Sign In
An Official Site ofOhio.gov

I-75, SR 129, Liberty Way ramp work scheduled

I-75, SR 129, Liberty Way ramp work scheduled 

Butler County (Friday, April 3, 2015) – Pavement work will take place on the ramps from southbound I-75 to Liberty Way and eastbound SR 129 to Liberty Way Friday, April 3. Work will take place from 7 p.m. to 6 a.m. Saturday, April 4. Traffic will be maintained and delays may be possible.

Also during this time, placement of portable concrete barrier wall will require short-term closures of the ramp from Liberty Way to southbound I-75. Closures will be intermittent and a detour will be posted. The ramp will be open to traffic by 6 a.m. Saturday, April 7.

Work will take place at the same time on Saturday night if rained out Friday night.

Arrow boards and/or signs will be in place to alert motorists of the upcoming lane and ramp closures and work is dependent on weather.

To help ensure the safety of the construction workers as well as the traveling public, motorists should remain alert, reduce their speed and watch for stopped traffic while passing through the work zone.​