Sign In
An Official Site ofOhio.gov

Pavement work requires I-275 lane closures

Pavement work requires Interstate 275 lane closures
 
Clermont County (Friday, Aug. 21, 2015) – Pavement work will require lane closures on Interstate 275 next week.
 
Beginning at 6 p.m. Monday, Aug. 24, there will be single lane closures on north and southbound I-275 between State Route 28 and Barg Salt Run Road, followed by a double lane closure at 9 p.m. All lanes will be open to traffic by 6 a.m. the following day. These lane closures will be in effect each night through Friday, Aug. 28.
 
If a concert or event is scheduled, southbound lane closures will not start until one hour after the event ends, or two hours after the event ends on northbound lanes.
 
Arrow boards and/or signs will be in place prior to the work zone to alert motorists of the upcoming lane closures.
 
To help ensure the safety of the construction workers as well as the traveling public, motorists should remain alert, reduce their speed and watch for stopped traffic while passing through the work zone.
 
 
 
###
 
 
For more information contact:
Sharon Smigielski, Public Information Officer, at (513) 933-6511
Liz Lyons, Public Information Specialist, at (513) 933-6534