I-270 and US 33 Interchange Improvement
8/14/2017

Updated Paving Schedule for the Dublin interCHANGE Project

Monday, August 14, 2017

  • 8pm US 33WB reduced to one lane between Frantz/Post Rd. and Avery-Muirfield Dr.
  • 9pm the ramp from I-270NB to US 33WB closed.  Detour: I-270NB to Sawmill Rd. to I-270WB to US 33WB.
  • 9pm the Marysville ramp from I-270WB to US 33WB closed.  Detour: Use the Avery-Muirfield ramp to US 33WB and Avery-Muirfield Dr.
  • 12am the ramp from I-270NB to US 33WB will open.
  • 12am both the Marysville & Avery-Muirfield Dr. ramps from I-270WB to US 33WB closed.  Detour: I-270SB to Tuttle Crossing Blvd. to I-270NB to US 33WB.
  • 12am the ramp from US 33WB to Avery-Muirfield Dr. closed.  Detour:  US 33WB to SR 161/Post Rd. to US 33EB to Avery-Muirfield Dr.
  • 5am all lanes and ramps open.

Tuesday, August, 15, 2017 

  • 7pm I-270SB reduced to three lanes between Sawmill Rd. and US 33.
  • 8pm US 33WB reduced to one lane between Frantz/Post Rd. and Avery-Muirfield Dr.
  • 9pm both the Marysville & Avery-Muirfield Dr. ramps from I-270WB to US 33WB closed.  Detour: I-270SB to Tuttle Crossing Blvd. to I-270NB to US 33WB.
  • 9pm the ramp from US 33WB to Avery-Muirfield Dr. closed.  Detour:  US 33WB to SR 161/Post Rd. to US 33EB to Avery-Muirfield Dr.
  • 12am the ramp from Avery-Muirfield Dr. to US 33WB closed.  Detour:  US 33EB to I-270SB to Tuttle Crossing Blvd. to I-270NB to US 33WB.
  • 5am all lanes and ramps open.

 

Wednesday, August 16, 2017

  • 7pm I-270NB reduced to three lanes between US 33 and Sawmill Rd.
  • 8pm US 33WB reduced to one lane between Frantz/Post Rd. and Avery-Muirfield Dr.
  • 9pm both the Marysville & Avery-Muirfield Dr. ramps from I-270WB to US 33WB closed.  Detour: I-270SB to Tuttle Crossing Blvd. to I-270NB to US 33WB.
  • 9pm the ramp from US 33WB to Avery-Muirfield Dr. closed.  Detour:  US 33WB to SR 161/Post Rd. to US 33EB to Avery-Muirfield Dr.
  • 12am the ramp from Avery-Muirfield Dr. to US 33WB closed.  Detour:  US 33EB to I-270SB to Tuttle Crossing Blvd. to I-270NB to US 33WB.
  • 5am all lanes and ramps open. 

Thursday, August 17, 2017

  • 7pm I-270SB reduced to three lanes between Sawmill Rd. and US 33.
  • 9pm both the Marysville & Avery-Muirfield Dr. ramps from I-270WB to US 33WB closed.  Detour: I-270SB to Tuttle Crossing Blvd. to I-270NB to US 33WB.
  • 5am all lanes and ramps open. 

**Due to paving being a moving operation, closure timeframes are approximate and may change without notice.** ​