Lucas/Wood County
 
1. Interstate 75/475: Interchange Upgrade
Lucas County (281-10):
 Upgrade the I-75/I-475 interchange, widen I-475 from Rushland Avenue to I-75, and construct a new interchange at ProMedica Parkway.

INTERSTATE RESTRICTIONS
Through 2012, the right lane in both directions of I-475, between Monroe Street and I-75, is restricted. Additional lane restrictions are possible, overnight from 7pm to 6am, on I-475 in both directions from Rushland Avenue to I-75 and on I-75 in both directions from Detroit Avenue to Berdan Avenue.

RAMP RESTRICTIONS 
  • Through July, the ramp from westbound I-475 to Douglas Road is closed. Detour: Secor Road (Exit 17); Monroe Street.
  • Through August, the ramp from Douglas Road to eastbound I-475 is closed.  Detour: Detour: Monroe Street; Secor Road; I-475.
  • Through 2013, the ramp from Monroe Street to eastbound I-475 is closed. Detour: Secor Road; eastbound I-475.
  • Through 2013, the ramp from North Cove Boulevard to westbound I-475 is closed. Detour: Central Avenue; Upton Avenue; westbound I-475.
  • The ramp from Upton/Kelley Avenue to eastbound I-475 is permanently closed. Detour: Central Avenue; Jeep Parkway; I-75. The ramp from ProMedica Parkway to eastbound I-475 is scheduled to open by fall 2012.
  • Through 2013, the ramp from eastbound I-475 to Jeep Parkway is closed. Detour: northbound I-75; Berdan Avenue (Exit 205B); Jeep Parkway.
 
CITY STREET TRAFFIC
  • Through 2013, Upton Avenue, between Georgia Avenue and Central Avenue and Central Avenue, between Upton Avenue and Jackman Road are reduced to one lane in each direction.
  • Through 2013, Sherbrooke Road, between Groveland Road and Marlow Road, is closed. Detour: Monroe Street; Douglas Road; Berdan Avenue.
  • Through 2012, Giant Street, between Upton Avenue and Bigelow Street, is closed for sewer relocation. Suggested alternate route: Jackman Road.

Project complete: Fall 2013. All work is weather permitting.
 
2. Interstate 75: Rest Area Utility Work *NEW WORK*
Wood County: On Wednesday, April 4, from 8am until 3:30pm, both northbound and southbound I-75 rest areas, just south of US 6, will be closed for utility work. All work is weather permitting.
 
3. Interstate 475: Maumee River Bridge
Lucas & Wood Counties (90-11):
 Through July, both directions of I-475, between SR 65 and U.S. 24, are reduced to one lane for bridge work. Through July, the ramps from eastbound and westbound US 24 to southbound I-475 are closed.  Detour: northbound I-475; Salisbury Road/Dussel Drive (Exit 6).  Project complete: November 2012.  All work is weather permitting.
 
4. U.S. Route 24: New Highway Construction *LANE RESTRICTIONS BEGIN MONDAY*
Lucas & Henry Counties (8015-09 & 201-09): Construction of a newly aligned four-lane divided highway from U.S. 24 Waterville to Napoleon. Motorists may encounter construction vehicles working near the new alignment throughout the project. Through September 2012, U.S. 24, between Dutch Road and Fallen Timbers Lane, is reduced to one lane in both directions.   Beginning Monday, April 2, through September, US 24, between Henry TR-10 and SR 424 will be reduced to one lane in both directions for tie-in work.
 
The following roads are closed for overpass construction:
·         Through summer 2012, Providence-Neapolis-Swanton Road, between Box Road and U.S. 24. Detour: Neowash Road; Jeffers Road; U.S. 24.
·         Through summer 2012, Patton Road, between Providence-Neapolis-Swanton Road and Manore Road. Detour: U.S. 24; Jeffers Road.
·         Through July 2012, TR 10 at U.S. 24. Detour for SR 424 to eastbound U.S. 24: southbound U.S. 6; eastbound SR 110; northbound SR 109; U.S. 24. Detour for westbound U.S. 24 to TR 10/SR 424: Westbound U.S. 24; westbound U.S. 6/24; Industrial Drive (Exit #41); eastbound U.S. 6/24 to the SR 424 interchange. 
 
The entire new U.S. 24 alignment, from Waterville to Napoleon, is scheduled to open to traffic in September 2012.  Project complete: May 2013. All work is weather permitting.
 
5. State Route 25: BG N. Main Street Widening Project
Wood County (136-11):
Through summer of 2012, N. Main Street (SR 25), between Dill Street and Newton Road, is reduced to one lane in both directions with a designated center left-turn lane, for utility work. Through summer of 2012, intermittent lane restrictions are possible in both directions of N. Main Street (SR 25) at Poe Road, for intersection work.  Access to all businesses will be maintained. Project complete: August 2013. All work is weather permitting.
 
6. State Route 105: Culvert Repair
Wood County (54-12):
Through April, SR 105, from Poe Road to just east of Anderson Road, is closed for culvert repair. Detour: Bowling Green Road; US 6; SR 199.  Project complete: September 2012.  All work is weather permitting.
 
7. Various Routes: Resurfacing & Bridge Work *UPDATE*
Wood County (637-11): 
Beginning Tuesday, April 10 through Tuesday, April 24, SR 281 between SR 199 and US 6 will be closed for bridge repair. Detour: US 6; SR 199.  Through May, intermittent lane restrictions will be possible on SR 281, from US 6 to SR 199 for resurfacing.  Closures for bridge repair on US 23 and SR 795 will be announced.  Lane restrictions on US 23, SR 281 and SR 795 for resurfacing will be announced.  Project complete: September 2012.   All work is weather permitting. 
Fulton/Henry/Williams County
 
8. State Route 424: Culvert Replacement
Henry County (591-11): Through April, SR 424, between SR 108 and SR 281, is closed for culvert replacement.  Local access will be maintained.  Detour: SR 108; SR 281. Resurfacing work will be announced following culvert work.  Project complete: September 2012. All work is weather permitting.
 
9. Hallett Avenue: Railroad Grade Separation
Fulton & Lucas Counties (1069-10): Through November 2012, Hallett Avenue, between Church Street and Garfield Avenue, is closed for construction of the overpass. Detour: Airport Highway; SR 64; Shaffer Road (CR J). Project complete: Summer 2013. All work is weather permitting.
 
Ottawa/Sandusky/Seneca County
 
10. State Route 53/163: Intersection Upgrade and Resurfacing
Ottawa County (278-11):
Through May 2012, expect lane restrictions at the intersection of SR 53 and SR 163 for intersection upgrade. Access to businesses will be maintained. The resurfacing work on SR 53 from SR 163 to Water Street is complete. Project complete in May 2012. All work is weather permitting.
 
District Wide
 
11. Various Routes: Guardrail Maintenance
District Wide (496-11): Through December 2012, nightly from 8pm to 6am, intermittent lane restrictions are possible district wide for guardrail maintenance. Project complete: December 2012. All work is weather permitting.
 
12. Various Routes: Electrical Maintenance
District Wide (572-11): Through December 2012, nightly from 8pm to 6am, intermittent lane restrictions are possible district wide for electrical maintenance. Project complete: December 2012. All work is weather permitting.
 
13. Various Routes:  Sign Replacement *NEW PROJECT*
District Wide (511-11):
Through December 2012, intermittent lane and shoulder restrictions are possible district wide for sign replacement. Interstate lane and ramp restrictions will be announced.  All work is weather permitting.
 
Up-to-the-minute road conditions are always available by logging onto www.BuckeyeTraffic.org.
   
 
###
 
For more information contact:
The District Two Public Information Office at (419) 373-4428
or email
D02.PIO@dot.state.oh.us