Sign In
An Official Site ofOhio.gov

State Route 129 Resurfacing and Bridge Repair project update

State Route 129 Resurfacing and Bridge Repair Project Update

Butler County (Tuesday, July 16, 2019) - The State Route 129 resurfacing and bridge repair project requires the following restrictions:
Tuesday, July 16 and Wednesday, July 17: Close the entrance and exit ramps on east SR 129 at SR 4 Bypass nightly from 10 p.m. until 5 a.m. the following day. Work will take place on both ramps simultaneously, but only one ramp will be closed at a time.
Thursday, July 18 and Friday, July 19: Close the entrance and exit ramps on east SR 129 at SR 747 nightly from 10 pm. until 5 a.m. the following day. Work will take place on both ramps simultaneously, but only one ramp will be closed at a time.
Arrow boards and/or signs will alert motorists of the work zone and restrictions. All work is contingent upon the weather.
To ensure the safety of the construction workers as well as the traveling public, motorists should remain alert, reduce their speed and watch for stopped traffic while passing through the work zone.
For ongoing traffic, construction and weather-related information, please check www.OHGO.com.
###
For more information contact: Brian Cunningham, District 8 Communications Manager, at 513-933-6517 or Liz Lyons, District 8 Public Information at 513-933-6534.