I-270 and US 33 Interchange Improvement
Traffic Advisory 4/2/2015
UPDATED April 3, 2015
 
interCHANGE Traffic Advisory
The following work is planned for next week on the project. All work is weather dependent; it may be postponed or cancelled without prior notice.

MONDAY, APRIL 6
Interstate 270 – (NEW) I-270 south will be reduced to two lanes between US 33 and Tuttle Crossing from 7 PM to 5 AM to remove striping.
 
US Route 33 – (NEW) US 33 will be reduced to one lane in each direction between Frantz Road and Avery Road from 8 PM to 5AM for pavement work.
TUESDAY, APRIL 7
Interstate 270 – (NEW) I-270 north will be reduced to three lanes between US 33 and Sawmill Road from 7 PM to 5 AM to remove striping.
US Route 33 – (NEW) US 33 will be reduced to one lane in each direction between Frantz Road and Avery Road from 8 PM to 5AM for pavement work.
WEDNESDAY, APRIL 8
US Route 33 and Avery Road
(NEW)
·         8 PM: The ramp from Avery Road south to US 33 east will be reduced to one lane.
·         9 PM: US 33 east will be reduced to one lane between Avery Road and Frantz Road.
·         9 PM: The ramp from US 33 east to I-270 south will close. The detour is US 33 east to I-270 north to Sawmill Road to I-270 south.
·         12 AM: The ramp from US 33 east to I-270 south will be open.
The closures are for roadway striping. All lanes open by 5 AM.
THURSDAY, APRIL 9
US Route 33 – (NEW)
·         8 PM: Frantz Rd. to US 33 west will be reduced to one turning lane.
·         8 PM: Post Rd. to US 33 west will be reduced to one turning lane
·         9 PM: The ramp from I-270 north to US 33 west will be closed. The detour is I-270 north to Sawmill Rd. to I-270 south to US 33 west.
·         9 PM: The ramp from US 33 west to I-270 south will be closed. The detour is US 33 west to Avery Rd. to US 33 east to I-270 south.
·         12AM : Both ramps will be open.
The closures are for roadway striping. All lanes open by 5 AM.
FRIDAY, APRIL 10
Interstate 270 – (NEW)
·         7 PM: I-270 south will be reduced to three lanes between Sawmill Rd. and Tuttle Crossing Blvd.
·         9 PM: I-270 south will be reduced to two lanes between Sawmill Rd. and Tuttle Crossing Blvd.
·         10 PM: The ramps from US 33 east and west to I-270 south will close. The detour is I-270 north to Sawmill Road to I-270 south.
·         11 PM: I-270 south will be reduced to one lane between Sawmill Rd. and Tuttle Crossing Blvd.
The closures are for roadway striping. All lanes open by 5 AM.
SATURDAY, APRIL 11
Interstate 270 – (NEW)
·         6 PM: I-270 north will be reduced to two lanes between Tuttle Crossing Blvd. and Sawmill Rd.
·         10 PM: The ramps from US 33 east and west to I-270 north will close. The detour is I-270 south to Tuttle Crossing Blvd. to I-270 north.
·         11 PM: I-270 north will be reduced to one lane.
·         3 AM: The ramp from I-270 north to US 33 west will close. The detour is I-270 north to Sawmill Road to I-270 south to US 33 west.
All lanes and ramps will be open by 8 AM. SUNDAY.
 
Don’t forget to like us on Facebook and please contact us with any questions or concerns. www.facebook.com/ODOTColumbusDistrict6.