Items: 251, 252, 253, 254, 255, 256, 258, 301, 302, 304, 305, 307, 320, 321, 407, 408, 409, 411, 421, 422, 423, 424, 442, 443, 446, 448, 451, 452, 609, 617, 618, 803, 811, 812, 822, 826, 850, 851, 852, 857, 859, 874, 880, 881, 882, 884, 886, 888, 896, Special Pressure Relief Joint.
Item 618 40100 Rumble Strips, (Asphalt Concrete)
General – Existing rumble strips are removed during pavement operations but there is not a pay item to replace them.
Recommended Action: Designers should look for existing rumble strips when beginning a project. Also look for existing rumble strips during the required field check prior to submitting final plans as conditions may have changed since the project began.