I-270 and US 33 Interchange Improvement
5/16/2017
For Immediate Release
May 16, 2017

UPDATED
Traffic Advisory
Due to some equipment issues last night, below is an updated traffic advisory for the I-270/US 33 interCHANGE project for the week.
Tuesday, May 16, 2017 – I-270 NB & SB Lane Closures for Concrete Sealing
  • 7pm I-270NB reduced to three lanes between US 33 and Sawmill Rd.
  • 7pm I-270SB reduced to three lanes between Sawmill Rd. and US 33.
  • 5am all lanes open.
 
(Updated) Tuesday, May 16, 2017
·       7pm US 33EB reduced to three lanes between I-270 and Frantz Rd.
·       7pm the ramp from I-270NB to US 33EB reduced to one right turn lane at the traffic signal.
·       9pm the ramp from US 33WB to I-270SB closed.  Detour: I-270NB to Sawmill Rd. to I-270SB
·       5am all lanes open.
(Updated) Wednesday, May 17, 2017 & Thursday, May 18, 2017
·       7pm US 33EB reduced to three lanes between Avery-Muirfield Dr. and I-270.
·       7pm the ramp from US 33EB to I-270SB reduced to one lane.
·       5am all lanes open.
Thursday, May 18, 2017
  • 7pm I-270SB reduced to 2 lanes between Sawmill Rd. and Tuttle Crossing Blvd.
  • 11pm I-270SB reduced to 1 lane between Sawmill Rd. and Tuttle Crossing Blvd.
  • 5am all lanes open.