I-270 and US 33 Interchange Improvement
7/31/2017

Tonight's Paving Schedule on the Dublin Project at 

I-270/US 33

Monday, July 31, 2017

  • 8pm US 33WB reduced to one lane between Frantz/Post Rd. and I-270.
  • 9pm I-270NB reduced to two lanes between Tuttle Crossing Blvd. and US 33.
  • 9pm the ramp from I-270NB to US 33WB closed.  Detour: I-270NB to Sawmill Rd. to I-270WB to US 33WB.
  • 5am all lanes and ramps open.​