I-270 and US 33 Interchange Improvement
8/25/2017
 
Shelly Surface Paving Work
Friday, August 25, 2017
  • 7pm I-270NB reduced to three lanes between US 33 and Sawmill Rd.
  • 9pm I-270NB reduced to two lanes between US 33 and Sawmill Rd.
  • 9pm the ramp from US 33EB to I-270EB closed.  Detour: I-270SB to Tuttle-Crossing Blvd. to I-270NB/EB.
  • 9pm the ramp from US 33WB to I-270EB closed.  Detour: I-270SB to Tuttle-Crossing Blvd. to I-270NB/EB.
  • 9am all lanes and ramps open.
 
Saturday, August 26, 2017
  • 7pm I-270NB reduced to three lanes between US 33 and Sawmill Rd.
  • 9pm I-270NB reduced to two lanes between US 33 and Sawmill Rd.
  • 9pm the ramp from US 33EB to I-270EB closed.  Detour: I-270SB to Tuttle-Crossing Blvd. to I-270NB/EB.
  • 9pm the ramp from US 33WB to I-270EB closed.  Detour: I-270SB to Tuttle-Crossing Blvd. to I-270NB/EB.
  • 9am all lanes and ramps open.
 
Sunday, August 27, 2017
  • 7pm I-270NB reduced to three lanes between US 33 and Sawmill Rd.
  • 9pm the ramp from I-270NB to US 33WB closed.  Detour: I-270NB to Sawmill Rd. to I-270WB to US 33WB.
  • 9pm the ramp from US 33EB to I-270EB closed.  Detour: I-270SB to Tuttle-Crossing Blvd. to I-270NB/EB.
  • 5am all lanes and ramps open. 
**Due to paving being a moving operation, closure timeframes are approximate and may change without notice.**
 
Trench Drains (Daytime)
Monday, August 28, 2017 thru Thursday, August 31, 2017  
  • 9am US 33WB reduced to two lanes between I-270 and Avery-Muirfield Dr.
  • 3pm all lanes open.