
Skip to main content
  
  
  
List of Work Locations and Addition Mapping_96631.pdfDistrict 1 - Various Routes - Raised Pavement Markings - (PID: 96631) List of Work Locations and Addition Mapping_96631
The Ohio Department of Transportation is proposing to replace raised pavement markers on various routes throughout District 1 (see attached list).

On 07/05/18, the scope of the project changed to include pavement marker work on State Route 273 in Hardin County (see attached mapping). All work will occur within the existing roadway right-of-way.

Traffic detours are not anticipated during construction. Construction is anticipated to begin in the fall of 2018.
Date of Publication: 7/9/2018
Project Mapping_100185.pdfHancock County - Industrial and Production Drives - Resurfacing (PID: 100185)Project Mapping_100185
The Ohio Department of Transportation, sponsored by the City of Findlay, is proposing to resurface Production Drive and Industrial Drive in the City of Findlay in Hancock County. See attached mapping. Work may also include curb and sidewalk replacement, manhole and catch basin adjustment, shoulder treatment, and grading and seeding. All work will occur within the existing roadway right-of-way.

Traffic detours are not anticipated during construction. Construction is scheduled to begin in the spring of 2019.
Date of Publication: 7/6/2018
Project Mapping_98467.pdfPaulding and Putnam Counties - State Route 114/US 224 - Resurfacing (PID: 98467) Project Mapping_98467
The Ohio Department of Transportation is proposing to resurface portions of State Routes (SR) 114 and 224 in Paulding and Putnam Counties (Paulding: SR 114 from the western corporate limits to the eastern corporate limits of the Village of Grover Hill. Putnam: SR 114 from the northern corporate limits of the Village of Kalida to US 224, US 224 from the Van Wert County line to just east of Ralph St in the Village of Kalida). See attached mapping. Curb ramp upgrades will occur in the Village of Kalida. All work will occur within existing roadway right-of-way.

Traffic detours are not anticipated during construction. Construction is expected to begin in the summer of 2019.
Date of Publication: 5/3/2018