The following is the weekly report concerning construction and maintenance work on state highways within the Ohio Department of Transportation District 1 which includes the counties of Allen, Defiance, Hancock, Hardin, Paulding, Putnam, Van Wert and Wyandot. This report is issued each week beginning in April and continues through November.

 

For the latest in statewide construction visit www.ohgo.com. Please contact us at 419-999-6803 with any information needs.

 

Construction and Maintenance Projects

Week of June 23, 2014

Allen County

Interstate 75 Reconstruction Project For the most recent information concerning the Interstate 75 reconstruction project through Lima and Allen County please visit www.odotlima75.org

Ohio 117 approximately two miles west of Westminster closed  June 16 for approximately one week for a drainage project. Traffic detoured onto Ohio 309, Ohio 235 and Ohio 67 back to Ohio 117. Work is being performed by the Allen County ODOT maintenance garage.

 

U.S. 30/Ohio 309 near Delphos may be restricted to one lane at times through the work zone for culvert work. Work is expected to be completed in late July. Work is being performed by Platinum Painting, Boardman.

Defiance County

 

Ohio 18 in the city of Defiance just east of the Ohio 15 (Ottawa Avenue) and Ohio 18 (East Second Street) intersection closed June 9 for two months for culvert replacement. Traffic detoured onto Ohio 281 and U.S. 24 back to Ohio 15/18. Traffic may also detour to Ohio 15/18 to Ohio 66, U.S. 24, to Ohio 281 back to Ohio 18. Work is being performed by Sand Ridge Excavating, Cloverdale.

 

Ohio 2 from just north of Hicksville to just west of Farmer will be restricted to one lane through the work zone for removal of raised pavement markers. Work is being performed by the Defiance County ODOT maintenance garage.

 

Hancock County

 

U.S. 224 interchange at Interstate 75 reconstruction, Findlay

 

The U.S. 224 interchange with Interstate 75, Findlay, is currently being reconstructed. The project began in February and is expected to be completed late this fall. Work is being performed by Miller Brothers Construction, Archbold.

 

The following traffic impacts related to the reconstruction are in effect or will occur in the upcoming weeks:

 

Interstate 75

 

- Both the northbound and southbound lanes are narrowed and shifted approaching the U.S. 224 interchange.

 

- Lane restrictions will continue both northbound and southbound for overhead work at the bridge. Restrictions will occur between 10 p.m. and 10 a.m.

 

U.S. 224

 

-On Thursday or Friday of the week, pouring of the concrete deck is expected to take place. The operation will take place during nighttime hours and may require the travel lanes on the bridge to be narrowed. Motorists are asked to be aware of concrete delivery trucks entering and exiting the work zone.

 

-In mid July, the ramps on the south side of the interchange (northbound exit, southbound entrance) will close for two weeks for reconstruction. Once the south side ramps are open, the ramps on the north side of the interchange will close, also for two weeks (southbound exit, northbound entrance).

 

-Short-term, daytime lane closures should be expected throughout the week. Traffic maintained with flaggers.

-Traffic on the bridge over Interstate 75, Findlay, is traveling on the north half of the bridge, one lane in each direction with no turn lanes. All ramps at the interchange are currently open.

 

-Motorists are cautioned to watch for construction vehicles entering and exiting at various locations throughout the work zone on U.S. 224 and along the interchange ramps.

 

 

--------------------------------------------------

 

Ohio 613 approximately a mile and a half west of Van Buren is now open following a culvert replacement.

 

U.S. 224 traffic signal upgrade on the east side of Findlay between Plaza Road (Best Buy) and County Road 236 is complete.

 

Ohio 568 between Blanchard Avenue in Findlay to County Road 180 is currently not restricted for pavement repair and resurfacing. The project is temporarily suspended to allow adjoining work by the city of Findlay to take place. The project will resume in September. Work is being performed by Shelly Co., Findlay.

 

Ohio 15 between U.S. 23 in Carey to Ohio 37 in Findlay is restricted to one lane through the work zone for resurfacing. Work is occurring in both the eastbound and westbound direction and during daytime hours. Work is expected to complete by the end of the month. Work is being performed by Kokosing, Fredericksburg.

 

Hardin County


U.S. 68 from the Kenton corporation limit to the Logan County line will be reduced to one lane through the work zone for pavement resurfacing. The project is expected to continue through June. Work is being performed by the Shelly Co., Findlay.

Paulding County

 

U.S. 127 in the village of Latty just south of County Road 92 will close for five days beginning June 23 for a railroad crossing repair. Traffic detoured onto Ohio 114, Ohio 637, and Ohio 613 back to U.S. 127.

 

Ohio 637 just south of Ohio 613 east of Broughton is now open following a railroad crossing repair.

 

Sealing of pavement cracks will be done at the following locations with traffic maintained through the work zone. Work is being performed by the Paulding County ODOT maintenance garage:

 

-Ohio 49 from the Van Wert County line to Payne

-Ohio 613 from the Indiana line to U.S. 127

-Ohio 114 from U.S. 127 to the Putnam County line

 

Putnam County

 

Ohio 115 just north of the Allen County line, south of Vaughnsville closed June 16 for approximately one week for a culvert replacement. Traffic detoured onto Ohio 65, Ohio 12 back to Ohio 115. Work is being performed by the Putnam County ODOT maintenance garage.

 

Ohio 634 between Ft. Jennings and Continental is reduced to one lane through the work zone for pavement resurfacing. The project is expected to be completed by the end of the week. Work is being performed by Gerken Paving, Napoleon.

 

Van Wert County

 

Ohio 49 south of  U.S. 224 will be restricted to one lane through the work zone for pavement repair. Work is being performed by the Van Wert County ODOT maintenance garage.

U.S. 224 from Van Wert to the Indiana line will be restricted to one lane through the work zone for pavement repair. Work is being performed by the Van Wert County ODOT maintenance garage

 

Wyandot County

 

Ohio 53 from the west corporation limit of the city of Upper Sandusky to Ohio 67, and from the courthouse in the city north to the Ohio 53/67 split is reduced to one lane through the work zone for pavement repair and resurfacing. The project will continue until mid July. Work is being performed by Kokosing, Fredericksburg.

 

Ohio 15 between U.S. 23 in Carey to Ohio 37 in Findlay is restricted to one lane through the work zone for resurfacing. Work is occurring in both the eastbound and westbound direction and during daytime hours. Work is expected to complete by the end of the month. Work is being performed by Kokosing, Fredericksburg.

 

U.S. 23 southbound between the north junction of Ohio 199 and County Highway 330 will be restricted to one lane through the work zone for pavement repair. Work is being performed by the Wyandot County ODOT maintenance garage.

 

 ###

 