I-270 and US 33 Interchange Improvement
7/28/2017
Post Rd. Weekend Closure

TONIGHT thru 6pm Saturday, July 29,2017 Post Rd. will be closed at US 33/SR 161.

·       The left turn from Frantz Rd. NB to US 33/SR 161 WB reduced from two lanes to one lane.

·       Frantz Rd. NB to US 33/SR 161 right turn lane closed.

·       Left and right turns from Frantz Rd. NB to US33/SR 161 EB/WB will be maintained. 

Posted Detours:

  • To Post Rd. from US 33/161: Frantz Rd. SB to Rings Rd. WB to Emerald Pkwy. NB to Post Rd.
  • To Post Rd. from Frantz Rd. NB: US 33/SR161 WB to Avery-Muirfield Dr. NB to Perimeter Dr. EB to Emerald Pkwy. NB to Post Rd.
  • To US 33/SR 161 from Emerald Pkwy NB: Emerald Pkwy. NB to High St. SB to US 33/SR 161
  • To US 33/SR 161 from Emerald Pkwy SB: Rings Rd EB to Frantz Rd. NB to US 33/SR 161.

Access to businesses on Post Rd. will be available from Emerald Pkwy.

Sunday, July 30, 2017 (Paving)

  • 8pm US 33WB reduced to one lane between Frantz/Post Rd. and I-270.
  • 9pm I-270NB reduced to two lanes between Tuttle Crossing Blvd. and US 33.
  • 9pm the ramp from I-270NB to US 33WB closed.  Detour: I-270NB to Sawmill Rd. to I-270WB to US 33WB.
  • 5am all lanes and ramps open. 

Monday, July 31, 2017

  • 7pm I-270SB reduced to two lanes between US 33 and Tuttle Crossing Blvd.
  • 9pm the ramp from US 33WB to I-270SB closed.  Detour: I-270EB to Sawmill Rd. to I-270WB/SB.
  • 9pm the ramp from US 33EB to I-270SB closed.  Detour: I-270EB to Sawmill Rd. to I-270WB/SB.
  • 11pm I-270SB reduced to one lane between US 33 and Tuttle Crossing Blvd.
  • 5am all lanes and ramps open. 

Tuesday, August 1, 2017

  • 7pm I-270SB reduced to two lanes between US 33 and Tuttle Crossing Blvd.
  • 9pm the ramp from US 33WB to I-270SB closed.  Detour: I-270EB to Sawmill Rd. to I-270WB/SB.
  • 9pm the ramp from US 33EB to I-270SB closed.  Detour: I-270EB to Sawmill Rd. to I-270WB/SB.
  • 11pm I-270SB reduced to one lane between US 33 and Tuttle Crossing Blvd.
  • 5am all lanes and ramps open. 

Wednesday, August 2, 2017

  • 7pm I-270SB reduced to three lanes between Sawmill Rd. and US 33.
  • 9pm both the Marysville & Avery-Muirfield Dr. ramps from I-270WB to US 33WB closed.  Detour: I-270SB to Tuttle Crossing Blvd. to I-270NB to US 33WB.
  • 5am all lanes and ramps open.

 Thursday, August 3, 2017

  • 7pm I-270SB reduced to three lanes between Sawmill Rd. and US 33.
  • 9pm the Avery-Muirfield Dr. ramp from I-270WB to US 33WB closed.  Detour: Use the Marysville ramp to US 33WB and Avery-Muirfield Dr.
  • 5am all lanes and ramps open.

 Friday, August 4, 2017

  • No closures due to the Dublin Irish Festival.
  • Paving will resume Sunday, August 6th after 8pm​