I-270 and US 33 Interchange Improvement
5/15/2017
For Immediate Release
May 15, 2017

UPDATED
Traffic Advisory for Work Beginning Tonight
Monday, May 15, 2017 & Tuesday, May 16, 2017
  • 7pm I-270NB reduced to three lanes between US 33 and Sawmill Rd.
  • 7pm I-270SB reduced to three lanes between Sawmill Rd. and US 33.
  • 5am all lanes open.
 
Tuesday, May 16, 2017
·       8 pm US 33 eastbound is reduced to three lanes between I-270 and Frantz Rd.
·       8 pm The ramp from I-270 north to US 33 eastbound is reduced to one right turn lane at the traffic signal.
·       5 am All lanes open.
Wednesday, May 17, 2017
·       8 pm US 33 eastbound is reduced to three lanes between Avery-Muirfield Dr. and I-270.
·       8 pm The ramp from US 33 eastbound to I-270 south is reduced to one lane.
·       5 am All lanes open.
Thursday, May 18, 2017
  • 7pm I-270SB reduced to 2 lanes between Sawmill Rd. and Tuttle Crossing Blvd.
  • 11pm I-270SB reduced to 1 lane between Sawmill Rd. and Tuttle Crossing Blvd.
  • 5am all lanes open.