Ohio.gov State Agencies  |  Online Services
Skip Ribbon Commands
Skip to main content
Site ActionsUse SHIFT+ENTER to open the menu (new window).Open Menu Navigate Up
Sign In
  
View: 
Selection Checkbox
Picture Size
1.03.13 Prepping Pier 3 Coffer Rings Facing Upstream.JPG
1.03.13 Prepping Pier 3 Coffer Rings Facing Upstream
800 x 53379 KB
1.04.13 Pier 5 Right Upstation Caisson Rebar Cage.JPG
1.04.13 Pier 5 Right Upstation Caisson Rebar Cage
800 x 533107 KB
1.04.13 Standing on Dike in Ohio Facing Towards KY Riverbank(Zoomed In).JPG
1.04.13 Standing on Dike in Ohio Facing Towards KY Riverbank(Zoomed In)
800 x 53364 KB
1.08.13 Pier 3 Coffer Ring Facing Downstream.JPG
1.08.13 Pier 3 Coffer Ring Facing Downstream
800 x 53373 KB
1.11.13 Abutment 1 Left Upstation Wing Wall.JPG
1.11.13 Abutment 1 Left Upstation Wing Wall
800 x 53395 KB
1.11.13 Pier 2 Coffer.JPG
1.11.13 Pier 2 Coffer
800 x 533108 KB
1.31.13 Rebar in Pier 5 Footer.JPG
1.31.13 Rebar in Pier 5 Footer
800 x 533135 KB
10.01.13 Inside of Abutment 2 Facing Downstation at Pile.jpg
10.01.13 Inside of Abutment 2 Facing Downstation at Pile
800 x 533184 KB
10.03.13 Ohio Backspan Formed Pile Cluster Caps for Falsework.jpg
10.03.13 Ohio Backspan Formed Pile Cluster Caps for Falsework
800 x 533171 KB
10.03.13 Standing to the Left of Pier 1 Facing Upstation.jpg
10.03.13 Standing to the Left of Pier 1 Facing Upstation
800 x 533190 KB
10.16.12 Abutment 1 Breast Wall.JPG
10.16.12 Abutment 1 Breast Wall
800 x 60095 KB
10.22.12 Standing on Dike in Ohio Facing Towards KY Riverbank.JPG
10.22.12 Standing on Dike in Ohio Facing Towards KY Riverbank
800 x 600119 KB
10.24.13 Standing on Barge Causeway Looking up Facing Towards Abutment 1.jpg
10.24.13 Standing on Barge Causeway Looking up Facing Towards Abutment 1
800 x 533172 KB
10.25.13 Standing on Bridge Deck Facing Downstation.jpg
10.25.13 Standing on Bridge Deck Facing Downstation
800 x 533294 KB
10.26.12 Welding Fins on a Casing for Pier 4.JPG
10.26.12 Welding Fins on a Casing for Pier 4
800 x 53392 KB
11.01.13 Taken From Upstream Facing Towards Abutment 1 Thru Pier 3(Zoomed In).jpg
11.01.13 Taken From Upstream Facing Towards Abutment 1 Thru Pier 3(Zoomed In)
800 x 533193 KB
11.09.12 Prepping Casing for Pier 4.JPG
11.09.12 Prepping Casing for Pier 4
800 x 53359 KB
11.20.12 Inside of Pier 3 Precast Segment Footer Lowering System.JPG
11.20.12 Inside of Pier 3 Precast Segment Footer Lowering System
800 x 53371 KB
2.20.13 Bottom Ring of Pier 2 Coffer Facing Upstream.JPG
2.20.13 Bottom Ring of Pier 2 Coffer Facing Upstream
800 x 533101 KB
2.22.13 Pouring Pier 5 Footer Facing Southeast.JPG
2.22.13 Pouring Pier 5 Footer Facing Southeast
800 x 53376 KB
3.08.13 Abutment 1 Left Wing Wall.JPG
3.08.13 Abutment 1 Left Wing Wall
800 x 53384 KB
3.27.13 Pier 2 Stem Rebar Facing Upstream.JPG
3.27.13 Pier 2 Stem Rebar Facing Upstream
800 x 533102 KB
3.28.12 Drill Rig Set Up at Pier 1 Facing Upstream.JPG
3.28.12 Drill Rig Set Up at Pier 1 Facing Upstream
800 x 600143 KB
3.28.12 Drill Rig Setting up to Drill Pier 1 Upstation Right Caisson.JPG
3.28.12 Drill Rig Setting up to Drill Pier 1 Upstation Right Caisson
800 x 600150 KB
3.28.12 Drilling Pier 1 Upstation Right Caisson.JPG
3.28.12 Drilling Pier 1 Upstation Right Caisson
800 x 600145 KB
3.28.12 Drilling Pier 1 Upstation Right Caisson2.JPG
3.28.12 Drilling Pier 1 Upstation Right Caisson2
800 x 600147 KB
3.28.12 Getting Ready to Install Casing at Pier 1 Upstation Right Caisson.JPG
3.28.12 Getting Ready to Install Casing at Pier 1 Upstation Right Caisson
800 x 60093 KB
3.28.12 Lowering Casing at Pier 1 Upstation Right Caisson.JPG
3.28.12 Lowering Casing at Pier 1 Upstation Right Caisson
800 x 600144 KB
3.28.12 Lowering Casing into Pier 1 Upstation Right Caisson.JPG
3.28.12 Lowering Casing into Pier 1 Upstation Right Caisson
800 x 600107 KB
3.28.12 Manitowoc 222 Set Up on Crane Pad to Service Pier 1.JPG
3.28.12 Manitowoc 222 Set Up on Crane Pad to Service Pier 1
800 x 600138 KB
3.28.12 Removing Spoils From Pier 1 Upstation Right Caisson.JPG
3.28.12 Removing Spoils From Pier 1 Upstation Right Caisson
800 x 600118 KB
3.29.12 During Assembly of Rebar Cage for Pier 1 Upstation Right Caisson.JPG
3.29.12 During Assembly of Rebar Cage for Pier 1 Upstation Right Caisson
800 x 600170 KB
4.05.13 Inside of Abutment 1 Breast Wall.JPG
4.05.13 Inside of Abutment 1 Breast Wall
800 x 533100 KB
4.09.12 Start of Drilling Pier 1 Upstation Left Caisson.JPG
4.09.12 Start of Drilling Pier 1 Upstation Left Caisson
800 x 600124 KB
4.10.12 Drilling Pier 1 Upstation Left Caisson.JPG
4.10.12 Drilling Pier 1 Upstation Left Caisson
800 x 600151 KB
4.12.12 Hoisting Pier 1 Upstation Center Caisson Rebar Cage Facing Upstream(2).JPG
4.12.12 Hoisting Pier 1 Upstation Center Caisson Rebar Cage Facing Upstream(2)
800 x 600115 KB
4.12.12 Hoisting Pier 1 Upstation Center Caisson Rebar Cage.JPG
4.12.12 Hoisting Pier 1 Upstation Center Caisson Rebar Cage
800 x 600101 KB
4.12.12 Lowering Pier 1 Upstation Center Caisson Rebar Cage into Casing.JPG
4.12.12 Lowering Pier 1 Upstation Center Caisson Rebar Cage into Casing
800 x 600114 KB
4.12.12 Lowering the Dowel Cage for the Column at Pier 1 Upstation Center Caisson Facing Upstream.JPG
4.12.12 Lowering the Dowel Cage for the Column at Pier 1 Upstation Center Caisson Facing Upstream
800 x 600129 KB
4.12.12 Pier 1 Upstation Center Dowel Rebar Cage for Column Set Facing Upstream.JPG
4.12.12 Pier 1 Upstation Center Dowel Rebar Cage for Column Set Facing Upstream
800 x 600151 KB
1 - 40Next